Loading...
HomeMy WebLinkAboutNC0003719_Biomonitoring Inspection_20050211Avv7A NCDENR North Carolina Department of Environment and Natural Resources Michael F. Easley, Governor February 11, 2005 Mr. Stanley Carter Service Complex Site Manager P.O.Box 1690 Fayetteville, NC 28312 SUBJECT:, Biomonitoring Inspection Report February 1, 2005 DAK Resins LLC — Fayetteville NC0003719 Cumberland County Dear Mr. Carter, William G. Ross Jr., Secretary Alan W. Klimek, .P.E., Director Coleen H. Sullins, Deputy Director Division of Water Quality Enclosed you will find a copy ' of the Biomonitoring Inspection Report for the inspection conducted during the week of February 1, 2005. The inspection included the same objectives as that of a routine Compliance Evaluation Inspection plus an Aquatic Toxicity (AT) test to evaluate the biological effect of the facility's discharge on test organisms. As part of the inspection a tour of the Wastewater Treatment Plant was conducted. All observations are in Section D. Summary of Findings/Comments of this inspection report. A whole effluent sample was collected at the combined effluent, located below outfalls 001 and 002 from February 1 to February 2 for the acute Pimepales promelas pass/fail toxicity test. This sample was sent to the Division of Water Quality (AT) Laboratory, (located on Reedy Creek Road in Raleigh). The aquatic toxicity test resulted in a "Pass", which indicated that the effluent would not be predicted to have acute water quality impacts on the receiving water. This facility was found to be in Compliance with permit NC0003719. The cooperation of Mr. Donald Allbright, ORC, was greatly appreciated. Dale Lopez Environmental Specialist cc: Donald Ray Allbright, ORC Kevin Bowden, ESB 225 Green Street — Suite 714, Fayetteville, North Carolina 28301-5043 Phone: 910-486-1541 \ FAX: 910-486-0707 \ Internet: www.enr.state.nc.us/ENR/ An Equal Opportunity / Affirmative Action Employer - 50 % Recycled 110 % Post Consumer Paper NorthCarolina - aturall* United States Environmental Protection Agency EPAWashington, D.C. 20460 WaterCompliance Inspection Report Form Approved. OMB No. 2040-0057 Approval expires 8-31-98 Section A: National Data System Coding (i.e., PCS) Transaction Code NPDES yr/mo/day Inspection 1 WI 2 ISI 3I NC0003719 I11 121 05/02/01 117 Type Inspector Fac Type 18U 19U 20LI Remarks 211III1IIIIIII1IIIIIIIII1I1IIIIIIIIIIIIIIIIIIIIII66 Inspection Work Days Facility Self -Monitoring Evaluation Rating B1 QA ---- ------- --------Reserved---------- 67 I 3.0 169 70 LI 71 U 72 Li] 731 I J 74 751 1 1 1 1 1 1 180 Section B: Facility Data Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include POTW name and NPDES permit Number) DAK Americas, LLC - Cedar Creek Site 3468 Cedar Creek Rd Fayetteville NC 28301 Entry Time/Date 10:30 AM 05/02/01 Permit Effective Date 03/04/01 Exit Time/Date 04:00 PM 05/02/01 Permit Expiration Date 06/10/31 Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) /// Donald Ray Allbright/ORC/910-433-4259/ Other Facility Data Name, Address of Responsible Official/Title/Phone and Fax Number Anthony Hudson, Manager Safety-Environmental,PO Box 1690 Contacted No Fayetteville NC 283027/910-433-8338/ Section C: Areas Evaluated During Inspection (Check only those areas evaluated) Permit Flow Measurement Operations & Maintenance Records/Reports Self -Monitoring Program Facility Site Review Effluent/Receiving Waters Laboratory Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s) and Signal r f Inspector(s) Agency/Office/Phone and Fax Dale Lopez FRO WQ//910 486-1.541 Ext.712/ till Numbers Date //(U - ,� Signature of Mana ement Q Aj eviiewwer Agency/Office/Phone and Fax Numbers Datet. 114, :L.,- . - 'a ii I/0 -5 EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete. 31 NPDES NC0003719 11 12 yr/mo/day Inspection Type 05/02/01 117 18 LB] 1 Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) This facility has a conscientiously run program. It accepts wastewater from DTF (DuPont) and DESK Resins. The 24-hour composite sample that was collected at the combined effluent, located below outfalls 001 and 002, from February 1 to February 2, resulted in a "pass" for the fathead minnow test (the acute Pi.mepales Promelas pass/fail toxicity test), which indicated that the effluent would not be predicted to have acute water quality impacts on the receiving water. permit Yes No NA NF (If the present permit expires in 6 months or less). Has the permittee submitted a new application? ❑ ❑ ❑ Is the facility as described in the.permit? 1 ❑ O O Are there any special conditions for the permit? 1 ❑ O O Is access to the plant site restricted to the general public? ■ O O 0 Is the inspector granted access to all areas for inspection? .000 Comment: Operations & Maintenance Yes No NA NF Does the plant have general safety structures in place such as rails around or covers over tanks, pits, or wells? •❑ ❑ ❑ Is the plant generally clean with acceptable housekeeping? •. ❑ O O Comment: Fgiiali7atinn Basins Yes No NA NF Is aeration adequate? O • O Is the basin free of bypass lines or structures to the natural environment? 0 0 0 • Is the general housekeeping acceptable? M ❑ O O Is the basin free. of excessive grease? 0 0 • 0 Are all pumps present? 0 ❑ • 0 Are all pumps operable? 00.0 Are float controls operable? 0 0 • 0 Are audible and visual alarms operable? 11000 Is basin size/volume adequate? 1 ❑ O O Comment: - econdary Clarifier Yes No NA NF Is the clarifier free of black and odorous wastewater? • ❑ ❑ O Is the site free of excessive buildup of solids in center well of circular clarifier? • ❑ O O Are weirs level? ■ O O O Is the site free of weir blockage? 1 ❑ O O Is the site free of evidence of short-circuiting? 1 ❑ O O Is scum removal adequate? • ❑ O O Is the site free of excessive floating sludge? 1 ❑ O O Is the drive unit operational? 1 O O Is the sludge blanket level acceptable? 1 ❑ O O Is the return rate acceptable (low turbulence)? • O 0 Is the overflow clear of excessive solids/pin floc? 1 ❑ ❑ ❑ Is the surface free of bulking ? 1 ❑ O O Comment: Aeration Basins Yes No NA NF Mode of operation Ext. Air Type of aeration system Surface Is the basin free of dead spots? 1 ❑ O ❑ Are surface aerators and mixers operational? • 0 0 0 Are the diffusers operational? 1 ❑ ❑ O Is the foam the proper color for the treatment process? 1 O O O Does the foam cover less than 25% of the basin' s surface? 1 ❑ O O Is the DO level acceptable? ;„• 0 0 0 Aeration Basins Are settleometer results acceptable? Comment: Yes No NA NF 000. I aboratory Yes No NA NF Are field parameters performed by certifed personnel or laboratory? 1 ❑ ❑ ❑ Are all other parameters(excluding field parameters) performed by a certified lab? •❑ ❑ ❑ Is the facility using a contract lab? 1 ❑ ❑ ❑ Are analytical results consistent with data reported on DMRs? 1 ❑ ❑ ❑ Is proper temperature set for sample storage (kept at 1.0 to 4.4 degrees Celsius)? • ❑ ❑ ❑ Incubator (Fecal Coliform) set to 44.5 degrees Celsius+/- 0.2 degrees? 0 0 • 0 Incubator (SOD) set to 20.0 degrees Celsius +/- 1.0 degrees? ❑ ❑ 1 ❑ Comment: Flow Measurement - Fffluent Yes No NA NF Is flow meter used for reporting? 1 ❑ ❑ ❑ Is flow meter calibrated annually? 1 ❑ ❑ ❑ Is flow meter operating properly? 1 ❑ ❑ ❑ (If units are separated) Does the chart recorder match the flow meter? ❑ ❑ ❑ NI Comment: Record Keepina Yes No NA NF Are records kept and maintained as required by the permit? •❑ ❑ ❑ Is all required information readily available, complete and current? 1 ❑ ❑ ❑ Are all records maintained for 3 years (lab. reg. required 5 years)? 1000 Are analytical results consistent with data reported on DMRs? .000 Are sampling and analysis data adequate and include: 11000 Dates, times and location of sampling 0 Name of individual performing the sampling 0 Results of analysis and calibration 0 Dates of analysis 0 Name of person performing analyses ❑ Transported COCs 0 Plant records are adequate, available and include 1 ❑ ❑ ❑ O&M Manual 0 As built Engineering drawings ❑ Schedules and dates of equipment maintenance and repairs 0 Are DMRs complete: do they include all permit parameters? 1 ❑ ❑ ❑ Has the facility submitted its annual compliance report to users? 00.0 (If the facility is = or > 5 MGD permitted flow) Do they operate 24/7 with a certified operator on each shift? ❑ ❑ ❑ Is the ORC visitation log available and current? 1000 Is the ORC certified at grade equal to or higher than the facility classification? 1 ❑ ❑ ❑ Is the backup operator certified at one grade less or greater than the facility classification? •❑ ❑ ❑ Is a copy of the current NPDES permit available on site? 1.1000 Is the facility description verified as contained in the NPDES permit? •❑ ❑ ❑ Does the facility analyze process control parameters, for example: MLSS, MCRT, Settleable Solids, DO, Sludge • ❑ 0 0 Judge, pH, and others that are applicable? Facility has copy of previous year's Annual Report on file for review? 0 0 0 • Comment: F RI tent Sampling Is composite sampling flow proportional? Is sample collected below all treatment units? Is proper volume collected? Is the tubing clean? Is proper temperature set for sample storage (kept at 1.0 to 4.4 degrees Celsius)? Is the facility sampling performed as required by the permit (frequency, sampling type representative)? Comment: Fffluent Pipe Is right of way to the outfall properly maintained? Are receiving water free of solids and floatable wastewater materials? Are the receiving waters free of solids / debris? Are the receiving waters free of foam other than a trace? Are the receiving waters free of sludge worms? If effluent (diffuser pipes are required) are they operating properly? Comment: Yes Nn NA NF ■ 000 ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ ■ ❑ ❑ ❑ Yes No NA NF ■ O O O ■ ❑ ❑ ❑ ■ 000 ■ ❑ ❑ ❑ ■ 0 0 ❑ ■ ❑ ■ ❑ • Regional Field Insp qtors Check List for Field Parameters PA,1,3n-A) fra ame of site to be Inspected: )44-1,1>c) eld certification # (if applicable): ,5--? •Inspector: PDES #: 4)e-tcc 39/e Region: 'it2 0 Circle the Parameter or parameters performed at this Site. esidual Chlorin, Settleable Solids , DO Conductivity . Instrumentation: . Does the facility have the equipment necessary to analyze field Parameters A pH meter Meil 6449 (2, A Residual Chlorine meter MC 1/ DO meter A Cone for settleable solids A thermometer or meter that measures temperature. Conductivity meter II. Calibration/Analysis: 1. Is the pH meter calibrated with buffers and checked with a 440d-buffer each day of use? Xvoir# For Total Residual Chlorine, is a check standard analyzed each day of use? 3. Is the air calibration of the DO meter performed each day of use? For Settleable Solids, is 1 liter of sample settled for 1 hour? 5. Is the temperature measuring device calibrated annually against a certified thermometer? • 6. For Conductivity, is a calibration standard analyzed each day of use? Yes Yes Yes Yes as circled above'? No No. No No No No No No No No No No y(Slcs- .eti 44/e" 4 au SLOW -di Idoede4 LA /Pr IV. Documentation: 1. Is the date and time that the sample was collected :documented? 2. Is the sample site documented?. 3. Is the sample collector documented? 4. Is the analysis date and time documented? 5. Did the analyst sign the documentation?. 6. Is record of calibration documented? 7. For Settleable Solids, is sample volume and 1 hour time settling time documented'? 8. For Temperature, is the annual calibration of the measuring device documented? Comments: Please submit a copy of this completed form to the Laboratory Certification Program. DWQ Lab Certification Chemistry Lab Courier # 52-01-01 FIELD INSPECTOR CHECKLIST REV. 04/23/2002