Loading...
HomeMy WebLinkAboutNCG030085_2021 DMR_20210309DAIMLER, Sean Quarry Sr. Environmental Engineer Daimler Trucks 1800 North Main Street Mount Holly, NC 28 i20 704,SZ2.7034 Phone March 9, 2021 NCDEQ- Division of Water Resources 610 East Center Avenue Suite 301 Mooresville, North Carolina 28115 To whom it may concern: Please find the enclosed February Stormwater Discharge Outfall (SDO) #001 and #002 forms for the Daimler Trucks NA, LLC - Mount Holly Truck Manufacturing Plant (TMP). The stormwater samples were collected on February 11, 2021. Results from this sampling event show an exceedance of the following parameter(s) at or above the corresponding benchmark: • SDO #001 (02-11-2021) - Zinc - 0.180 mg/L (Benchmark 0.126 mg/L) ■ SDO #002 (02-11-2021) -Zinc - 0.260 mg/L (Benchmark 0.126 mg/L) • SDO #002 (02-11-2021) - Copper- 0.013 mg/L (Benchmark 0.010 mg/L) Daimler remains in Tier 3 at SDO #001 and SDO #002 for Zinc and Copper. Shield will continue to perform monthly sampling per Tier requirements until instructed to decrease sampling frequency by Daimler. Should you have any questions, please contact me at 704-822-7034 or sean.guai,ry@daimler.com. Sincerely, Daimler Trucks NA, LLC Sean Quarry Sr. Environmental Engineer Enclosures - ❑TNA signed DMR forms (2 copies) *OT-TTUT ENGINEERING, INC. March 1, 2021 Mr. Sean Quarry Daimler Trucks North America, LLC 1800 North Main Street Mount 1 lolly, NC 28120 Subject: Monthly Stormwater Sampling — February 2021 NPDES General Permit No. NCG030000 Daimler Trucks of North America LLC - Mount Holly, North. Carolina Shield Project No. 1140109-08 Dear Mr. Quarry: Shield Engineering, Inc. (Shield) successfully collected monthly stormwater samples for Stormwater Discharge OutfalIs (SDO) 4001 and 4002 at the Mount Holly facility for the month of February 2021. During the February 11 ' sampling event, Shield's field measurements of pl-I were 7.4 for both SDO 8001 and SDO #002. In addition to collection of samples, Shield performed Qualitative Monitoring at SDO #001 and #002. The QMR for SDO #002 shows that during the inspection, a light oil sheen was observed in the stormwater discharge. Shield recommends that the facility inspects the areas that drain into SDO #002 in order to determine the source(s) of oil. A partially completed discharge monitoring report (DMR) is attached, as well as the analytical results and Qualitative Monitoring Report Forms. The person designated to act as the permittee by Daimler Trucks — Mount Holly facility should sign pages 1 and 2 of the DMR_ The signed DMR form should then be mailed to the regulatory agency regional office at Mooresville, NC. Results from the February 111 sampling event show an cxcccdance for Zinc at SDO #001 and #002 and an exceedance for Copper at SDO #002. Daimler remains in Tier 3 at SDO #001 and SDO #002 for Zinc, Copper and TSS. Shicld will continue to perform monthly sampling per Tier 2 requirements until instructed to decrease sampling frequcncy by Daimler. Shield greatly appreciates the opportunity to provide environmental services to Daimicr Trucks, North America. If you have any questions in reference to this document or require further information, please feel free to contact either of the undersigned at (704) 394-6913. Respectfully, SHIELD ENGINEERING, INC. M agdal ine Tzannis Senior Project Manager Melia L . Greene, Eff Senior Engineer 4Reri in, P.E. President/CEO ATTACHMENTS Stormwater DMR, Qualitative Monitoring Report, Analytical Rcsu Its 4301 Taggart Creek Road Telephone 704,394.6913 Charlofte, NC 28208 www-shieldengineedng.com Fax 704.394.6968 NCDEQ Division of Energy. Mineral and Land Resources Stormwater Discharge Monitoring Report (DMR) Form for NCG030000 Metal Fabrication Click here for instructions Complete, sign, scan and submit the DMR via the Stormwater NPDES Permit Data Monitoring Report (DMR) Upload for within 30 days of receiving sampling results. Mail the original, signed hard copy of the OMR to the appropriate DEMLR Regional Office. Certificate of Coverage No. NCG03 0085 Person Collecting Samples: Magdaline Txannis /Shield Engineering, lnc. Facility Name: Daimler Trucks - Mount Holly Laboratory Name: Pace Analytical Services, LLC Facility County: Gaston Laboratory Cert. No.: 329 Discharge during this period: ✓❑ Yes ❑ No (if no, skip to signature and dare) Has your facility implemented mandatory Tier response actions this sample period for any benchmark exceedances? Yes ❑ No If so, which Tier (1, II, or III)? Ill A copy of this DMR has been uploaded electronically via httips., ledocs.deo.nc.govlForms/SW-DMR ❑✓ Yes ❑ No Date Uploaded: 3.q'twzl Analytical Monitoring Requirements for Qutfalis with Industrial Activities — Benchmarks in (Red) Parameter Code parameter Outfall 001 Outfall NA Outfall Outfall Outfall N/A Receiving Stream Class WS-IV; CA WS-IV; CA N/A _Date Sample Collected MM/DD/YYYY 02/11/2021 0.56 02/11/2021 0.56 46529 24-Hour Rainfall in inches C0530 T55 in mg/L (100 or SO') 32 86 00400 pH in standard units (6.0 — 9.0) 7.4 7.4 01119 Copper, total recoverable in mg/L 0.0071 0.013 (0.010) 01051 Lead, total recoverable in mg/ L 0.0018 0.0053 (a.075) 01094 Zinc, total recoverable in mg/ L 0,180 0.260 (0.126) 78141 Total Toxic Organics [TTO) in mg/L(1) NA NA (if required) 00552 Non -Polar Oil & Grease in mg/L(IS) <5.1 3.6 Additional parameters for outfalls in drainage areas that use >55 gallons per month of new hydraulic oil on average NCOIL Estimated New Motor/Hydraulic Oil NA NA Usage in al/month ' 0utfaUs to Outstanding Resource Waters (0RW), High Quality Waters (HQW), Trout Waters (Tr) and Primary Nursery Areas (PNA) have a benchmark TSS limit of 50 mg/L. All other water classifications have a benchmark of 100 mg/L Notes (optional): Exceedance of Zinc at SDD #001 & 4002. Exceedance of Copper at SDO #002. "I certify by my signature below, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and elief, true, accurate, and complete. I am aware that there are significant penalties for submitting false informatioq, including the possibiiiles and imprisonment for knowing violations." Signature of Permittee or Delegated Authorized Individual Dat Email Address Phone Number Total Toxic Organics Certification: "Based upon my inquiry of the person or persons directly responsible for managing compliance with the permit monitoring requirement for total toxic organics MO), I certify that to the best of my knowledge and belief, no leak, spill, or dumping of concentrated toxic organics into the stormwater or onto areas which are exposed to rainfall or stormwater runoff has occurred since filing the last discharge monitoring r� ort. I further certify that this facility is implementing all the provisions of the Solent Management -Plan included in theS ormwater Pollution Prevention Plan." Signature of Permittee or Delegated Authorized Individual Email Address J Date Phone Number ?4- *7 y — 7 3 �r S