HomeMy WebLinkAbout090188_30 Day POA_20210128PLAN OF ACTION (P®A) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
Fecility Number: -1 0 8 County: hlagl.en
Faclifty Name: bennr-li Place Natco v, j
Certified operator Name:
Operator (?W�R'
I. Current liquid level(s) in inches as measu
lowest pred from the current liquid level in the lagoon to the
oint on the top of the dam for lagoons without spillways; and from the current liquid level
in the lagoon to the bottom of the spillway for lagoons with spillways.
Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6
Lagoon Name/Identifier (0): I
Spillway (Yes or No):
Level (inches):
2. Check all applicable items
Liquid level is within the designed structural freeboard elevations of one or more struoturss. Five
and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within
acceptable ranges,
Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day .
Plan of -Action -Is attached. Agronomic balance is within acceptable range.
Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to
pumped and hauled is reflected In section ill tables. Included- within. this plan is a list of the
proposed sites with related facility number(s), number acres and receiving crop Information.
Contact and secure approval from the Division of Water Quality priorprior to transfer of waste
to a site not covered In the facillty's certified animal waste management plan.
Operation will be partially or fully depirpuiated.
- attach a complete schedule %ft corresponding animal units and dates for depopulation
- If animals are to be moved to another permitted facility, provide facility number, lagoon
freeboard levels and herd population for the receiving facility
3. Earliest possible date to begin land application of waste: 1M q1aG' z1
---" 16 - -
I hereby certify.that I have reviewed -the information listed above and included within the attached Plan
of Action, and to the best of my knowledge and ability, the Information Is accurate and correct.
(signature)
Phone:- qlp-yq•, ylfo
�
Date:
-d 0�
PoA Cover Page 2i21100
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1. Structure ID: 1
line m =
140.6 lb PAN
2. Structure ID:
line In =
lb PAN
3. Structure ID:
line m =
lb PAN
4. Structure ID:
line m =
lb PAN
5. Structure ID:
line m =
lb PAN
6. Structure ID:
line m =
lb PAN
n. lines 1 + 2 + 3 + 4 + 5 + 6 =
140.6 lb PAN
Ill. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD.
o. tract #
p. field #
q. crop
r. acres
s. remaining IRR
2 PAN balance
(lb/acre)
I. TOTAL PAN
BALANCE FOR
FIELD (Ibs.)
column r x s
u. application window'
1747
1
overseed
2.48
35.00
86.8
Oct -Mar
1747
2
overseed
3.20
35.00
112.0
Oct -Mar
1747
3
overseed
3.16
35.00
110.6
Oct -Mar
1747
4
overseed
2.53
35.00
88.6
Oct -Mar
1747
5
fescue graze
1.02
100.00
102.0
Aug -Jul
1747
6
fescue graze
3.78
100.00
378.0
Aug -Jul
**estimates on PAN left***
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 878.0 lb. PAN
IV. FACILITY'S FDA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) = 140.6 lb. PAN
x. Crop's remaining PAN balance (line v from section III) = 878.0 lb. PAN
y. Overall PAN balance (w - x) _ -737 lb. PAN
NARRATIVE:
Will begin pumping as soon field conditions are acceptable.
PoA (30 Day) 2/21/00
PLAN OF ACTION (POA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID): I 1
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr./24 hr. storm & structural freeboard
c. line b - line a (inches in red zone) _
d. top of dike surface area according to design
(area at below structural freeboard elevation)
a. line c/12 x line d x 7.48 gallons/ft'
3. Projected volume of waste liquid produced during draw down period
f. temporary storage period according to structural design
—18-0 inches
19.0 inches
1.0 inches
42076 ft2
26227 gallons
180 days
g. volume of waste produced according to structural design 44543 ft3
h. current herd # 6080 certified herd # 6080
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated 12/22/2020
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
44543 ft'
Ofo
26133 ft3
88109 gallons
1.23 Ibs/1000 gal.
140.6 Ibs. PAN
PoA (30 Day) 2/21/00