Loading...
HomeMy WebLinkAbout090045_30 Day POA_20210216PLAN OF Facility Number: Facility Name: CT ON (P FIR I1G FREE R T ; N6MAL FACLLMES �!. fa Irrn County: {�,�.�.; .- '3kL'kt Certified Operator Name: >o rbn 111 e I! o n 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Operator# 106LI362 Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Lagoon Name/Identifier (ID): Front Spillway (Yes or No): Level (inches): 2. Check ail applicable items - Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility number(s), number acres and receiving crop information. Contact and secure approval from the Division of Water Quality prior to transfer of waste to a site not covered in the facility's certified animal waste management plan. Operation will be partially or fully depopulated. - attach a complete schedule with corresponding animal units and dates for depopulation - if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: I hereby certify that I have reviewed the information listed above anu mciuoed within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Phone: 9 /0- SI /6 80 V Facility Owner/Manager (print) Date: acility Owner/Manager (signature) PoA Cover Page 2/21/00 11. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: 2. Structure ID: 3. Structure ID: 4. Structure ID: 5. Structure ID: 6. Structure ID: Fox Bay Back Fox Bay Front n. lines 1 + 2 + 3 + 4 + 5 + 6 = line m = Ib PAN line m = 760.5 Ib PAN line m = Ib PAN line m = Ib PAN line m = Ib PAN line m = Ib PAN 760.5 Ib PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN T LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining IRR-2 PAN balance (Ib/acre) t. TOTAL PAN BALANCE FOR FIELD (Ibs.) column rxs u. applicalionwindav' 415 1 overseed 2.50 25 62.5 Sept - Mar 415 2 overseed 1.80 25 45.0 Sept - Mar 415 3 overseed 2.48 25 62.0 Sept - Mar 425 4 overseed 3.54 25 88.5 Sept - Mar. 415 5 overseed 3.10 25 77.5 Sept - Mar 415 1 bermuda 2.50 150 375.0 March -Sept 415 2 bermuda 1.80 150 270.0 March -Sept ** guesstimate on PAN and bermuda window starts March 1** 1State curren crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 980.5 Ib. PAN IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = x. Crop's remaining PAN balance (line v from section 11I) = y. Overall PAN balance (w - x) = 760.5 Ib. PAN 980.5 Ib. PAN -220 Ib. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump Si haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add thesefields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: Will begin pumping asoon as fields dry out. PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/identifier (ID): I Fox Bay Front 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (incheg in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # 3520 certified herd # 15.0 19.0 inches inches 4.0 inches 72816 ft2 181555 gallons 180 87035 3520 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j)x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated m. ((lines e + k)/1000) x line I = 2/3/21 REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) days ft3 87035 ft3 0 44625 ft3 ft3 164136 gallons 2.20 Ibs/1000 gal. 760.5 Ibs. PAN PoA (30 Day) 2/21/00