Loading...
HomeMy WebLinkAbout20060684 Ver 1_AsBuilt Monitoring Report_20120806City of Greensboro 1. / North Carolina o KPINMMI TO: NCDENR, DIV. OF WATER QUALITY DATE: WINSTON -SALEM REGIONAL OFFICE PROJECT: 585 WAUGHTOWN STREET RE: WINSTON- SALEM, NC 27107 ATTENTION: SUE HOMEWOOD WE ARE SENDING YOU: ® ATTACHED ❑ UNDER SEPARATE COVER VIA: THE FOLLOWING ITEMS: ❑ SHOP DRAWINGS ❑ PRINTS ❑ SPECIFICATIONS ❑ CHANGE ORDER ❑ LETTER ® OTHER f-1 N,C.Dept, of ENR MAY 16 2012 Fngir ring & Inspectio inston -Salem MAY 15, 2012 DWQ #06 -0684 NEW GARDEN ROAD STREAM RESTORATION MONITORING RECORD 4 41-e 0 V G ` 6<02 COPIES DATE REVISION DESCRIPTION 1 5/15/2012 ❑ LEVEL 1 STREAM RESTORATION MONITORING ® FOR YOUR USE ❑ AS REQUESTED 4 FIRST YEAR MONITORING REPORT, RETURNED FOR CORRECTIONS, ❑ FOR REVIEW ❑ CHANNEL STABILITY ❑ RETURNED,AI;TER LOAN ❑ FOR DISTRIBUTION ❑ OTHER COMMENTS: THESE ARE TRANSMITTED AS CHECKED BELOW: ❑ FOR APPROVAL ❑ APPROVED AS SUBMITTED ❑ APPROVED AS NOTED ® FOR YOUR USE ❑ AS REQUESTED 4 ❑ RETURNED FOR CORRECTIONS, ❑ FOR REVIEW ❑ RESUBMITTED ❑ RETURNED,AI;TER LOAN ❑ FOR DISTRIBUTION ❑ OTHER COMMENTS: COPY To USACE. FILE SIGNED GUY B. INGLE `� r, PO Box 3136 ; Greensboro, NC 27 402-3136 , www.,ureensboro- ne.gov � 336- 373 -CITY (2489) TTY # 333 -6930 City of Greensboro L / North Carolina L MOTiER TOWN RTAN-153 M ITiTAL TO: U.S. ARMY CORPS OF ENGINEERS RALEIGH REGULATORY FIELD OFFICE 3331 HERITAGE TRADE DRIVE, SUITE 105 WAKE FOREST, NC 27587 ATTENTION: MR. THOMAS BROWN WE ARE SENDING YOU: M ATTACHED THE FOLLOWING ITEMS: ❑ SHOP DRAWINGS ❑ CHANGE ORDER Engineering & Inspections DATE: MAY 15, 2012 PROJECT: SAW- 2007 -03980 RE: NEW GARDEN ROAD STREAM RESTORATION MONITORING RECORD ❑ UNDER SEPARATE COVER VIA: ❑ PRINTS ❑ SPECIFICATIONS ❑ PLANS ❑ LETTER M OTHER COPIES DATE REVISION DESCRIPTION 1 5/15/2012 AS REQUESTED LEVEL 1 STREAM RESTORATION MONITORING ❑ RESUBMITTED ❑ FOR DISTRIBUTION FIRST YEAR MONITORING REPORT, OTHER COMMENTS: CHANNEL STABILITY THESE ARE TRANSMITTED AS CHECKED BELOW: ❑ FOR APPROVAL ❑ APPROVED AS SUBMITTED M FOR YOUR USE ❑ AS REQUESTED ❑ FOR REVIEW ❑ RESUBMITTED ❑ FOR DISTRIBUTION ❑ OTHER COMMENTS: COPY TO FILE ❑ APPROVED AS NOTED ❑ RETURNED FOR CORRECTIONS ❑ RETURNED AFTER LOAN SIGNED GUY B. INGLE PO Box 3136 -- Greensboro, NC 27402 -3136 www.greensboro- nc.gov 336 -373 -CITY (2489) = TTY # 333 -6930 1 RECEIVED N.0 Dept u• C'R �. RQ Fw' IS 2092 CITY OF GREENSBORO if.. Regional Office ENGINEERING DIVISION , NEW GARDEN ROAD WIDENING, PHASE II PROJECT # -P -3741 ' CULVERT REPLACEMENT AND ' STREAM RELOCATION /RESTORATION HORSEPEN CREEK MAIN TRIBUTARY #2 AND TRIBUTARY A LEVEL 1 STREAM RESTORATION MONITORING FIRST YEAR MONITORING REPORT CHANNEL STABILITY ' MAY 75, 2012 1 t 1 1 1 US Infrastructure of Carolina, Inc. 125 South Elm Street, Suite 510 Greensboro, North Carolina 27401 N.C. License #C -1950 Carolina Wetland Services, Inc. 550 East Westinghouse Blvd. Charlotte, NC 28273 1 1 1 1 I 1 1 1 1 1 1 1 1 1 1 1 1 I 1 1 1 1 1 1 i 1 1 i 1 1 1 1 1 1 1 1 1 Level 1 Stream Restoration Monitoring Horsepen Creek Main Tributary #2 and Tributary A FIRST YEAR MONITORING REPORT Channel Stability New Garden Road Widening Phase II City of Greensboro, North Carolina Engineering Division Project No. P -3 741 US Infrastructure of Carolina, Inc. 125 South Elm Street, Suite 510 Greensboro, North Carolina 27401 N.C. License #C -1950 Prepared by: 12 Carolina Wetland Services, Inc. 550 East Westinghouse Blvd. Charlotte, NC 28273 I.I FS J CWS 1 1 i 1 1 1 1 1 1 1 1 1 1 i 1 1 1 1 1 Table of Contents Page Introduction........................................................................................................ ..............................1 Methods............................................................................................................... ..............................1 PhotoReference Sites ...................................................................................... ............................... l ChannelStability ............................................................................................. ............................... 3 Results................................................................................................................. ............................... 3 PhotoReference Sites ....................................................................................... ..............................3 ChannelStability .............................................................................................. ..............................4 MainTributary # 2 ......................................................................................... ..............................4 TributaryA .................................................................................................. ............................... 7 Summary............................................................................................................ ............................... 8 Comments........................................................................................................ ............................... 8 Figures Figure1: Site Location Map ................................................................................. ..............................2 Figure 2: As -Built Cross Sections and Photo Location Map .............................. ............................... 5 AppendixA ........................................................................................................ ..............................9 Photopage 1 — First Year Monitoring Photographs AppendixB ..................................................................................................... ............................... 27 Main Tributary #2 Cross Sections Main Tributary #2 Longitudinal Profile Main Tributary #2 Pebble Count Main Tributary #2 Raw Data AppendixC ..................................................................................................... ............................... 52 Tributary A Cross Sections Tributary A Longitudinal Profile Tributary A Pebble Count Tributary A Raw Data 1 1 1 i i fl 1 1 1 1 First Year Monitoring Report: Channel Stability New Garden Road Widening Phase II Project No. P -3741 Introduction The New Garden Road Widening Phase I1 Project is located in Greensboro, North Carolina as shown on the Site Location Map (Figure 1) on the next page. Construction of this project necessitated the relocation of portions of two tributaries to Horsepen Creek, Main Tributary #2 (South) and Tributary A (North). The relocation of these stream reaches was completed in March 2011. The stream relocations were permitted through the U.S. Army Corps of Engineers (Action I.D. SAW 2007 - 03980) and the North Carolina Department of Environment and Natural Resources (DWQ Project #06 -0684) and required a Level 1 Stream Restoration Mitigation and Monitoring Plan for this project. This level of monitoring includes the establishment of photo reference sites, plant survival monitoring, and channel stability monitoring. The relocated stream reaches were assessed using Rosgen Level II Classification methods. The following end of first year survey was conducted to evaluate and document the conditions of the relocated stream channels following one year after the completion of construction. This data will be compared to the as -built survey which provided a baseline for these future monitoring events. Methods Photo Reference Sites I n 1 1 1 I Photographs were taken during: 1) First Year Survey for Channel Stability on January 25, 2012 In stream structures including rock vanes, root wads, and grade control sills were photographed facing upstream and downstream. Stream bed and banks were photographed for visual comparison of stability. First Year Monitoring Report: Channel Stability New Garden Road Widening Phase II Project No. P -3741 2 First Year Monitoring Report: Channel Stability New Garden Road Widening Phase II Project No. P -3741 Channel Stability A geomorphic survey was performed by engineers from USI with the assistance of a scientist from CWS on January 10, 2012 following one year after the construction of the new stream channels. The survey included a longitudinal profile, a cross sectional survey, substrate sampling (Wolman reach -wide pebble count), and photo documentation of each of the stream reaches. This data was used to classify each reach using the Rosgen Level II system. Bank pins were also checked on both reaches to monitor bank stability. Surveying methods (using a rod level and tape ) followed the gu idelines given m Stream Channel Reference Sites: An Illustrated Guide to Field Technique, General Technical Report RM -245, United States Department of Agriculture, Forest Service. A relative benchmark for the First Year survey was established on the top of an existing sanitary sewer manhole immediately adjacent to New Garden Road. The surveys of both streams were tied together to the top of the sanitary sewer manhole with a given elevation of 100.00. IPlease note that during the First Year survey it was discovered that the power pole used during the As -Built survey as a relative benchmark had been removed. This necessitated using the sanitary sewer manhole as mentioned above as a new and hopefully permanent benchmark. Also and following completion of the First Year survey, the benchmark data used for the As -Built Isurvey was found to be in error. The As -Built Report (dated October 21, 2011) showed a benchmark elevation of 777.2. Upon further research, the actual benchmark elevation was found tto be 777.02. Therefore, all of the elevations collected during the As -Built survey had to be adjusted by the difference of 0.18 feet. The As -Built data as shown in this report reflects this ' adjustment. IResults IPhoto Reference Sites As part of the First Year survey for the project, all areas of the project were photo documented. ' In stream structures including rock vanes, root wads, and grade control sills were photographed facing upstream and downstream. Stream bed and banks were photographed for visual Icomparison of stability. Representative photographs are included in Photopage 1 (Appendix A). 1 3 1 1 1 1 1 t 1 1 1 1 1 'k 1 First Year Monitoring Report: Channel Stability New Garden Road Widening Phase II Project No. P -3741 The locations and directions of each of these photographs are shown in Figure 2 (Page 5). As an aside, the same locations and directions were used for these photographs as those taken during the As -Built survey. Channel Stability Main Tributary #2 Main Tributary #2 flows north through the project area and through the new culvert installed beneath the widened New Garden Road. The First Year survey of Main Tributary #2 was conducted on January 10, 2012 by representatives from USI and CWS. The relocated stream channel exhibited substrate consisting of medium gravel (D50 = 8 mm). The channel slope is 0.003 ft/ft with a sinuosity of 1.18. The average bankfull width and depth for this reach are 27 feet and 1.94 feet, respectively. The average bankfull cross sectional area for riffle portions of the stream is 52.43 ft2. The average flood -prone area width for Main Tributary #2 is approximately 60 feet. The new stream channel has a Rosgen Level II classification of C5. Permanent cross sections were established during the As -Built survey and marked with rebar to allow future monitoring of the same locations. Figure 2 on page 5 shows the locations of these permanent cross sections. The As -Built and First Year conditions of Main Tributary #2 (Cross Sections A and B) are summarized below in the following tables. Channel cross sections, the longitudinal profile, and pebble count data for Main Tributary #2 are included in Appendix B. Provide the followine data for each crnsc- cectinn• Crncc Sertinn A Date Measured: 6/28/2010 1/10/2012 Cross - section being measured: A A Cross - sectional area: as- built/present 60.01 sf 52.43 sf Bankfull width: as- built/present 27.00 ft 27.00 ft Floodprone Width: as- built/present 60.00 ft 60.00 ft Width/depth: as- built/present 12.15 13.90 Entrenchment ratio: as- built/present 2.22 2.22 Stream Type: as- built/present* C5 C5 nnir requirea /nr rilpe crns.s- secoons .0 First Year Monitoring Report: Channel Stability New Garden Road Widening Phase II Project No. P -3741 o U N o z G oN WzQ U F O .w o Q Z J F W r r O F V w a m 0 01 0 (� U to tW O tw/� U CC V N to O 0. W � -0, WW O lzp a Q C W a� C4 °z --u to [` a M w H � ¢ / W � — m / \ / \ U o / w / v � ` N / U \ o / CO Q n v U O 2 U > I � \ U)m O p v > ° 11 cr om M / 0 Q I/ W I 00 N I O J z 2 \ 00 3W I $a N H Q O N Z W 2 Q O U N N > I U 1 W I � 1 y co O I ¢ N U O I \ w 1 y n N ctDi O I Nm \ z N U) W � I V ¢ N Q > O D N F Q \ O to W O n \ Z W W W U O\ N \ O 2 ¢ ¢ \ O W a: W C W \ F W ° tr Z cli Fr < is o m \ > yaj tY U Z } O ¢ \ \ OD \ o ZO 0 N Q Q \ o Q Q J O ~ \\ O > L J Q 0 \ a W Li W m \ W N to Y f \ ¢ F \ 7 O U Z m ? a Z \ w J I I X C 5 fFirst Year Monitoring Report: Channel Stability New Garden Road Widening Phase II Project No. P -3741 u Provide the followine data for each cross - section: Cross Section R Date Measured: 6/28/2010 1/10/2012 Cross - section being measured: B B Cross - sectional area: as- built/present 73.91 sf 68.42 sf Bankfull width: as- built/present 27.00 ft 27.00 ft Floodprone Width: as- built/present 70.00 ft 70.00 ft Width/depth: as- built/present 9.86 10.65 Entrenchment ratio: as- built/present 2.59 2.59 Stream Type: as- built/present* C5 C5 IT owy, reyuu•ea /or ri//le cress - sections I fl 1 1 1 1 1 The As -Built and First Year conditions of Main Tributary #2 (Longitudinal Profile) are summarized below in the following table. The longitudinal profile for Main Tributary #2 is included in Appendix B. Date Measured: 6/28/2010 1/10/2012 Avg. slope riffles: as- built/present 0.005 ft/ft 0.023 ft/ft Avg. slope pools: as- built/present 0 ft/ft 0 ft/ft Number of riffles: as- built/present 1 1 Number of pools: as- built/present 4 4 The As -Built and First Year conditions of Main Tributary #2 (Pebble Counts) are summarized below in the following table. The pebble count data for Main Tributary #2 is included in Appendix B. Date Measured: 6/28/2010 1/10/2012 Cross - section being measured A and B A and B D16: as- built/present 0.125 0.125 D50: as- built/present 0.5 8.0 D84: as- built/present 11.3 16.0 The As -Built and First Year conditions of Main Tributary 42 (Visual Inspection) are summarized below in the following table. Date Inspected: 6/28/2010 1/10/2012 Structure Type Cross Vane Cross Vane Is water piping through or around structure? No No Head cut or down cut present? No No Bank or scour erosion present? No No Other problems noted? No No 0 P LI 1 First Year Monitoring Report: Channel Stability New Garden Road Widening Phase II Project No. P -3741 Tributary A Tributary A is a minor tributary which flows west along the toe of the widened New Garden Road embankment to its confluence with Main Tributary #2. The First Year survey of Tributary A was conducted on January 10, 2012 by representatives from USI and CWS. The relocated stream channel exhibited substrate consisting of fine gravel (D50 = 5.7 mm). The channel slope is 0.015 ft/ft with a sinuosity of 1.37. The average bankfull width and depth for this reach are 17 feet and 2.03 feet, respectively. The average bankfull cross sectional area for riffle portions of the stream is 34.43 ft2. The average flood -prone area width for Tributary A is approximately 45 feet. The new stream channel has a Rosgen Level II classification of E4. Permanent cross sections were established during the As -Built survey and marked with rebar to allow future monitoring of the same locations. Figure 2 on page 5 shows the locations of these permanent cross sections. The As -Built and First Year conditions of Tributary A (Cross Sections C and D) are summarized below in the following tables. Channel cross sections, the longitudinal Iprofile, and pebble count data for Tributary A are included in Appendix C. 1 1 1 1 1 1 1 Provide the following data for each crncc- cectinn• rrncc Certinn C Date Measured: 6/28/2010 1/10/2012 Cross - section being measured: C C Cross - sectional area: as- built/present 32.45 sf 34.43 sf Bankfull width: as- built/present 17.00 ft 17.00 ft Floodprone Width: as- built/present 45.00 ft 45.00 ft Width/depth: as- built/present 8.91 8.39 Entrenchment ratio: as- built/present 2.65 2.65 Stream Type: as- built/present* E4 E4 only requireu jot' lYJjIC c'r0s.S'- .S'eC17on.S Provide the fnllowinu data fnr Parh rrncc_certinn• ('rnee Cnrtinn " Date Measured: 6/28/2010 1/10/2012 Cross - section being measured: D D Cross - sectional area: as- built/present 39.59 sf 44.76 sf Bankfull width: as- built/present 19.00 ft 20.50 ft Floodprone Width: as- built/present 55.00 ft 55.00 ft Width/depth: as- built/present 9.12 9.39 Entrenchment ratio: as- built/present 2.89 2.68 Stream Type: as- built/present* E4 E4 on1}' reytureu jor rype cro.t.S-.secuon.t 7 SFirst Year Monitoring Report: Channel Stability New Garden Road Widening Phase II Project No. P -3741 The As -Built and First Year conditions of Tributary A (Longitudinal Profile) are summarized below in the following table. The longitudinal profile for Tributary A is included in Appendix C. 1 I fl t LI Date Measured: 6/28/2010 1/10/2012 Avg. slope riffles: as- built/present 0.023 ft/ft 0.023 ft/ft Avg. slope pools: as- built/present 0 ft/ft 0 ft/ft Number of riffles: as- built/present 3 3 Number of pools: as- built/present 4 4 The As -Built and First Year conditions of Tributary A (Pebble Counts) are summarized below in the following table. The pebble count data for Tributary A is included in Appendix C. Date Measured: 6/28/2010 1/10/2012 Cross - section being measured C and D C and D D16: as- built/present 0.125 <0.062 D50: as- built/present 8.0 5.7 D84: as- built/present 22.6 32.0 The As -Built and First Year conditions of Tributary A (Visual Inspection) are summarized below in the following table. Date Inspected: 6/28/2010 1/10/2012 Structure Type Cross Vane Cross Vane Is water piping through or around structure? No No Head cut or down cut present? No No Bank or scour erosion present? No No Other problems noted? I No No Summary Comments The channels (Main Tributary #2 and Tributary A) relocated as part of the New Garden Road Widening Phase Il Project appear to be geomorphically and hydraulically stable with regard to pattern, profile, and dimension. Other than ongoing monitoring and observation there are no recommendations to perform any remediation at this time. 8 First Year Monitoring Report: Photo Documentation — Photopage 1 New Garden Road Widening Phase II Project No. P -3741 1 f 1 1 Appendix A Photopage 1 — First Year Monitoring Photographs n 1 1 First Year Monitoring Report: Photo Documentation — Photopage 1 INcw Uarucl► tcuau wiuenmg rnase ii YYo)eCt NO. V -S /41 Photo 1: Tributary A — permanent cross section, left bank looking upstream Photo 2: Tributary A — permanent cross section, left bank looking upstream 10 First Year Monitoring Report: Photo Documentation — Photopage I New Garden Road Widening Phase II Project No. P -3741 Photo 3: Tributary A — permanent cross section, left bank looking upstream Photo 4: Tributary A — Root Wad Area A, centerline looking upstream First Year Monitoring Report: Photo Documentation — Photopage 1 New Garden Road Widening Phase II wi yy Project No. P -3741 Photo 5: Tributary A — Grade Control Sill A, centerline looking upstream Photo 6: Tributary A — Cross Vane A, left bank looking downstream 12 First Year Monitoring Report: Photo Documentation — Photopage 1 Garden New R•.• Widening Phase 11 Project a, r� i f � � I s � � i! t� e�• � 4i'�e > .�m y � w r .! i4 13 First Year Monitoring Report: Photo Documentation — Photopage 1 New Garden Road Widening Phase II Proiect No. P -3741 Photo 9: Tributary A — Cross Vane A, left bank looking upstream Photo 10: Tributary A — Cross Vane A, left bank looking upstream 14 First Year Monitoring Report: Photo Documentation — Photopage 1 New Garden Road Widening Phase I1 Photo 11: Tributary A — Cross Vane B, left bank looking downstream No. P -3741 Photo 12: Tributary A — Root Wad Area B, left bank looking upstream 15 First Year Monitoring Report: Photo Documentation — Photopage 1 New Garden Road Widening Phase II No. P -3741 Photo 13: Tributary A — Confluence with Main Tributary #2, looking downstream Photo 14: Tributary A — Cross Vane B, left bank looking upstream 16 First Year Monitoring Report: Photo Documentation — Photopage I New Garden Road Widening Phase II Project No. P -3741 Photo 15: Main Tributary #2 — permanent cross section, right bank looking upstream Photo 16: Main Tributary #2 — Root Wad Area D, right bank looking downstream 17 First Year Monitoring Report: Photo Documentation — Photopage I New Garden Road Widening Phase II Project No. P -3741 18 First Year Monitoring Report: Photo Documentation — Photopage 1 19 First Year Monitoring Report: Photo Documentation — Photopage 1 New Garden Road Widening Phase II Project No. P -3741 Photo 21: Main Tributary #2 — Cross Vane D, centerline looking downstream Photo 22: Main Tributary #2 — Root Wad Area D, centerline looking upstream 20 ' First Year Monitoring Report: Photo Documentation — Photopage 1 New Garden Road Widening Phase II Project No. P -3741 1 1 � I 1 s �iO-- - zc Photo 23: Main Tributary #2 — Cross Vane D, left bank looking upstream Photo 24: Main Tributary #2 — Cross Vane C, left bank looking downstream 1 21 First Year Monitoring Report: Photo Documentation — Photopage I New Garden Road Widening Phase II �? im 1� No. P -3741 P' Photo 25: Main Tributary #2 — Riffle Pool B, centerline looking upstream Photo 26: Main Tributary #2 — Cross Vane C, centerline looking downstream 22 First Year Monitoring Report: Photo Documentation — Photopage 1 New Garden Road Widening Phase II Project No. P -3741 Photo 27: Main Tributary #2 — Cross Vane C, right bank looking downstream Photo 28: Main Tributary #2 — Confluence with Tributary A, looking downstream 23 First Year Monitoring Report: Photo Documentation — Photopage I New Garden Road Widening- Phase II Project No. P -3741 I 1� d' Photo 29: Main Tributary 42 — Cross Vane C, right bank looking upstream Photo 30: Main Tributary #2 — Miscellaneous, left bank looking downstream 24 First Year Monitoring Report: Photo Documentation — Photopage 1 New Garden Road Widening Phase II Project No. P -3741 s .. Y Til, f Syr i�. Photo 31: Main Tributary #2 — Root Wad D, left bank looking upstream showing both permanent cross sections Fhoto 32: Main Tributary #2 — Root Wad D, left bank looking downstream 25 First Year Monitoring Report: Photo Documentation — Photopage 1 New Garden Road Widening Phase II Project No. P -3741 Photo 33: Main Tributary #2 — New Garden Road culvert, looking upstream Photo 34: Main Tributary #2 — Downstream of New Garden Road, looking downstream 26 First Year Monitoring Report: Main Tributary #2 New Garden Road Widening Phase II Project No. P -3741 1 � I � I � I � I � I 1 1 1 27 Appendix B Main Tributary #2 Cross Sections As -Built (Corrected) First Year Monitoring ' Comparison Main Tributary #2 Longitudinal Profile As -Built (Corrected) First Year Monitoring Comparison Main Tributary #2 Pebble Count Main Tributary #2 Raw Data As -Built (Corrected) First Year Monitoring 1 1 1 27 First Year Monitoring Report: Main Tributary #2 New Garden Road Widening Phase II Project No. P -3741 28 Q _ O 4A O � U a 7 O O - - LO p� LO 8 ca � I I — O �r I ,p i _ LO V I 41 I I - p O L U ' N M � I V cu M � I p .Q I N _ O I N � c� O W r C I L I O r N Z — LO Q O ('11) u01lenal3 28 First Year Monitoring Report: Main Tributary 92 New Garden Road Widening Phase II Project No. P -3741 29 LO ti m I J O N ~ I m 0 I (� p m I ' O I i I C) I Cfl O a I %-W m I I I LO LO = I � f+ V i I LO N N i � o U , o N I v M i N ' O M 'L I = I i LO N I I ' p N O I C 4 L i I O T- 0 ' I LO z I m ('11) u01jen913 29 First Year Monitoring Report: Main Tributary #2 New Garden Road Widening Phase II Project No. P -3741 30 LO O Q O 'C I I I � � p a I � m I LL m i � I O LO � I Q I LO O I ITT (� I O I I' to N I I O U I U) .••. M v � 04 I O fC L>, I I CIO ur � I I LO N C .R I I O N � I I V cc LO O G) � I I O r i CU I I LO z I I a I o O I,- to M .- O ti LO (• ) uoi4LIna19 30 First Year Monitoring Report: Main Tributary #2 New Garden Road Widening Phase II Project No. P -3741 31 LO ti m O m v L 8 c v cc LL m C I LO LO a° m ' o LO C o a o 0 L U � CVO I L _ M :9 I N � L I ❑ O +� M • L ~ � LO N C O N 0 I LO C O I LO z I i I m 0 ('4) U01jeA913 31 First Year Monitoring Report: Main Tributary #2 New Garden Road Widening Phase II Project No. P -3741 32 O a I O �_ (0 +� U I a co C: O I LO 8 � m L� m Q I I I I} LO v I O �4+ I O N N I I O U i LO M v N I I � U Q M N 0 'L. LO CV H I I O i O N � I I � LO o I r GJ I O � L I r (� 0 I I 3 I Liz � I I a O ('41) UOilena13 32 First Year Monitoring Report: Main Tributary #2 New Garden Road Widening Phase II Project No. P -3741 33 LO m � U O d 0 I c LO Q N ^0 Li I p C t0 m O N M Y.1 I LL m Q O I O I I _ I LO LO 'V /1 Vi U) I I O LO O I U LO O v U') •C H I Q O � i M I Lt') � I I N I O p N I Lf) r R i I O I Z , I LO O ('11) UOIIBAO13 33 First Year Monitoring Report: Main Tributary #2 New Garden Road Widening Phase II Project No. P -3741 a O 4u �a •� 4 4t O io-+ Pm •r c �z m v w � m m � m m O Y >� I� fjfj7J jffJ I 0 0 0 0 0 r r r r r- (000) UO14c"ald 34 O'bLZ O'O5Z O'SZZ O'OOZ 0'S: 1 O'OSI w C 0 O'SZi cn 0'001 0'05 0'yZ 0'0 0 0 0 t- r r- First Year Monitoring Report: Main Tributary #2 New Garden Road Widening Phase II Project No. P -3741 r� O � 5 bpi .0 O � a r 4k O N •C Z 0 0 0 0 0 N C 00 �C r r r r r- (laal) u0uc.,,0121 35 O'OiZ O'SZZ O'OOZ 0'S: i O'O3T w c 0 0'001 0'5L O'OS 0'3Z 0'0 0 0 0 � b b r r r a V l0 w 7 � 0 0 0 0 0 N C 00 �C r r r r r- (laal) u0uc.,,0121 35 O'OiZ O'SZZ O'OOZ 0'S: i O'O3T w c 0 0'001 0'5L O'OS 0'3Z 0'0 0 0 0 � b b r r r First Year Monitoring Report: Main Tributary 92 New Garden Road Widening Phase II Project No. P -3741 O rA � � a r O r�' � O •r ti H �z 0 0 0 0 0 N O 00 �p ( ;ael) u0.1VA013 36 0 *i-Z O'Oiz O'SZZ O'00Z 0'3.:I 0'051 C 0 rs O'SZi 0'001 0.5c 0'05 0'3Z 0'0 0 0 0 r r- r- m V w � II1 V m Y f i t 0 0 0 0 0 N O 00 �p ( ;ael) u0.1VA013 36 0 *i-Z O'Oiz O'SZZ O'00Z 0'3.:I 0'051 C 0 rs O'SZi 0'001 0.5c 0'05 0'3Z 0'0 0 0 0 r r- r- 1 1 t I I 1 t 1 1 1 t r 1 1 First Year Monitoring Report: Main Tributary #2 New Garden Road Widening Phase I1 Project No. P -3741 Main Tributary #2 - Pebble Count 1 37 Metric mm Particle S A N D Count Tot # % Tot % Cum <0.062 Silt/Clay 11 100 11.0 11.00 0.062 - 0.125 Very Fine Sand 1 100 1.0 12.00 0.125 - 0.250 Fine Sand 8 100 8.0 20.00 0.25-0.5 Med. Sand 2 100 2.0 22.00 0.5-1.0 Coarse Sand 19 100 19.0 41.00 1.0-2.0 Very Coarse Sand 1 100 1.0 42.00 2-4 Ve Fine Gravel G R A V L 0 100 0.0 42.00 4-5.7 Fine Gravel 3 100 3.0 45.00 5.7-8 Fine Gravel 1 100 1.0 46.00 8-11.3 Medium 11 100 11.0 57.00 11.3-16 Medium 13 100 13.0 70.00 16-22.6 Coarse 14 100 14.0 84.00 22.6-32 Coarse 10 100 10.0 94.00 32-45 Very Coarse 2 100 2.0 96.00 45-64 Very Coarse 3 100 3.0 99.00 64-90 Small c b b e 0 100 0.0 99.00 90-128 Small 1 100 1.0 100.00 128-180 Large 0 100 0.0 100.00 180-256 Large 0 100 0.0 100.00 256-362 Small B U 1 a e 0 100 0.0 100.00 362-512 Small 0 100 0.0 100.00 512-1024 Medium 0 100 0.0 1 100.00 1024-2048 Large - Very Large 0 100 0.0 100.00 Bedrock Bedrock 0 100 0.0 100.00 1 37 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 First Year Monitoring Report: Main Tributary #2 New Garden Road Widening Phase II Project No. P -3741 N F .rA V ( %) ;aaa.cad aAUCFM J O O O O O O O O O O O O O C C G O O O O 2 0% 00 l- �v V, R M N .4 C 0 R 0 0 0 0 vi o v, o vi o M M N N .r rr ( %) �oaldad 38 0 0 �n o 2IJO.Ipag 8bOZ _KOI PUT -ZiS ZT5 -Z9£ Z9£ -9SZ 9SZ -08I 08I -8Zi 8Zi -06 06 -t,9 t9 -it Sb -Z£ Z£ -9'ZZ 9'ZZ -9i H -£'ii £'Ii -8 r -Z D'Z -0'i D'i -S'0 i'0 -SZ'0 ISZ'0 -SZi'0 ;ZVO -Z90'0 :90'0 8 a� a 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 First Year Monitoring Report: Main Tributary #2 New Garden Road Widening Phase II Project No. P -3741 39 a ----- - - - - -- ON ------ - - - - -- MENOMONEE■ 39 a 1 1 1 1 1 1 1 1 i 1 1 1 1 1 1 1 1 1 1 First Year Monitoring Report: Main Tributary #2 New Garden Road Widening Phase II Project No. P -3741 w w w vii a u. 1i Q pw p p N P O O O Cfl G.� Y a � a a � �O L ^ Y G1 ° lL m Q 9•rH O 30 .4,92 m3i3w-mvz O R � 9 s_ m a 82`- ° - 2 a P'o 9P fro §�s���a�� E 033mo---- - - - - -- °C�� 29 -- - - - - - - - - - ° z G ��So rye ° eg u 5 - °z UeEC ❑rFi� m o� c `u �3 40 LO Cfl Q O CO 0 � a � �O L ^ Y G1 lL m Q O O LO d N U O 0 U L N M H M H LO N c N .a m LO O C) ea LO 4) Z a O I� f� I- f` f- Cfl CD (D (•}U) UOIIBA813 First Year Monitoring Report: Main Tributary #2 New Garden Road Widening Phase II Project No. P -3741 w wwwwvi ww wE. zm C G Sm c t o Q a ai D Y o 0 e•u �wr9'iF� or `i°V �'' 3 �mtia�w�m3i3w�,ua a b m O N N 1l „ O 8 N C li N 8 41 n rar.ss YA! 1 _ 3 M W U ae .-I � •a° I I s U G J i� O I •a° 8 = _ 0 S _ o u s o cfl � M U •C � m I - _ _ _ _ _ _ _ _ ° _ �g2 z o0 ab O I In }1 I I 5 LO Qu �.Z ►I c o o � a �a E P U0.wA m 8yyai � �3 41 YA! 1 _ M W � I I G J i� O I _ 0 o cfl � M m I , m O I In }1 I I LO I N O N i LO N I Lid U � I I � � � N I � O y i I C ca M +a I F N � i D O I I I p i 1^ VJ I I N � t4 i N O I i 1 O r n V I I LO Z I m O O Iq N O w O N ('U) UOIIBA013 41 First Year Monitoring Report: Main Tributary #2 New Garden Road Widening Phase II Project No. P -3741 LONGITUDINAL PROFILE: Water Surface - Main Tributary #2 Project Name: New Garden Road Widening Phase II �[ Project Location: Greensboro, NC u Date: 6/28/2010 BM # 1 (ft.)-- 777.02 Height of Height "1 1 1 1 1 42 Distance; Point Back -Sight Instrument Fore-Sight Depth STATION B.M. # 1 B.S. 1.71 ILL 101.71 F.S. Elevation 100.00 Corrected Elevation COMMENTS 0.0 101.71 11.93 89.78 766.80 tail of riffle 13.0 101.71 12.06 89.65 766.67 pool max depth 38.0 101.71 12.01 89.70 766.72 part of glide 59.0 101.71 12.03 89.68 766.70 pool max depth 76.0 101.71 12.12 89.59 766.61 103.0 101.71 12.14 89.57 766.59 head of riffle 122.0 101.71 12.12 89.59 766.61 tail of riffle 138.0 101.71 12.32 89.39 766.41 pool max depth 139.0 101.71 12.36 89.35 766.37 144.0 160.0 101.71 101.71 12.38 12.36 89.33 89.35 766.35 766.37 pool max depth 172.0 101.71 12.39 89.32 766.34 214.0 101.71 12.44 8927 766.29 215.0 101.71 12.45 89.26 766.28 pool max depth 225.0 101.71 12.49 89.22 766.24 246.0 101.71 12.48 89.23 766.25 278.0 101.71 12.48 89.23 766.25 WS Slope (ft. /ft.) 0.002 "1 1 1 1 1 42 t 1 t 1 1 1 1 t 1 1 1 fl First Year Monitoring Report: Main Tributary #2 New Garden Road Widening Phase II Project No. P -3741 LONGITUDINAL PROFILE: Thalweg - Main Tributary #2 Project Name: New Garden Road Widening Phase II Project Location: Greensboro, NC Date: 6/28/2010 Thahveg Slope (ft. /ft.) 0.003 43 BM # 1 (ft.)-- 777.02 Height of Height Distance; Point Back -Sight Instrument Fore-Sight Depth STATION B.S. H.L F.S. Elevation Corrected Elevation COMMENTS B.M. # 1 1.71 101.71 100.00 0.0 101.71 1216 89.55 766.57 tail of nffle 13.0 101.71 12.92 88.79 765.81 poolmaxdepth 38.0 10171 12.78 88.93 765.95 part of glide 59.0 101.71 12.13 89.58 766.60 poolmaxdepth 76.0 101.71 12.38 89.33 76635 103.0 101.71 14.33 87.38 76440 head of riffle 122.0 101.71 13.43 88.28 765.30 tail ofriffle 138.0 101.71 12.32 89.39 766.41 poolmaxdepth 139.0 101.71 13.37 88.34 765.36 144.0 101.71 13.98 8773 764.75 pool max depth 160.0 101.71 13.02 88.69 765.71 I72.0 101.71 12.60 89.11 766.13 214.0 101.71 12.58 89.13 766.15 215.0 101.71 13.97 87.74 764.76 pool max depth 225.0 101.71 14.74 86.97 763.99 2460 101.71 13.23 88.48 765.50 278.0 101.71 12.71 89.00 766.02 Thahveg Slope (ft. /ft.) 0.003 43 1 1 1 L � 1 1 t t I 1 -1 s 1 1 1 First Year Monitoring Report: Main Tributary #2 New Garden Road Widening Phase II Project No. P -3741 LONGITUDINAL PROFILE: Left Top of Bank - Main Tributary #2 Project Name: New Garden Road Widening Phase II Project Location: Greensboro, NC Date: 6/28/2010 Valley Slope (Uft.) 0.009 44 BM # 1(ft.)-- 777 02 Height of Height Distance; Point Back -Sight Instrunient Fore -Sight Depth STATION B.S. RL F.S. Devotion Corrected Elevation CONEWNI'S B.M. # 1 171 101.71 100.00 0.0 101.71 6.67 95.04 772.06 tail of riffle 13.0 101.71 6.52 9519 772.21 pool max depth 38.0 101.71 5.83 95.88 772.90 part of glide 59.0 101.71 6.25 95.46 772.48 pool max depth 76.0 101.71 6.24 95.47 772.49 103.0 101.71 6.47 95.24 772.26 head ofnffle 122.0 101.71 8.42 93.29 770.31 tail of riffle 138.0 101.71 8.99 92.72 769.74 pool max depth 144.0 101.71 8.76 92.95 769.97 pool max depth 160.0 101.71 8.76 92.95 769.97 172.0 101.71 8.89 92.82 769.84 214.0 101.71 8.80 92.91 769.93 225.0 101.71 8.54 93.17 770.19 246.0 101.71 8.85 92.86 769.88 278.0 101.71 8.85 92.86 769.88 Valley Slope (Uft.) 0.009 44 1 f 1 1 l 1 1 r E 1 1 1 1 First Year Monitoring Report: Main Tributary #2 New Garden Road Widening Phase II Project No. P -3741 LONGITUDINAL PROFILE: Left Bankfull - Main Tributary #2 Project Name: New Garden Road Widening Phase II Project Location: Greensboro, NC Date: 6/28/2010 BM # 1 (ft.)-- 777.02 45 Height of Height Distance; Pomt Back -Sight Instnmrent Fore-Sight Depth STATION B.S. ILL F.S. Bevation Corrected Elevation CONIlIEFIVTS B.M. # 1 1.71 101.71 100.00 0.0 101.71 9.22 92.49 769.51 tail of riffle 13.0 101.71 9.27 92.44 769.46 poolmaxdepth 38.0 101.71 9.32 92.39 769.41 part of glide 59.0 101.71 9.02 92.69 769.71 pool max depth 76.0 101.71 9.24 92.47 769.49 103.0 101.71 9.24 92.47 769.49 head of riffle 122.0 101.71 9.51 92.20 769.22 tail of riffle 138.0 101.71 9.49 92.22 769.24 pool max depth 144.0 101.71 9.21 92.50 769.52 pool max depth 160.0 101.71 9.30 92.41 769.43 172.0 101.71 9.35 92.36 769.38 214.0 101.71 981 91.90 768.92 225.0 101.71 9.61 92.10 76912 278.0 101.71 9.63 92.08 769.10 45 {} (} 23 r �§w )!)) o � /}\ First Year Monitoring Report: Main Tributary # New Garden Road Widening Phase a Project No. Pa71 / / a ■kkk■ �_ )\ � k i&!� ■!! ;�l� |!2 ■§ | =7 @ : °i��( ; ;2�.�■. ■, ;.au. 5g § *nA §- .e ! \!!5!!!!!!! =m2«kmrPlARq §rma» »; ■» »rre | � \ §�----- - - -- -- §\ -; ---- ---- - - -- -- !� § [[ )} }} � � \ qm m■ §) })a 46 LO m _ C 5 � / � e ■ @ 7 k LO LO 0 ) \I} o , O U') L) g C/) i p � ■ o U O � C14 it Lr) CV) ■ ■ � R R p LO C G _ S C\l ■ o C 2 D ■ � O 2 ` p 2 | « CD 7 r- £ n 2 r- m w 3 S U (2)ugmA0 G o � U 'D 3 v° z F E.o p "N Gp4y O 3C7 � zz O G z.9 rA 0 Q Q a U W Pr L1 First Year Monitoring Report: Main Tributary #2 New Garden Road Widening Phase II Project No. P -3741 N $$ �g as c � m C Y C m W s r'W mo�e9W a �� m y � W W Y Q m faL A F v u e m 0 (A 5 G s ggm °os�ss.ssss R � E; z cY 14 14 14 w ycy r 5 m i O y� b 7 523 47 i a O v o - LO Y d (0 LL O O i ' I O O a c o ' O LO m m , N LO O L � ' U O N ' v L R � ' i o •L � i O � •� � LO N •a O N O LO C d i � � � i i O 1 3 ' y Z i ' i In i 'm •AA' 1AA_ (AAi) (0 (A0 W A�A A-A 1_ 1_ 1A_ 1_ 1A_ ( �y) UOIIBA813 47 First Year Monitoring Report: Main Tributary #2 New Garden Road Widening Phase II Project No. P -3741 LONGITUDINAL PROFILE: Water Surface - Main Tributary #2 Project Name: New Garden Road Widening Phase H Project Location: Greensboro, NC Date: 1/10/2012 WS Slope (ft. /ft.) 0.003 48 BM # 1 (ft.)-- 775.70 Height of Height Distance; Point Back -Sight Instrument Fore -Sight Depth STATION B.S. H.L F.S. Elevation CorrectedBe-ation COMMENTS B.M. # 1 3.26 103.26 100.00 0.0 103.26 11.99 91.27 766.97 tail of riffle 9.0 103.26 11.99 91.27 766.97 pool max depth 32.0 103.26 11.98 91.28 766.98 38.0 103.26 11.97 91.29 766.99 part of glide 59.0 103.26 12.01 91.25 766.95 poolmaxdepth 76.0 103.26 12.40 90.86 766.56 95.0 103.26 12.40 90.86 766.56 100.0 103.26 12.38 90.88 766.58 103.0 103.26 12.40 90.86 766.56 head of riffle 138.0 103.26 12.47 90.79 766.49 pool max depth 139.0 103.26 12.63 90.63 766.33 144.0 103.26 12.58 90.68 766.38 pool max depth 162.0 103.26 12.57 90.69 766.39 172.0 103.26 12.57 90.69 766.39 214.0 103.26 12.60 90.66 766.36 215.0 103.26 12.66 90.60 766.30 pool max depth 225.0 103.26 12.66 90.60 766.30 246.0 103.26 12.63 90.63 766.33 278.0 103.26 12.70 90.56 766.26 WS Slope (ft. /ft.) 0.003 48 First Year Monitoring Report: Main Tributary #2 New Garden Road Widening Phase II LONGITUDINAL PROFILE: Thalvveg - Main Tributary #2 Project Name: New Garden Road Widening Phase II Project Location: Greensboro, NC Date: 1/10/2012 Project No. P -3741 Thalweg Slope (ft. /ft.) 0.004 G• BM # 1 (ft.)-- 775.70 Height of Height Distance; Point Back -Sight Instrument Fore -Sight Depth STATION B.S. H.L F.S. 13evation Corrected Flevati on CONEWNTS B.M. # 1 3.26 103.26 100.00 0.0 103.26 12.22 91.04 766.74 tail of riffle 9.0 103.26 13.13 90.13 765.83 pool max depth 32.0 103.26 12.98 90.28 765.98 38.0 103.26 12.98 90.28 765.98 part of glide 59.0 103.26 12.16 91.10 766.80 pool maxdepth 76.0 103.26 12.74 90.52 766.22 95.0 103.26 14.22 89.04 764.74 100.0 103.26 14.18 89.08 764.78 103.0 103.26 14.11 89.15 764.85 head of riffle 122.0 103.26 14.18 89.08 764.78 tail of riffle 138.0 103.26 12.60 90.66 766.36 pool max depth 139.0 103.26 13.46 89.80 765.50 144.0 103.26 13.97 89.29 764.99 pool max depth 162.0 103.26 13.43 89.83 765.53 172.0 103.26 13.15 90.11 765.81 214.0 103.26 12.92 90.34 766.04 215.0 103.26 14.41 88.85 764.55 pool max depth 225.0 103.26 15.25 88.01 763.71 246.0 103.26 13.50 89.76 765.46 278.0 103.26 13.00 90.26 765.96 Thalweg Slope (ft. /ft.) 0.004 G• ' ' First Year Monitoring Report: Main Tributary #2 New Garden Road Widening Phase II LONGITUDINAL PROFILE: Left Bankfull - Main Tributary #2 Project Name: New Garden Road Widening Phase II Project Location: Greensboro, NC Date: 1/12/2012 BM # I (ft.)= 775.70 Height of Height Distance; Point Back -Sight Instrument Fore -Sight Depth Project No. P -3741 STATION B.S. RL F.S. Elevation Corrected Elevation COMMENTS ' B.M. # 1 3.26 103.26 100.00 0.0 103.26 9.33 93.93 769.63 tail of riffle 9.0 103.26 9.18 94.08 769.78 pool max depth 32.0 103.26 9.58 93.68 769.38 ' 38.0 103.26 9.49 93.77 769.47 part of glide 59.0 103.26 9.44 93.82 769.52 pool max depth 76.0 103.26 9.58 93.68 76938 100.0 103.26 9.67 93.59 769.29 138.0 103.26 9.67 93.59 769.29 pool max depth 162.0 103.26 9.27 93.99 769.69 172.0 103.26 9.27 93.99 769.69 214.0 103.26 9.34 93.92 769.62 ' 246.0 103.26 9.47 93.79 769.49 278.0 103.26 9.85 93.41 769.11 50 ' First Year Monitoring Report: Main Tributary #2 New Garden Road Widening Phase II Project No. P -3741 LONGITUDINAL PROFILE: Right Bankfull - Main Tributary #2 Project Name: New Garden Road Widening Phase H ' Project Location: Greensboro, NC Date: 1/10/2012 ' Distance; Point STATION BM # 1 (ft.)= 775.70 Height of Height Back -Sight Instrument Fore -Sight Depth B.S. H:L F.S. Elevation Corrected Elevation CONIMINTS B.M. # 1 3.26 103.26 100.00 0.0 103.26 9.05 94.21 769.91 tail of riffle 9.0 103.26 8.80 94.46 770.16 pool max depth 32.0 38.0 103.26 103.26 8.77 8.89 94.49 94.37 770.19 770.07 part of glide 59.0 103.26 9.49 93.77 769.47 pool max depth 76.0 103.26 9.47 93.79 769.49 100.0 103.26 9.77 93.49 769.19 ' 138.0 103.26 9.35 93.91 769.61 pool max depth 162.0 103.26 9.72 93.54 769.24 172.0 103.26 9.78 93.48 769.18 214.0 103.26 9.59 93.67 769.37 246.0 103.26 9.87 93.39 769.09 278.0 103.26 10.24 93.02 768.72 � I � I � I � I � I � I � I i I � I First Year Monitoring Report: Tributary A New Garden Road Widening Phase II Project No. P -3741 Appendix C Tributary A Cross Sections As -Built (Corrected) First Year Monitoring Comparison Tributary A Longitudinal Profile As -Built (Corrected) First Year Monitoring Comparison Tributary A Pebble Count Tributary A Raw Data As -Built (Corrected) First Year Monitoring 52 First Year Monitoring Report: Tributary A New Garden Road Widening Phase II Project No. P -3741 53) LO its Q) I O t n/ I 0 3 o LL Y I I o z E CO U O I I U M +� V I I I N +� i I 0 O i L U I I ' I N I V H I � I p i LO i T- i I I 4 L � I I 0 I 3 I ' 4 I z I I I I LO I I I 0 LO I� CO I� I� 47 Cfl r-_ CD LO CD ('41) uOIJeAa13 53) First Year Monitoring Report: Tributary A New Garden Road Widening Phase II Project No. P -3741 54 °I I LO =n I I I � � 0 U') (D a C O a I O C Y 0 � `/ 0 I w/ LL m LO I C I I I o , Q O a , �r cn I ' N N � i LO � i M U � I I Q i I O � (A N `� H , � I � i O O I I LO � i r c� O z I ' I I I LO ° O LO CO r O LO ('41) UOIJeA913 54 First Year Monitoring Report: Tributary A New Garden Road Widening Phase II Project No. P -3741 55 LO VI � I � o I /^ a VJ LL I O a� p (Q C +� I V I N I N i O Co 4 I L I U � I Q i N I j U ++ I � I = � i O i I M 4 I LO 41 I L I � I O I Z � I I I I LO I I U' O LO M T-- m r*- LO ('Ij) U014eA013 55 First Year Monitoring Report: Tributary A New Garden Road Widening Phase II Project No. P -3741 56 LO I, L() ^ O I I ; � 0 `� CL I o I o c °' Q j m LO 2 LL m O I I ++ I I I N I N I L U , I I LO (y) Q O $ CD 3 � c .Q L N C i O N LO r V 3 o d I r 2 I I I I I LO Q I ' 0 LO CO rn r- LO ('41) UOIJUAa13 56 First Year Monitoring Report: Tributary A New Garden Road Widening Phase II Project No. P -3741 57 LO W I O U ca 0 w CO I LL m Q O i LO I (y) V I I N I � N i M O ' U , V 0 Vi F" p ; LO I C i .a L ' I z I I I I LO I I <.i O LO (y) r 0-) rl-- LO ('41) U014VA013 57 First Year Monitoring Report: Tributary A New Garden Road Widening Phase II Project No. P -3741 58 I L1) Lt7 ^ 43 I � I I O O v 0 I j d � CO O m � 0 I LL Q I V y � I I Q L U I I � M I ' M Y � I U � Lo I � � 0 I i O N i LO L I r V I O � z I I ' I r I I I LO in I 1 I 0 LO M 47 LO ('4) U014eAal3 58 First Year Monitoring Report: Tributary A New Garden Road Widening Phase II Project No. P -3741 ;r y O :C r� O �x cz r~ i+ n y Z c o 0 c od �d ao r r r r r m v w R O Q >� >A7I FIjT- J Q' 0 0 0 r r r (Iaaj) UOt Aaj:j 59 0'081 O'0L1 0'091 0'011 O'Ot'i 0'0£1 O'OZi O'OTI O'OOi C 0'06 0'08 0'OL 0'09 0'01 0'017 0'0£ 0'OZ 0'Oi 0'0 0 0 0 00 1C �! � a � r- r r- First Year Monitoring Report: Tributary A New Garden Road Widening Phase II Project No. P -3741 y .r P-0a n1- r O r 0 O 00 V^ N O 00 (laaj) uOr)raal:l •1 0.081 0' 0.1 0,09T 0' 051 0'01-1 O'0£i O'OZi 0'011 0'001 0'06 0'08 0'O;. 0,09 0'05 O'Of O'OZ O'Oi + 0'0 0 T a� V l6 w 3 � � m U- U- Y le 00 00 d � 0 O 00 V^ N O 00 (laaj) uOr)raal:l •1 0.081 0' 0.1 0,09T 0' 051 0'01-1 O'0£i O'OZi 0'011 0'001 0'06 0'08 0'O;. 0,09 0'05 O'Of O'OZ O'Oi + 0'0 0 T First Year Monitoring Report: Tributary A New Garden Road Widening Phase II Project No. P -3741 O � � a O r a O H y 0'081 0'0, T O'09T O'OST O'Ot,T O'O£I O'OZT ' 0'O T I O'OOT w C 0'06 r !a 0'08 0'0 0'09 0'01 0'Ot' i 0'0£ J 0'OZ + ++ 0'01 1 0'0 c o 0 0 o e o e o x r ° 00 W (�aa ;} uou�Aal� 61 v V R Y Y m 0'081 0'0, T O'09T O'OST O'Ot,T O'O£I O'OZT ' 0'O T I O'OOT w C 0'06 r !a 0'08 0'0 0'09 0'01 0'Ot' i 0'0£ J 0'OZ + ++ 0'01 1 0'0 c o 0 0 o e o e o x r ° 00 W (�aa ;} uou�Aal� 61 1 1 1 1 L 1 1 t First Year Monitoring Report: Tributary A New Garden Road Widening Phase II Project No. P -3741 Tributary A - Pebble Count 1 62 Metric mm Particle S A N D Count Tot # % Tot % Cum <0.062 Silt/Clay 23 100 23.0 23.00 0.062 - 0.125 Very Fine Sand 8 100 8.0 31.00 0.125 - 0.250 Fine Sand 5 100 5.0 36.00 0.25-0.5 Med. Sand 3 100 3.0 39.00 0.5-1.0 Coarse Sand 3 100 3.0 42.00 1.0-2.0 Very Coarse Sand 0 100 0.0 42.00 2-4 Very Fine Gravel G R A V E L 3 100 3.0 45.00 4-5.7 Fine Gravel 0 100 0.0 45.00 5.7-8 Fine Gravel 6 100 6.0 51.00 8-11.3 Medium 3 100 3.0 54.00 11.3-16 Medium 8 100 8.0 62.00 16-22.6 Coarse 10 100 10.0 72.00 22.6-32 Coarse 7 100 7.0 79.00 32-45 Very Coarse 8 100 8.0 87.00 45-64 Very Coarse 5 100 5.0 92.00 64-90 Small C n b e 5 100 5.0 97.00 90-128 Small 1 100 1.0 98.00 128-180 Large 0 100 0.0 98.00 180-256 Large 0 100 0.0 98.00 256-362 Small B 1 a e r 0 100 0.0 98.00 362-512 Small 0 100 0.0 98.00 512-1024 Medium 0 100 0.0 98.00 1024-2048 Large -Very Large 0 100 1 0.0 98.00 Bedrock Bedrock 2 100 1 2.0 100.00 1 62 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 First Year Monitoring Report: Tributary A New Garden Road Widening Phase II Project No. P -3741 d° cc H 7 O u ,A PC Q 40 "'S V ( %) JUSUad aAPejmmn D 0 .°r O°� 0°0 rC � � Q M N . p 0 0 0 0 0 0 o vS o ( %) ;naaaad 63 R R vj d )POlpaq BtOZ -6ZOT PZOT-ZIS ZIS -Z9£ Z9£ -9SZ 9SZ -08T 08I -8ZT 9ZT -06 06-V9 t9 -Sb St-Z£ Z£ -9'ZZ 9'ZZ -9T 9I-£'TI £'TI -8 8-."S L'S - 6 t-Z 0'Z -0'T 0'T -S'0 S'0 -SZ'0 OSZ'0 -SZI'0 SZT'0 - Z90'0 Z90'0> a 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Report: First Year Monitoring New Garden •... Widening Phase 11 Project No. P-371 ism ME MENEM ----- - - - - -- ----------- ENEEMILIENE■ 64 d E��a U U 93 ° � 12 z z Jb zz� O O 1'`91 6 3 A First Year Monitoring Report: Tributary A New Garden Road Widening Phase II Project No. P -3741 c*. u.pw riE. pwu.wwti A 13E' C C... a m a � V 1 n N c e• "SO —Cik CF o e e 'j C� r�i i C ■�� M G �' b', C d a°0 m.4 29 a"a�w°3f�w`v ua m I 4 N fi °o 9 ss�s� m �E'�� I C U A c°. s 5 r� f m i '^ N e� a� 65 LC) V 1 t 1 S G1 p LL m () C i O ; I M r rJ I I N I N I O N i (y) O L I U I N v i � d � 1 U 1 � Q N r 1 j I I I t4 O I I LO N LJ� r I I I L 1 C) 0 1 3 1 1 d Z I i i LO I I I O U-) ui I� ti � cfl cfl C9 ('11) u01;enal3 First Year Monitoring Report: Tributary A New Garden Road Widening Phase II Project No. P -3741 LO w wwwwv'�i ww we t O L U _ O N Oi N W LO O j C L � ° gC Qm g s 3 w a I G O QxuOxF,G, ENV gIr°On xr u a � y m 55 O a IL m Ci Y 5 {r. fs y P4 G F u u° m amm50: A Q, 98 of P 0 5 0 m s ssr rs !$gg��aa�mmaa� s� a " _ _ ^ F 'n n n n n n 'n e 3 2 y' o 0 0 5 az ^ ___ ____ 2 o F d zzc5� � e a O u u p ��eW F� ao gym i M� ^ �3 66 LO I I t O L U _ O N W LO O j O d j (n a I -6 Y d O C IL m O 1 V 1 Q a) I It N I I N N i LO � � M U � I I M � L: .0 I M .L I N H Q C) O , N tL' ' 1 1 LO L I I 0 I 3 � o 1 1 � z f 1 I I Li) O In M r O I�- LO (-:4) uOJ ;PA813 66 I 1 1 1 1 1 1 1 1 1 1 t 1 t 1 First Year Monitoring Report: Tributary A New Garden Road Widening Phase II Project No. P -3741 LONGITUDINAL PROFILE: Water Surface - Tributary A Project Name: New Garden Road Widening Phase II Project Location: Greensboro, NC Date: 6/28/2010 WS Slope (ft. /ft.) 0.014 67 BM #I (ft.)-- 777.02 Height of Height Distance; Point Back -Sight Instrument Fore -Sight Depth STATION B.S. H.L F.S. Flevadon CorrectedFlevation CONPAENTS B.M. # 1 1.71 101.71 100.00 0.0 101.71 9.97 91.74 768.76 head of nffle 10.0 101.71 10.20 91.51 768.53 riffle 13.0 101.71 10.54 91.17 768.19 pool max depth 27.0 101.71 10.80 90.91 767.93 head of riffle 44.0 101.71 11.20 90.51 767.53 tail of riffle 58.0 101.71 11.17 90.54 767.56 pool maxdepth 80.5 101.71 11.41 90.30 767.32 head of riffle 82.0 101.71 11.90 89.81 766.83 tail ofriffle 88.0 101.71 11.99 89.72 766.74 pool max depth 101.0 101.71 11.98 89.73 766.75 pool 115.0 101.71 12.00 89.71 766.73 head of riffle 128.0 101.71 12.00 89.71 766.73 tail of riffle 147.0 101.71 12.03 89.68 766.70 pool max depth 148.0 101.71 12.62 89.09 766.11 head of riffle 154.0 101.71 12.62 89.09 766.11 tail ofriffle 171.0 101.71 12.45 89.26 766.28 poolmaxdepth 185.0 101.71 12.60 89.11 766.13 head of riffle WS Slope (ft. /ft.) 0.014 67 First Year Monitoring Report: Tributary A New Garden Road Widening Phase II Project No. P -3741 LONGITUDINAL PROFILE: Thalweg - Tributary A Project Name: New Garden Road Widening Phase II ' Project Location: Greensboro, NC Date: 6/28/2010 1 I 1 1 1 68 Distance; Point Back -Sight BM # 1(ft.)= 777.02 Height of Height Instrument Fore -Sight Depth STATION B.S. ILL F.S. Elevation Corrected Elevation COMMENTS B.M. # 1 1.71 101.71 100.00 0.0 101.71 10.15 91.56 768.58 head of riffle 10.0 101.71 10.20 91.51 768.53 riffle 13.0 101.71 11.06 90.65 767.67 poolmaxdepth 27.0 101.71 10.80 90.91 76793 head of riffle 44.0 101.71 11.41 90.30 767.32 tail of riffle 58.0 101.71 11.99 89.72 766.74 poolmaxdepth 80.5 101.71 11.41 90.30 767.32 head of riffle 82.0 101.71 13.00 88.71 76573 tail of riffle 88.0 101.71 13.44 88.27 765.29 pool max depth 101.0 115.0 101.71 101.71 13.80 12.89 87.91 88.82 764.93 765.84 pool head of riffle 128.0 101.71 13.13 88.58 765.60 tail of riffle 147.0 101.71 12.04 89.67 766.69 poolmaxdepth 148.0 101.71 14.03 87.68 764.70 head of riffle ' 154.0 101.71 14.11 87.60 764.62 tailofnffle 171.0 101.71 12.57 89.14 766.16 poolmaxdepth 185.0 101.71 13.10 88.61 765.63 head of riffle Thalweg Slope (ft. /ft,) 0.015 1 I 1 1 1 68 First Year Monitoring Report: Tributary A New Garden Road Widening Phase II Project No. P -3741 LONGITUDINAL PROFILE: Left Top of Bank - Tributary A Project Name: New Garden Road Widening Phase lI Project Location: Greensboro, NC Date: 6/28/2010 1 Valley Slope (ft /ft ) 0.002 I t 1 1 1 1 69 BM # 1 (ft.)= 777.02 Height of Height Distance; Point Back -Sight Instrument Fore-Sight Depth STATION B.S. ILL F.S. Devation Corrected Devation CONIl101iTS B.M. # 1 1.71 101.71 100.00 0.0 101.71 5.69 96.02 773.04 head of riffle 10.0 101.71 5.52 96.19 773.21 riffle 27.0 101.71 5.68 96.03 773.05 head ofnffle 44.0 101.71 5.66 96.05 773.07 tail of riffle 58.0 101.71 5.59 96.12 773.14 pool max depth 62.0 101.71 5.65 9606 773.08 80.5 101.71 5.66 96.05 773.07 head of riffle 88.0 101.71 5.83 95.88 772.90 poolmaxdepth 101.0 101.71 5.92 95.79 772.81 pool ' 115.0 119.0 101.71 101.71 5.88 5.59 95.83 96.12 772.85 773.14 head of riffle 128.0 101.71 5.19 96.52 773.54 tail of riffle 147.0 101.71 5.91 95.80 772.82 pool max depth 154.0 101.71 6.03 9568 772.70 tall of riffle 171.0 101.71 6.03 95.68 772.70 poolmaxdepth 185.0 101.71 603 95.68 772.70 head of riffle 1 Valley Slope (ft /ft ) 0.002 I t 1 1 1 1 69 fFirst Year Monitoring Report: Tributary A New Garden Road Widening Phase II Project No. P -3741 LONGITUDINAL PROFILE: Right Bankfull - Tributary A Project Name: New Garden Road Widening Phase II Project Location: Greensboro, NC Date: 6/28/2010 I 1 1 1 1 1 1 1 70 BM 41 (ft.)= 777.02 Height of Height Distance; Point Back -Sight Instrument Fore-Sight Depth STATION B.S. ILL F.S. Illevation Corrected Elevation COMMENTS B.M. # 1 1.71 101.71 100.00 0.0 101.71 7.14 94.57 771.59 head ofnfile 10.0 101.71 7.09 94.62 771.64 riffle 27.0 101.71 7.67 94.04 771.06 head of riffle 44.0 101.71 7.95 93.76 770.78 tail of riffle 58.0 101.71 8.14 93.57 770.59 poolmaxdepth 80.5 10171 8.69 93.02 770.04 head of riffle 88.0 101.71 8.68 93.03 770.05 poolmaxdepth 101.0 101.71 9.64 92.07 769.09 pool 115.0 101.71 9.35 92.36 769.38 head of riffle 128.0 101.71 9.47 92.24 769.26 tail of riffle ' 147.0 101.71 9.10 92.61 769.63 poolmaxdepth 154.0 10171 9.10 92.61 769.63 tail of riffle 171.0 10I.71 9.47 92.24 769.26 poolmaxdepth 185.0 101.71 9.47 92.24 769.26 head of riffle I 1 1 1 1 1 1 1 70 First Year Monitoring Report: Tributary A New Garden Road Widening Phase II Project No. P -3741 u', www�wi, w� we.QQ P M CC O 8 O p V M N W Y W va F9�"9ex �4- ti �4GG NA wvua e m N N N N ry 71 e 8 8 8 8 8 r r 8 r LO d' 0: 0 p °y U 9 � Qi _ z Q m m c I a T n/ I IL j m d W m \/ I r 3 Q g a a a a a a a a a U I 8 E. s 4 m - _ - w h O I I M *a i E�z I Z zz�� G E u 5 N � �z� a °' o� y N .. .. .. .., c o O ' I U 71 LO d' 0: L I � Qi _ Q m m c I a T n/ I IL j m d W m \/ I L lL Qi U I O I I M *a i I I I N I O M N O ' I U Q I LO NwY.. i i v I 1 � I O i LO I C d � � i O •w I V � I I d � Z I I I I I I LO I I U' Z! O W W W 1_ P- 1_ (•11) UOIJBA813 First Year Monitoring Report: Tributary A New Garden Road Widening Phase II Project No. P -3741 u. w w wwvi ww w� P P 4 3� Y W C C y d a Y d 9 m I L � d rq°'r'O W W �2Qap�GEx„ u e w I 3 c�'�AE o dYe aA cu Q° amv,azw�co3��wv�va w a � � N 12 8 g r 1 g h° 8 C n s ffi R � u xx o� U C � 7 3 0 2 7'a c e a a e v a e e v e v 0 0 0 Z zzc= c 41 a I � 72 U) Ul I L I w a I Ul `O 7 ... I a = cn 0 ' o i limy O I L) i , CO) O I d (A I N ' ' O I L � a I I ' w ' O I � N I N I C O I N I I L I � i 3 a y � r Z I , , I LO I I O LO M 0') r- LO ti C.0 Q0 ti ti (•jj) U011BA819 72 1 1 1 1 1 1 1 1 1 1 L I 1 1 1 1 First Year Monitoring Report: Tributary A New Garden Road Widening Phase II Project No. P -3741 LONGITUDINAL PROFILE: Water Surface - Tributary A Project Name: New Garden Road Widening Phase II Project Location: Greensboro, NC Date: 1/10/2012 WS Slope (ft. /ft.) 0.016 73 BM # 1 (ft.)= 775 70 Height of Height Distance; Point Back -Sight Instrument Fore -Sight Depth STATION B.S. ILL F.S. Elevation Corrected Elevation CONEMENTS B.M. # 1 2.45 102.45 100.00 0.0 102.45 9.43 93.02 768.72 head of riffle 10.0 102.45 9.60 92.85 768.55 riffle 13.0 102.45 10.04 92.41 768.11 pool max depth 27.0 102.45 10.23 92.22 767.92 head of riffle 44.0 102.45 10.65 91.80 767.50 tail of riffle 58.0 102.45 10.63 91.82 767.52 pool max depth 62.0 102.45 10.63 91.82 767.52 77.0 102.45 10.68 91.77 767.47 head of riffle 82.0 102.45 10.81 91.64 767.34 tail of rife 83.0 102.45 11.35 91.10 766.80 88.0 102.45 11.37 91.08 766.78 pool max depth 101.0 102.45 11.35 91.10 766.80 pool 116.0 102.45 11.37 9108 766.78 head of riffle 119.0 102.45 11.40 91.05 766.75 128.0 102.45 11.38 91.07 766.77 tail ofriffle 147.0 102.45 11.44 91.01 76671 pool max depth 148.0 102.45 11.80 90.65 766.35 head of riffle 154.0 102.45 11.77 90.68 766.38 tail of rife 170.0 102.45 11.80 90.65 766.35 pool max depth 1850 102.45 1180 90.65 766.35 head of riffle WS Slope (ft. /ft.) 0.016 73 1 1 1 1 1 74 First Year Monitoring Report: Tributary A New Garden Road Widening Phase II Project No. P -3741 LONGITUDINAL PROFILE: Thahveg - Tributary A Project Name: New Garden Road Widening Phase II 1 Project Location: Greensboro, NC Date: 1/10/2012 BM # 1 (ft.)-- 775.70 Height of Height Distance; Point Back -Sight Instrument Fore -Sight Depth STATION B.M. # 1 B.S. H.L F.S. Flevation Corrected Elevation CONUVERM 2.45 102.45 100.00 0.0 102.45 9.57 92.88 768.58 head of riffle 10.0 102.45 9.70 92.75 768.45 riffle 13.0 102.45 10.63 91.82 767.52 pool max depth 27.0 102.45 10.39 92.06 767.76 head of riffle 44.0 102.45 10.79 91.66 767.36 tail of rife 58.0 102.45 11.45 91.00 766.70 poolmaxdepth 62.0 102.45 11.17 91.28 766.98 77.0 10245 1081 91.64 767.34 head of riffle 82.0 102.45 10.89 9156 767.26 tail of rife 83.0 102.45 11.35 91.10 766.80 88.0 102.45 12.66 89.79 765.49 pool max depth 101.0 102.45 12.98 89.47 765.17 pool 116.0 102.45 12.20 90.25 765.95 head of riffle 119.0 102.45 12.44 90.01 765.71 128.0 102.45 12.46 89.99 765.69 tail of rife 147.0 102.45 11.54 90.91 766.61 pool max depth 148.0 102.45 13.49 88.96 764.66 head of rife 154.0 102.45 13.50 88.95 764.65 tail of rife 170.0 102.45 12.07 90.38 766.08 pool max depth 185.0 102.45 12.64 89.81 765.51 head of riffle Thalweg Slope (ft. /ft.) 0.013 1 1 1 1 1 74 First Year Monitoring Report: Tributary A New Garden Road Widening Phase II Project No. P -3741 LONGITUDINAL PROFILE: Left Bankfull - Tributary A Project Name: New Garden Road Widening Phase II Project Location: Greensboro, NC Date: 1/10/2012 1 1 1 I I 1 1 75 BM # 1(ft.)= 775.70 Height of Height Distance; Point Back -Sight Instrument Fore -Sight Depth STATION B.S. RL F.S. Elevation Corrected Elevation COMMENTS B.M. # 1 2.45 102.45 100.00 0.0 102.45 6.83 9562 771.32 head of riffle 10.0 102.45 6.74 95.71 771.41 riffle 27.0 102.45 6.95 95.50 771.20 head of riffle 44.0 102.45 747 94.98 770.68 tail of riffle 62.0 102.45 7.89 94.56 770.26 77.0 102.45 8.39 94.06 769.76 head of riffle 116.0 102.45 9.14 93.31 769.01 head of riffle 119.0 102.45 8.85 93.60 769.30 128.0 102.45 8.98 93.47 769.17 tail of riffle 147.0 10245 8.56 93.89 769.59 pool max depth 170.0 102.45 8.82 93.63 769.33 pool max depth 1 1 1 I I 1 1 75 First Year Monitoring Report: Tributary A New Garden Road Widening Phase II Project No. P -3741 LONGITUDINAL PROFILE: Right Bankfull - Tributary A Project Name: New Garden Road Widening Phase II Project Location: Greensboro, NC Date: 1/10/2012 1 1 1 76 BM # 1 (ft.)= 775.70 Height of Height Distance; Point Back -Sight Instrument Fore-Sight Depth STATION B.M. #1 B.S. ILL 2.45 102.45 F.S. Devation Corrected Oevation 100.00 COMl ENTS 10.0 102.45 6.86 9559 771.29 riffle 27.0 102.45 7.44 95.01 770.71 head of riffle 44.0 102.45 7.19 95.26 770.96 tail of riffle 62.0 102.45 8.14 94.31 770.01 pool max depth 77.0 102.45 785 94.60 770.30 head of riffle 116.0 102.45 8.53 93.92 769.62 head of riffle ' 119.0 102.45 8.63 93.82 769.52 128.0 102.45 8.66 93.79 769.49 tail of riffle 147.0 102.45 8.54 93.91 769.61 pool max depth 170.0 185.0 10245 102.45 8.83 9.13 93.62 93.32 769.32 769.02 pool max depth head of riffle 1 1 1 76