Loading...
HomeMy WebLinkAboutNC0088781_NPDES Permit_20110921NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coleen H. Sullins Dee Freeman Governor Director Secretary September 21, 2011 MEMORANDUM To: Bob Sledge Point Source Branch, Expedited Unit Through: Belinda Henson, Water Quality Regional Supervisor lam .4, Fayetteville Regional Office From: Mark Brantley, Environmental Chemist )1�, Fayetteville Regional Office A-14— SUBJECT: Minor NPDES Permit Renewal Lower Cape Fear Water and Sewer Authority Bladen Bluffs Regional Surface WTP NPDES Permit No. NC 0088781 Bladen County Please find below, regional comments for the subject minor permit renewal. • Facility is currently under construction with startup scheduled for sometime in spring of 2012. No wastewater has been discharged yet. According to their permit application they expect to start discharging sometime in the early part of 2012. • Applicant is not requesting modification of the facility or increasing flow at this time. • A rating sheet is not attached as no modifications were made to this facility during the previous permit cycle. The Fayetteville Regional Office agrees in re -issuing this permit in keeping with the Cape Fear River Basin Wide Planning Strategy. Cc: Central Files OIV 1te Location: 225 Green Street, Suite 714, Fayetteville, North Carolina 28301 Phone: 910-433-33001 FAX: 910-486-07071 Customer Service: 1-877-623-6748 Internet: www.ncwaterquality.org An Equal Opportunity Employer NorthCarolina Naturally