HomeMy WebLinkAboutNCC211421_ESC Approval Submitted_20210311ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
BRIAN WRENN
Director
NORTH CAROLINA
Environmental Quality
March 5, 2021
LETTER OF APPROVAL WITH MODIFICATIONS
Duke Energy Progress, LLC
Attn: Duncan Brewer, Project Director
410 S. Wilmington Street
Raleigh, NC 27601
RE: Project Name: Mayo Ash Basin Landfill Erosion and Sediment Control
Acres Approved: 133.4
Project ID: PERSO-2021-008
County: Person
City: Roxboro
Address: Boston Road
River Basin: Roanoke
Stream Classification: Other
Submitted By: Wood Environment and Infrastructure Solutions, Inc.
Date Received by LQS: February 19, 2021
Plan Type: Revised - Industrial
Dear Mr. Brewer:
This office has reviewed the subject erosion and sedimentation control plan. We find the plan to
be acceptable with modifications and hereby issue this letter of Approval with Modifications. The
Modifications Required for Approval are listed on the attached page. This plan approval shall
expire three (3) years following the date of approval, if no land -disturbing activity has been
undertaken, as is required by Title 15A NCAC 4B .0129.
As of April 1, 2019, all new construction activities are required to complete and submit an
electronic Notice of Intent (eNOI) form requesting a Certificate of Coverage (COC) under the
NCG010000 Construction General Permit. After the form is reviewed and found to be complete,
you will receive a link with payment instructions for the $100 annual permit fee. After the fee is
received, you will receive the COC via email. You MUST obtain the COC prior to commencement
of any land disturbing activity. The eNOI form may be accessed at deq.nc.gov/NCGO1. Please
direct questions about the eNOI form to Annette Lucas at Annette.Lucas(c�r�,ncdenr.gov or Paul
DEQ
,_ North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
4��R'��/� Raleigh Regional Office 11628 Mail Service Center 13800 Barrett Drive I Raleigh, North Carolina 27609
NOR%H GAROLINA �
919.791.4200
Letter of Approval with Modifications
Duke Energy Progress, LLC
March 5, 2021
Page 2 of 4
Clark at Paul. Clarkkncdenr. gov. If the owner/operator of this project changes in the future, the
new responsible party is required to apply for his/her own COC.
Title 15A NCAC 4B .0118(a) and the NCGO1 permit require that the following documentation
be kept on file at the job site:
1. The approved E&SC plan as well as any approved deviation.
2. The NCGO1 permit and the COC, once it is received.
3. Records of inspections made during the previous 12 months.
Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection
to ensure compliance with the approved plan.
North Carolina's Sedimentation Pollution Control Program is performance -oriented, requiring
protection of existing natural resources and adjoining properties. If, following the commencement
of this project, it is determined that the erosion and sedimentation control plan is inadequate to
meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General
Statute 113A-51 through 66), this office may require revisions to the plan and implementation of
the revisions to ensure compliance with the Act.
Acceptance and approval of this plan is conditioned upon your compliance with Federal and State
water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may
also apply to this land -disturbing activity. This approval does not supersede any other permit or
approval.
Please note that this approval is based in part on the accuracy of the information provided in the
Financial Responsibility Form, which you provided. This permit allows for a land -disturbance, as
called for on the application plan, not to exceed the approved acres. Exceeding the acreage will
be a violation of this permit and would require a revised plan and additional application fee. You
are requested to file an amended form if there is any change in the information included on the
form. In addition, it would be helpful if you notify this office of the proposed starting date for this
project. Please notify us if you plan to have a preconstruction conference.
Your cooperation is appreciated.
Rev. 05222020
Letter of Approval with Modifications
Duke Energy Progress, LLC
March 5, 2021
Page 3 of 4
Sincerely,0 Kr[�—
L
Dylan Reinhardt
Assistant Regional Engineer
Land Quality Section
Enclosures: Certificate of Approval
Modifications Required for Approval
NPDES NCGO1 Fact Sheet
cc: Regional Office file
Wood Environment and Infrastructure Solutions, Inc., ATTN: Claudia Prado, PE
(claudia.prado(c�r�,woodplc.com)
Rev. 05222020
Letter of Approval with Modifications
Duke Energy Progress, LLC
March 5, 2021
Page 4 of 4
MODIFICATIONS REQUIRED FOR APPROVAL
Project Name: Mayo Ash Basin Landfill Erosion and Sediment Control
Project ID: PERSO-2021-008
County: Person
Provide a copy of the USACE 404 permit for the office file. A revision will be required
approving the impacts proposed before work may proceed to the second phase. This
approval only covers the work to be done in Phase 1 without any impacts to streams or
wetlands. Acceptance and approval of this plan is conditioned upon your compliance
with Federal and State water quality laws, regulations, and rules. (GS 113A-54.1(c),
15A NCAC 04B .0106(1))
Ref. G.S. 113A-54.1 through G.S. 113A-57
Sections 15A NCAC 04A.0101 through 15A NCAC 04E.0504
General Permit NCG 010000 NPDES for Construction Activities
Rev. 05222020