Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
090025_30day POA_20210202
PLAN OF ACu O>IM (PoA) FORa1 ac 11 y G�vt�oa�[Qetr: Q� Zc3 Faeulaty Name: 9-0 ir"\rn,� f�� tr '� V.r V CAE F RE F O RD AT AMMA count 1-4-dail Cll 11 UDES Cerr�ifiedi Operator Name: )3. 1 1 �,� �� >^�0�`�1�1; Opemit©rr 1 r t 1. Current liquid level(s)in inches as t q i�easr�reo? from the current liquid level in the lagoon to the lowest point on the top of the darn for lagoons vvithout spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure • Lagoon Name/Identifier (ID): f Spillway (Yes or No); Level (inches): 2. Check ail applicable items 3 L{ Liquid level is within the designed .structural freeboard elevations"of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range, Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to pumped and hauled is reflected in section 111 tables. Included within this plan is a list of the proposed sites with related facility number(s), number acres and receiving crop information. Contact and secure approval) from the Division of Water Quality prior totransfer of waste to a site not covered in the facility's certified animal waste management plan. Operation will be partially or fully depopulated. - attach a complete schedule with corresponding animal units and dates for depopulation if animals are to be moved to.another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land applidation of waste: -f 02 — 2_,O 2-0 [! hereby certify that i have reviewed the information 'listed above and irad6Kded within the attached Plan & ction, and to the best of my knowledge and ability, the information is accurate and correct. nl i 11 i ann I:.. StY tIM Facility Owner/Manager (print) . (L)//14. Facility Owner/Manager (signature) Phone: (9 1 (5) 7 2 - 2,0(2( Date; �o /80/a0c70. PoA Coves Pare 2121/00 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: 2. Structure ID: 3. Structure ID: 4. Structure ID: 5. Structure ID: 6. Structure ID: Storms 1 2 3 4 n. lines 1 +2+3+4+5+6= line m = line m = line m = line m = line m = line m = 1066.2 Ib PAN Ib PAN 169.9 Ib PAN 128.6 Ib PAN Ib PAN Ib PAN 1364.7 Ib PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN THIS 30 DAY PERIOD. r GRIVLI. o. tract # LJv 111V 1 L.w 1 . .i-a-vv p. field # ■ v q. crop .....v.. . . ... .... .....- . -- - -- - r. acres ---- s. remaining IRR-2 PAN balance (Ib/acre) t. TOTAL PAN BALANCE FOR FIELD (Ibs.) column r x s u application windows 903 K-P wheat 30.00 75.00 2250.0 9/1-4/30 ** guestimate on remaining PAN balance I —I I 1State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = x. Crop's remaining PAN balance (line v from section 110= y. Overall PAN balance (w - x) = 2250.0 Ib. PAN 1364.7 Ib. PAN 2250.0 Ib. PAN -885 Ib. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If newfields are to be included as an option for lowering lagoon level, add thesefields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: pumping will begin as soon as field conidtions allow. PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Storms 1 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # 4896 certified herd # 18.0 19.0 inches inches 1.0 inches 127596 ft2 79535 gallons 180 161410 4896 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated m. ((lines e + k)/1000) x line I = C 12/2/20 REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) days ft3 161410 ft3 0 77000 ft3 ft3 297218 gallons 2.83 Ibs/1000 gal. 1066.2 Ibs. PAN PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD 1. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 3 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # 4896 certified herd # 18.0 19.0 inches inches 1.0 inches 128256 ft2 79946 gallons 180 161411 48961 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated m. ((lines e + k)/1000) x line I = 12/2/20 REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) days ft3 161411 ft3 0 77350 ft3 ft3 297655 gallons 0.45 Ibs/1000 gal. 169.9 lbs. PAN PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 4 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current heal # 4896 certified herd # 18.0 19.0 inches inches 1.0 inches 128656 ft2 80196 gallons 180 161411 4896 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated m. ((lines e + k)/1000) x line I = 12/2/20 REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) days ft3 161411 ft3 0 77583 ft3 ft3 297946 gallons 0.34 Ibs/1000 gal. 128.6 lbs. PAN PoA (30 Day) 2/21/00