HomeMy WebLinkAboutNCC211433_ESC Approval Submitted_20210312ROY COOPERa»
Governor
MICHAEL S. REGAN
Secretary
v
a
BRIAN WRENN
NORTH CAROLINA
Director
Environmental Quality
March 5, 2021
LETTER OF APPROVAL WITH MODIFICATIONS
King's Cross Properties, LLC
ATTN: Sam Hooker, Managing Member
1229 Hall Rd.
Westfield, NC 27053
RE: Project Name: King's Crossing - SECTION 5
Acres Approved: 15AS
Project ID: STOKE-2021-013
County: Stokes
City: King
Address: Moore Rd.
River Basin: Yadkin-PeeDee
Stream Classification: C
Submitted By: Gupton's Royal Design Group, PA
Date Received by LQS: February 4, 2021
Plan Type: New
Dear Sir or Madam:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to
be acceptable with modifications and hereby issue this letter of Approval with Modifications. The
Modifications Required for Approval are listed on the attached page. This plan approval shall
expire three (3) years following the date of approval, if no land -disturbing activity has been
undertaken, as is required by Title 15A NCAC 413.0129.
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the
NCGO10000 Construction General Permit. After the form is reviewed and found to be complete,
you will receive a link with payment instructions for the $100 annual permit fee. After the fee is
received, you will receive the COC via email. You MUST obtain the COC prior to commencement
of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCG01. Please
direct questions about the eNOI form to Annette Lucas at Annette.lucas@ncdenr.gov or Paul
Clark at Paul.clark@ncdenr.gov. If the owner/operator of this project changes in the future, the
new responsible party is required to apply for his/her own COC.
Title 15A NCAC 413.0118(a) and the NCG01 permit require that the following documentation be
kept on file at the job site:
DNorth Carolina. Department of Envtronmental Quality I Division of Energy, Mineral and land Resources
EQ 1 Winston-Salem Regional Office 1 450 Hanes Mill Road Salle 300 ( Winston-Salem, North Carolina 27103
�\ 336.776.9800
Letter of Approval with Modifications
King's Cross Properties, LLC
March 5, 2021
Page 2 of 3
1. The approved E&SC plan as well as any approved deviation.
2. The NCG01 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection
to ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring
protection of existing natural resources and adjoining properties. If, following the
commencement of this project, it is determined that the erosion and sedimentation control plan
is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973
(North Carolina General Statute 113A-51 through 66), this office may require revisions to the
plan and implementation of the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State
water quality laws, regulations, and rules. In addition, local city or county ordinances or rules
may also apply to this land -disturbing activity. This approval does not supersede any other
permit or approval.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form, which you provided. This permit allows for a land -disturbance,
as called for on the application plan, not to exceed the approved acres. Exceeding the acreage
will be a violation of this permit and would require a revised plan and additional application fee.
You are requested to file an amended form if there is any change in the information included on
the form. In addition, it would be helpful if you notify this office of the proposed starting date for
this project. Your cooperation is appreciated.
Sincerely,
Za ary L ntz, EI
Assistant Regional Engineer
Land Quality Section
Enclosures: Certificate of Approval
Modifications Required for Approval
NCG01 Fact Sheet
cc: Marshal Eddleman of Gupton's Royal Design Group, PA (via email)
WSRO file
Letter of Approval with Modifications
King's Cross Properties, LLC
March 5, 2021
Page 3 of 3
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: King's Crossing - SECTION 5
Project ID: STOKE-2021-013
County: Stokes
Modifications pursuant to applicable North Carolina General Statutes and./or Regulations:
1. Approval by a representative of the Land Quality Section will be required prior to removal
conversion of the sediment basin to post -construction stormwater SCMs.
[15A NCAC 4B .0106(a)(5)]
2. Concrete washout station and stockpiles should not be located within 50 feet of any storm
drain, basin, or stream unless no alternative is feasible. [G.S. 143-215.1]
3. Temporary slope drains should be provided where temporary diversions discharge into
sediment basins or traps. [G.S. 113A-57(3)]
4. Diversions should be installed along the top of the sediment basin wall directed toward slope
drains to prevent sheet flow over sediment basin slopes. [G.S. 113A-57(3)]
5. A construction entrance should be provided where construction traffic will access a paved
surface. [G.S. 113A-57(3)]
6. Additional measures may be required - The applicant is responsible for the control of
sediment on -site. If the approved erosion and sedimentation control measures prove
insufficient, the applicant must take those additional steps necessary to stop sediment from
leaving this site. [15A NCAC 4B .0115]
Ref: G.S. 113A-54.1 through G.S. 113A-57
Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504
General Permit NCG 010000 NPDES for Construction Activities