Loading...
HomeMy WebLinkAbout090169_Structural Evaluation, Other_20210111Date of Visit: Arrival Timer Departure Time: County - Farm Name: ;%i/1yt® L !~ Owner Email: Owner Name: C�pd �Y S �y ; �l 'Sr Phone: Mailing Address: ��Region: Physical Address: Facility Contact: ,//.may r'5—yI Z-- Title: Phone: Onsite Representative: Certified Operator: Back-up Operator: Location of Farm: Latitude: Discharees and Stream Impacts 1. Is any discharge observed from any part of the operation? Discharge originated at: ❑ Structure ❑ Application Field ❑ Other: a. Was the conveyance man-made? b. Did the discharge reach waters of the State? (If yes, notify DWR) c. What is the estimated volume that reached waters of the State (gallons)? Integrator: Certification Number: Certification Number: d. Does the discharge bypass the waste management system? (If yes, notify DWR) 2. Is there evidence of a past discharge from any part of the operation? 3. Were there any observable adverse impacts or potential adverse impacts to the waters of the State other than from a discharge? Longitude: ❑ Yes [3"No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes ❑ No ❑ NA ❑ NE ❑ Yes �No ❑ NA ❑ NE ❑ Yes dNo ❑ NA ❑ NE Page I of 3 21412015 Continued Facility Number: 607 jDate of Inspection: Waste Collection & Treatment 4. Is storage capacity (structural plus storm storage plus heavy rainfall) less than adequate? Yes ❑ No ❑ NA ❑ NE a. If yes, is waste level into the structural freeboard? E]4'es ❑ No ❑ NA ❑ NE Structure 1 Structure 2 Structure 3 Structure 4 Structure 5 Structure 6 Identifier: Spillway?: Designed Freeboard (in): Observed Freeboard (in): / L7 j5y✓ YTt!O 1 5. Are there any immediate threats to the integrity of any of the structures observed? ❑ Yes No ❑ NA ❑ NE (i.e., large trees, severe erosion, seepage, etc.) 6. Are there structures on -site which are not properly addressed and/or managed through a ❑ Yes E No ❑ NA ❑ NE waste management or closure plan? If any of questions 4-6 were answered yes, and the situation poses an immediate public health or environmental threat, notify DWR 7. Do any of the structures need maintenance or improvement? ❑ Yes ro ❑ NA ❑ NE 8. Do any of the structures lack adequate markers as required by the permit? ❑ Yes [3 <o ❑ NA ❑ NE (not applicable to roofed pits, dry stacks, and/or wet stacks) 9. Does any part of the waste management system other than the waste structures require ❑ Yes No ❑ NA ❑ NE maintenance or improvement? Waste Application 10. Are there any required buffers, setbacks, or compliance alternatives that need ❑ Yes [—]No ❑ NA E NE maintenance or improvement? 11. Is there evidence of incorrect land application? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA I3 1VE ❑ Excessive Ponding ❑ Hydraulic Overload ❑ Frozen Ground ❑ Heavy Metals (Cu, Zn, etc.) ❑ PAN ❑ PAN > 10% or 10 lbs. ❑ Total Phosphorus ❑ Failure to Incorporate Manure/Sludge into Bare Soil ❑ Outside of Acceptable Crop Window ❑ Evidence of Wind Drift ❑ Application Outside of Approved Area 12. Crop Type(s): 13. Soil Type(s): 14. Do the receiving crops differ from those designated in the CAWMP? ❑ Yes [—]No ❑ NA �E 15. Does the receiving crop and/or land application site need improvement? ❑ Yes ❑ No ❑ NA [J]NE 16. Did the facility fail to secure and/or operate per the irrigation design or wettable ❑ Yes ❑ No ❑ NA [5NE acres determination? 17. Does the facility lack adequate acreage for land application? ❑ Yes [:]No ❑ NA �E 18. Is there a lack of properly operating waste application equipment? ❑ Yes ❑ No ❑ NA Fa4E Reauired Records & Documents 19. Did the facility fail to have the Certificate of Coverage & Permit readily available? [:]Yes [—]No ❑ NA ©'NE 20. Does the facility fail to have all components of the CAWMP readily available? If yes, check. ❑ Yes ❑ No ❑ NA �E the appropriate box. ❑ WUP ❑Checklists ❑ Design ❑ Maps ❑ Lease Agreements ❑ Other: 21. Does record keeping need improvement? If yes, check the appropriate box below. ❑ Yes [—]No ❑ NA DXE ❑ Waste Application ❑ Weekly Freeboard ❑ Waste Analysis ❑ Soil Analysis ❑ Waste Transfers ❑ Weather Code ❑ Rainfall ❑ Stocking ❑ Crop Yield ❑ 120 Minute Inspections ❑ Monthly and 1" Rainfall Inspections ❑ Sludge Survey 22. Did the facility fail to install and maintain a rain gauge? ❑ Yes ❑ No ❑ NA - NEB,. ' 23. If selected, did the facility fail to install and maintain rainbreakers on irrigation equipment? ❑ Yes ❑ No ❑ NA E < Page 2 of 3 21412015 Continued Facility Number: Date of Inspection: 24. Did the facility fail to calibrate waste application equipment as required by the permit? ❑ Yes dtto ❑ NA 25. Is the facility out of compliance with permit conditions related to sludge? If yes, check ❑ Yes �"lxo ❑ NA r.N� the appropriate box(es) below. ❑ Failure to complete annual sludge survey ❑ Failure to develop a POA for sludge levels ❑ Non -compliant sludge levels in any lagoon List structure(s) and date of first survey indicating non-compliance: 26. Did the facility fail provide documentation of an actively certified operator in charge? ❑ Yes o ❑ NA `,�-1 �4i 27. Did the facility fail to secure a phosphorus loss assessments (PLAT) certification? ❑ Yes E 11O ❑ NA E Other Issues 28. Did the facility fail to properly dispose of dead animals with 24 hours and/or document ❑ Yes ❑ No ❑ NA EIE and report mortality rates that were higher than normal? 29. At the time of the inspection did the facility pose an odor or air quality concern? ❑ Yes ❑ No ❑ NA �i IE If yes, contact a regional Air Quality representative immediately. 30. Did the facility fail to notify the Regional Office of emergency situations as required by the ❑ Yes E2—Ko ❑ NA [ IE permit? (i.e., discharge, freeboard problems, over -application) 31. Do subsurface tile drains exist at the facility? If yes, check the appropriate box below. ❑ Yes ❑ No ❑ NA dNE ❑ Application Field ❑ Lagoon/Storage Pond ❑ Other: 32. Were any additional problems noted which cause non-compliance of the permit or CAWMP? ❑ Yes /' [�]'No ❑ NA tE33. Did the Reviewer/Inspector fail to discuss review/inspection with an on -site representative? ❑ Yes ❑'N� ❑ NA 34. Does the facility require a follow-up visit by the same agency? ❑ Yes �o ❑ NA ❑ NE ,. t t � GG`` ( k�j E41, 101 .1 j�" k `iIVI; A10s Now ;'k 6--<J7 d- 3d d ffe To— Reviewer/Inspector Name: I�P FuWh�Phone: }/0 3e3—c�i5 f Reviewer/Inspector Signature: Date: /l Page 3 of 3 21412015