Loading...
HomeMy WebLinkAbout20070379 Ver 1_More Info Letter_20070521QF WATF,,~j Michael F. Easley, Governor Q ~ ~ ( Willi G R J S r ,~ ecretary am . oss r., ~ tom-- North Carolina Department of Environment and Natural Resources ~ ~ ~ .~ Alan W. Klimek, P.E. Director Division of Water Quality May 21, 2007 DWQ Project # 07-0379 Buncombe County CERTIFIED MAIL: RETURN RECEIPT REQUESTED Mr. Michael Pierce 5 Bailey Run Fairview, NC 28730 Subject Property: Cedar Pointe Crossing Gashes Creek [040302, 6-78-21, C] REQUEST FOR MORE INFORMATION Dear Mr. Pierce: On March 2, 2007, the Division of Water Quality (DWQ) received your application dated February 20, 2007, to fill or otherwise impact 0.019 acres of 404/wetland and 3401inear feet of perennial stream (280 linear feet permanent impacts, 60 linear feet temporary impacts) to develop Outparcel D. On May 1, 2007, the DWQ received additional information from you, however, the DWQ has determined that your application remains incomplete and/or provided inaccurate information as discussed below. The DWQ will require additional information in order to process your application to impact protected wetlands and/or streams on the subject property. Therefore, unless we receive five copies of the additional information requested below, we will have to move toward denial of your application as required by 15A NCAC 2H .0506 and will place this project on hold as incomplete until we receive this additional information. Please provide the following. information so that we may continue to review your project. Additional Information Requested: 1) Since this proposed impervious area on this project is 41.2 percent, General Certification 3631 (available at: http://h2o.enr.state.nc.us/ncwetlands/documents/WQC3631.~df) requires that the project have asite-specific stormwater management plan that is designed to remove 85 percent of TSS according to the DWQ Stormwater BMP Manual. Applicants have the following two options when pursuing a 401 certification: a) Conditiona1401 certification: To receive a 401 certification with a condition that a final stormwater management plan be submitted within 60 calendar days of the 401 certification issuance, the applicant must submit a preliminary stormwater management plan that shows the types, sizes and locations of the proposed stormwater BMPs on the site plan. For each proposed BMP, the applicant must submit a DWQ worksheet for the BMP with all items in Part I: Project Information completed. b) Final 401 certification: In order to receive a fina1401 certification, the applicant must submit a final stormwater management plan that shows the types, sizes and locations of the proposed stormwater BMPs on the site plan. For each proposed BMP, the applicant must submit a DWQ worksheet for the BMP with all items in Part I.• Project Information and Part II: Required Items 401 Oversight/Express Review Permitting Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-1786 /FAX 919-733-6893 /Internet: httn://h2o.enr.state.nc.us/ncwetlands None Carolina ~turally An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper Mr. Michael Pierce Page 2 of 2 May 21, 2007 Checklist completed. Some examples of the information that must be included per the Required Items Checklist are detailed plans of each BMP, a planting plan (if applicable), details of the inlet and outlet structures, access easements, and a signed and notarized operation and maintenance agreement. Please contact the DWQ within three weeks of the date of this letter to verify that you have received this letter and to provide us with a date that we may expect to receive this requested information. If we do not receive this requested information within one week of the date you indicate it will be forthcoming, your project will be withdrawn and you will need to reapply with a new application and a new fee. Please contact me in writing and Kevin Barnett of the DWQ Asheville Regional Office. If we do not hear from you within three weeks, we will assume that you no longer want to pursue this project and we will consider the project as withdrawn. This letter only addresses the application review and does not authorize any impacts to wetlands, waters or protected buffers. Please be aware that any impacts requested within your application are not authorized (at this time) by the DWQ. Please call Ms. Cyndi Karoly or Mr. Ian M illan at 919-733- 1786 if you have any questions regarding or would like to set up a meeting to did u s this matter. Cyndi Karoly, Supervisor ~Ol Oversight/Express Review Permitting Unit CBKlijm cc: Kevin Barnett, DWQ Asheville Regional Office USACE Asheville Regulatory Field Office File Copy Central Files Clement Riddle, C1earWater Environmental Consultants, Inc., 718 Oakland Street, Hendersonville, NC 28791 Filename: 070379CedarPoiuteCrossing(Bu ncombe)On_Hold2