HomeMy WebLinkAbout090198_30 Day POA_20210308PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 3/8/2021 Pinnacle Sow 1st Stage 09-198 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period 99 f. temporary storage period 132 g. volume of waste produced according to structural design h. current herd # 3158 certified herd # 27.0 31.0 inches inches 4.0 inches 298935 ft2 745345 gallons 180 259534.5 3158 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period days ft3 259535 ft3 0 173316.5 ft3 ft3 539621 gallons I. current waste analysis dated 12/9/2021 0.89 Ibs/1000 gal. m. ((lines e + k)/1000) x line I = REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) 1143.6 Ibs. PAN PoA (30 Day) Pinnacle (1-2) (09-198) PoA30day (3-8-21) 3/8/2021 PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES 30 DAY DRAW DOWN PERIOD I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE 1. Structure Name/Identifier (ID): 3/8/2021 Pinnacle Sow 2nd Stage 09-198 2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard a. current liquid level according to marker b. designed 25 yr./24 hr. storm & structural freeboard c. line b - line a (inches in red zone) = d. top of dike surface area according to design (area at below structural freeboard elevation) e. line c/12 x line d x 7.48 gallons/ft3 3. Projected volume of waste liquid produced during draw down period 99 f. temporary storage period < 132 g. volume of waste produced according to structural design h. current herd # 3158 certified herd # 25.0 31.0 inches inches 6.0 inches 295293 ft2 1104396 gallons 180 259534.5 3158 actual waste produced = current herd # x line g = certified herd # i. volume of wash water according to structural design j. excess rainfall over evaporation according to design k. (lines h + i + j) x 7.48 x 30 days/line f= 4. Total PAN to be land applied during draw down period I. current waste analysis dated m. ((lines e + k)/1000) x line I = 12/9/2021 REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE. (Click on the next Structure tab shown below) days ft3 259535 ft3 0 173316.5 ft3 ft3 539621 gallons 0.61 Ibs/1000 gal. 1002.9 Ibs. PAN PoA (30 Day) Pinnacle (1-2) (09-198) PoA30day (3-8-21) 3/8/2021 II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24 HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY 1. Structure ID: Pinnacle Sow 1st Stage line m = 1143.6 Ib PAN 2. Structure ID: Pinnacle Sow 2nd Stage line m = 1002.9 Ib PAN 3. Structure ID: line m = Ib PAN 4. Structure ID: line m = Ib PAN 5. Structure ID: line m = Ib PAN 6. Structure ID: line m = Ib PAN n. lines 1 + 2 + 3 + 4 + 5 + 6 = 2146.5 Ib PAN III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD. o. tract # p. field # q. crop r. acres s. remaining IRR- 2 PAN balance (Ib/acre) t. TOTAL PAN BALANCE FOR FIELD (Ibs.) column r x s u. application window' p2 - p29 Bermuda Hay 66.69 325.00 21674.3 3/1 - 9/30 'State current crop ending application date or next crop application beginning date for available receiving crops during 30 day draw down period. v. Total PAN available for all fields (sum of column t) = 21674.3 Ib. PAN PoA (30 Day) Pinnacle (1-2) (09-198) PoA30day (3-8-21) 3/8/2021 IV. FACILITY'S PoA OVERALL PAN BALANCE w. Total PAN to be land applied (line n from section II) = x. Crop's remaining PAN balance (line v from section III) = y. Overall PAN balance (w - x) = 2146.5 Ib. PAN 21674.3 Ib. PAN -19528 Ib. PAN Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN based on new information. If new fields are to be included as an option for lowering lagoon level, add these fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the receiving facility. NARRATIVE: This is updat to last POA date 2/8/2021. Waste will be applied as soon as weather permits. PoA (30 Day) Pinnacle (1-2) (09-198) PoA30day (3-8-21) 3/8/2021