Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
20070503 Ver 2_Worksheets_20070522
Project No. DWQ EXP 07-0503 Project Name: E-22 School Bio-retention 2 SUBMITTED DESIGN: REQUIRED DESIGN: elevations ~-=~~ Permanent Pool (ft) 317 ~ 6 ft. depth check depth Temporary Pool (ft) 323 areas Permanent Pool SA (sq ft) 7396 40478 sq. ft. check surfac Drainage Area (ac) ac Impervious Area (ac) 1.41 % impervious Rational C 0.63 Size % 5 no sand underdrain volumes Inlet Velocity 5.2 0 fps check veloci Inlet Flow Depth 6 in Depth to Ground Water 5 6 ft Planting Soil Infiltration 1.2 0.52 in/hr ok In-Situ Soil Infiltration 0.5 0.00 in/hr ok Project No. DWQ EXP 07-0503 Project Name: E-22 School Bio-retention 1 SUBMITTED DESIGN. elevations Permanent Pool (ft) 305 Temporary Pool (ft) 311 areas Permanent Pool SA (sq ft) 20037. Drainage Area (ac) 14.32 Impervious Area (ac) 5.6'7 Rational C 0.59 Size % 5 volumes Inlet Velocity Inlet Flow Depth Depth to Ground Water Planting Soil Infiltration In-Situ Soil Infiltration 6.5 6 6 1.2 0.5 D D (~v~ REQUIRED DESIGN: 6 ft. depth 184015 sq. ft. ac 39.6 % impervious no sand underdrain 0 fps in Eft 0.52 in/hr 0.00 in/hr 0 0 s - ~-~ ~ ~ check depth check surfac check veloci ok ok r~af- O~