Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
090131_30 Day POA_20210104
PLAN OF CTHO(Poi) FOR HIGH FREEBOARD AT AIAL FACILITIES County: . 6 ` i Facility Number: 9 _ j 3 l Facility Name: Kith- l Wm Wu(tv&i ��"_ Certified Operator Name: L� 4flf%i I`1(� Goden Operator It q 86o43 . 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Lagoon Name/Identifier (ID): Spillway (Yes or No): Level (inches): 1. lD 2. Check all applicable items E 1t v 510n dorz.e /2) IS )2t20 = 50 Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. _ _ Liquid level is within the'25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility number(s), number acres and receiving crop information. Contact and secure approval from the Division of Water Quality prior to transfer of waste to a site not covered In the facility's certified animal waste management plan. Operation will be partially or fully depopulated. - attach a complete schedule with corresponding animal units and dates for depopulation - if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: / -- ? dO& / i hereby certify that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Cinetrrnim @Men Facility Owner/Manager (print) Phone: gip -`374— 431o8 C" Date: - (i 'c20 a, I Facility Owner/Manager (signature) PoA Cover Page 2121/00 II. TOTAL VOLUME OF WASTE STORED WITHIN STRUCTURAL FREEBOARD ELEVATIONS FOR ALL WASTE STRUCTURES FOR FACILITY 1. structure ID: 2. structure ID: 3. structure ID: 4. structure ID: 5. structure ID: 6. structure ID: 1 0 n. lines 1 + 2 + 3 + 4 + 5 + 6 = o. line n / 27154 = line I = 44898 gallons line I = gallons line I = gallons line I = gallons line I = gallons line 1= gallons 44898 gallons 1.65 acre -inches III. TOTAL ACRES AVAILABLE TO RECEIVE WASTE DURING 5 DAY DRAW DOWN PERIOD''2 'While this section deals with hydraulic loading capacities, applications cannot exceed agronomic rate for receiving crop according to its certified waste plan. 2Fields with no remaining PAN balance, no receiving crop, and/or completely saturated are not considered available to receive waste. p. tract # q. field # r. soil type s. crop t. acres u. remaining IRR-2 PAN balance (lb/acre) v. maximum application rate (in/hr) w. maximum application amount (inches) 4742 1 ExA overseed 5.35 50 0.35 1 4742 2 ExA overseed 4.51 50 0.35 1 x. total acres available during 5 day draw down (sum of column t) _ 9.86 acres IV. FACILITY'S PoA OVERALL HYDRAULIC LOAD TO BE LAND APPLIED PER ACRE y. line o = 0.17 inches per acre to be applied within 5 days line x If unable to land apply hydraulic Toad listed in line y, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new hydraulic load based on new information. PoA (5 Day) 2/21/00 Plan to land apply hydraulic load: 1. Describe moisture conditions of fields? (e.g. Is there water standing in field; does irrigation equipment mar down in field; "trafficability" across soils; will soils absorb application without runoff, etc.) some areas are still wet hopefully will dry out later this week. They will select the dryest loactions to pump. Plans to irrigate Wed or Thursday. Needs about 2 hours to irrigrate and will be out of structural. no rain in forecast until the Friday and 50% then. 2. Date and amount of last rainfall event? DATE: 1 /1 /21-1 /2/21 3. Dates of last waste application event per field: AMOUNT: 3.40 inches 12/28 and 29 - pumped about 15 min on several fields 4. Given optimum soil and weather conditions, is irrigation equipment capable of applying the volume in line "n" at appropriate seasonal (i.e. winter) application rates within 5 days? Maybe - depending on how quickly fields dry out. fields are still wet. Selling pigs this week - 2 loads went out today. 5. Irrigation schedule for next 5 days - include daily schedule; proposed application rates and amounts per irrigation event; changes made in gun sizes, nozzles, "o" rings, operating time, travel speed, etc. to meet proposed changes in application rates and amounts; and any other information for consideration. No changes to equipment. Plan using solid set on Wednesday or Thursday as field conditions allow. Selling pigs out this week. PoA (5 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 5 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): White Plains 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # 0 certified herd # 10.0 19.0 inches inches " 9.0 inches 48000 ft2 269280 gallons 180 44543 6060 days ft3 actual waste produced = current herd # x line g = ft3 certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 5 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated m. ((lines e + k)/1000) x line I = 5 Total volume of waste to be land applied during 5 day draw down I. total volume to be land applied line e + line k = 44692 gallons REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 9/29/2020 0 28000 ft3 ft3 5818 gallons 0.54 lbs/1000 gal. 148.6 Ibs. PAN 5�'�"2-I Structure Evaluation Inspection Facility Number: 0-- 5V _ Date: Time in: / j Time out: y ;3© Farm Name: cii,a0 cicif' -c_ Farm 911 address: Owner Name: Ward t tr)c,rr Phone Facility Contact: $- Onsite Representative: MI5 aIntegrator: Certified Operator: Cert. Number Is storage capacity less than adequate? Yes _ No If yes is waste level into the structural freeboard? Yes No Was non -compliant level reported to DWR POA received Structure: 1 2 3 4 5 6 Identifier: Spillway? Designed Freeboard (in.): Observed Freeboard (in.): 32 3oz— Are there any immediate threats to the integrity of any of the structures observed? Yes No Do any structures lack adequate markers as required by the permit? Yes No Does any part of the waste,management system need repair Yes No / Condition of field's wf Condition of receiving crop Comments: Structure Evaluation Inspection Facility Number: -- 62/ 7 Date: / 9D ? Time in: (3 Time out: '9; 00 Farm Name: Efrw4-a— i-1-.� Falist-tiV Farm 911 address: Owner Name: ` ny;T -T rPhone Facility Contact: J - Onsite Representative: __ -- Integrator: Certified Operator: Cert. Number Is storage capacity less than adequate? Yes -'No If yes is waste level into the structural freeboard? Yes No Was non -compliant level reported to DWR POA received Structure: 1 2 3 4 5 6 Identifier: Spillway? Designed Freeboard (in.): (9:.. II' Observed Freeboard (in.): /3 Are there any immediate threats to the integrity of any of the structures observed? Yes No Do any structures lack adequate markers as required by the permit? Yes No Does any part of the waste.,,rnahagement system need repair Yes Condition of field's Condition of receiving crop.1, wY[ Comments: 176 No / a-4-ate1 Structure Evaluation Inspection Facility Number: -- °)'� Date: „ /. -tea/ Time in: 3,'t/5 Time out: i%.' Lli— Farm Name: . tiolhy Mtn. -one, big Farm 911 address: Owner Name: ijt ,-s fl'r c //raw Phone Facility Contact: Onsite Representative: S Integrator: Certified Operator: Cert. Number Is storage capacity less than adequate? Yes No.../v If yes is waste level into the structural freeboard? Yes No Was non -compliant level reported to DWR POA received Structure: 1 2 3 4 5 6 Identifier: I Q% spillway? A Designed Freeboard (in.): Observed Freeboard (in.): Are there any immediate threats to the integrity of any of the structures observed? Yes No Do any structures lack adequate markers as required by the permit? Yes No Does any part of the waste .management system need repair Yes _ No Condition of field's w ,� Condition of receiving crop. Comments: rretij ci /'na d Icrcr trra(✓/ .'. 2 7 6 pearl 3 o r .7 5a/9yr-el .3 aa._ i n-, Structure Evaluation Inspection Facility Number: 9)" -- /7,3 Time in: Date: /- ra- / ge130 Time out: Farm Name: Farm 911 address: Owner Name:- Ls,,s;7Z Phone Facility Contact: S®-.-- Onsite Representative:,-6e--(--- Integrator: Certified Operator: Cert. Number Is storage capacity less than adequate? Yes If yes is waste level into the structural freeboard? Yeses No Was non -compliant level reported to DWR POA received p4 Structure: 1 2 3 4 5 6 Identifier: Spillway? Designed Freeboard (in.): / q- Observed Freeboard (in.): 3 Are there any immediate threats to the integrity of any of the structures observed? Yes No Do any structures lack adequate markers as required by the permit? Yes No Does any part of the waste_riahagement system need repair Yes No ✓ Condition of field's % e 1: Condition of receiving crop. ,cod Comments: