Loading...
HomeMy WebLinkAbout20120579 Ver 1_More Info Received_20120807Martin Marietta Materials 8710 Red Oak Blvd Suite 540 Charlotte, NC 28217 Ph 704- 409 -1475 Fax 704 - 527 -9283 I rs" o � `1 � Transmittal Letter August 3 2012 Martin Marietta Materials A A TO Attention ttention Homewood NCDWQ Winston Salem Regional Office Prints Culvert Crossing Detail p Copy of Letter Resubmit copies for approval 585 Waughtown Street AUG - 7 2012 Thomasville 401 Certification Winston Salem NC 27107 Re WATER ds a� rr Total Quantity We are sending you Description Shop Drawings Resopnse Letter 8 -3-12 Prints Culvert Crossing Detail p Copy of Letter Resubmit copies for approval Change Order AUG - 7 2012 Plans L:Ws, Other WATER ds a� rr Total Quantity As Requested Reproducible Returned for Corrections Samples Return [ #] corrected prints Comments Copy to Sig pafu re Copies Description 1 Resopnse Letter 8 -3-12 1 Culvert Crossing Detail p Resubmit copies for approval AUG - 7 2012 L:Ws, WATER ds a� rr These are transmitted as checked below For Approval Approved as Submitted Resubmit copies for approval For Your Use Approved as Noted Submit [ #] copies for distribution As Requested Returned for Corrections Return [ #] corrected prints Comments Copy to Sig pafu re Martin Marietta Materials August 3 2012 Delivery by FedEx Ms Sue Homewood NC DWQ Winston -Salem Regional Office 585 Waughtown Street Winston Salem NC 27107 Re Martin Marietta Thomasville Quarry Section 401 Water Quality Certification DWQ# 12 0579 Dear Ms Homewood This letter is to address the comments generated from the July 11 2012 review Please see the responses below addressing the items from this letter 1 A site visit was conducted with DWQ on July 31 2012 to review the existing culvert the proposed culvert extension and the existing stream between the proposed culvert outlet and the existing railroad culvert The determination was made by DWQ that the proposed culvert mvert will not be required to be buried due to the presence of rock The determination was made by DWQ that the existing stream located between the proposed outlet and the existing railroad culvert will continue to function as an intermittent stream in a natural state 2 I have included a proposed plan detailing the proposed culvert extension 3 The proposed additional impervious area from the roadway construction will be directed into the mining pit This handling of the stormwater will meet the Phase II Post Construction requirements for non metallic mines Should you have any questions or need any additional information, please do not hesitate to contact me at (704) 409 1475 or via a marl at jay ravens @martmmanetta com r y ens Sr Environmental Engineer Martin Marietta Materials Inc 8701 Red Oak Blvd Suite 540 Charlotte NC 28217 Cc Ian McMillan N C Division of Water Quality Wetlands /401 Ashley Rodgers State Mining Specialist (via email) dwq response coverletter 8 -3 12 docx 0 LSVLSII 1:/ L5I I AUG -72012 DENR WATER OMUM-Ify ll�� I v V\A