Loading...
HomeMy WebLinkAboutWQCS00004_NOV-2020-DV-0425 Response_20200925Metropolitan Sewerage District OF BUNCOMBE COUNTY, NORTH CAROLINA G. Landon Davidson, P.G., Regional Supervisor Water Quality Regional Operations Section Asheville Regional Office Division of Water Resources, NCDEQ Subject: NOTICE OF VIOLATION Tracking Number: NOV-2020-DV-0425 510 Riverview Drive Sanitary Overflow — August 31, 2020 Permit No. WQCS00004 Metropolitan Sewerage District of Buncombe County Mr. Davidson, September 21, 2020 PCIF4 SEP 2 51020 Water Quality Regional Operations Asheville Regional Office In response to the above -mentioned notice of violation for the SSO located at 510 Riverview Drive, MSD would like to provide you with information about the cause of overflow and upcoming projects that are in MSD's capital improvement program that will address this aging infrastructure. Carrier Bridge pump station control panel lost power due to the uninterruptible power supply (UPS) failing. Crews were notified of the issue and had the pumps back online within 20 minutes. Here is the list of corrective actions that have been implemented to ensure the incident at Carrier Bridge does not occur again. 1. Currently, Carrier Bridge PS communicates to MSD SCADA by DSL service, with a Cellular Modem as a backup communication in an occurrence of a DSL communication failure. We are improving the communication testing of the DSL and Cell Modem redundancy by performing a Cell Modem communication test every 15 minutes, while DSL communication is active. When four consecutive cell modem communication tests fail, a cell modem failure will be reported to SCADA personnel. When a DSL failure occurs, the failure will be reported to SCADA personnel. In the event of a DSL and Cell Modem communication failure, a station communication alarm will be triggered and immediately be reported to On Call Personnel. 2. Modifications made to the RTU/Pump Control Panel equipment for automatic failover from uninterruptible power supply (UPS) AC power to Utility AC power. 3. An annual preventive maintenance schedule has been created in our Cityworks software to replace the batteries in the UPS annually. 4. Implementation of a monthly UPS test to ensure proper operation of UPS equipment. The overflow occurred just upstream of Carrier Bridge pump station. All residuals were removed from the area and lime and gravel were placed at the area of spill. At the time of the overflow the river flow was running at 89.4 million gallons per hour. The Sanitary Sewer Overflow accounted for Tess than 0.3% of the total river flow for the short duration of the overflow. Carrier Bridge Pump Station Replacement Project # 2019045 is currently in design with CDM. Planned construction to begin in Spring 2022 at an estimated construction cost of $35 million. MSD has acquired the land adjacent to the existing pump station for this project. MSD has invested in excess of $400 million into the collection system for Capital Replacement Projects since consolidation in 1990. These projects have had huge impacts to the reduction of SSO's in the South French Broad River Corridor with a 91% reduction in SSO's since 1999. MSD has budgeted $332.4 million in Capital Improvements over the next 10 years with $66 million going directly to this area of the South French Broad River Corridor. If you have any additional questions regarding the overflow or any of the above -mentioned projects, please give me a call. Thanks, C. Kenneth Stines Division Director System Services Division MSD of Buncombe County, NC kstines@msdbc.org (828)225-8244 cc: Tom Hartye -Protecting Our Natural Resources~ 2028 Riverside Drive ASHEVILLE, NORTH CAROLINA 28804 TELEPHONE: (828)225-8244 FAX: (828)251-9040 WEBSITE: www.msdbc.org Written response for: Notice of Violation & Intent to Issue Civil Penalty Tracking Number: NOV-2020-DV-0425 Sanitary Sewer Overflows — August 2020 Collection System Permit No. WQCS00004 Metropolitan Sewerage District of Buncombe County ncident #: 202002520 510 Riverview Drive SEP 2 5 2020 Water Quality Region; 4E_ Asheville Regional Office I confirm that I have received written response for the SSO's listed above: (Name) 09-75-zoze (Date)