HomeMy WebLinkAbout20120742 Ver 1_Shoreline Stabilization_201208032® 1 2074 2 ROWBOAT Dock & Dredge 858 Williamson Road Mooresville, NC 28117 (704) 663 -3478 (866) 647 -8679 (FAX) www.rowboatcompany.com July 24, 2012 Cyndi Karoly NC Division of Water Quality Parkview Building 1650 Mail Service Center Raleigh, NC 27699 -1650 RE: Lake Norman (f� Y[ A j Dear Cyndi, Our firm is processing this application on behalf of Barry Gordon to stabilize approximately 181 linear feet of shoreline by installing Class B Rip Rap at 763 Morrison Farm Road, Troutman, NC 28166 on Lake Norman, Iredell County, North Carolina. A copy of the Duke Power Company application, pertinent drawings and a location map are enclosed for your use. To access the project: See Duke Energy Application for directions by road. We look forward to hearing from you at the earliest time possible. Sincerely, THE ROWBOAT COMPANY, INC. Michael Degner Senior Designer Enclosed: Five (5) Copies Check # , $240.00 AUG - 3 L�i2 1 i 2 2 2 The following is an abbreviated application form for those applying for a 401 Water Quality Certification to impact FERC (Federal Energy Regulatory Commission) regulated lake shore or bottom under the U.S. Army Corps of Engineers Permit GP30. This Application cannot be used for wetland or stream impacts. Please provide five (5) copies of this application and supporting information as well as a non - refundable application fee to the Division of Water Quality of $240.00 for impacts to lake bottom of less than 1 acre and $570.00 for impacts to lake bottom of greater or equal to 1 acre. Applications should be sent to: Division of Water Quality 401 Oversight/Express Review Permitting 1650 Mail Service Center Raleigh, NC 27699 -1650 I. Applicant Information Owner /Applicant Information Name: _ �Q�� 6 'Pl&W? Mailing Address: Z63/'/�,`sm� Telephone Number: _74*f-f ®Z 3516 Fax Number: °---- E -mail Address: ba/ir��Q Pmf�m/I �i°!9A G 2. Agent Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner /applicant.) Name: r 0/ Company Affiliation: Mailing Address: 'X Telephone Number: 7,r,-f-66 3- 3117-1 Fax Number: E -mail Address: /v J e-ldw-(!il (_!o �y eorw R. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. You may use the diagram below to make a hand sketch of your project. Also, see the example below for guidance. Both the vicinity map and site plan must include a scale and north arrow. The footprints of all buildings, impervious surfaces, or other facilities must be included. 1. Location County: �&de Nearest Town: `i`,,6pa �wa/f Subdivision name or site address (include phase /lot number): --- Directions to site please include road numbers, landmarks, etc. (This is not necessary if an adequate vicinity map is included): 5ee- clue ( 5ca/'c/Bv,� 2. Describe the existing land use or condition of the site at the time of this application: 3. Property size (acres): ®, 753 4. Nearest body of water (stream/river /sound/ocean/lake): 5. Describe the purpose of the proposed work: 1Fo 6. List the type of equipment to be used to construct the project: eW411041,' & Sk:� 5fee� 7. Amount of impact (including all excavation, backfill, rip rap, retaining walls, etc.) below the normal pool lake level in square feet or acres: sa 8.a. Amount of impact (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) above the normal pool lake level and 50 feet land -ward in square feet or acres: 8.b. Please describe vegetation above the normal pool lake level and 50 feet landward to be impacted (number of trees for instance): y4e, U �Q a 444 A A 1 11-1 vffy, T Applicant/Agent' Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) Mike Deaner From: Barry Gordon [barry@gordoniron.com] Sent: Tuesday, June 19,'2012 2:11 PM To: Mike Degner Subject: Re: Authorization To whom it may concern: I give Rowboat Dock and Dredge the authority to act as my agent by speaking on my behalf to process the DWQ permit.' Barry S Gordon - Homeowner 763 Morrison Farm Road Troutman, NC 28166 - - - -- Original Message - - - -- From: Mike Degner To: barry�a gordoniron.com Cc: Randy Jordan Sent: Tuesday, June 19, 2012 1:32 PM Subject: Authorization Barry, We are processing your DWQ application for the installation of the rip rap at your property on Morrison Farm Road. They have asked us for an authorization from you to act as your agent for this permit. Please respond to this e-mail and acknowledge that you give Rowboat Dock & Dredge authorization to speak on your behalf to process this DWQ permit for you. Sincerely, Mike Degner Senior Designer (704) 663 -3478 (866) 647 -8679 FAX (704) 201 -3472 cell 1 DUKE ENERGY LAKE MANAGEMENT, EC12 -Q P O BOX 1006 CHARLO'T'TE, NC 28201 -1006 704 - 382 -1567 or TOLL FREE 1- 800 - 443 -5193 APPLICATION FOR PERMIT TO STABILIZE THE SHORELINE IN NORTH CAROLINA. Please type or print and fill in all blanks. If information is not applicable, so indicate by placing a N/A in blank. PLEASE SUBMIT APPLICATION AND APPROPRIATE DUKE ENERGY FILING FEE. PAYABLE TO DUKE ENERGY, TO ABOVE ADDRESS. L Applicant Information A. Name 1! B. Mailing Address I C. Telephone Location of Proposed Project A. Lake �/ r B. Street Address C. County // D. City/Town/Community or Landmark % /'t9upl'GK/I E. Section Lot # Subdivision F. Directions to property by road ��,� 14 7I 5ileo f IYl G. Latitude and Longitude for the project site SEE ATTACIIED MAP Please submit a map showing the coordinates or a detailed map (USGS quad map, city map, etc.) showing the exact location of the project site. (NOTE: Latitude/Longitude coordinates can be found on internet site, www.mapblast-com ) III. Description of Project A. Length of wall /�5'/ B. Material G� /li )5 C. Distance from property line/shoreline IV. Intended Use of Project Area A. Private -\1 B. Commercial V. Applicant's Signature 3- °-� Date /� �i✓ PLEASE NOTE THE FOLLO - A COPY OF THE COMPLETED APPLICATION WITH A ROAD MAP SHOWING LOCATION OF THE PROPERTY MUST BE SUBMrrTED TO: US ARMY CORPS OF ENGINEERS, 151 PATTON AVE. - ROOM 208, ASHEVEU E, NC 28801 -5006 • A COPY OF THE 'DUKE ENERGY APPLICATION FOR PERMIT TO STABILIZE THE SHORELINE IN NORTH CAROLINA" AND SEVEN (7) COPIES OF THE COMPLETED "NC DIVISION OF WATER QUALITY PRE - CONSTRUCTION NOTIFICATION APPLICATION" MUST BE SUBMITTED WITH THE DIVISION OF WATER QUALITY APPLICATION FEE TO: NC DIVISION OF WATER QUALITY ATTENTION: CYNDI KAROLY PARKVIEW BLDG, 2321 CRABTREE ROAD RALEIGH, NC 27604 -2260 (919) 733 -1786 11 /10 /00ssb op WATF9 o� pG Office Use Only: 1 Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 Pre - Construction Notification PCN Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: ❑Section 404 Permit ❑Section 10 Permit 1b. Specify Nationwide Permit (NWP) number: or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ❑ Yes ❑ No 1 d. Type(s) of approval sought from the DWQ (check all that apply): ❑ 401 Water Quality Certification - Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification - Express ❑ Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes ❑ No For the record only for Corps Permit: ❑ Yes ❑ No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes No 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1h below. ❑ Yes XNo 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes X No 2. Project Information 2a. Name of project: 2b. County: 2c. Nearest municipality / town: 2d. Subdivision name: 2e. NCDOT only, T.I.P. or state project no: 3. Owner Information 3a. Name(s) on Recorded Deed: 3b. Deed Book and Page No. 3c. Responsible Party (for LLC if applicable): 3d:- Street address:- �- -� 3e. City, state,-zip: 3f. Telephone no.: 7��{- 6 Z — .3L5-?10 3g. Fax no.: 3h. Email address: ba ®lAm ww. cem Page 1 of 10 PCN Form - Version 1.3 December 10, 2008 Version 4. Applicant Information (if different from owner) 4a. Applicant is: [,Agent ❑ Other, specify: 4b. Name: l- 4c. Business name (if applicable): YIVL+1449"7 9- d 4d. Street address: S' 141-hl i, e9d WA UN 4e. City, state, zip: p d fe gf 4f. Telephone no.: Try — 63- 4g. Fax no.: 4h. Email address: e�6 5. Agent/Consultant Information (if applica le) 5a. Name: 5b. Business name (if applicable): 5c. Street address: 5d. City, state, zip: 5e. Telephone no.: 5f. Fax no.: 5g. Email address: Page 2 of 10 PCN Form — Version 1.3 December 10, 2008 Version B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): 4t& Z_Ily 03� 1b. Site coordinates (in decimal degrees): Latitude: : G33q66— Longitude: -go. QZ$-p, (DD.DDDDDD) (- DD.DDDDDD) 1 c. Property size: 3 acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to proposed project: 2b. Water Quality Classification of nearest receiving water: 4A. QC 2c. River basin: 3. Project Description C� 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: �Zy�� >:s a PAFVk4 &6, -ho/40 &A la�k J1&11na4_ yG 15 L. , �ia�e r� son a sav/ce Q a R4D xF n �,ds e 1d , i Yte6k el,s, 3b. List the total estimated acreage of all existing wetland's existing on the property: N0 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 3d. Explain the purpose of the proposed project: / 5A&&/fie 8'fab 3e. Describe the overall project in detail, including / the type of equipment to be used: `p���}y,�„� Pl�Ke¢ �c�•�i�e/l W fN be UW 4U ,0y/`'� " 0 lace )%e 1?w Rkj tjA 14& Sh oOolwA 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / project (including all prior phases) in the past? ❑ Yes ❑ No Unknown Comments: 4b. If the Corps made the jurisdictional determination, what type of determination was made? - ❑ Preliminary Q Final 4c. If yes, who delineated the jurisdictional areas? Agency /Consultant Company: Name (if known): Other: 4d. If _yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation 5. Project History 5a. Have - permits or certifications been requested or obtained for this project (including all prior phases) in the past? ❑ Yes XNo ❑ Unknown 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? 6b. If yes, explain. ❑ Yes ® No Page 3 of 10 PCN Form — Version 1.3 December 10, 2008 Version Page 4 of 10 PCN Form — Version 1.3 December 10, 2008 Version C. Proposed Impacts Inventory 1. Impacts Summary 1a. Which sections were completed below for your project (check all that apply): ❑ Wetlands ❑ Streams - tributaries Buffers Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ — non -404, other) (acres) Temporary T W1 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W2 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W3 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ w4 ❑ p ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W5 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W6 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ 2g. Total wetland impacts 2h. Comments: 3. Stream Impacts` If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number - Permanent (P) or (PER) or intermittent (Corps - 404, 10 DWQ — non -404, stream width length (linear Temporary (T) (INT)? other) (feet) feet) - T ❑ PER ❑ Corps ❑ INT ❑ DWQ T ❑ PER ❑ Corps ❑ INT ❑ DWQ T FTIP ❑ PER ❑ Corps ❑ INT ❑ DWQ ❑ PER ❑ Corps ❑ INT ❑ DWQ S5 El [:IT E] PER El -- ❑ INT I ❑ DWQ S6 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ 3h. Total stream and tributary impacts 3i. Comments: Page 4 of 10 PCN Form — Version 1.3 December 10, 2008 Version 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individually list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of waterbody impact number- (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Tem orar T 5g. Comments: 5h. Is a dam high hazard permit required? �C1 NPEIT 4 t o/ vlcM I x* 5j. Size of pond watershed (acres): ®, OZ ,reS 02 ❑P ❑T 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 03 ❑P ❑T ❑ Neuse ❑ Tar- Pamlico ❑ Other: Project is in which protected basin? Catawba ❑ Randleman 6b. 04 ❑P ❑T 6d. 6e. 6f. 6g. 4f. Total open water impacts (JZ QL/e, S 4g. Comments: 5. Pond or Lake Construction A If pond or lake construction proposed, then complete the chart below. 5a. 5b. 5c. 5d. 5e. Pond ID Proposed use or purpose Wetland Impacts (acres) Stream Impacts (feet) Upland number of pond (square feet) Temporary T (acres) required? B1 P (� T INC {�b:f.2E� //1� l�a'FQa/ 'I d` ❑ Yes FNo ►dx 1$r = g � ,, 1 Flooded Filled Excavated Flooded Filled Excavated Flooded r1 P2 5f. Total 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require mitigation, then you MUST fill out Section D of this form. 6a. ❑ Neuse ❑ Tar- Pamlico ❑ Other: Project is in which protected basin? Catawba ❑ Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number - Reason Buffer Zone 1 impact -Zone 2 impact- - Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary T impact required? B1 P (� T INC {�b:f.2E� //1� l�a'FQa/ 'I d` ❑ Yes FNo ►dx 1$r = g � ,, 1 ig'x � _ B2 ❑P ❑T E] Yes ❑ No B3 ❑P ❑T El Yes ❑ No 6h. Total buffer impacts I'Flo 3c90 6i. Comments: i e,,44J&A11e 4ccers 'ern ::t -4.6 e jwj, G(r /wc Page 5 of 10 PCN Form - Version 1.3 December 10, 2008 Version D. Impact Justification and Mitigation 1. Avoidance and Minimization 1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts throucjh construction techniques. XO 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ❑ Yes X,No 2b. If yes, mitigation is required by (check all that apply): ❑ DWQ ❑ Corps 2c. If yes, which mitigation option will be used for this project? ❑ Mitigation bank ❑ payment to in -lieu fee program ❑ Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete if Making a Payment to In -lieu Fee Program 4a. Approval letter from in -lieu fee program is attached. ❑ Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ❑ warm ❑ cool ❑cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non - riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Page 6 of 10 PCN Form — Version 1.3 December 10, 2008 Version 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes 9 No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in -lieu fee fund). 6h. Comments: Page 7 of 10 PCN Form — Version 1.3 December 10, 2008 Version E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified Yes ❑ No within one of the NC Riparian Buffer Protection Rules? 1 b. If yes, then is a diffuse flow plan included? If no, explain why. Comments: 511ale, 1 84.6, ❑ Yes No ate// 2. Stormwater Management Plan 2a. What is the overall percent imperiousness of this project? 0 2b. Does this project require a Stormwater Management Plan? ❑ Yes X No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: ,< f acre r54.c/%Ge_ 2d. If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: ❑ Certified Local Government 2e. Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program ❑ DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? 'AA ❑ Phase II 3b. Which of the following locally - implemented stormwater management programs ❑ NSW ❑ USMP apply (check all that apply): ❑ Water Supply Watershed ❑ Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 4. DWQ Stormwater Program Review ❑ Coastal counties 4a. Which of the following state - implemented stormwater management programs apply ❑ HQW. ❑ ORW (check all that - apply): ❑ Session Law 2006 -246 ❑ Other: 4b.- Has -the approved Stormwater Management Plan with proof of approval been - - - - - attached? ❑ Yes ❑ No 5. DWQ 401- Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b. Have all of the 401 Unit submittal requirements been met? ❑ Yes ❑ No Page 8 of 10 PCN Form — Version 1.3 December 10, 2008 .Version F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1a. Does the project involve an expenditure of public (federal /state /local) funds or the ❑ Yes No use of public (federal /state) land? 1 b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ❑ Yes ❑ No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval ❑ Yes ❑ No letter.) Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ❑ Yes No or Riparian Buffer Rules (15A NCAC 213 .0200)? 2b. Is this an after - the -fact permit application? ❑ Yes No 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ❑ Yes No additional development, which could impact nearby downstream water quality? ,'� 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non- discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. /I Page 9 of 10 PCN Form — Version 1.3 December 10, 2008 Version 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or habitat? ❑ Yes No 5b. Have you checked with the USFWS concerning Endangered Species Act ❑Yes No impacts? 5c. If yes, indicate the USFWS Field Office you have contacted. Raleigh ❑ ❑ Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ❑ Yes X No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? fit �/JC tj �J'e lj°!C a 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ❑ Yes Y3 No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? a4,164 4*' �A .(/a -e/t 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA- designated 100 -year floodplain? —Ti—yes ❑ No 8b. If yes, explain how project meets FEMA requirements: �ckd✓'G 5><a� /� ���^ �,�/90 Q, � A 8c. What source(s) did you use to make the floodplain determination? ��eZ 04 Sr-�e 9,alVe A plican Agent's Mignature Applicant/Agent's Printed Name Da_ te_ (Agent's signature is valid only if an authorization letter from the applicant is rovided. Page 10 of 10 PCN Form — Version 1.3 December 10, 2008 Version i ,1 z z- 00 o ��m =z� m m 1 N�Orr! � NSW g y Zc � In �1 L5 4� $. 000 � mm olo0ovw t.12 m 11, Iwo n7 !-M !-Z V, UUOC�ppfOfgVq�� Cwf1�4►cp Vl imp 4f Alt 22 �m M; z � CIO CIO CIO CIO TO 18O NuI%Wa ° °4i °aa°N° + 4i0 c>tyH iv�o' mmmm��� Z= Z m o o z DATE: Rowboat Dock o m N Z� 3 O ° rtx CO , �" MAD 07/11/1 & Dredge d e g i > IV, M• N � (D APPROVED DATE: N O Fn :3 to D (D Q (D Q O (7 Z O O � -1 0-3 0 O PROJECT MANACM. DATE: RJJ 07/11/1 CoomMmae 858 woio� pin. Very e..t Yppresvills. NC 28117 W O N U4 O C :3 5.0 Q 7 Cl O 7 Q SCALE: [Y VARIES (704) 663-3478 (704) 883 -8298 FAX m wabsito: — .rowbootaomporq.eom t m zm nT yr a 04 m 0 DO� a r OA � 3n m r CO) W m zi _ z ° 3 Zr a DRAM DATE: Rowboat Dock M N 3 �_ v ° x Cu �`` MAD 07/11/1 & Dredge I > N• �• (n ? N APPROVED DATE: N N 0 p 0 (D (i Z Comiklend Among the Very Best ---� ,� :3 r-r (D Q O PROJECT Yom, R: DATE: 838 WeRomson Rood W °*� W V) ° O RJJ 07/1/1 Mon re.M., NC 8117 o O O C 7 j j SCALE: (704) 553-3298 FAX N N m O VARIES .eosite:....rowtwotcompany.com r� F + .'y ,. it �` A',�" h� F nv ,. dr.. ... *n. -�.• � r, , >.. •;.... SAO rum if ITY Zek =fib t •'y . r fit+. tC`x' �`' �. tAil US- TZ ITT�.- ` � ,�t: ��P�a7' , � Y�.�._ « f �s.w ".1�yly�I .. YCr• i.-.., Mw Latitude and Longitude of a Point iTouchMap.com Mebile and DesMep Maps Home n Latitude and Longitude of a Point Page 1 of 1 Maps I Country - State I Places I Google Earth I Cities i Earthquakes I I Am Here I Lat - Long To find the latitude and longitude of a point Click on the map, Drag the marker, or enter the... is, Address: 763 Morrison Farm Road, Troutman, NC (Go Map Center: Get Address - Land Plat Size - Street View - Google Earth 3D - Area Photographs Try out the Google Earth Plug -in. Google Earth gives you a 3D look of the area around the center of the map, which is usually your last click point, and includes latitude, longitude and elevation information. Latitude and Longitude of a Point Note: Right click on a blue marker to remove it. Show Point from Latitude and Longitude Clear /Reset All Markers Center Red Marker Use this if you know the latitude and longitude coordinates of -- -- a point and want to see where on the map the point is. Use: + for N Lat or E Long — for S Lat or W Long. Get the Latitude and Longitude of a Point Example: +40.689060 - 74.044636 Note: Your entry should not have any embedded spaces. When you click on the map, move the marker or enter an address the latitude and longitude coordinates of the point are inserted in the boxes below. Latitude: 35.633855 Longitude: - 80.925070 Degrees Minutes Seconds Latitude: 35 38 1.8774 Longitude: -80 55 30.252 Decimal Deg. Latitude: Decimal Deg. Longitude: Show Point Example: +34 40 50.12 for 34N 40'50.12" Degrees Minutes Seconds Latitude: Longitude: © iTouchMap.com 2007 -2012 http : / /itouchmap.com/latlong.html 6/19/2012 gp�}ya �a f 518. OR 7swI#t ea wr e s s r a \ i - ° H :vlc eed f�� ° _