Loading...
HomeMy WebLinkAbout20090229 Ver 3_More Info Letter_20120813A'JPAI MC®EN North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Chuck Wakild, P.E. Dee Freeman Governor Director Secretary August 13, 2012 Project No. 09 -0229, Ver.2 Dare County CERTIFIED MAIL: RETURN RECEIPT REQUESTED Mr. Dave Lekson, Field Chief U.S. Army Corps of Engineers Washington Regulatory Field Office 2407 West Fifth Street Washington, NC 27889 Subject Property: Heritage of Faith Family Church Dear Mr. Lekson: On behalf of the NC DWQ - Wetlands, Buffers, Stormwater, Compliance and Permitting (WeBSCaPe) Unit, we respectfully request that you consider the following comments within your review of the 404 Individual Permit request for the above referenced property: This Office requests that the applicant please re- submit their site plans on full plan sheets at a scale of no smaller than 1 " =50' with topographic contours shown. Please locate all proposed impervious surfaces, including proposed gravel surfaces, on the plans. Please locate all isolated or non - isolated wetlands, streams, and other waters of the State as overlays on the site plan. - Per 15A NCAC 2H .0502(c) 2. This Office was unable to locate an alternatives analysis for this project. Please provide this information. - Per 15A NCAC 2H .0506(b)(l ) 3. This Office was unable to locate an avoidance and minimization analysis for this project. Please provide this information. - Per 15A NCAC 2H .0506(b)(2) 4. This Office is unable to comment on avoidance and minimization due to the limited information provided by the aerial map included with the Public Notice. This Office notes that the proposed project will require a stormwater management plan. The project is proposed to contain 28 percent impervious cover and drains to Shellfish Area (SA) and High Quality Watershed (HQW) waters. Please contact coastal stormwater staff with the DWQ Washington Regional Office to discuss a stormwater management plan. - - Per 15A NCAC 2H - .0306(b)(5) -- - -- - 6. This Office requests that the applicant please provide cross section details showing the provisions for aquatic life passage. - Per 15A NCAC 2H .0502(c) Wetlands, Buffers, Stormwater Compliance and Permitting Unit (WeBSCaPe) 1650 Mail Service Center, Raleigh North Carolina 27699 -1650 Phone 919-807-6300\ FAX 919 -807 -6494 Internet http "portal ncden orglweb;wghvs An Equal Opportunity 1.Affi native Action Employe Heritage of Faith Family Church Page 2 of 2 August 13, 2012 7. This Office requests that the applicant please indicate all wetland impacts including fill slopes on the site plan. — Per 15A NCAC 2H .0502(c) 8. This Office requests that the applicant please provide a qualitative indirect and cumulative impact analysis for the project. — Per 15A NCAC 2H .0506(b)(4) 9. This Office notes that the proposed project will require a sediment and erosion control plan from the NC Division of Land Resources — Land Quality Section. 10. Staff with the DWQ Washington Regional Office noted an onsite cemetery located slightly north of the proposed project area. Has this been addressed with the NC State Historic Preservation Office? Thank you for your attention. If you have any questions, please contact Karen Higgins (919- 807 -6360) or Ian McMillan (919- 807 -6364) in our Central Office in Raleigh. 6incerely, �S c Karen Higgins, etlands, Buffers, Stormwater, Compliance and Permitting (WeBSCaPe), Supervisor KAH/ijm cc: David Stowe, Heritage of Faith Family Church, Inc., P.O. Box 297, Buxton, NC 27920 Josh Pelletier, U.S. Army Corps of Engineers - Washington Regulatory Field Office Roberto Scheller, DWQ Washington Regional Office File Copy Jeff Garnett, EPA, Sam Nunn Federal Center, 61 Forsyth Street SW, Atlanta, GA 30303 Filename: Hentage of Faith FamilyChurch (Dare)IP_Commentmg_Letter_USACE