HomeMy WebLinkAboutSW6210205_1644-Drawdown_20210310Spring Lake Ray Road Dollar General Pond 1
Drawdown Time
Temporary storage volume =
Orifice #1 diameter=
Area of orifice =
Orifice #2 diameter =
Area of orifice =
Orifice Coefficient (Cd) _
Orifice elevation --
Water elevation ---
Driving head (H) _
Discharge (Q) _
Drawdown time =
8,185 cf
1.125 in
1
0.0069 sf
0 in
0
0.0000 sf
0.60
271.05 ft
272.34 ft
0.43 ft
0.0218 cfs
375493 s
104.3 hr
4_3 days
1644-Drawdown.xlsx Printed 3/10/2021