Loading...
HomeMy WebLinkAboutSW6210205_Storm outlet_20210310OUTLET PROTECTION DESIGN PHASE DESIGN PRELIM PROJECT NAME PROJECT NO CONSTR / X / Spring Lake Ray Road Dollar General 1644 REVISION RECORD LOCATION BY Spring Lake, North Carolina CSB OTHER (SPECIFY) CHECKED BY 0 Storm Outlet Structure FES No.= FES-3 Pipe Dia= 15 in Q10 = 5.12 cfs Qfull = 18.14 cfs Vfull = 14.76 fps From Fig. 8.06.b.1: From Fig. 8.06.b.2: t Length Storm Outlet Structure FES No.= FES-5 Pipe Dia= 18 in Q10 = 8.95 cfs Qfull = 18.26 cfs Vfull = 10.32 fps From Fig. 8.06.b.1: From Fig. 8.06.b.2: Zone D5o DMAX Riprap Class Apron Thickness Apron Length Apron Width @ Outlet Apron Width @ End Zone D5o DMAX Riprap Class Apron Thickness Apron Length Apron Width @ Outlet Apron Width @ End Q10/Qfull = 0.28 V/Vfull = 0.85 V = 12.6 fps = 2 = 8 in = 12 in = B = 18 in = 7.5 ft = 3.75 ft = 8.8 ft Q10/Qful1 = 0.49 V/Vfull = 0.99 V = 10.2 fps = 2 = 8 in = 12 in = B = 18 in = 9.0 ft = 4.5 ft = 10.5 ft 1644-Storm Drainage.xls LATEST REVISION: 3/10/2021 10:19 AM PAGE 1 OF 1