HomeMy WebLinkAbout090198_30 Day POA_20210308PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID):
3/8/2021
Pinnacle Sow 1st Stage
09-198
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr./24 hr. storm & structural freeboard
c. line b - line a (inches in red zone) =
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c/12 x line d x 7.48 gallons/ft3
3. Projected volume of waste liquid produced during draw down period
99
f. temporary storage period 132
g. volume of waste produced according to structural design
h. current herd # 3158 certified herd #
27.0
31.0
inches
inches
4.0 inches
298935
ft2
745345 gallons
180
259534.5
3158
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
days
ft3
259535 ft3
0
173316.5
ft3
ft3
539621 gallons
I. current waste analysis dated 12/9/2021 0.89 Ibs/1000 gal.
m. ((lines e + k)/1000) x line I =
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
1143.6 Ibs. PAN
PoA (30 Day)
Pinnacle (1-2) (09-198) PoA30day (3-8-21) 3/8/2021
PLAN OF ACTION (PoA) FOR HIGH FREEBOARD AT ANIMAL FACILITIES
30 DAY DRAW DOWN PERIOD
I. TOTAL PAN TO BE LAND APPLIED PER WASTE STRUCTURE
1. Structure Name/Identifier (ID):
3/8/2021
Pinnacle Sow 2nd Stage
09-198
2. Current liquid volume in 25 yr./24 hr. storm storage & structural freeboard
a. current liquid level according to marker
b. designed 25 yr./24 hr. storm & structural freeboard
c. line b - line a (inches in red zone) =
d. top of dike surface area according to design
(area at below structural freeboard elevation)
e. line c/12 x line d x 7.48 gallons/ft3
3. Projected volume of waste liquid produced during draw down period
99
f. temporary storage period < 132
g. volume of waste produced according to structural design
h. current herd # 3158 certified herd #
25.0
31.0
inches
inches
6.0 inches
295293
ft2
1104396 gallons
180
259534.5
3158
actual waste produced = current herd # x line g =
certified herd #
i. volume of wash water according to structural design
j. excess rainfall over evaporation according to design
k. (lines h + i + j) x 7.48 x 30 days/line f=
4. Total PAN to be land applied during draw down period
I. current waste analysis dated
m. ((lines e + k)/1000) x line I =
12/9/2021
REPEAT SECTION I FOR EACH WASTE STRUCTURE ON SITE.
(Click on the next Structure tab shown below)
days
ft3
259535 ft3
0
173316.5
ft3
ft3
539621 gallons
0.61
Ibs/1000 gal.
1002.9 Ibs. PAN
PoA (30 Day)
Pinnacle (1-2) (09-198) PoA30day (3-8-21) 3/8/2021
II. TOTAL POUNDS OF PAN STORED WITHIN STRUCTURAL FREEBOARD AND/OR 25 YR./24
HR. STORM STORAGE ELEVATIONS IN ALL WASTE STRUCTURES FOR FACILITY
1. Structure ID: Pinnacle Sow 1st Stage line m = 1143.6 Ib PAN
2. Structure ID: Pinnacle Sow 2nd Stage line m = 1002.9 Ib PAN
3. Structure ID: line m = Ib PAN
4. Structure ID: line m = Ib PAN
5. Structure ID: line m = Ib PAN
6. Structure ID: line m = Ib PAN
n. lines 1 + 2 + 3 + 4 + 5 + 6 =
2146.5 Ib PAN
III. TOTAL PAN BALANCE REMAINING FOR AVAILABLE CROPS DURING 30 DAY DRAW DOWN
PERIOD. DO NOT LIST FIELDS TO WHICH PAN CANNOT BE APPLIED DURING THIS 30 DAY PERIOD.
o. tract #
p. field #
q. crop
r. acres
s. remaining IRR-
2 PAN balance
(Ib/acre)
t. TOTAL PAN
BALANCE FOR
FIELD (Ibs.)
column r x s
u. application window'
p2 - p29
Bermuda Hay
66.69
325.00
21674.3
3/1 - 9/30
'State current crop ending application date or next crop application beginning date for available
receiving crops during 30 day draw down period.
v. Total PAN available for all fields (sum of column t) = 21674.3 Ib. PAN
PoA (30 Day)
Pinnacle (1-2) (09-198) PoA30day (3-8-21)
3/8/2021
IV. FACILITY'S PoA OVERALL PAN BALANCE
w. Total PAN to be land applied (line n from section II) =
x. Crop's remaining PAN balance (line v from section III) =
y. Overall PAN balance (w - x) =
2146.5 Ib. PAN
21674.3 Ib. PAN
-19528 Ib. PAN
Line y must show as a deficit. If line y does not show as a deficit, list course of action here including pump and
haul, depopulation, herd reduction, etc. For pump & haul and herd reduction options, recalculate new PAN
based on new information. If new fields are to be included as an option for lowering lagoon level, add these
fields to the PAN balance table and recalculate the overall PAN balance. If animal waste is to be hauled to
another permitted facility, provide information regarding the herd population and lagoon freeboard levels at the
receiving facility.
NARRATIVE:
This is updat to last POA date 2/8/2021. Waste will be applied as soon as weather permits.
PoA (30 Day)
Pinnacle (1-2) (09-198) PoA30day (3-8-21) 3/8/2021