Loading...
HomeMy WebLinkAboutNC0048305_CEI_20210309 SENT VIA ELECTRONIC MAIL ONLY: NO HARD COPY WILL BE MAILED March 09, 2021 Naiden Kremenliev Email: naiden@tryonfinishing.com Tryon Finishing Corporation SUBJECT: Compliance Inspection Report Carolina Yarn Processors NPDES WW Permit No. NC0048305 Polk County Dear Permittee: The North Carolina Division of Water Resources conducted an inspection of the Carolina Yarn Processors on 2/10/2021. This inspection was conducted to verify that the facility is operating in compliance with the conditions and limitations specified in NPDES WW Permit No. NC0048305. The findings and comments noted during this inspection are provided in the enclosed copy of the inspection report entitled "Compliance Inspection Report". There were no significant issues or findings noted during the inspection and therefore, a response to this inspection report is not required. If you should have any questions, please do not hesitate to contact me at 828-296-4686 or via email at mikal.willmer@ncdenr.gov. Sincerely, Mikal Willmer, Environmental Specialist II Water Quality Regional Operations Section Asheville Regional Office Division of Water Resources, NCDEQ ATTACHMENTS: Inspection Report Ec: LF Deborah Bradley, ORC DocuSign Envelope ID: 57D9AFE2-9C3F-4DA6-9410-61C9B1303E44 EPA United States Environmental Protection Agency Washington, D.C. 20460 Water Compliance Inspection Report Form Approved. OMB No. 2040-0057 Approval expires 8-31-98 Section A: National Data System Coding (i.e., PCS) Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type 1 N 52 NC0048305 21/02/10 C S31112171819 20 21 66 Inspection Work Days Facility Self-Monitoring Evaluation Rating B1 QA ----------------------Reserved------------------- N67707172 73 74 75 80 Section B: Facility Data Name and Location of Facility Inspected (For Industrial Users discharging to POTW, also include POTW name and NPDES permit Number) Carolina Yarn Processors 250 Screvens Rd Tryon NC 28782 Entry Time/Date Permit Effective Date Exit Time/Date Permit Expiration Date 09:10AM 21/02/10 19/10/01 Name(s) of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) /// Deborah M Bradley/ORC/828-859-5626/ Other Facility Data 10:00AM 21/02/10 23/07/31 Name, Address of Responsible Official/Title/Phone and Fax Number Naiden Kremenliev,250 Screven Rd Tryon NC 28782/President/828-859-5891/Contacted No Section C: Areas Evaluated During Inspection (Check only those areas evaluated) Permit Effluent/Receiving Waters Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s) and Signature(s) of Inspector(s)Agency/Office/Phone and Fax Numbers Date Mikal Willmer DWR/Division of Water Quality/828-296-4686/ Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date EPA Form 3560-3 (Rev 9-94) Previous editions are obsolete. Page#1 DocuSign Envelope ID: 57D9AFE2-9C3F-4DA6-9410-61C9B1303E44 3/9/2021 3/9/2021 NPDES yr/mo/day 21/02/10 Inspection Type C3111218 1 Section D: Summary of Finding/Comments (Attach additional sheets of narrative and checklists as necessary) Mikal Willmer, with the Asheville Regional Office, conducted a compliance evaluation inspection of the Tryon Finishing's sedimentation basins and sand filter beds and associated outfalls on February 10, 2021. This inspection was conducted to determine whether the facility is being operated and maintained in compliance NPDES Permit No. NC0048305. Deborah Bradley, ORC, and Naiden Kremenliev, President Tryon Finishing, were present and assisted in the inspection. Facility is classified physical chemical. Industrial process wastewater is discharged to the Town of Tryon’s collection system under their IUP. The water discharged to the creek is generated during the treatment of the facility's freshwater pond water. Last discharged from the sand filter beds and secondary sedimentation (001 and 002) basin in 2016. Facility has been primarily using city water. Tryon Finishing staff indicated they were only using one filter and discharging every few months (003). Currently using significantly less water and have not needed to clean the basins since purchasing the facility. The facility's boiler has not been used since 2018. Water use will increase once the boiler is put back into service. No current plans to upgrade any parts of the water treatment system. Equipment is aging (approximately 40 to 50 years old) but reported to still be operational. It was noted the access steps to the sedimentation basin at the top of the hill are broken and present a safety hazard to workers. Should the system be put into use full time, Tryon Finishing should provide safe access for routine maintenance. Additionally, ensure all liquid totes stored on the pavement outside do not drain or have the potential to discharge to any onsite stormwater systems. NC0048305 17 (Cont.) Page#2 DocuSign Envelope ID: 57D9AFE2-9C3F-4DA6-9410-61C9B1303E44 Permit:NC0048305 Inspection Date:02/10/2021 Owner - Facility: Inspection Type: Carolina Yarn Processors Compliance Evaluation Permit Yes No NA NE (If the present permit expires in 6 months or less). Has the permittee submitted a new application? Is the facility as described in the permit? # Are there any special conditions for the permit? Is access to the plant site restricted to the general public? Is the inspector granted access to all areas for inspection? Comment: Effluent Pipe Yes No NA NE Is right of way to the outfall properly maintained? Are the receiving water free of foam other than trace amounts and other debris? If effluent (diffuser pipes are required) are they operating properly? Comment: Page#3 DocuSign Envelope ID: 57D9AFE2-9C3F-4DA6-9410-61C9B1303E44