Loading...
HomeMy WebLinkAbout20201347 Ver 1_Blasting - Google Docs_20210310Blasting will be most likely required to complete the proposed work during Spring 2022 - Fall 2022. Geotechnical investigations have been performed along the project corridor, but the specific locations where blasting might be necessary are not yet known. Pre -drilling will be performed once construction begins and the blasting plan will be developed as necessary. The blasting plan will be provided upon request once completed. There are no red HUCs within 0.25 mile from the study area.