Loading...
HomeMy WebLinkAbout780035_30 Day POA_20210203attiNocoGo -PLAN OF ACTION (PoA) FOR HIM AT aNNW. FACILITIES Facility Number:. . - 3J� County: Facilty Name:. LaVee r arms a' hi \r Certified Opsriltor Name: I ° I ichat i Inman Operator# 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the' top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Lagoon Name/identifier (ID): Spillway (Yes or No): Level (inches): 2. Check &II applicable items eXi'2,Y15ion .. ng II 9 I abQ) Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. • Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Volume and PAN content of waste to pumped and hauled Is reflected in section IiI tables. Included within this plan is a list of the proposed sites with related facility number(s), number acres and receiving crop information. Contact and secure approval from the Division of Water Resources prior to transfer of waste to a site not covered in the facility's certified animal waste management plan. • Operation will be partially or fully depopulated. - attach a complete schedule with corresponding animal units and dates for rodepopulation e fa - If animals are to be moved to another permitted facility, pr facility freeboard levels and herd population for the receiving facility 3. Earliest possiblea131ao�-i date to begin land application of waste: _ of Action, and to the bast of my knowledge and ability, included hereby.certify that lime reviewed the information listed above and the information is accurate and correct ed Plan 1v�, ``hh 1 O11Ad Marl Pirrone: ©l 10< 854-3J2G7 S YlFecal Own Manager (print) 'Date: Facility Ownerlllilanager (signature) a ialaoai PoA Cover Page 2I21100 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Luvee #2 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # 3520 certified herd # 18.0 19.0 inches inches 1.0 inches 88750 ft2 55321 gallons 180 116047 3520 days ft3 actual waste produced = current herd # x line g = 116047 ft3 certified herd # i. volume of wash water according to structural design ft3 j. excess rainfall over evaporation according to design ft3 k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated m. ((lines e + k)/1000) x line I = 12/17/2020 REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 51770.8 209213 gallons 2.38 Ibs/1000 gal. 629.6 lbs. PAN PoA (30 Day) 2/21/00 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: 2. Structure ID: 3. Structure ID: 4. Structure ID: 5. Structure ID: 6. Structure ID: Luvee #2 n.lines1+2+3+4+5+6= line m = 629.6 Ib PAN line m = Ib PAN line m = Ib PAN line m = Ib PAN line m = Ib PAN line m = Ib PAN 629.6 Ib PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. O. tract # p. field # q. crop r. acres s. remaining !RR 2 PAN balance (Ib/acre) t. TOTAL PAN BALANCE FOR FIELD (Ibs.) column r x s u. application window' 34748 1A overseed pasture 3.09 40.00 123.6 Oct -Mar 34748 IAA overseed pasture 3.72 40.00 148.8 Oct -Mar 34748 1B overseed pasture 2.65 40.00 106.0 Oct -Mar 34748 1C overseed pasture 2.15 40.00 86.0 Oct -Mar 34748 2A overseed pasture 2.11 40.00 84.4 Oct -Mar 34748 2B overseed pasture 2.65 40.00 106.0 Oct -Mar 34748 2C overseed pasture 2.54 40.00 101.6 Oct -Mar 34748 3A overseed pasture 4.55 40.00 182.0 Oct -Mar 34748 3B overseed pasture 2.02 40.00 80.8 Oct -Mar ** guestimates on PAN*** 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for aII fields (sum of column t) = IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = x. Crop's remaining PAN balance (line v from section III) = y. Overall PAN balance (w - x) = 1019.2 Ib. PAN 629.6 Ib. PAN 1019.2 Ib. PAN -390 Ib. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: will begin pumping when field conditions allow. PoA (30 Day) 2/21/00