HomeMy WebLinkAbout820122_30 Day POA_20210223PLAN OFACTION(Poa) FOR HIGH FREEBOARD AT ANIMAL FACILITIES Facility Number: 82-0122 County: Sampson Facility Name: Ernest Odum I & II Certified Operator Name: Ashley Odum Operator Number: 20044 1. Current liquid level(s) in inches as measured from the current liquid level in the lagoon to the lowest point on the top of the dam for lagoons without spillways; and from the current liquid level in the lagoon to the bottom of the spillway for lagoons with spillways. Lagoon 1 Lagoon 2 Lagoon 3 Lagoon 4 Lagoon 5 Lagoon Name/ID: 1 II Large II Small Spillway(Y or N): N N N Level(inches): 13 15 15 2. Check all applicable items Liquid level is within the designed structural freeboard elevations of one or more structures. Five and 30 day Plans of Action are attached. Hydraulic and agronomic balances are within acceptable ranges. X Liquid level is within the 25 year 24 hour storm elevations for one or more structures. A 30 day Plan of Action is attached. Agronomic balance is within acceptable range. Waste is to be pumped and hauled to off site locations. Bolume and PAN content of waste to be pumped and hauled is reflected in section III tables. Included within this plan is a list of the proposed sites with related facility numbers, number of acres and receiving crop information. Contact and secure approval from the DWQ prior to transfer of waste to a site not covered in the facility's CAWMP. Operation will be partially or fully depopulated. *Attach a complete schedule with corresponding animal units and dates for depopulation *if animals are to be moved to another permitted facility, provide facility number, lagoon freeboard levels and herd population for the receiving facility 3. Earliest possible date to begin land application of waste: 2/23/21 I hereby certify that 1 have reviewed the information listed above and included within the attached Plan of Action, and to the best of my knowledge and ability, the information is accurate and correct. Ashley Odum Phone: 9102144986 Facility Owner/Manager (print) Ashley Odum Facility Owner/Manager (signature) Date: 2/23/21 11. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: 2. Structure ID: 3. Structure ID: 4. Structure ID: 5. Structure ID: 6. Structure ID: Oduml Odum II Large Odum II Small n. lines 1 + 2 + 3 + 4 + 5 + 6 = line m = 1416.9 Ib PAN line m = 241.8 Ib PAN line m = 73.7 Ib PAN line m = Ib PAN line m = Ib PAN line m = Ib PAN 1732.4 Ib PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD o. tract # p field # r. acres t. TOTAL PAN BALANCE FOR FIELD (Ibs) column rxs u. applicationwindow' s remaining IRR-2 PAN balance (Ib/acre) q. crop 101 2.96 286.00 846.6 Mar1-Sep30 Bermuda 102 com 3.26 107.00 348.8 Feb 15-June 30 103 corn 3.92 107.00 419.4 Feb 15-June 30 104 3.64 286.00 1041.0 Marl-Sep30 Bermuda 105 1.94 286.00 554.8 Marl Sep30 Bermuda 106 3.40 263.00 894.2 Marl-Sep30 Bermuda 107 4.53 286.00 1295.6 Mar1-Sep30 Bermuda 108 Wheat 3.13 85.00 266.1 Sept-March3l 109 Wheat 4.21 85.00 357.9 Sept-March3l 111 4.21 263.00 1107.2 Marl-Sep30 Bermuda 112 2,83 286.00 809.4 Marl-Sep30 Bermuda 113 2.60 286.00 743.6 Marl-Sep30 Bermuda 114 2,69 286.00 769.3 Marl-Sep30 Bermuda 232 1.42 263.00 373.5 Marl-Sep30 Bermuda 233 3.30 263.00 867.9 Marl Sep30 Bermuda 234 Com 4.53 69.00 312.6 Feb 15-June 30 235 Corn 4.64 69.00 320.2 Feb 15-June 30 236 Com 4.37 111.00 485.1 Feb 15-June 30 State curren crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section 11) = x. Crop's remaining PAN balance (line v from section III) = y. Overall PAN balance (w -x)= 11813.1 Ib. PAN 1732.4 Ib. PAN 11813,1 Ib. PAN -10081 Ib. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. Forpump & haul arid herd roduction options, recalculate new PAN based an new nformation. If new fields are to be included as an option for lowering lagoon level, add thesefields to the PAN balance PoA (30 Day) 2/21/00 table and recalculate the overall FAN balance. It animal waste is to be hauled to another permitted tacimy, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: PoA (30 Day) 2/21(00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Odum I 2. Current liquid volume in 25 yr./24 hr. storm sto age & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e, line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # 3200 certified herd # 13.0 19.0 inches inches 6.0 inches 96000 ft2 359040 gallons 180 89219.9 36001 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4, Total PAN to be land applied during draw down period I. current waste analysis dated m. ((lines e + k)/1000) x line I = 2/2/21 REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) days ft3 79307 ft3 0 78400 fl3 ft3 196608 gallons 2.55 Ibs/1000 gal. 1416.9 Ibs. PAN PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Odum II Large 2. Current liquid volume in 25 yr./24 hr. storm sto age & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e, line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # 2280 certified herd # 15.0 19.0 inches inches 4.0 inches 15000 ft2 37400 gallons 180 62701.8 2530 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period days ft3 56506 ft3 0 8,560 Its ft3 81116 gallons I. current waste analysis dated I 2/2/21 2.04 Ibs/1000 gal. m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 241.8 Ibs. PAN PoA (30 Day) 2/21/00 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): Odum II Small 2. Current liquid volume in 25 yr./24 hr. storm sto age & structural freeboard a, current liquid level according to marker 15.0 inches b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) 76501f12 19.0 inches 4.0 inches e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period f. temporary storage period according to structural design g. volume of waste produced according to structural design h. current herd # 280 certified herd # 19074 gallons 180 9890.4 300 actual waste produced = current herd # x line g = certified herd # I. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated m. ((lines e + k)/1000) x line I = 2/2/21 REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) days f13 9231 ft3 0 4462.5 ft3 ft3 17071 gallons 2.04 Ibs/1000 gal. 73.7 Ibs. PAN PoA (30 Day) 2/21/00