Loading...
HomeMy WebLinkAbout090169_30 Day POA_2021011570?-003 191 ' PLAID OF ACTION (PoA) FSR HIGH FREBOARD AT ANIMAL FACILITIES Facility Number: q - I q County; @laden Facility Name° 64 lies e ':aYms Certified Operator Name; C16C4US G-r )tr'Silk. ''Operator # I692$0 • 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point an the top of the darn for Iagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Structure 1 .Structure 2. Structure 3 Structure 4 Structure 5 Structure 0 ' liagoon Name/Identifier (iD): 1 Spillway (Yes or No): Level (inches): l/1112 - sa�z�.y 2. Check/all applicable items £y-knSioY) /zi?� l A)7 J.76;2U I *Wail V Liquid level is within the designed structural freeboard elevations of one or more strut ctures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic baiahces are within acceptable ranges. Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste isto be pumped and hauled to off site locations. Volume and PAN content of waste to pumped and hauled is reflected in section 111 tables. included' within this plan is a list of the proposed sites with related facility number(s), number acres and receiving crop information. Contact and secure approval from the Division of Water Quality prior to transfer of waste to a site not covered In the facility's certified animal waste management plan, Operation will be partially or fully depopulated. - attach a complete schedule with corresponding animal units and dates for depopulation' - tf animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: �. /.�—aD1 i hereby certify,that I have reviewed the information listed above and mamma within the attached Plan of Action, and to the best of my knowledge and ability, the Information is accurate and correct. . Ci'lar l es Vtl' CI(jrasjore- Facility Owner/Manager (print) Facility Owner/Man er (signature) . Phone: • O— 976..24c 2 Date: l r/5_ 2 l .... -. PoA Cover Page 212110D II. TOTAL VOLUME OF WASTE STORED WITHIN STRUCTURAL FREEBOARD ELEVATIONS FOR ALL WASTE STRUCTURES FOR FACILITY 1. structure ID: 2. structure ID: 3. structure ID: 4. structure ID: 5. structure ID: 6. structure ID: Gillespie n.lines1+2+3+4+5+6= o. line n / 27154 = line I = 129646 gallons line I = gallons line I = gallons line I = gallons line I = gallons line I = gallons 129646 gallons 4.77 acre -inches III. TOTAL ACRES AVAILABLE TO RECEIVE WASTE DURING 5 DAY DRAW DOWN PERIOD1'2 'While this section deals with hydraulic loading capacities, applications cannot exceed agronomic rate for receiving crop according to its certified waste plan. 2Fields with no remaining PAN balance, no receiving crop, and/or completely saturated are not considered available to receive waste. p. tract # q. field # r. soil type s. crop t. acres u. remaining IRR-2 PAN balance (lb/acre) v. maximum application rate (in/hr) w. maximum application amount (inches) 1754 12 Dr overseed 1.6 50 0.4 1 1754 14 GrB overseed 2.1 50 0.5 1 1754 15 Dr overseed 9.2 50 0.4 1 1754 6 GrB overseed 4 50 0.5 1 1754 8 Dr overseed 1.6 50 0.4 1 x. total acres available during 5 day draw down (sum of column t) _ 18.50 acres IV. FACILITY'S PoA OVERALL HYDRAULIC LOAD TO BE LAND APPLIED PER ACRE line o = PoA (5Yjay) 2/21700-- 0.26 inches per acre to be applied within 5 days line x If unable to land apply hydraulic Toad listed in line y, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new hydraulic load based on new information. Plan to land apply hydraulic load: 1. Describe moisture conditions of fields? (e.g. Is there water standing in field; does irrigation equipment mar down in field; "trafficability" across soils; will soils absorb application without runoff, etc.) high moisture, only applying in high, dry places. Irrigation will take place as soon as weather and land conditions permit. 2. Date and amount of last rainfall event? DATE: 3. Dates of last waste application event per field: 01/11/20 AMOUNT: 0.70 inches pump one time for 1.5 hours - field 1. 4. Given optimum soil and weather conditions, is irrigation equipment capable of applying the volume in line "n" at appropriate seasonal (i.e. winter) application rates within 5 days? Soil was saturated. Can pump later this week on soil as they dry out and hopefully no rain. 5. Irrigation schedule for next 5 days - include daily schedule; proposed application rates and amounts per irrigation event; changes made in gun sizes, nozzles, "0" rings, operating time, travel speed, etc. to meet proposed changes in application rates and amounts; and any other information for consideration. Irrigate as weather and land conditions permit. Will pump short times, on dryer fields later this weekend. PoA (5 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES FIVE (5) DAY DRAW DOWN PERIOD I. TOTAL VOLUME TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Gillespie 2. Current liquid volume in structural freeboard a. current liquid level according to marker b. designed structural freeboard zone (Normally 12 inches or greater) c. line b - line a (inches within structural freeboard) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft' 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # 3200 certified herd # 10.0 12.0 inches inches 2.0 inches 78408 ft2 97749 gallons 180 105497 3200 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 5 days/line f = 4. Total volume of waste to be land applied during 5 day draw down I. total volume to be land applied line e + line k = days ft3 105497 ft3 0 48020 ft3 ft3 31897 gallons 129646 gallons REPEAT SECTION 1 FOR EACH WASTE STRUCTURE ON SITE WITH A LIQUID LEVEL WITHIN THE STRUCTURAL FREEBOARD ELEVATIONS. (Click on the next Structure tab shown below) PoA (5 Day) 2/21/00 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Gillespie line m = 844.4 Ib PAN 2. Structure ID: line m = 3. Structure ID: line m = 4. Structure ID: line m = 5. Structure ID: line m = 6. Structure ID: line m = n. lines 1 +2+3+4+5+6= Ib PAN Ib PAN Ib PAN Ib PAN Ib PAN 844.4 Ib PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining !RR- 2 PAN balance (Ib/acre) t. TOTAL PAN BALANCE FOR FIELD (Ibs.) column r x s u. application window' 1754 12 overseed 1.60 50.00 80.0 Oct - March 1754 14 overseed 1.60 50.00 80.0 Oct - March 1754 15 overseed 9.20 50.00 460.0 Oct - March 1754 6 overseed 4.00 50.00 200.0 Oct - March 1754 8 overseed 1.60 50.00 80.0 Oct - March ** guestimate on PAN left 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = x. Crop's remaining PAN balance (line v from section III) = y. Overall PAN balance (w - x) = NARRATIVE: 900.0 Ib. PAN 844.4 Ib. PAN 900.0 Ib. PAN -56 Ib. PAN Will begin pumping as soon as field conditions permit. PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Gillespie 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft' 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # 3200 certified herd # 11.0 19.0 inches inches 8.0 inches 78408 ftz 390995 gallons 180 105497 3200 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated m. ((lines e + k)/1000) x line I = 10/19/2020 REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) days ft3 105497 ft' 0 48020 ft3 ft3 191385 gallons 1.45 Ibs/1000 gal. 844.4 Ibs. PAN PoA (30 Day) 2/21/00