HomeMy WebLinkAboutSW3210301_Supplement-EZ Form_20210309SUPPLEMENT-EZ COVER PAGE
FCJRMS I..CJADFD
PROJECT INFORMATION��������������������������������������������������������������������������������������������������
1
.....................................................................................................................................................................................................................................................................................................................................................................................................................................................
Project Name
Cresswind - Phase 2
2
Project Area ac
44.1
3
Coastal Wetland Area (ac)
0..
4
Surface Water Area ac
0.5
5
Is this project High or Low Densit ?
High
6
Does this project use an off -site SCM?
No
COMPLIANCE WITH 02H .1003(4�..........................................................................................
7
Width of ve etated setbacksprovided feet
30
8
Will the vegetated setback remain vegetated?
Yes
9
( )(..
Is BUA other that as listed m 1003 4 c d out of the setbacks
Yes
10
Is streambank stabilization proposed on this project?
No
NUMBER AND TYPE OF SCNIs.
11
Infiltration System
0
12
.....................................................................................................................................................................................................................................................................................................................................................................................................................................................
B ioretention Cell
0
13
Wet Pond....
i...
14
Stormwater Wetland
0..
15
Permeable Pavement
0
16
Sand Filter
0
17
Rainwater„Harvesting (RWH)
0..
18
Green Roof
0..
19
Level Spreader -Filter Strip (LS-FS)
0
20
Disconnected Impervious Surface (DIS)
0
22
Dry Pond....
0..
23
StormFilter
0
24
Silva CelL........
0..
25
Bayfilter
0
26
Filterra
0
E RM51.DIFD
DESIGNER CERTIFICATION
27
Name and Title:
Matthew S. Kiker
28
Organization:
Thomas & Hutton
29
Street address:
1020 Euclid Avenue
30
City, State, Zip:
Charlotte, NC 28203„
31
Phone number(s):
980-201-5507
32
Email:
kiker.m@tandh.com
Certification Statement:
I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or
supervision, that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and
that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent
with the information provided here.
Designer
CA
i
AL -
049480 -
����� •••FN0INEER•••��,�.�.
`Se`al
r
- Z40C:'. 4 Y
Signature of Designer
Date
DRAINAGE AREAS
............................................................................................................................................................................................................................................................................
1 Is this a high density project? Yes
2 If so, number of drainage areas/SCMs 1
Is all/part of this project subject to previous rule
3 versions? No
ci..ici< ro i..ra D21
DRAINAGE�AREAINFORMATION�...... ...... ...... ...... ...... ................................................................................1.................
4
Type of SCM
N/A
Wet Pond
5
Total BUA in project (sq ft)
1 319710 sf
1319710 sf
New BUA on subdivided lots (subject to
6
permitting) (sq ft)
860000 sf
860000 sf
New BUA outside of subdivided lots (subject to
7
ermitting) (sD
459710 sf
459710 sf
8
Offsite -total area (sq ft)
sf
sf
9
Offsite BUA (sq ft)
sf
sf
10
Breakdown of new BUA outside subdivided lots:
Parking (sq ft)
sf
sf
Sidewalk (sq ft)....
26890 sf
26890 sf
Roof (sq ft)
sf
sf
Roadway (sq ft)
93466 sf
93466 sf
Future (sq ft)
244354 sf
244354 sf
Other, please specify in the comment box
below sq ft
sf
sf
New infiltrating permeable pavement on
11
subdivided lots (sq ft)
sf
sf
New infiltrating permeable pavement outside of
12
subdivided lots s ft
sf
sf
Exisitng BUA that will remain (not subject to
13
permitting) (sq ft)
sf
sf
14
Existing BUA that is already„permitted „ (sq ft)
sf
sf
15
Existing BUA that will be removed (sq ft)
sf
sf
16
Percent BUA
67%
67%
17
Design storm (inches)
1 in
18
Design volume of SCM (cu ft)
107158 cf
19
Calculation method for design volume
Simple
ADDITIONAL UFO
Please use this space to provide any additional information about the
area(s)
The future area is intended to account for a portion of a future phase to be
managed with this Phase 2 pond.
WET POND
1
Drainage area number
1
2
Design volume of SCM (cu ft)
107158 cf
GENERAL MDC FROM 02H .1050
3
Is the SCM sized to treat the SW from all surfaces at build -out?
Yes
4
is the SCM located away from contaminated soils?
Yes
..........................................................................................................................................................................................................................................................................................................................
5
What are the side slopes of the SCM (H:V)?
3:1
Does the SCM have retaining walls, gabion walls or other
6
engineered side slopes?
No
Are the inlets, outlets, and receiving stream protected from erosion
7
(10-year storm)?
Yes
is there an overflow or bypass for inflow volume in excess of the
8
design volume?
Yes
9
What is the method for dewatering the SCM for maintenance?
Drawdown Orifice
..........................................................................................................................................................................................................................................................................................................................
10
If applicable, will the SCM be cleaned out after construction?
Yes
11
Does the maintenance access comply with General MDC (8)?
Yes
12
Does the drainage easement comply with General MDC (9)?
Yes
if the SCM is on a single family lot, does (will?) the plat comply with
13
..........................................................................................................................................................................................................................................................................................................................
General MDC (10)?
No
14
Is there an O&M Agreement that complies with General MDC (11)?
Yes
15
Is there an O&M Plan that complies with General MDC (12) .
Yes
16
Does the SCM follow the device specific MDC?
Yes
17
Was the SCM designed by an NC licensed professional?
Yes
WET POND
MDC FROM 02H .1053
18
Method used
SA/DA
..........................................................................................................................................................................................................................................................................................................................
19
Has a stage/storage table been provided in the calculations?
Yes
Elevation of the excavated main pool depth (bottom of sediment
20
removal) (fmsl)
560:50
21
Elevation of the main pool bottom -(top of sediment removal) (fmsl)
561.00
Elevation of the temporary pool (fmsl)
565:51
......................................................................................................................................................................................................................................................................................
Surface area of the main permanent pool (square feet)
38866
Volume ..of.the..main..pe permanent
pool feet) p (
Average depth of the.. main.. poolfeet..( .................................................................................................................................2.89..ft......
9 )
..eused.................................................................................................................................................Equation..3
Avera(1 q
q....e..pdet„quation
33
Is this 15-20% of the volume in the main pool?
Yes
...................................................................................................................................................................................................................................................................................................
34
Clean -out depth for forebay (inches)
48 it
..................................................................................................................................................................................................................................................................................................
35
Design volume of SCM (cu ft)
10715E
36
Is the outlet an orifice or a weir.
Orific
...................................................................................................................................................................................................................................................................................................
37
If orifice, orifice diameter (inches)
5. in
...................................................................................................................................................................................................................................................................................................
38
If weir, weir height (inches)
...................................................................................................................................................................................................................................................................................................
39
If weir, weir length (inches)
...................................................................................................................................................................................................................................................................................................
40
Drawdown time for the temporary pool (days)
3
...................................................................................................................................................................................................................................................................................................
Are the inlet(s) and outlet located in a manner that avoids short-
41
circuiting?
Yes
42
Are berms or baffles provided to improve the flow path?
No
...................................................................................................................................................................................................................................................................................................
43
Depth of forebay at entrance (inches)
60 it
44
Depth of forebay at exit (inches)
54 it
45
Does water flow out of the forebay in a non -erosive manner?
Yes
..................................................................................................................................................................................................................................................................................................
46
Width of the vegetated shelf (feet)
6 ft
...................................................................................................................................................................................................................................................................................................
47
Slope of vegetated shelf (H:V)
6:1
...................................................................................................................................................................................................................................................................................................
Does the orifice drawdown from below the top surface of the
48
permanent pool?
Yes
...................................................................................................................................................................................................................................................................................................
Does the pond minimize impacts to the receiving channel from the 1-
49
yr, 24-hr storm?
Yes
...................................................................................................................................................................................................................................................................................................
Are fountains proposed? (If Y, please provide documentation that
50
...................................................................................................................................................................................................................................................................................................
MDC(9) is met.)
No
51
...................................................................................................................................................................................................................................................................................................
Is a trash rack or other device provided to protect the outlet system?
Yes
52
Are the dam and embankment planted in non -clumping turf grass?
Yes
.............'S3'.§pecies..of.
turf .that.will..be..used..o n.the..dam..and..embankment
Bermu
54
Has a planting plan been provided for the vegetated shelf.
Yes
ADDITIONAL�INFORMATION�....
...... ""...... ...... ...... ...... ...... ...... ...... ....�������������������
Flease use this s aoe to rovde an addtrona� nformatonabout
p p Y
11 55
the wet pond(s):
Wet Pond 1 5:10 PM 2/22/2021