Loading...
HomeMy WebLinkAboutSW6210205_1644-O&M_20210310Operation & Maintenance Agreement Project Name: Project Location: Spring Lake Ray Road Dollar General Intersection of Ray Rd & Nursery Road, Harnett County Cover Page Maintenance records shall be kept on the following SCM(s). This maintenance record shall be kept in a log in a known set location. Any deficient SCM elements noted in the inspection will be corrected, repaired, or replaced immediately. These deficiencies can affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the SCM(s). The SCM(s) on this project include (check all that apply & cc Infiltration Basin Quantity: Infiltration Trench Quantity: Bioretention Cell Quantity: Wet Pond Stormwater Wetland Permeable Pavement Sand Filter Rainwater Harvesting Green Roof Level Spreader - Filter Strip Proprietary System Treatment Swale Dry Pond Disconnected Impervious Surface User Defined SCM Low Density Quantity: Quantity: Quantity: Quantity: Quantity: Quantity: Quantity: Quantity: Quantity: Quantity: Present: Present: Present: 'resoonair g O&M sheets will Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Location(s): Type: ae aaaea automaticai Isouthern end of property I I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for each SCM above, and attached O&M tables. I agree to notify NCDEQ of any problems with the system or prior to any changes to the system or responsible party. Responsible Party: Title & Organization: Street address: City, state, zip: Phone number(s): Email: Signature County of personally appeared before me this Brian Clodfelter Manager - Rhetson Companies, Inc 2075 Juniper Lake Road West End, NC 27376 910-944-0881 brian@rhetson.com , a Notary Public for the State of , do hereby certify that day of acknowledge the due execution of the Operations and Maintenance Agreement . Witness my hand and official seal, Date: and Seal STORM-EZ Version 1.5 My commission expires O&M Agreement 3/10/2021 Page 1 of 1 Wet Pond Maintenance Requirements Important operation and maintenance procedures Immediately after the wet detention basin is established, the plants on the vegetated - shelf and perimeter of the basin should be watered twice weekly if needed, until the plants become established (commonly six weeks). No portion of the wet pond should be fertilized after the initial fertilization that is required to establish the plants on the vegetated shelf. Stable groundcover will be maintained in the drainage area to reduce the sediment load to the wet pond. If the pond must be drained for an emergency or to perform maintenance, the flushing of sediment through the emergency drain will be minimized as much as At least once annually, a dam safety expert will inspect the embankment. Any problems that are found will be repaired immediately. The measuring device used to determine the sediment elevation shall be such that it will give an accurate depth reading and not readily penetrate into accumulated After the wet pond is established, it will be inspected quarterly and within 24 hours after every storm event greater than 1.0 inches (or 1.5 inches if in a Coastal County) . Records of operation and maintenance shall be kept in a known set location and shall be available upon request. ection activities shall be performed as follows. Any problems that are found shall be repaired immediately. SCM element: Potential problem: How to remediate the problem: The entire wet pond Remove the trash/debris. Areas of bare soil Regrade the soil if necessary to remove the gully, The perimeter of the and/or erosive gullies plant ground cover and water until it is established. wet pond have formed. Provide lime and a one-time fertilizer application. The inlet pipe is Unclog the pipe. Dispose of the sediment off -site. clogged (if cracked or otherwise Repair or replace the pipe. The inlet device damaged (if Erosion is occurring in Regrade the swale if necessary and provide erosion the swale (if control devices such as reinforced turf matting or applicable). riprap to avoid future problems with erosion. Sediment has Search for the source of the sediment and remedy the accumulated to a problem if possible. Remove the sediment and depth greater than the dispose of it in a location where it will not cause original design depth impacts to streams or the SCM. The forebay for sediment storage. Provide additional erosion protection such as Erosion has occurred. reinforced turf matting or riprap if needed to prevent future erosion problems. Weeds are present. Remove the weeds, preferably by hand. If pesticide is used, wipe it on the plants rather than spraying. Wet Pond Maintenance Requirements (Continued) SCM element: Potential problem: How to remediate the problem: Sediment has Search for the source of the sediment and remedy the accumulated to a problem if possible. Remove the sediment and depth greater than the dispose of it in a location where it will not cause original design impacts to streams or the SCM. The main treatment sediment stora e Algal growth covers Consult a professional to remove and control the algal area over 50% of the area. growth. Cattails, p ragmi es or other invasive plants Remove the plants by wiping them with pesticide (do cover 50% of the not spray). basin surface. Best professional practices show that pruning is needed to Prune according to best professional practices. maintain optimal plant health. Determine the source of the problem: soils, The vegetated shelf Plants are dead, hydrology, disease, etc. Remedy the problem and diseased or dying. replace plants. Provide a one-time fertilizer application to establish the ground cover if a soil test Remove the weeds, preferably by hand. If pesticide is Weeds are present. used, wipe it on the plants rather than spraying. Shrubs have started to grow on the Remove shrubs immediately. embankment. Evidence of muskrat or Consult a professional to remove muskrats or beavers beaver activity is and repair any holes or erosion. A tree has started to Consult a dam safety specialist to remove the tree. The embankment grow on the An annual inspection by an appropriate professional shows Make all needed repairs immediately. that the embankment needs re air. Clean out the outlet device and dispose of any Clogging has sediment in a location where it will not cause impacts occurred. The outlet device to streams or the SCM. The outlet device is Repair or replace the outlet device. damaged. Weeds or volunteer Remove the weeds or trees. trees are growing on Floating wetland island (if applicable) damaged, Restore the anchor cable to its design state. disconnected or Wet Pond Maintenance Requirements (Continued) SCM element: Potential problem: How to remediate the problem: Erosion or other signs Repair the damage and improve the flow dissipation of damage have structure. occurred at the outlet. The receiving water Discharges from the wet pond are causing erosion or Contact the local NCDEQ Regional Office. sedimentation in the receivinq water. Wet Detention Pond Design Summary Wet Pond Diaaram WET POND ID Pond #' Pretreatment othe No than forebay? Has Veg. Filter, Yes FOREBAY Permanent Pool El.M Temporary Pool El: Clean Out Depth: Sediment Removal Bottom Elevation: MAIN POND Permanent Pool El.M Temporary Pool El: Clean Out Depth: Sediment Removal Bottom Elevation: ATTACH ADDITIONAL SHEETS IF NECESSARY