Loading...
HomeMy WebLinkAbout090183_30 Day POA_20210108PLAN OF ACTION (P®A) FOR HIGH FREEBOARD AT ANIMAC FACILITIES Facility Number: 9_ . ' 0 3 County: B ]ad m Facility Name: 51 Certified Operator Name: Operator # 1 & 30 % 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Structure 9 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Lagoon Name/Identifier (ID): Spillway (Yes or No): -- Level (inches): CP 7 � 2. Check all applicable items E4011 Siorl %m ilioy / Dec. Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to . pumped and hauled is reflected in section III tables. Included, within this plan is a list of the proposed sites with related facility number(s), number acres and receiving crop information. Contact and secure approval from the Division of Water Quality prior to transfer of waste to a site not covered in the facility's certified animal waste management plan. Operation will be partially or fully depopulated, - attach a complete schedule with corresponding animal units and dates for depopulation - if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility Earliest possible date to begin land application of waste: I hereby certify.that I have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the Information is accurate and correct. TSaaG Sin Facility OwnerlManager (print) Phone: q ID " ? ?y' 31q$ t _ Date: rl8laboZ Facility Owner/M ager (sig Lure) PoA Cover Page 2121100 II. TOTAL VOLUME OF WASTE STORED WITHIN STRUCTURAL FREEBOARD ELEVATIONS FOR ALL WASTE STRUCTURES FOR FACILITY 1. structure ID: 2. structure ID: 3. structure ID: 11 line I = 44898 gallons line I = gallons line I = 4. structure ID: line I = 5. structure ID: line I = 6. structure ID: line I = n.lines 1+2+3+4+5+6m o. line n / 27154 = gallons gallons gallons gallons 44898 gallons 1.65 acre -inches III. TOTAL ACRES AVAILABLE TO RECEIVE WASTE DURING 5 DAY DRAW DOWN PERIOD''2 'While this section deals with hydraulic loading capacities, applications cannot exceed agronomic rate for receiving crop according to its certified waste plan. 2Fields with no remaining PAN balance, no receiving crop, and/or completely saturated are not considered available to receive waste. p. tract # q. field # r. soil type s. crop t. acres u. remaining IRR-2 PAN balance (Vacre) v. maximum application rate (in/hr) w. maximum application amount (inches) 1068 1 Ra os - ryegrass 13.60 50.00 0.4 1 1068 2 Ra os - ryegrass 16.20 50.00 0.4 1 1068 3 Ra os - ryegrass 7.30 50.00 0.4 1 1068 9 Ra os 7.30 50.00 0.4 1 1068 10 Ra los 1 7.301 50.001 0.4 1 1068 11 GbA os 15.50 50.00 0.5 1 1068 51 Ra Jos 1 7.901 50.001 0.4 1 1068 6 Ra Jos 1 13.101 50.001 0.4 1 x. total acres available during 5 day draw down (sum of column t) = 88.20 acres IV. FACILITY'S PoA OVERALL HYDRAULIC LOAD TO BE LAND APPLIED PER ACRE Y. line o = 0.02 inches per acre to be applied within 5 days line x If unable to land apply hydraulic load listed in line y, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, PoA (5 Day) 2121/00 1. Describe moisture conditions of fields? (e.g. Is there water standing in field; does irrigation ment mar aown in neia;-iramcaminy" across sous; will sous aDsorD application witnout runoff, etc.) areas are still wet, but hopefully will dry out within the week. They will select the dryest loactions to pump. rain is forecasted for today. z. uate and amount of last raintall event? DATE: 01/013/21 Field 1 - Nov 25, Field 10 - Nov 24, Field 9 - Nov 23 AMOUNT: 0.70 inches Maybe - depending on how quickly fields dry out. fields are still wet. Depoped over the last 3 weeks. All houses are empty. per irrigation event; changes made in gun sizes, nozzles, "o" rings, operating time, travel speed, etc. to changes to equipment. Will pump if condidtions allow. sold out over the last few weeks PoA (5 Day) 2/21/00 PLAN OF ACTION (POA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 5 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Singletary Finishing 9-183 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker 6.0 inches b. designed 25 yr./24 hr. storm & structural freeboard 19.0 inches c. line b - line a (inches in red zone) = 13.0 inches d. top of dike surface area according to design (area at below structural freeboard elevation) 188760 ft2 a. line c/12 x line d x 7.48 gallons/ft' 1629585 gallons 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 180 days g. volume of waste produced according to structural design 261105.9 ft3 h. current herd # certified herd # 7920 actual waste produced = current herd # x line g = W certified herd # i. volume of wash water according to structural design ft3 j. excess rainfall over evaporation according to design 110110 ft3 k. (lines h + i + j) x 7.48 x 5 days/line f= 22878 gallons 4. Total PAN to be land applied during draw down period I. current waste analysis dated 1 11/18/2020 1.97 Ibs/1000 gal. m. ((lines e + k)/1000) x line I = 3058.4 Ibs. PAN 5 Total volume of waste to be land applied during 5 day draw down 1. total volume to be land applied line e + line k = 264164 gallons REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 11. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Singletary Finishing 9-183 line m = 3925.0 lb PAN 2. Structure ID: line m = lb PAN 3. Structure ID: 4. Structure ID: 5. Structure ID: 6. Structure ID: n. tines 1+2+3+4+5+6= line m = lb PAN line m = lb PAN line m = lb PAN line m = lb PAN 3925.0 lb PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining IRR 2 PAN balance (lb/acre) t. TOTAL PAN BALANCE FOR FIELD (Ibs.) column r x s u. application window' 1068 1 os - ryegrass 13.60 50.00 680.0 Aug -July 1068 2 os - ryegrass 16.20 50.00 810.0 Aug -July 1068 3 os - ryegrass 7.30 50.00 365.0 Aug -July 1068 9 os 7.30 50.00 365.0 Sept - March 1068 loos 7.30 50.00 365.0 Se t -March 1068 11 os 15.50 50.00 775.0 Se t -March 1068 5 os 7.90 50.00 395.0 Sept - March 1068 6 os 13.10 50.00 655.0 Sept -March *** PAN are estimates'** 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 4410.0 lb. PAN IV. FACILITY'S FDA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = 3925.0 lb. PAN x. Crop's remaining PAN balance (line v from section III) = 4410.0 lb. PAN y. Overall PAN balance (w - x) _ -485 lb. PAN NARRATIVE: Will begin pumping as soon as field conditions permit. PoA (30 Day) 2/21/00 PLAN OF ACTION (POA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): ISingletary Finishing 9-183 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) _ d. top of dike surface area according to design (area at below structural freeboard elevation) a. line c/12 x line d x 7.48 gallons/ft' 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design 6.0 inches 19.0 inches 13.0 inches 188760 ft2 1529585 gallons 180 days g. volume of waste produced according to structural design 261105.9 ft' h. current herd # 7920 certified herd # 7920 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated 11/18/2020 m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 261106 ft' 0 ft3 110110 ft3 462782 gallons 1.97 Ibs/1000 gal. 3925.0 Ibs. PAN PoA (30 Day) 2/21/00