Loading...
HomeMy WebLinkAboutNCC202732_Notice of Termination_20210310Action History (UTC-05:00) Eastern Time (US & Canada) Subrrit by Anonymous User 3/10/2021 10:36:15 AM (NOT Submittal) Approve by Morman, Alaina 3/11/2021 3:04:20 PM (NOT Request Review- NCC202732) • The task was assigned to EADS\amorman1. The due date is: March 15, 2021 5:00 PM 3/10/2021 10:36 AM 1 � NORTH CAROLINA Enrlronmenral Quallly Certificate of NCC202732 Coverage (COC) Enter the Certificate of Coverage Nmber No.* 2020 Annual Fee Status 2021 Annual Fee Status May be blank (if not yet billed) Information associated with this permit: Project Name Oak Springs Subdvision Address Oak Spring Road, Indian Trail, NC County Union Latitude 35.0980 Longitude -80.6570 Permittee Listed JBH Development, LLC Legally Responsible Bart Hopper Individual NC Reference No. NCG01-2020-2732 E&SC Plan ID UNION-2020-059 Original NOI 27557 Tracking No. Date COC Issued 6/29/2020 Prior Rescission Cate populates only if COCwas already rescinded at tirre of subrrittal. Date Reason for Rescission/Ternnination Request: Reason for r Project Closed -Out Termination of r Sale (Another Owner/Operator obtained a new COC) Coverage * r Mistake or Invalid Coverage r Other Sale (Another Owner/Operator obtained new COC) Ad d i o n a I Ivbre information about the basis of this request, if needed. Explanation Supporting Upload Supporting Documentation if applicable. Documentation Oak Springs Project I Financial -Responsibility -Form 149.02KB - Signed.pdf NCG01-eNO1-Certification-Form-Signed.pdf 82.44KB Oak Spring Proj I Certificate of Coverage.pdf 36.22KB NUst be FDFfornat Project Close-out Information: Final Close-out Inspection Approval Project Close-out Mist beFDFforrrat Approval Documentation North Carolina General Statute 143-215.66 (1) provides that: Anyperson who knowinglymakes any false statement, representation, or certification in anyapplication, record, report, plan, or other documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case underthis Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring deice or method required to be operated or maintained under this Article or rules of the Commission implementing this Article shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to exceed ten thousand dollars ($10,000). rJ I, as an authorized representative, hereby request rescission of coverage under the NPDES Stormwater Permit for the subject facility. I am familiar with the information contained in this request and to the best of my knowledge and belief such information is true, complete and accurate. *This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name* Bart Hopper Title * Manager Organization* JBH Development, LLC Date * 03/10/2021 Email for bhopper@hoppercommunities.com Confirmation * Contact Telephone* 7048054801 NOT Certification Hopper Oak Springs Subdivision NOT Form.pdf 364.67KB Form Mast be FDF Forrrat Is this COC Already Ensure this CCChas not been rescinded since subrrittal! Rescinded? Additional Email CCd on Notification Errails (Optional) cmccullough@hoppercommunities.com Original Permittee GCdonWtificationBiails Email bhopper@hoppercommunities.com Original Site Contact CCd on Kbtificaiton Bmils Email bhopper@hoppercommunities.com