Loading...
HomeMy WebLinkAbout090025_30Day POA_20210216Alec 3 L3�' PL,;, OF ACTIIOK (P©A)) FOR GIIIGM FREEBOARD AT ANIMAL F 1 CI L11TI S Facility Number: f - �� County: IC),? 'l r7�e'rt".'\ Facility Name: ;( -1.)Yr1Y) `' —l;( V V\ V, Certified Operator Name: i'� . t. 1U/1 Slue kivk 1. Current liquid level(s) in inch‘s as mead /ed from the current liquid of level in the lagoon t. �o the lowest point on the top of the dam for lagoons without spillways; end from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Structure 1- -Structure 2 Structure 3 Structure 4 Structure 5 Structure G 7 Operator l / 3 7 Lagoon Name/identifier (ID): Spillway (Yes or No): Level (inches): 5 2. Check all applicable items c Yl 3100 ,it 1s/30/a v Liquid level is within the designed .structural freeboard elevations. or one or more structures, Five.' and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range, Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to pumped and hauled is reflected in section 111 tables. included within this plan is a list of the proposed sites with related facility number(s), number acres and receiving crop information. Contact and secure approval from the (Division of Waterr Quality prior to transfer of waste to a site not covered in the facility's certified animal waste management (plan. Operation will be partially or fully depopulated. -- attach a complete schedule with corresponding animal units and dates for depopulation - if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: • Ma/Rd) 6 herreby certify that fl have reviewed the information Misted above and iindluded within the attached Plan of,Action, and to the best of niy knowledge and ability, the information, is accurate and correct \ a n R S:1-0\tr tr\I S - Facility Owner/Manager (print) Faciiity Owner/Manager (signature) phone: (9 10) 7 2 - Date; iPoA.Coverr Pale 2121/0B II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: 2. Structure ID: 3. Structure ID: 4. Structure ID: 5. Structure ID: 6. Structure ID: Storms 5 6 n.Iines1+2+3+4+5+6= line m = 196.2 Ib PAN line m = Ib PAN line m = Ib PAN line m = Ib PAN line m = Ib PAN line m = Ib PAN 196.2 Ib PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN IST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining IRR- 2 PAN balance (Ib/acre) t. TOTAL PAN BALANCE FOR FIELD (Ibs.) column r x s u. application window' 1043 J wheat 2.60 75.00 195.0 Sept - April 30 P1 wheat 4.90 75.00 367.5 Sept - April 30 ** guestimate on PAN left State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = x. Crop's remaining PAN balance (line v from section III) = y. Overall PAN balance (w - x) _ NARRATIVE: 562.5 Ib. PAN 196.2 Ib. PAN 562.5 Ib. PAN -366 Ib. PAN will begin pumping as soon as field conditions allow. PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Storms 5 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # 8568 certified herd # 17.0 19.0 inches inches 2.0 inches 127596 ft2 159070 gallons 180 161410 8568 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated m. ((lines e + k)/1000) x line I = 12/7/2020 REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) days ft3 161410 fe 0 77000 ft3 ft3 297218 gallons 0.43 lbs/1000 gal. 196.2 Ibs. PAN PoA (30 Day) 2/21/00