Loading...
HomeMy WebLinkAbout20191233 Ver 2_Crabtree West Permit Drawings 03_05_2021_20210305-L1- -HSW- -Y5-TYPE-IIITYPE-IIITYPE-III-EBCR--EBCR-Ri chl and Cr e ekCrabtree Creek H14014.00 GREENWAY ENGINEER HYDRAULICS ENGINEER PROJECT NO.: REVISIONS: NO.DATE 919-996-4785 RALEIGH, NC 27601 SUITE 600 222 W. HARGETT ST, RALEIGH MUNICIPAL BUILDING CULTURAL RESOURCES RECREATION and PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com T 919.380.8750 Raleigh, NC 27603 Suite 1100 223 West Street, Firm License No. C-1051 LISA SCHIFFBAUER, PROJECT MANAGER CONTACT: Raleigh, NC 27606 VHB Engineering NC, P.C. (C-3705) 940 Main Campus Drive, Suite 500 DATE: OCTOBER 17, 2019PROFESSIONALENGINEERNORTH CARO LINA SEAL 14101 J HN M . KAM P ATORH FUNC. CLASSIFICATION LEAN ANGLE DESIGN SPEED = = = DESIGN DATA PROJECT LENGTHGRAPHIC SCALES 0 PROFILE (HORIZONTAL)PLANS PROFILE (VERTICAL) 0 GREENWAY 20 DEGREES 20 MPH NORTH CAROLINA CITY OF RALEIGH CRABTREE CREEK WEST GREENWAY FROM EBENEZER CHURCH ROAD TO LINDSAY DRIVE LOCATION: 1 VICINITY MAPEBENEZER CHURCH RD.DURALEI GH RD.LI NDSAY DR.PICARDY DR.POYNER RD.BOXWOOD RD. WEAVER DR. -L1--L2--Y2- -Y1- -L1- -L2- STA. 46+30.36 END CONSTRUCTION -L1- STA. 4+12.68 BEGIN CONSTRUCTION BEGIN PROJECT -L1- STA. 63+10.02 END CONSTRUCTION -L2- STA. 10+80.60 BEGIN CONSTRUCTION 30 15 0 30 60 30 15 30 60 LENGTH OF PROJECT LENGTH OF BRIDGE LENGTH OF BOARDWALK LENGTH OF ASPHALT TRAIL = = = = 1.80 MI 0.06 MI 0.01 MI 1.73 MI1"=30'1"=30'1"=6' PARK STATE UMSTEAD 4 5 6 7 8 9 10 11 12 13 14 15 6 1236 CRABTREE CREEK RICHLAND CREEKCOR: 636-99220450-01-17 FA# CMAQ.0520(57) WBS: 43714.3.8 16 17 NCDOT TIP# C-5604-OD & EROSION CONTROL BOARDWALKS, BRIDGES, DRAINAGE, GRADING, PAVING, RETAINING WALLS, TYPE OF WORK: ACCESS CONSTRUCTION ACCESS CONSTRUCTION ACCESS CONSTRUCTION ACCESS CONSTRUCTION END PROJECT ACCESS CONSTRUCTION WETLAND AND SURFACE WATER IMPACTS PERMIT SHEET 1 OF 24 PERMIT DRAWING PARK STATE UMSTEAD LI NDSAY DR.DURALEI GH RD.EBENEZER CHURCH RD.PICARDY DR.W/E 252.4 W/E 285.7 262.1 W/E W/E 272.8 274.9 W/E W/E 273.1 259.5 W/E W/E 247.3 232.1 W/E 240.4 W/E W/E 240.4 EXIST ROWS RIPRAP STREAM F STREAM G WETLAND H WETLAND I WETLAND K WETLAND L STREAM ECRABTREE CREEKCRABTREE CREEK C R ABT REE C REE K CRABTREE CREEK STREAM J RICHLAND CREE KRIC HL AND CREEK WETLAND E WETLAND C WETLAND B WETLAND A WETLAND G WETLAND D STREAM B STREAM B STREAM C STREAM A FUNC. CLASSIFICATION LEAN ANGLE DESIGN SPEED = = = DESIGN DATA PROJECT LENGTHGRAPHIC SCALES 0 PROFILE (HORIZONTAL)PLANS PROFILE (VERTICAL) 0 GREENWAY 20 DEGREES 20 MPH NORTH CAROLINA CITY OF RALEIGH CRABTREE CREEK WEST GREENWAY FROM EBENEZER CHURCH ROAD TO LINDSAY DRIVE LOCATION: 1 VICINITY MAPEBENEZER CHURCH RD.DURALEI GH RD.LI NDSAY DR.PICARDY DR.POYNER RD.BOXWOOD RD. WEAVER DR. -L1--L2--Y2- -Y1- -L1- -L2- STA. 46+30.36 END CONSTRUCTION -L1- STA. 4+12.68 BEGIN CONSTRUCTION BEGIN PROJECT -L1- STA. 63+10.02 END CONSTRUCTION -L2- STA. 10+80.60 BEGIN CONSTRUCTION 30 15 0 30 60 30 15 30 60 LENGTH OF PROJECT LENGTH OF BRIDGE LENGTH OF BOARDWALK LENGTH OF ASPHALT TRAIL = = = = 1.80 MI 0.06 MI 0.01 MI 1.73 MI1"=30'1"=30'1"=6' PARK STATE UMSTEAD 4 5 6 7 8 9 10 11 12 13 14 15 6 1236 CRABTREE CREEK RICHLAND CREEKCOR: 636-99220450-01-17 FA# CMAQ.0520(57) WBS: 43714.3.8 16 17 NCDOT TIP# C-5604-OD & EROSION CONTROL BOARDWALKS, BRIDGES, DRAINAGE, GRADING, PAVING, RETAINING WALLS, TYPE OF WORK: ACCESS CONSTRUCTION ACCESS CONSTRUCTION ACCESS CONSTRUCTION ACCESS CONSTRUCTION END PROJECT ACCESS CONSTRUCTION WETLAND AND SURFACE WATER IMPACTS PERMIT SHEET 1 OF 24 PERMIT DRAWING PARK STATE UMSTEAD LI NDSAY DR.DURALEI GH RD.EBENEZER CHURCH RD.PICARDY DR.SITE 1 SITE 14 SITE 2 SITE 3 SITE 13 11 & 12 SITES SITE 10 SITE 8 SITE 7 SITE 4 SITE 5 SITE 6 TO RENUMBERING OF THE SITES. NOTE: SITE 7 HAS BEEN DELETED DUE SITE 9 H14014.00 SCALE: 1"=30' GREENWAY ENGINEER HYDRAULICS ENGINEER PROJECT NO.: REVISIONS: NO.DATE 919-996-4785 RALEIGH, NC 27601 SUITE 600 222 W. HARGETT ST, RALEIGH MUNICIPAL BUILDING CULTURAL RESOURCES RECREATION and PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com T 919.380.8750 Raleigh, NC 27603 Suite 1100 223 West Street, Firm License No. C-1051 LISA SCHIFFBAUER, PROJECT MANAGER CONTACT: Raleigh, NC 27606 VHB Engineering NC, P.C. (C-3705) 940 Main Campus Drive, Suite 500 DATE: OCTOBER 17, 2019PROFESSIONALENGINEERNORTH CARO LINA SEAL 14101 J HN M . KAM P ATORH RIP RAP WOODED AREA WOODED AREA LOT 213 PIN 0786-12-9457 BM 2007, PG 2444-2446 DB 16344, PG 1019 ASSOCIATION INC UMSTEAD HOMEOWNERS THE HAMPTONS AT N/F LOT 112 PIN 0786-21-7624 BM 2007, PG 2444-2446 DB 16344, PG 1019 ASSOCIATION INC UMSTEAD HOMEOWNERS THE HAMPTONS AT N/F EL. = 245.11 -L1- STA. 4+12.68 MATCH EXISTING PATH BEGIN GRADE 8.9' CLEAR CHURCH RD EBENEZER PI = 5+58.33 EL = 237.83'(-)5 .00 0 0% VC = 90' PI = 8+83.33 EL = 239.61' (+)0.5500%(-)0.9000% VC = 20' -L1- STA. 10+88.33 BEGIN BOARDWALK 1 -L1- STA. 11+18.33 END BOARDWALK 1 CL OF GREENWAY EXISTING GRADE AT CL OF GREENWAY PROPOSED GRADE AT (+) 2.1000% EL. = 233.60 STA. 11+25.00 BEGIN DITCH RT. 18" HDPE 18" HDPE SEE DETAIL 6 EMBANKMENT RIP RAP AT 5 SY GEOTEXTILE 1 TON CLASS B RIP RAP SEE DETAIL 6 EMBANKMENT RIP RAP AT REMOVEJB w/Slab Lid 15" RCP-III 7 SY GEOTEXTILE 2 TONS CLASS B RIP RAP GEOTEXTILE EST 10 SY EST 3 TONS CLASS B RIP RAP GEOTEXTILE EST 5 SY EST 1 TON CLASS B RIP RAP SEE DETAIL 5 DDE =4 CY 20' @ 1.50% 2' BASE TAIL DITCH SEE DETAIL 3 EST 165 SY GEOTEXTILE EST 55 TONS CLASS B RIP RAP TOE PROTECTION SEE DETAIL 3 EST 45 SY GEOTEXTILE EST 15 TONS CLASS B RIP RAP TOE PROTECTIONGREU TL-34+00 5+00 6+00 7+00 8+00 10+0011+00 -L1- 11+00 9+0015+00 -Y5-TYPE-IIITYPE-IIITYPE-III15+0013+0014+0017+00+40.00C A T-1+15 .00 11' 11' 1 2' 12' 8' 8' 10.5' B M 2007 PG 1484 TREE CONSERVATION AREA 100' WIDE GREEN WAY & F F C F F FFF F F C C F F F FF F F C C C F F F F C C C C C F C C F F C C CFCF F F F FCCFF F F C FCC WETLAND D STREAM B 18" HDPE SEE DETAIL 6 EMBANKMENT RIP RAP AT 5+00 11+00 12'12'BM 2007 PG 1484TREE CONSERVATION AREA 100' WIDE GREEN WAY & F F F F C F F FFSTREAM BSEE SHEET 5MATCHLINE -L1- STA 11+50.0044567891011 230 240 250 260 230 240 250 260-L1-MATCHLINE -L1- STA. 11+50.00 SEE SHEET 5SEE SHEETS 16 & 16A FOR -Y3- AND -HSW- PLAN & PROFILES S S SURFACE WATER DENOTES IMPACTS IN SHEET 2 OF 24 PERMIT DRAWING TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY SITE 1 SITE 2 SITE 2 SITE 1 WATERS SURFACE IMPACTS IN TEMPORARY CRABTREE CREEK 235235235235235235 235235235235235235235235235235 235 235 235 235 235 240240240240240240240 240240240240 240 240 240240240240240240240 240245245245245245 245245 245 245 245 250250250250250250250 255255255255255255255 255 260260260260260260 265H14014.00 SCALE: 1"=30' GREENWAY ENGINEER HYDRAULICS ENGINEER PROJECT NO.: REVISIONS: NO.DATE 919-996-4785 RALEIGH, NC 27601 SUITE 600 222 W. HARGETT ST, RALEIGH MUNICIPAL BUILDING CULTURAL RESOURCES RECREATION and PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com T 919.380.8750 Raleigh, NC 27603 Suite 1100 223 West Street, Firm License No. C-1051 LISA SCHIFFBAUER, PROJECT MANAGER CONTACT: Raleigh, NC 27606 VHB Engineering NC, P.C. (C-3705) 940 Main Campus Drive, Suite 500 DATE: OCTOBER 17, 2019PROFESSIONALENGINEERNORTH CARO LINA SEAL 14101 J HN M . KAM P ATORH RIP RAP WOODED AREA WOODED AREA LOT 213 PIN 0786-12-9457 BM 2007, PG 2444-2446 DB 16344, PG 1019 ASSOCIATION INC UMSTEAD HOMEOWNERS THE HAMPTONS AT N/F LOT 112 PIN 0786-21-7624 BM 2007, PG 2444-2446 DB 16344, PG 1019 ASSOCIATION INC UMSTEAD HOMEOWNERS THE HAMPTONS AT N/F EL. = 245.11 -L1- STA. 4+12.68 MATCH EXISTING PATH BEGIN GRADE 8.9' CLEAR CHURCH RD EBENEZER PI = 5+58.33 EL = 237.83'(-)5 .00 0 0% VC = 90' PI = 8+83.33 EL = 239.61' (+)0.5500%(-)0.9000% VC = 20' -L1- STA. 10+88.33 BEGIN BOARDWALK 1 -L1- STA. 11+18.33 END BOARDWALK 1 CL OF GREENWAY EXISTING GRADE AT CL OF GREENWAY PROPOSED GRADE AT (+) 2.1000% EL. = 233.60 STA. 11+25.00 BEGIN DITCH RT. 18" HDPE 18" HDPE SEE DETAIL 6 EMBANKMENT RIP RAP AT 5 SY GEOTEXTILE 1 TON CLASS B RIP RAP SEE DETAIL 6 EMBANKMENT RIP RAP AT REMOVEJB w/Slab Lid 15" RCP-III 7 SY GEOTEXTILE 2 TONS CLASS B RIP RAP GEOTEXTILE EST 10 SY EST 3 TONS CLASS B RIP RAP GEOTEXTILE EST 5 SY EST 1 TON CLASS B RIP RAP SEE DETAIL 5 DDE =4 CY 20' @ 1.50% 2' BASE TAIL DITCH SEE DETAIL 3 EST 165 SY GEOTEXTILE EST 55 TONS CLASS B RIP RAP TOE PROTECTION SEE DETAIL 3 EST 45 SY GEOTEXTILE EST 15 TONS CLASS B RIP RAP TOE PROTECTIONGREU TL-34+00 5+00 6+00 7+00 8+00 10+0011+00 -L1- 11+00 9+0015+00 -Y5-TYPE-IIITYPE-IIITYPE-III15+0013+0014+0017+00+40.00C A T-1+15 .00 11' 11' 1 2' 12' 8' 8' 10.5' B M 2007 PG 1484 TREE CONSERVATION AREA 100' WIDE GREEN WAY & ELEV: 234.59' E: 2082272.420 N: 762725.321 F F C F F FFF F F C C F F F FF F F C C C F F F F C C C C C F C C F F C C CFCF F F F FCCFF F F C FCC WETLAND D STREAM B 18" HDPE SEE DETAIL 6 EMBANKMENT RIP RAP AT 235235 240 5+00 11+00 12'12'BM 2007 PG 1484TREE CONSERVATION AREA 100' WIDE GREEN WAY & ELEV: 234.59' E: 2082272.420 N: 762725.321235 235235235 F F F F C F F FFSTREAM BSEE SHEET 5MATCHLINE -L1- STA 11+50.0044567891011 230 240 250 260 230 240 250 260-L1-MATCHLINE -L1- STA. 11+50.00 SEE SHEET 5SEE SHEETS 16 & 16A FOR -Y3- AND -HSW- PLAN & PROFILES S S SURFACE WATER DENOTES IMPACTS IN SHEET 3 OF 24 PERMIT DRAWING TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY SITE 1 SITE 2 SITE 2 SITE 1 WATERS SURFACE IMPACTS IN TEMPORARY CRABTREE CREEK LOT 112 PIN 0786-21-7624 BM 2007, PG 2444-2446 DB 16344, PG 1019 ASSOCIATION INC UMSTEAD HOMEOWNERS THE HAMPTONS AT N/F PIN 0786320346 DB 015580, PG 00928 CITY OF RALEIGH N/F PIN 0786-22-4319 DB 015298, PG 00731 JENNIFER A. KEUS MICHAEL A. KEUS & N/F PT Sta. 11+62.92 PC Sta. 13+62.35 PRC Sta. 14+10.98 PC Sta. 15+49.45 PC Sta. 18+01.16 PRC Sta. 18+95.08 12+00 13+00 14+00 15+00 16+00 17+00 18+00 PT Sta. 16+57.63 PT Sta. 14+78.29.02.02.0212'12' BM 2007 PG 1484TREE CONSERVATION AREA100' WIDE GREENWAY & B M 2007 P G 1484 TREE C O NSER V ATI O N A RE A 75' WI DE G REE N WA Y &ELEV: 237.76' E: 2082369.914 N: 762693.756 ELEV: 236.42' E: 2082468.510 N: 762661.142 PI = 11+83.33 EL = 236.91' (-)0.9000%(+)0.5000% VC = 30' PI = 12+78.33 EL = 237.39' (+)0.5000%(-)1.1050% VC = 40' PI = 14+13.33 EL = 235.90' (-)1.1050%(+)2.7000% VC = 70' PI = 15+48.33 EL = 239.54' (+)2.7000%(-)3 .8000% VC = 30' PI = 16+08.33 EL = 237.26'(-)3 .8000%(+)0.3515% VC = 70' -L1- STA. 14+80.25 BEGIN BRIDGE 1 -L1- STA. 15+32.41 END BRIDGE 1 CL OF GREENWAY EXISTING GRADE AT CL OF GREENWAY PROPOSED GRADE AT El = 234.125 (+) 0.5000%El = 235.00(+) 0.5000% (+) 1.0000% (+) 0.5000% PI =11+50.00 EL. = 235.50STA. 14+25.00END DITCH RT.EL. = 236.50STA. 18+00.00END DITCH RT.PI =16+50.00EL. = 234.41 STA. 15+32.00 BEGIN DITCH RT.EL. = 234.50STA. 16+00.00BEGIN DITCH LT.H14014.00 SCALE: 1"=30' GREENWAY ENGINEER HYDRAULICS ENGINEER PROJECT NO.: REVISIONS: NO.DATE 919-996-4785 RALEIGH, NC 27601 SUITE 600 222 W. HARGETT ST, RALEIGH MUNICIPAL BUILDING CULTURAL RESOURCES RECREATION and PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com T 919.380.8750 Raleigh, NC 27603 Suite 1100 223 West Street, Firm License No. C-1051 LISA SCHIFFBAUER, PROJECT MANAGER CONTACT: Raleigh, NC 27606 VHB Engineering NC, P.C. (C-3705) 940 Main Campus Drive, Suite 500 DATE: OCTOBER 17, 2019PROFESSIONALENGINEERNORTH CARO LINA SEAL 14101 J HN M . KAM P ATORH SEE DETAIL 1 SPECIAL CUT DITCH 10 SY GEOTEXTILE 3 TONS CLASS B RIP RAP SEE DETAIL 1 SPECIAL CUT DITCH SEE DETAIL 1 SPECIAL CUT DITCH SEE DETAIL 3 EST 45 SY GEOTEXTILE EST 15 TONS CLASS B RIP RAP TOE PROTECTION SEE DETAIL 6 EMBANKMENT RIP RAP AT RIP RAP CLASS II SEE DETAIL 13 EST 140 SY GEOTEXTILE EST 75 TONS BANK STABILIZATION RIP RAP CLASS II SEE DETAIL 6 EMBANKMENT RIP RAP AT RIP RAP CLASS II F C F C F C F CF F C F CC C C F C F C F F F C PC Sta. 15+49.45 15+00MATCHLINE -L1- STA 11+50.00 SEE SHEET 4MATCHLI NE -L1- STA 19+00.00 SEE SHEET 651213141516171819 220 230 240 250 260 220 230 240 250 260-L1-MATCHLINE -L1- STA. 19+00.00 SEE SHEET 6MATCHLINE -L1- STA. 11+50.00 SEE SHEET 4SITE 3 SITE 3 S S SURFACE WATER DENOTES IMPACTS IN SHEET 4 OF 24 PERMIT DRAWING TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY CRABTREE CREEK RI C HL AND C R E E KF F C F 235235235 235 235235235235235235235235235 235 235 235 235235 235235235235235235 235 2 3 5 235 240240240240240240240240245245245245245245245250250250250250250255255255255255255260260260260260265265265265270270270270270275275275275280280280285285290LOT 112 PIN 0786-21-7624 BM 2007, PG 2444-2446 DB 16344, PG 1019 ASSOCIATION INC UMSTEAD HOMEOWNERS THE HAMPTONS AT N/F PIN 0786320346 DB 015580, PG 00928 CITY OF RALEIGH N/F PIN 0786-22-4319 DB 015298, PG 00731 JENNIFER A. KEUS MICHAEL A. KEUS & N/F PT Sta. 11+62.92 PC Sta. 13+62.35 PRC Sta. 14+10.98 PC Sta. 15+49.45 PC Sta. 18+01.16 PRC Sta. 18+95.08 12+00 13+00 14+00 15+00 16+00 17+00 18+00 PT Sta. 16+57.63 PT Sta. 14+78.29.02.02.0212'12' BM 2007 PG 1484TREE CONSERVATION AREA100' WIDE GREENWAY & B M 2007 P G 1484 TREE C O NSER V ATI O N A RE A 75' WI DE G REE N WA Y &ELEV: 237.76' E: 2082369.914 N: 762693.756 ELEV: 236.42' E: 2082468.510 N: 762661.142 PI = 11+83.33 EL = 236.91' (-)0.9000%(+)0.5000% VC = 30' PI = 12+78.33 EL = 237.39' (+)0.5000%(-)1.1050% VC = 40' PI = 14+13.33 EL = 235.90' (-)1.1050%(+)2.7000% VC = 70' PI = 15+48.33 EL = 239.54' (+)2.7000%(-)3 .8000% VC = 30' PI = 16+08.33 EL = 237.26'(-)3 .8000%(+)0.3515% VC = 70' -L1- STA. 14+80.25 BEGIN BRIDGE 1 -L1- STA. 15+32.41 END BRIDGE 1 CL OF GREENWAY EXISTING GRADE AT CL OF GREENWAY PROPOSED GRADE AT El = 234.125 (+) 0.5000%El = 235.00(+) 0.5000% (+) 1.0000% (+) 0.5000% PI =11+50.00 EL. = 235.50STA. 14+25.00END DITCH RT.EL. = 236.50STA. 18+00.00END DITCH RT.PI =16+50.00EL. = 234.41 STA. 15+32.00 BEGIN DITCH RT.EL. = 234.50STA. 16+00.00BEGIN DITCH LT.H14014.00 SCALE: 1"=30' GREENWAY ENGINEER HYDRAULICS ENGINEER PROJECT NO.: REVISIONS: NO.DATE 919-996-4785 RALEIGH, NC 27601 SUITE 600 222 W. HARGETT ST, RALEIGH MUNICIPAL BUILDING CULTURAL RESOURCES RECREATION and PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com T 919.380.8750 Raleigh, NC 27603 Suite 1100 223 West Street, Firm License No. C-1051 LISA SCHIFFBAUER, PROJECT MANAGER CONTACT: Raleigh, NC 27606 VHB Engineering NC, P.C. (C-3705) 940 Main Campus Drive, Suite 500 DATE: OCTOBER 17, 2019PROFESSIONALENGINEERNORTH CARO LINA SEAL 14101 J HN M . KAM P ATORH SEE DETAIL 1 SPECIAL CUT DITCH 10 SY GEOTEXTILE 3 TONS CLASS B RIP RAP SEE DETAIL 1 SPECIAL CUT DITCH SEE DETAIL 1 SPECIAL CUT DITCH SEE DETAIL 3 EST 45 SY GEOTEXTILE EST 15 TONS CLASS B RIP RAP TOE PROTECTION SEE DETAIL 6 EMBANKMENT RIP RAP AT RIP RAP CLASS II SEE DETAIL 13 EST 140 SY GEOTEXTILE EST 75 TONS BANK STABILIZATION RIP RAP CLASS II SEE DETAIL 6 EMBANKMENT RIP RAP AT RIP RAP CLASS II 235235 235 240F C F C F C F CF F C F CC C C F C F C F F F C PC Sta. 15+49.45 15+00 16+00 B M 2007 P G 1484 T REE C O NSE R V ATI O N A RE A 75' WI DE G REE N WA Y &MATCHLINE -L1- STA 11+50.00 SEE SHEET 451213141516171819 220 230 240 250 260 220 230 240 250 260-L1-MATCHLINE -L1- STA. 19+00.00 SEE SHEET 6MATCHLINE -L1- STA. 11+50.00 SEE SHEET 4SITE 3 SITE 3 S S SURFACE WATER DENOTES IMPACTS IN SHEET 5 OF 24 PERMIT DRAWING SEE SHEET 6MATCHLI NE -L1- STA 19+00.00 TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY CRABTREE CREEK RI C HL AND C R E E KF F C F W PIN 0786320346 DB 015580, PG 00928 CITY OF RALEIGH N/F (BM 1985, PG 1303) 40' SANITARY SEWER EASEMENT PI = 23+55.00 EL = 241.66' VC = 30' PI = 24+05.00 EL = 239.66' VC = 70' (+)1.2000%(-)4 .0000%(+)0.5000% PI = 20+65.00 EL = 238.87' (+)0.3515% VC = 50' PI = 21+35.00 EL = 241.18' (+)3.3000%(-)1.5000% VC = 80' PI = 22+15.00 EL = 239.98' (+)1.2000% VC = 50' CL OF GREENWAY EXISTING GRADE AT CL OF GREENWAY PROPOSED GRADE AT El = 238.80(+) 0.5000% (+) 0.8000%El = 240.00(+) 0.5000% (+) 0.5000%PI =26+50.00PI =25+00.00EL. = 237.98 STA. 23+37.00 BEGIN DITCH RT.EL. = 238.50STA. 22+00.00END DITCH LT.EL. = 238.16STA. 23+32.00BEGIN DITCH LT.EL. = 239.00STA. 25+00.00END DITCH LT.EL. = 236.50PI =20+00.00(+) 1.0000% -L1- STA. 22+82.92 BEGIN BRIDGE 2 -L1- STA. 23+35.08 END BRIDGE 2 H14014.00 SCALE: 1"=30' GREENWAY ENGINEER HYDRAULICS ENGINEER PROJECT NO.: REVISIONS: NO.DATE 919-996-4785 RALEIGH, NC 27601 SUITE 600 222 W. HARGETT ST, RALEIGH MUNICIPAL BUILDING CULTURAL RESOURCES RECREATION and PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com T 919.380.8750 Raleigh, NC 27603 Suite 1100 223 West Street, Firm License No. C-1051 LISA SCHIFFBAUER, PROJECT MANAGER CONTACT: Raleigh, NC 27606 VHB Engineering NC, P.C. (C-3705) 940 Main Campus Drive, Suite 500 DATE: OCTOBER 17, 2019PROFESSIONALENGINEERNORTH CARO LINA SEAL 14101 J HN M . KAM P ATORH SEE DETAIL 1 SPECIAL CUT DITCH SEE DETAIL 6 EMBANKMENT RIP RAP AT SEE DETAIL 6 EMBANKMENT RIP RAP AT SEE DETAIL 1 SPECIAL CUT DITCH RIP RAP CLASS II SEE DETAIL 13 EST 90 SY GEOTEXTILE EST 45 TONS BANK STABILIZATION RIP RAP CLASS II SEE DETAIL 6 EMBANKMENT RIP RAP AT SEE DETAIL 6 EMBANKMENT RIP RAP AT RIP RAP CLASS II SEE DETAIL 13 EST 90 SY GEOTEXTILE EST 45 TONS BANK STABILIZATION 2 3 +0 0 PC Sta. 23+36.13 24+00 F C C PRC Sta. 19+78.45 PRC Sta. 20+32.01 PT Sta. 20+68.40 PT Sta. 22+79.44 PC Sta. 21+79.15 20+00 21+00 22+00 2 3 +0 0 PC Sta. 23+36.13 24+00 25+00 26+00 PCC Sta. 26+52.14 PCC Sta. 26+84.91 12'12'CFCFF C F F F F C C C C C C F C F F C C CCSTA 27+00.00 SEE SHEET 7MATCHLINE -L1-6 220 230 240 250 260 220 230 240 250 260 19 20 21 22 23 24 25 26 -L1-MAT C HLI NE -L1- ST A 19+00.00 SEE S HEET 5 27MATCHLINE -L1- STA. 27+00.00 SEE SHEET 7MATCHLINE -L1- STA. 19+00.00 SEE SHEET 5S S SURFACE WATER DENOTES IMPACTS IN SHEET 6 OF 24 PERMIT DRAWING SITE 4 SITE 4 SITE 4 TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY SITE 4 RICHLAND CREEK 235235235235235235235235 235235 235 235 235235235 240 240 240 240240240240240240 240 240240245245 250250 255255 260265265270275280W PIN 0786320346 DB 015580, PG 00928 CITY OF RALEIGH N/F PIN 0786-21-7624 BM 2007, PG 2444-2446 DB 11903, PG 91 COMPANY, LLC THE HAMPTONS DEVELOPMENT N/F (BM 1985, PG 1303) 40' SANITARY SEWER EASEMENT PI = 23+55.00 EL = 241.66' VC = 30' PI = 24+05.00 EL = 239.66' VC = 70' (+)1.2000%(-)4 .0000%(+)0.5000% PI = 20+65.00 EL = 238.87' (+)0.3515% VC = 50' PI = 21+35.00 EL = 241.18' (+)3.3000%(-)1.5000% VC = 80' PI = 22+15.00 EL = 239.98' (+)1.2000% VC = 50' CL OF GREENWAY EXISTING GRADE AT CL OF GREENWAY PROPOSED GRADE AT El = 238.80(+) 0.5000% (+) 0.8000%El = 240.00(+) 0.5000% (+) 0.5000%PI =26+50.00PI =25+00.00EL. = 237.98 STA. 23+37.00 BEGIN DITCH RT.EL. = 238.50STA. 22+00.00END DITCH LT.EL. = 238.16STA. 23+32.00BEGIN DITCH LT.EL. = 239.00STA. 25+00.00END DITCH LT.EL. = 236.50PI =20+00.00(+) 1.0000% -L1- STA. 22+82.92 BEGIN BRIDGE 2 -L1- STA. 23+35.08 END BRIDGE 2 H14014.00 SCALE: 1"=30' GREENWAY ENGINEER HYDRAULICS ENGINEER PROJECT NO.: REVISIONS: NO.DATE 919-996-4785 RALEIGH, NC 27601 SUITE 600 222 W. HARGETT ST, RALEIGH MUNICIPAL BUILDING CULTURAL RESOURCES RECREATION and PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com T 919.380.8750 Raleigh, NC 27603 Suite 1100 223 West Street, Firm License No. C-1051 LISA SCHIFFBAUER, PROJECT MANAGER CONTACT: Raleigh, NC 27606 VHB Engineering NC, P.C. (C-3705) 940 Main Campus Drive, Suite 500 DATE: OCTOBER 17, 2019PROFESSIONALENGINEERNORTH CARO LINA SEAL 14101 J HN M . KAM P ATORH SEE DETAIL 1 SPECIAL CUT DITCH SEE DETAIL 6 EMBANKMENT RIP RAP AT SEE DETAIL 6 EMBANKMENT RIP RAP AT SEE DETAIL 1 SPECIAL CUT DITCH RIP RAP CLASS II SEE DETAIL 13 EST 90 SY GEOTEXTILE EST 45 TONS BANK STABILIZATION RIP RAP CLASS II SEE DETAIL 6 EMBANKMENT RIP RAP AT RIP RAP CLASS II SEE DETAIL 13 EST 90 SY GEOTEXTILE EST 45 TONS BANK STABILIZATION 2 3 +0 0 PC Sta. 23+36.13 24+00235235240F C C PRC Sta. 19+78.45 PRC Sta. 20+32.01 PT Sta. 20+68.40 PT Sta. 22+79.44 PC Sta. 21+79.15 20+00 21+00 22+00 2 3 +0 0 PC Sta. 23+36.13 24+00 PRC Sta. 24+26.46 25+00 26+00 PCC Sta. 26+52.14 PCC Sta. 26+84.91 12'12'BM 2007 PG 1484 TREE CONSERVATION AREA 75' WIDE GREENWAY &CFCFF C F F F F C C C C C C F C F F C C CCSTA 27+00.00 SEE SHEET 7MATCHLINE -L1-6 220 230 240 250 260 220 230 240 250 260 19 20 21 22 23 24 25 26 -L1-MAT C HLI NE -L1- ST A 19+00.00 SEE S HEET 5 27MATCHLINE -L1- STA. 27+00.00 SEE SHEET 7MATCHLINE -L1- STA. 19+00.00 SEE SHEET 5S S SURFACE WATER DENOTES IMPACTS IN SHEET 7 OF 24 PERMIT DRAWING SITE 4 SITE 4 SITE 4 TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY SITE 4 RICHLAND CREEK 2 8+ 00 2 9 + 0 0 30+00PRC Sta. 30+48.05 31+00 PT Sta. 31+14.39 32+00PRC Sta. 37+75.79PCC Sta. 37+16.57PI Sta. 42+75.83.02.0212'12'BM 2 0 0 7 PG 1 4 8 4TREE CONSERVATI ON AREA7 5' WI DE GREENWAY &C C C F C FCFF C C F F C C C PIN 0786-21-7624 BM 2007, PG 2444-2446 DB 11903, PG 91 COMPANY, LLC THE HAMPTONS DEVELOPMENT N/F (BM 1985, PG 1303) 40' SANITARY SEWER EASEMENT (168.9 ACRES PER RECORDS) PIN 0786-34-9208 DB 1592, PG 361 AGGREGATES, INC BENCHMARK CAROLINA N/F PI = 28+25.00 EL = 241.76' VC = 20' PI = 29+30.00 EL = 243.23' VC = 20' PI = 31+55.00 EL = 242.67' VC = 30' (+)0.5000%(+)1.4000% (+)1.4000%(-)0.2500%(-)0.2500% (+)1.3000% -L1- STA. 31+13.00 BEGIN BOARDWALK 2 -L1- STA. 31+33.00 END BOARDWALK 2 CL OF GREENWAY EXISTING GRADE AT CL OF GREENWAY PROPOSED GRADE AT El = 241.20(+) 0.6000% (+) 1.0000%El = 242.20(-) 0.5000% (+) 1.2000%EL. = 241.35STA. 31+20.00END DITCH RT.EL. = 241.30 STA. 31+25.00 BEGIN DITCH LT.PI =29+50.00PI =28+50.00H14014.00 SCALE: 1"=30' GREENWAY ENGINEER HYDRAULICS ENGINEER PROJECT NO.: REVISIONS: NO.DATE 919-996-4785 RALEIGH, NC 27601 SUITE 600 222 W. HARGETT ST, RALEIGH MUNICIPAL BUILDING CULTURAL RESOURCES RECREATION and PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com T 919.380.8750 Raleigh, NC 27603 Suite 1100 223 West Street, Firm License No. C-1051 LISA SCHIFFBAUER, PROJECT MANAGER CONTACT: Raleigh, NC 27606 VHB Engineering NC, P.C. (C-3705) 940 Main Campus Drive, Suite 500 DATE: OCTOBER 17, 2019PROFESSIONALENGINEERNORTH CARO LINA SEAL 14101 J HN M . KAM P ATORH SEE DETAIL 6 EMBANKMENT RIP RAP AT SEE DETAIL 6 EMBANKMENT RIP RAP AT SEE DETAIL 1 SPECIAL CUT DITCH SEE DETAIL 1 SPECIAL CUT DITCH SEE DETAIL 6 EMBANKMENT RIP RAP AT 24031+00 32+00 SEE SHEET 6MATCHLINE -L1- STA 27+00.00230 240 250 27 28 29 30 31 32 33 230 240 250 7 220 260 220 260-L1-MATCHLINE -L1- STA 33+00.00 SEE SHEET 8SEE SHEET 8MATCHLINE -L1- STA 33+00.00MATCHLINE -L1- STA 27+00.00 SEE SHEET 6S S SURFACE WATER DENOTES IMPACTS IN SHEET 8 OF 24 PERMIT DRAWING SITE 5 SITE 5 SITE 5 SITE 5 TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY SITE 5 RICHLAND CREEK F C F 235235235 235 2 3 5 240 240240240240240 2 4 0 240 2402402402402402402452452452452452452452452452452502502502502502 5 0 250 2552552552552 5 5 2602602602602602602652652652652702702752 8+ 00 2 9 + 0 0 30+00PRC Sta. 30+48.05 31+00 PT Sta. 31+14.39 32+00PRC Sta. 37+75.79PCC Sta. 37+16.57PI Sta. 42+75.83.02.0212'12'BM 2 0 0 7 PG 1 4 8 4TREE CONSERVATI ON AREA7 5' WI DE GREENWAY &C C C F C FCFF C C F F C C C PIN 0786-21-7624 BM 2007, PG 2444-2446 DB 11903, PG 91 COMPANY, LLC THE HAMPTONS DEVELOPMENT N/F (BM 1985, PG 1303) 40' SANITARY SEWER EASEMENT (168.9 ACRES PER RECORDS) PIN 0786-34-9208 DB 1592, PG 361 AGGREGATES, INC BENCHMARK CAROLINA N/F PI = 28+25.00 EL = 241.76' VC = 20' PI = 29+30.00 EL = 243.23' VC = 20' PI = 31+55.00 EL = 242.67' VC = 30' (+)0.5000%(+)1.4000% (+)1.4000%(-)0.2500%(-)0.2500% (+)1.3000% -L1- STA. 31+13.00 BEGIN BOARDWALK 2 -L1- STA. 31+33.00 END BOARDWALK 2 CL OF GREENWAY EXISTING GRADE AT CL OF GREENWAY PROPOSED GRADE AT El = 241.20(+) 0.6000% (+) 1.0000%El = 242.20(-) 0.5000% (+) 1.2000%EL. = 241.35STA. 31+20.00END DITCH RT.EL. = 241.30 STA. 31+25.00 BEGIN DITCH LT.PI =29+50.00PI =28+50.00H14014.00 SCALE: 1"=30' GREENWAY ENGINEER HYDRAULICS ENGINEER PROJECT NO.: REVISIONS: NO.DATE 919-996-4785 RALEIGH, NC 27601 SUITE 600 222 W. HARGETT ST, RALEIGH MUNICIPAL BUILDING CULTURAL RESOURCES RECREATION and PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com T 919.380.8750 Raleigh, NC 27603 Suite 1100 223 West Street, Firm License No. C-1051 LISA SCHIFFBAUER, PROJECT MANAGER CONTACT: Raleigh, NC 27606 VHB Engineering NC, P.C. (C-3705) 940 Main Campus Drive, Suite 500 DATE: OCTOBER 17, 2019PROFESSIONALENGINEERNORTH CARO LINA SEAL 14101 J HN M . KAM P ATORH SEE DETAIL 6 EMBANKMENT RIP RAP AT SEE DETAIL 6 EMBANKMENT RIP RAP AT SEE DETAIL 1 SPECIAL CUT DITCH SEE DETAIL 1 SPECIAL CUT DITCH SEE DETAIL 6 EMBANKMENT RIP RAP AT 24031+00 32+00 SEE SHEET 6MATCHLINE -L1- STA 27+00.00230 240 250 27 28 29 30 31 32 33 230 240 250 7 220 260 220 260-L1-MATCHLINE -L1- STA 33+00.00 SEE SHEET 8SEE SHEET 8MATCHLINE -L1- STA 33+00.00MATCHLINE -L1- STA 27+00.00 SEE SHEET 6S S SURFACE WATER DENOTES IMPACTS IN SHEET 9 OF 24 PERMIT DRAWING SITE 5 SITE 5 SITE 5 SITE 5 TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY SITE 5 RICHLAND CREEK F C F PIN 0786-21-7624 BM 2007, PG 2444-2446 DB 11903, PG 91 COMPANY, LLC THE HAMPTONS DEVELOPMENT N/F (BM 1985, PG 1303) 40' SANITARY SEWER EASEMENT (168.9 ACRES PER RECORDS) PIN 0786-34-9208 DB 1592, PG 361 AGGREGATES, INC BENCHMARK CAROLINA N/F 3 4 +0 0 35+0036+0037+003 8 + 0 0 39+00 40+00 45 + 00 41+00 42+00 4 3 + 0 0 44+00 46+0047+0048+0049+00 50+00 51+0052+0053+00 54+00 B M 2007 PG 1484 TREE CONSERVATION AREA 75' WIDE GREEN WAY & PI = 34+35.00 EL = 246.31' VC = 20' (+)1.3000% -L1- STA. 34+61.92 BEGIN BRIDGE 3 -L1- STA. 35+04.08 END BRIDGE 3 CL OF GREENWAY EXISTING GRADE AT CL OF GREENWAY PROPOSED GRADE AT EL. = 244.00 STA. 33+50 END DITCH LT. CL OF GREENWAY EXISTING GRADE AT CL OF GREENWAY PROPOSED GRADE AT -L1- STA. 39+79.83 BEGIN BOARDWALK 3 (-)0.8786% PI = 36+23.35 EL = 244.65' VC = 129' PI = 37+95.22 EL = 252.82' VC = 40' VC = 20' EL = 251.98' PI = 37+53.00 (+)5.6500% (+)2.0000% (+)8.3300% (+)2.0000% VC = 20' EL = 265.98' PI = 39+53.21 (+)3.0000%(+)4.0000%(+)5.0000%(+)6.0000% PI = 40+01.84 EL = 266.95' PI = 40+21.84 EL = 267.55' PI = 40+41.84 EL = 268.35' PI = 40+61.84 EL = 269.35' H14014.00 SCALE: 1"=30' GREENWAY ENGINEER HYDRAULICS ENGINEER PROJECT NO.: REVISIONS: NO.DATE 919-996-4785 RALEIGH, NC 27601 SUITE 600 222 W. HARGETT ST, RALEIGH MUNICIPAL BUILDING CULTURAL RESOURCES RECREATION and PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com T 919.380.8750 Raleigh, NC 27603 Suite 1100 223 West Street, Firm License No. C-1051 LISA SCHIFFBAUER, PROJECT MANAGER CONTACT: Raleigh, NC 27606 VHB Engineering NC, P.C. (C-3705) 940 Main Campus Drive, Suite 500 DATE: OCTOBER 17, 2019PROFESSIONALENGINEERNORTH CARO LINA SEAL 14101 J HN M . KAM P ATORH 10 SY GEOTEXTILE 3 TONS CLASS B RIP RAP DRAIN GRADE TO 10 SY GEOTEXTILE 3 TONS CLASS B RIP RAP 18" HDPE SEE DETAIL 8 BERM DITCH EST 399 SY GEOTEXTILE EST 248 TONS CLASS II RIP RAP SEE DETAIL 9 BERM DITCH SEE DETAIL 1 SPECIAL CUT DITCH SEE DETAIL 1 SPECIAL CUT DITCH SEE DETAIL 1 SPECIAL CUT DITCH RIP RAP CLASS II RIP RAP CLASS II SEE DETAIL 13 EST 90 SY GEOTEXTILE EST 45 TONS BANK STABILIZATION ( Not to Scale) BANK STABILIZATION STA 34+71 -L- DETAIL 13 GEOTEXTILE Type of Liner= CLASS II RIPRAP 3.0'min. 2.0' NWS STA 34+95 -L- SEE DETAIL 1 SPECIAL CUT DITCH SEE DETAIL 1 SPECIAL CUT DITCH SEE DETAIL 1 SPECIAL CUT DITCH RIP RAP CLASS II RIP RAP CLASS II SEE DETAIL 13 EST 90 SY GEOTEXTILE EST 45 TONS BANK STABILIZATION C C C F C F F C FCFFCCF F F CF F C C C C C C CCCFFFCFCFCFCCCFF F F C F F F F C CC FCF F F F PIN 0786-21-7624 BM 2007, PG 2444-2446 DB 11903, PG 91 COMPANY, LLC THE HAMPTONS DEVELOPMENT N/F 3 4 +0 0 35+0040+00 33 34 35 36 37 38 39 8 240 250 260 270 240 250 260 270 40 41 -L1-STA 54+00.00 SEE SHEET 9MATCHLI NE -L1-MATCHLINE -L1- STA. 41+00.00 SEE SHEET 8AMATCHLINE -L1- STA. 33+00.00 SEE SHEET 7SEE SHEET 7 STA 33+00.00 MATCHLINE -L1- SHEET 10 OF 24 PERMIT DRAWING S S SURFACE WATER DENOTES IMPACTS IN TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY SITE 6 SITE 6 SITE 6 SITE 6 SITE 6 RI CHLAND CREEK 240 2 4 0 2 4 0 240240240240240240 2452452452 4 5 245 245 245 2 5 0250 250 250 2 5 5255 2552 5 5 2 6 0 260 260 2602652 6 5 265 265 265270270270 270 2 7 0 270 275 275275275275 275275 280 2802802802 8 0 280 280 2 8 0 2852852852852852 8 5 285 2 8 5 2 8 5 2902902902902 9 0 290 290 290 295295295295295 295 295 295 300300300300300300 3 0 0 30 0 300 3053053053 0 5 305 3 0 5 305 310310310310 3 1 0 310 3153153153153153 1 5 315 320320320320 320 325325325330330335340PIN 0786-21-7624 BM 2007, PG 2444-2446 DB 11903, PG 91 COMPANY, LLC THE HAMPTONS DEVELOPMENT N/F (BM 1985, PG 1303) 40' SANITARY SEWER EASEMENT (168.9 ACRES PER RECORDS) PIN 0786-34-9208 DB 1592, PG 361 AGGREGATES, INC BENCHMARK CAROLINA N/F 3 4 +0 0 35+0036+0037+003 8 + 0 0 39+00 40+00 45 + 00 41+00 42+00 4 3 + 0 0 44+00 46+0047+0048+0049+00 50+00 51+0052+0053+00 54+00 B M 2007 PG 1484 TREE CONSERVATION AREA 75' WIDE GREEN WAY & PI = 34+35.00 EL = 246.31' VC = 20' (+)1.3000% -L1- STA. 34+61.92 BEGIN BRIDGE 3 -L1- STA. 35+04.08 END BRIDGE 3 CL OF GREENWAY EXISTING GRADE AT CL OF GREENWAY PROPOSED GRADE AT EL. = 244.00 STA. 33+50 END DITCH LT. CL OF GREENWAY EXISTING GRADE AT CL OF GREENWAY PROPOSED GRADE AT -L1- STA. 39+79.83 BEGIN BOARDWALK 3 (-)0.8786% PI = 36+23.35 EL = 244.65' VC = 129' PI = 37+95.22 EL = 252.82' VC = 40' VC = 20' EL = 251.98' PI = 37+53.00 (+)5.6500% (+)2.0000% (+)8.3300% (+)2.0000% VC = 20' EL = 265.98' PI = 39+53.21 (+)3.0000%(+)4.0000%(+)5.0000%(+)6.0000% PI = 40+01.84 EL = 266.95' PI = 40+21.84 EL = 267.55' PI = 40+41.84 EL = 268.35' PI = 40+61.84 EL = 269.35' H14014.00 SCALE: 1"=30' GREENWAY ENGINEER HYDRAULICS ENGINEER PROJECT NO.: REVISIONS: NO.DATE 919-996-4785 RALEIGH, NC 27601 SUITE 600 222 W. HARGETT ST, RALEIGH MUNICIPAL BUILDING CULTURAL RESOURCES RECREATION and PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com T 919.380.8750 Raleigh, NC 27603 Suite 1100 223 West Street, Firm License No. C-1051 LISA SCHIFFBAUER, PROJECT MANAGER CONTACT: Raleigh, NC 27606 VHB Engineering NC, P.C. (C-3705) 940 Main Campus Drive, Suite 500 DATE: OCTOBER 17, 2019PROFESSIONALENGINEERNORTH CARO LINA SEAL 14101 J HN M . KAM P ATORH 10 SY GEOTEXTILE 3 TONS CLASS B RIP RAP DRAIN GRADE TO 10 SY GEOTEXTILE 3 TONS CLASS B RIP RAP 18" HDPE SEE DETAIL 8 BERM DITCH EST 399 SY GEOTEXTILE EST 248 TONS CLASS II RIP RAP SEE DETAIL 9 BERM DITCH SEE DETAIL 1 SPECIAL CUT DITCH SEE DETAIL 1 SPECIAL CUT DITCH SEE DETAIL 1 SPECIAL CUT DITCH RIP RAP CLASS II RIP RAP CLASS II SEE DETAIL 13 EST 90 SY GEOTEXTILE EST 45 TONS BANK STABILIZATION ( Not to Scale) BANK STABILIZATION STA 34+71 -L- DETAIL 13 GEOTEXTILE Type of Liner= CLASS II RIPRAP 3.0'min. 2.0' NWS STA 34+95 -L- SEE DETAIL 1 SPECIAL CUT DITCH SEE DETAIL 1 SPECIAL CUT DITCH SEE DETAIL 1 SPECIAL CUT DITCH RIP RAP CLASS II RIP RAP CLASS II SEE DETAIL 13 EST 90 SY GEOTEXTILE EST 45 TONS BANK STABILIZATION 2 40 240245245 C C C F C F F C FCFFCCF F F CF F C C C C C C CCCFFFCFCFCFCCCFF F F C F F F F C CC FCF F F F PIN 0786-21-7624 BM 2007, PG 2444-2446 DB 11903, PG 91 COMPANY, LLC THE HAMPTONS DEVELOPMENT N/F 3 4 +0 0 35+0040+00 33 34 35 36 37 38 39 8 240 250 260 270 240 250 260 270 40 41 -L1-STA 54+00.00 SEE SHEET 9MATCHLI NE -L1-MATCHLINE -L1- STA. 41+00.00 SEE SHEET 8AMATCHLINE -L1- STA. 33+00.00 SEE SHEET 7SEE SHEET 7 STA 33+00.00 MATCHLINE -L1- SHEET 11 OF 24 PERMIT DRAWING S S SURFACE WATER DENOTES IMPACTS IN TS TS IMPACTS IN SURFACE WATER DENOTES TEMPORARY SITE 6 SITE 6 SITE 6 SITE 6 SITE 6 RI CHLAND CREEK BLDGRD 259.5 W/E W/E 247.3 240.4 W/E W/E 240.4 (BOOK OF MAPS 1990, PAGE 410)40' SANI TARY SEW ER EASEM ENT(168.9 ACRES PER RECORDS) PIN 0786-34-9208 DB 1592, PG 361 AGGREGATES, INC BENCHMARK CAROLINA N/F H14014.00 SCALE: 1"=30' GREENWAY ENGINEER HYDRAULICS ENGINEER PROJECT NO.: REVISIONS: NO.DATE 919-996-4785 RALEIGH, NC 27601 SUITE 600 222 W. HARGETT ST, RALEIGH MUNICIPAL BUILDING CULTURAL RESOURCES RECREATION and PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com T 919.380.8750 Raleigh, NC 27603 Suite 1100 223 West Street, Firm License No. C-1051 LISA SCHIFFBAUER, PROJECT MANAGER CONTACT: Raleigh, NC 27606 VHB Engineering NC, P.C. (C-3705) 940 Main Campus Drive, Suite 500 DATE: OCTOBER 17, 2019PROFESSIONALENGINEERNORTH CARO LINA SEAL 14101 J HN M . KAM P ATORH MATCHLINE -L2- STA 21+50.00 SEE SHEET 1211 SITE 7 SITE 7 S S SURFACE WATER DENOTES IMPACTS IN SHEET 12 OF 24 PERMIT DRAWING C R A B T R E E C R E E K 10+0011+0012 +0 0 13+00 1 4 + 0 0 15+0016+00 17+0018+00 19+0020 +00 21 +00 MATCHLINE -L2- STA 21+50.00 SEE SHEET 1211 SITE 7 SITE 7 S S SURFACE WATER DENOTES IMPACTS IN SHEET 12 OF 24 PERMIT DRAWING C R A B T R E E C R E E K 2GI SEE DETAIL 7 CONCRETE DITCH SEE DETAIL 6 EMBANKMENT RIP RAP AT 18" HDPE 10 SY GEOTEXTILE 3 TONS CLASS B RIP RAP SEE DETAIL 5 DDE =7 CY 20' @ 1.0% 2' BASE TAIL DITCH EST 92 SY GEOTEXTILE EST 32 TONS CLASS B RIP RAP SEE DETAIL 3 TOE PROTECTION EST 243 SY GEOTEXTILE EST 85 TONS CLASS B RIP RAP SEE DETAIL 3 TOE PROTECTION EST 185 SY GEOTEXTILE EST 65 TONS CLASS B RIP RAP SEE DETAIL 10 BERM DITCH SEE DET AIL 11DDE =8 C Y14' @ 0.71 %4' B ASE T AIL DIT C H2GI SEE DETAIL 7 CONCRETE DITCH SEE DETAIL 6 EMBANKMENT RIP RAP AT 18" HDPE 10 SY GEOTEXTILE 3 TONS CLASS B RIP RAP SEE DETAIL 5 DDE =7 CY 20' @ 1.0% 2' BASE TAIL DITCH C F FFFFCFF C C CCCCCFF CC F F1 4 + 0 0 15+0018+00 FF C C C F 2 2 5 2 2 5 225 225225225225225225225 225225225225225230230230230 2 3 0230230230230230230 230230230230230230235235235235235235235235235235 2 3 5 235 23523523 52352 3 5 2 3 5 240240240240240240240240240240 240240 2402402 4 0 240 240 240245245245245245245245245245 245 245245245245245 245245 245 245 245245250250250250250250250250250250 250 250250 250 2 5 0 2502502552552552552552552552552552552552 5 5 255255 255 255 255 255 255260 260 260260260260260 260260260260260260260260260260 260260 260 260 260 2652652652652652652 6 5 265265 265265 2 6 5 265265265265 2702702702702702 7 0 270 270 270 275275275275275275275 275275 275 2802802802 80 280 280 280 280 285285285285290290 295BLDGRD 259.5 W/E W/E 247.3 240.4 W/E W/E 240.4 (BOOK OF MAPS 1990, PAGE 410)40' SANI TARY SEW ER EASEM ENT(168.9 ACRES PER RECORDS) PIN 0786-34-9208 DB 1592, PG 361 AGGREGATES, INC BENCHMARK CAROLINA N/F H14014.00 SCALE: 1"=30' GREENWAY ENGINEER HYDRAULICS ENGINEER PROJECT NO.: REVISIONS: NO.DATE 919-996-4785 RALEIGH, NC 27601 SUITE 600 222 W. HARGETT ST, RALEIGH MUNICIPAL BUILDING CULTURAL RESOURCES RECREATION and PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com T 919.380.8750 Raleigh, NC 27603 Suite 1100 223 West Street, Firm License No. C-1051 LISA SCHIFFBAUER, PROJECT MANAGER CONTACT: Raleigh, NC 27606 VHB Engineering NC, P.C. (C-3705) 940 Main Campus Drive, Suite 500 DATE: OCTOBER 17, 2019PROFESSIONALENGINEERNORTH CARO LINA SEAL 14101 J HN M . KAM P ATORH MATCHLINE -L2- STA 21+50.00 SEE SHEET 1211 SITE 7 SITE 7 S S SURFACE WATER DENOTES IMPACTS IN SHEET 13 OF 24 PERMIT DRAWING CRABTREE CREEK 10+0011+0012 +0 0 13+00 1 4 + 0 0 15+0016+00 17+0018+00 19+0020 +00 21 +00 MATCHLINE -L2- STA 21+50.00 SEE SHEET 1211 SITE 7 SITE 7 S S SURFACE WATER DENOTES IMPACTS IN SHEET 13 OF 24 PERMIT DRAWING CRABTREE CREEK 2GI SEE DETAIL 7 CONCRETE DITCH SEE DETAIL 6 EMBANKMENT RIP RAP AT 18" HDPE 10 SY GEOTEXTILE 3 TONS CLASS B RIP RAP SEE DETAIL 5 DDE =7 CY 20' @ 1.0% 2' BASE TAIL DITCH EST 92 SY GEOTEXTILE EST 32 TONS CLASS B RIP RAP SEE DETAIL 3 TOE PROTECTION EST 243 SY GEOTEXTILE EST 85 TONS CLASS B RIP RAP SEE DETAIL 3 TOE PROTECTION EST 185 SY GEOTEXTILE EST 65 TONS CLASS B RIP RAP SEE DETAIL 10 BERM DITCH SEE DET AIL 11DDE =8 C Y14' @ 0.71 %4' B ASE T AIL DIT C H2GI SEE DETAIL 7 CONCRETE DITCH SEE DETAIL 6 EMBANKMENT RIP RAP AT 18" HDPE 10 SY GEOTEXTILE 3 TONS CLASS B RIP RAP SEE DETAIL 5 DDE =7 CY 20' @ 1.0% 2' BASE TAIL DITCH 225230235235240245245250255C F FFFFCFF C C CCCCCFF CC F F1 4 + 0 0 15+0018+00 FF C C C F 122223242526272829 210 220 230 240 250 210 220 230 240 250 MATCHLINE -L2- STA. 21+50.00 SEE SHEET 11AMATCHLINE -L2- STA. 29+50.00 SEE SHEET 13MATCHLINE -L2- STA 29+50.00 SEE SHEET 13MATCHLINE -L2- STA 21+50.00 SEE SHEET 11SITE 8 SITE 8 SHEET 14 OF 24 PERMIT DRAWING S S SURFACE WATER DENOTES IMPACTS IN SITE 9 SITE 9 CRABTREE CREEKCL OF GREENWAY EXISTING GRADE AT CL OF GREENWAY PROPOSED GRADE AT PI = 24+51.49 EL = 241.00' (+)0.0000% VC = 50' PI = 27+57.03 EL = 241.00' (-)3 .0000% VC = 40' (-)3 .0000% PI = 22+17.63 EL = 232.35' (-)0.4000%(+)3.7000% VC = 250' 36" HDPEEl = 233.40El = 233.40PI =21+50.00(-) 8.8000%PI =22+00.00 El = 229.00 (+) 1.6000%PI =23+25.00El = 231.00(+) 8.0000%PI =24+00.00El = 237.00(+) 8.4000%EL. = 239.10STA. 24+25END DITCH RT.(+) 6.2500%El = 231.00PI =27+00.00EL. = 230.00 STA. 26+84.00 BEGIN DITCH LT.(+) 36.0000%(+) 20.0000% ( - ) 6.2300%(-) 15.3200%El = 254.43PI =27+75.000(-) 1 0. 9 2 0 0 %(-) 19.5400%PI =28+00.000El = 250.60PI =28+25.000El = 247.88PI =28+50.000El = 242.99PI =28+75.000El = 238.81(-) 14.8400 %(-) 16.7200 %(- ) 3 .6000%PI =29+00.000El = 235.10PI =29+25.000El = 234.20CLEARANCE VERTICAL 6' EL. = 236.32 -L2- STA. 23+24.33 -L2- STA. 23+24.33= -L2- STA. 25+00.37 BEGIN BRIDGE 4 -L2- STA. 27+15.37 END BRIDGE 4 48" SANITARY SEWER PIPE EL. = 240.00 STA. 27+25.00 END DITCH LT. H14014.00 SCALE: 1"=30' GREENWAY ENGINEER HYDRAULICS ENGINEER PROJECT NO.: REVISIONS: NO.DATE 919-996-4785 RALEIGH, NC 27601 SUITE 600 222 W. HARGETT ST, RALEIGH MUNICIPAL BUILDING CULTURAL RESOURCES RECREATION and PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com T 919.380.8750 Raleigh, NC 27603 Suite 1100 223 West Street, Firm License No. C-1051 LISA SCHIFFBAUER, PROJECT MANAGER CONTACT: Raleigh, NC 27606 VHB Engineering NC, P.C. (C-3705) 940 Main Campus Drive, Suite 500 DATE: OCTOBER 17, 2019PROFESSIONALENGINEERNORTH CARO LINA SEAL 14101 J HN M . KAM P ATORH(BO O K O F M A P S 1990, PAG E 410 )40' SAN ITARY S EW ER EA S EM EN T (15.34 ACRES PER RECORDS) PIN 0786-62-0033 DB 15551, PG 1993 SOUTHEAST, INC HANSON AGGREGATES N/F 36" HDPE 28 SY GEOTEXTILE 11 TONS CLASS B RIP RAP SEE DETAIL 6 EMBANKMENT RIP RAP AT SEE DETAIL 6 EMBANKMENT RIP RAP AT EST 262 SY GEOTEXTILE EST 87 TONS CLASS B RIP RAP SEE DETAIL 4 SPECIAL CUT DITCH EST 25 SY GEOTEXTILE EST 10 TONS CLASS B RIP RAP SEE DETAIL 3 TOE PROTECTION EST 43 SY GEOTEXTILE EST 15 TONS CLASS B RIP RAP SEE DETAIL 4 SPECIAL CUT DITCH EST 262 SY GEOTEXTILE EST 85 TONS CLASS B RIP RAP SEE DETAIL 4 SPECIAL CUT DITCH EST 185 SY GEOTEXTILE EST 65 TONS CLASS B RIP RAP SEE DETAIL 10 BERM DITCH SEE DETAIL 11 DDE =8 CY 14' @ 0.71% 4' BASE TAIL DITCH EST 157 SY GEOTEXTILE EST 53 TONS CLASS B RIP RAP SEE DETAIL 12 BERM DITCH RIP RAP CLASS II RIP RAP CLASS II 28 SY GEOTEXTILE 11 TONS CLASS B RIP RAP SEE DETAIL 11 DDE =8 CY 14' @ 0.71% 4' BASE TAIL DITCH 22+00 25+0023+00 24 +00 26+00 28+0029+0027+00 39.02' RT +59.64 45.08' RT +26.87 46.04' RT +60.25 34.91' RT +35.80 ELEV: 232.76' E: 2085915.929 N: 761861.471 C F C F CF C F C F C F C CFFCFF22+00 -L2- PCC Sta. 23+24.33 27+00 F C F CF SEE DETAIL 6 EMBANKMENT RIP RAP AT 225225225 2252252252252252 30230230230 230230230230235235235235235235 235235240240240240240 2 40 2 40 240 240 245245245245245 245 245245 245 250250250250250250250 250250 25 0 255255255255 255 255255 2 5 5 260260260260 260 260 260 265265265 2 6 5 270270270270 270 2 7 0 275275 2 7 5280280122223242526272829 210 220 230 240 250 210 220 230 240 250 MATCHLINE -L2- STA. 21+50.00 SEE SHEET 11AMATCHLINE -L2- STA. 29+50.00 SEE SHEET 13MATCHLINE -L2- STA 29+50.00 SEE SHEET 13MATCHLINE -L2- STA 21+50.00 SEE SHEET 11SITE 8 SITE 8 SHEET 15 OF 24 PERMIT DRAWING S S SURFACE WATER DENOTES IMPACTS IN SITE 9 SITE 9 CRABTREE CREEKCL OF GREENWAY EXISTING GRADE AT CL OF GREENWAY PROPOSED GRADE AT PI = 24+51.49 EL = 241.00' (+)0.0000% VC = 50' PI = 27+57.03 EL = 241.00' (-)3 .0000% VC = 40' (-)3 .0000% PI = 22+17.63 EL = 232.35' (-)0.4000%(+)3.7000% VC = 250' 36" HDPEEl = 233.40El = 233.40PI =21+50.00(-) 8.8000%PI =22+00.00 El = 229.00 (+) 1.6000%PI =23+25.00El = 231.00(+) 8.0000%PI =24+00.00El = 237.00(+) 8.4000%EL. = 239.10STA. 24+25END DITCH RT.(+) 6.2500%El = 231.00PI =27+00.00EL. = 230.00 STA. 26+84.00 BEGIN DITCH LT.(+) 36.0000%(+) 20.0000% ( - ) 6.2300%(-) 15.3200%El = 254.43PI =27+75.000(-) 1 0. 9 2 0 0 %(-) 19.5400%PI =28+00.000El = 250.60PI =28+25.000El = 247.88PI =28+50.000El = 242.99PI =28+75.000El = 238.81(-) 14.8400 %(-) 16.7200 %(- ) 3 .6000%PI =29+00.000El = 235.10PI =29+25.000El = 234.20CLEARANCE VERTICAL 6' EL. = 236.32 -L2- STA. 23+24.33 -L2- STA. 23+24.33= -L2- STA. 25+00.37 BEGIN BRIDGE 4 -L2- STA. 27+15.37 END BRIDGE 4 48" SANITARY SEWER PIPE EL. = 240.00 STA. 27+25.00 END DITCH LT. H14014.00 SCALE: 1"=30' GREENWAY ENGINEER HYDRAULICS ENGINEER PROJECT NO.: REVISIONS: NO.DATE 919-996-4785 RALEIGH, NC 27601 SUITE 600 222 W. HARGETT ST, RALEIGH MUNICIPAL BUILDING CULTURAL RESOURCES RECREATION and PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com T 919.380.8750 Raleigh, NC 27603 Suite 1100 223 West Street, Firm License No. C-1051 LISA SCHIFFBAUER, PROJECT MANAGER CONTACT: Raleigh, NC 27606 VHB Engineering NC, P.C. (C-3705) 940 Main Campus Drive, Suite 500 DATE: OCTOBER 17, 2019PROFESSIONALENGINEERNORTH CARO LINA SEAL 14101 J HN M . KAM P ATORH(BO O K O F M A P S 1990, PAG E 410 )40' SAN ITARY S EW ER EA S EM EN T (15.34 ACRES PER RECORDS) PIN 0786-62-0033 DB 15551, PG 1993 SOUTHEAST, INC HANSON AGGREGATES N/F 36" HDPE 28 SY GEOTEXTILE 11 TONS CLASS B RIP RAP SEE DETAIL 6 EMBANKMENT RIP RAP AT SEE DETAIL 6 EMBANKMENT RIP RAP AT EST 262 SY GEOTEXTILE EST 87 TONS CLASS B RIP RAP SEE DETAIL 4 SPECIAL CUT DITCH EST 25 SY GEOTEXTILE EST 10 TONS CLASS B RIP RAP SEE DETAIL 3 TOE PROTECTION EST 43 SY GEOTEXTILE EST 15 TONS CLASS B RIP RAP SEE DETAIL 4 SPECIAL CUT DITCH EST 262 SY GEOTEXTILE EST 85 TONS CLASS B RIP RAP SEE DETAIL 4 SPECIAL CUT DITCH EST 185 SY GEOTEXTILE EST 65 TONS CLASS B RIP RAP SEE DETAIL 10 BERM DITCH SEE DETAIL 11 DDE =8 CY 14' @ 0.71% 4' BASE TAIL DITCH EST 157 SY GEOTEXTILE EST 53 TONS CLASS B RIP RAP SEE DETAIL 12 BERM DITCH RIP RAP CLASS II RIP RAP CLASS II 28 SY GEOTEXTILE 11 TONS CLASS B RIP RAP SEE DETAIL 11 DDE =8 CY 14' @ 0.71% 4' BASE TAIL DITCH 22523023022+00 25+0023+00 24 +00 26+00 28+0029+0027+00 39.02' RT +59.64 45.08' RT +26.87 46.04' RT +60.25 34.91' RT +35.80 ELEV: 232.76' E: 2085915.929 N: 761861.471 C F C F CF C F C F C F C CFFCFF22+00 -L2- PCC Sta. 23+24.33 27+00 225230235240245250 260 F C F CF SEE DETAIL 6 EMBANKMENT RIP RAP AT PC Sta. 39+53.11 4 0 + 0 038+0039+0011+00 44+00 -L2- PT Sta. 44+27.68 CRABTREE CREEK C/L.02.0 2 CRABTREE CREEK C/L-L2- PC Sta. 43+50.00 -L2_REV- PT Sta. 12+52.44 = -L2_REV- PC Sta. 10+00.00 -L2- PT Sta. 41+00.00 = -L2_REV- PT Sta. 10+50.00 -L2_REV- PC Sta. 11+03.88 12+00 -L2_REV- -L2- 500 YR BASE FLOOD EL.=252' 100 YR BASE FLOOD EL.=244' RIM EL.=246.86' GROUND EL.=232.30' 500 YR BASE FLOOD EL.=252' 100 YR BASE FLOOD EL.=244' RIM EL.=246.68' GROUND EL.=231.22' ELEV: 232.40' E: 2086715.232 N: 761161.153 ELEV: 230.90' E: 2086908.717 N: 761151.456FFCCF CFFFCC F C C F F F F F F C C C C F C F F F LOT 288 PIN 1786-61-9227 DB 10019, PG 313 KHALED A. HARFOUSH N/F LOT 287 PIN 0786-71-0351 DB 15666, PG 797 ELIZABETH ANN CRAIG JOSHUA RAY CRAIG & N/F (BOOK OF MAPS 1990, PAGE 542) 20' SANITARY SEWER EASEMENT (BOOK OF MAPS 1990, PAGE 410) 40' SANITARY SEWER EASEMENT CL OF GREENWAY EXISTING GRADE AT CL OF GREENWAY PROPOSED GRADE AT (-)0.5500%(+)1.2000% (+)1.2000%(-)0.5000% 18" HDPE 18" HDPE PI = 44+85.00 EL = 230.16' (-)0.5000% VC = 80' H14014.00 SCALE: 1"=30' GREENWAY ENGINEER HYDRAULICS ENGINEER PROJECT NO.: REVISIONS: NO.DATE 919-996-4785 RALEIGH, NC 27601 SUITE 600 222 W. HARGETT ST, RALEIGH MUNICIPAL BUILDING CULTURAL RESOURCES RECREATION and PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com T 919.380.8750 Raleigh, NC 27603 Suite 1100 223 West Street, Firm License No. C-1051 LISA SCHIFFBAUER, PROJECT MANAGER CONTACT: Raleigh, NC 27606 VHB Engineering NC, P.C. (C-3705) 940 Main Campus Drive, Suite 500 DATE: OCTOBER 17, 2019PROFESSIONALENGINEERNORTH CARO LINA SEAL 14101 J HN M . KAM P ATORH 18" HDPE 18" HDPE SEE DETAIL 6 EMBANKMENT RIP RAP AT SEE DETAIL 6 EMBANKMENT RIP RAP AT 18" HDPE PI = 37+90.40 EL = 231.43' VC = 100' PI = 39+20.40 EL = 232.99' VC = 150' (BOOK OF MAPS 1990, PAGE 410)40' SANITARY SEWER EASEMENT-L2- PC Sta. 43+50.00-L2_REV- PT Sta. 12+52.44 = 12+00 ELEV: 230.90' E: 2086908.717 N: 761151.456 F S 15 " DIP INV=219.59'RIM=223.55'TOP OF CONCRETE=224.75' OTCB INV=219.81' STREAM F WETLAND H WETLAND IWETLAND K CRABTREE CREEKWETLAND I 39+0018" HDPE SEE DETAIL 6 EMBANKMENT RIP RAP AT MATCHLINE -L2- STA 37+50.00 SEE SHEET 1314 220 230 240 250 210 220 230 240 250 210 37 38 39 40 41 42 43 44 MATCHLINE -L2- STA 45+00.00 SEE SHEET 15MATCHLINE -L2- STA 37+50.00 SEE SHEET 13MAT CHLI NE - L 2- S T A 4 5 + 0 0. 0 0 S E E S HE E T 1 5 WETLAND DENOTES FILL INFF CLEARING DENOTES MECHANIZED* * * * ** * ** * * S S SURFACE WATER DENOTES IMPACTS IN SITE 11 SITE 10 SITE 10 SHEET 16 OF 24 PERMIT DRAWING SITE 12 SITES 11 & 12 -L2-FF 225 225 225 225225 225225 225225225225225225225 225230230230 230 230 230230230 230 2302302 3 0230 230230 2302302302302302302352352352352352 35 235 2352402402402 40240 240 245245245245 245 245 245 250250250255 PC Sta. 39+53.11 4 0 + 0 038+0039+0011+00 44+00 -L2- PT Sta. 44+27.68 CRABTREE CREEK C/L.02.0 2 CRABTREE CREEK C/L-L2- PC Sta. 43+50.00 -L2_REV- PT Sta. 12+52.44 = -L2_REV- PC Sta. 10+00.00 -L2- PT Sta. 41+00.00 = -L2_REV- PT Sta. 10+50.00 -L2_REV- PC Sta. 11+03.88 12+00 -L2_REV- -L2- 500 YR BASE FLOOD EL.=252' 100 YR BASE FLOOD EL.=244' RIM EL.=246.86' GROUND EL.=232.30' 500 YR BASE FLOOD EL.=252' 100 YR BASE FLOOD EL.=244' RIM EL.=246.68' GROUND EL.=231.22' ELEV: 232.40' E: 2086715.232 N: 761161.153 ELEV: 230.90' E: 2086908.717 N: 761151.456FFCCF CFFFCC F C C F F F F F F C C C C F C F F F LOT 288 PIN 1786-61-9227 DB 10019, PG 313 KHALED A. HARFOUSH N/F LOT 287 PIN 0786-71-0351 DB 15666, PG 797 ELIZABETH ANN CRAIG JOSHUA RAY CRAIG & N/F (BOOK OF MAPS 1990, PAGE 542) 20' SANITARY SEWER EASEMENT (BOOK OF MAPS 1990, PAGE 410) 40' SANITARY SEWER EASEMENT CL OF GREENWAY EXISTING GRADE AT CL OF GREENWAY PROPOSED GRADE AT (-)0.5500%(+)1.2000% (+)1.2000%(-)0.5000% 18" HDPE 18" HDPE PI = 44+85.00 EL = 230.16' (-)0.5000% VC = 80' H14014.00 SCALE: 1"=30' GREENWAY ENGINEER HYDRAULICS ENGINEER PROJECT NO.: REVISIONS: NO.DATE 919-996-4785 RALEIGH, NC 27601 SUITE 600 222 W. HARGETT ST, RALEIGH MUNICIPAL BUILDING CULTURAL RESOURCES RECREATION and PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com T 919.380.8750 Raleigh, NC 27603 Suite 1100 223 West Street, Firm License No. C-1051 LISA SCHIFFBAUER, PROJECT MANAGER CONTACT: Raleigh, NC 27606 VHB Engineering NC, P.C. (C-3705) 940 Main Campus Drive, Suite 500 DATE: OCTOBER 17, 2019PROFESSIONALENGINEERNORTH CARO LINA SEAL 14101 J HN M . KAM P ATORH 18" HDPE 18" HDPE SEE DETAIL 6 EMBANKMENT RIP RAP AT SEE DETAIL 6 EMBANKMENT RIP RAP AT 18" HDPE 225 225 230 PI = 37+90.40 EL = 231.43' VC = 100' PI = 39+20.40 EL = 232.99' VC = 150' (BOOK OF MAPS 1990, PAGE 410)40' SANITARY SEWER EASEMENT-L2- PC Sta. 43+50.00-L2_REV- PT Sta. 12+52.44 = 12+00 ELEV: 230.90' E: 2086908.717 N: 761151.456 F S 15 " DIP INV=219.59'RIM=223.55'TOP OF CONCRETE=224.75' OTCB INV=219.81' STREAM F WETLAND H WETLAND IWETLAND K CRABTREE CREEKWETLAND I 225 23023039+0018" HDPE SEE DETAIL 6 EMBANKMENT RIP RAP AT MATCHLINE -L2- STA 37+50.00 SEE SHEET 1314 220 230 240 250 210 220 230 240 250 210 37 38 39 40 41 42 43 44 MATCHLINE -L2- STA 45+00.00 SEE SHEET 15MATCHLINE -L2- STA 37+50.00 SEE SHEET 13MAT CHLI NE - L 2- S T A 4 5 + 0 0. 0 0 S E E S HE E T 1 5 WETLAND DENOTES FILL INFF CLEARING DENOTES MECHANIZED* * * * ** * ** * * S S SURFACE WATER DENOTES IMPACTS IN SITE 11 SITE 10 SITE 10 SHEET 17 OF 24 PERMIT DRAWING SITES 11 & 12 SITE 12 -L2-FF W W W LOT 286 PIN 0786-71-1358 DB 15033, PG 273 CHARLES S. NICHOLS JULIA G. HAFER & N/F LOT 285 PIN 0786-71-3423 DB 3161, PG 815 JOYE W. VOSHELL ROBERT W. VOSHELL & N/F PC Sta. 45+90.21 PT Sta. 46+28.53 PC Sta. 46+66.36 PRC Sta. 46+88.81 PT Sta. 47+18.22 POT Sta. 47+83.07 46+0047+00POT Sta. 10+00.00 PI Sta. 10+35.00 PI Sta. 11+90.00 PI Sta. 13+45.00 .02 .02 POT Sta. 14+95.00 12' 500 YR BASE FLOOD EL.=251' 100 YR BASE FLOOD EL.=246' RIM EL.=232.32' GROUND EL.=231.31' ELEV: 230.98' E: 2087290.732 N: 761270.901 ELEV: 254.00' E: 2087193.401 N: 761636.715 EL. = 250.36 -PLCON- STA. 14+85.00 END GRADE EL. = 240.71 -PLCON- STA. 10+20.00 BEGIN GRADE -PLCON- STA. 10+39.92 BEGIN BOARDWALK 5 -PLCON- STA. 14+65.08 END BOARDWALK 6 CLEARANCE VERTICAL 9' SEWERSANITARYSEWERSANITARYCLEARANCE VERTICAL 8' -L2- PI = 13+48.00 EL = 245.67' PI = 14+00.00 EL = 247.38'(+)4.00% (+)3.00% (+)1.50% (+)1.50% PI = 10+30.00 EL = 240.90' (+)1.98% PI = 14+65.00 EL = 249.83' (+)2.64% EL. = 243.60 -PLCON- STA. 12+08.92 BEGIN BRIDGE 5 * EL. = 243.60 -PLCON- STA. 12+09.92 END BOARDWALK 5 * EL. = 245.10 -PLCON- STA. 13+10.08 BEGIN BOARDWALK 6 * EL. = 245.10 -PLCON- STA. 13+11.08 END BRIDGE 5 * * BOARDWALK & BRIDGE OVERLAP ONE FOOT. H14014.00 SCALE: 1"=30' GREENWAY ENGINEER HYDRAULICS ENGINEER PROJECT NO.: REVISIONS: NO.DATE 919-996-4785 RALEIGH, NC 27601 SUITE 600 222 W. HARGETT ST, RALEIGH MUNICIPAL BUILDING CULTURAL RESOURCES RECREATION and PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com T 919.380.8750 Raleigh, NC 27603 Suite 1100 223 West Street, Firm License No. C-1051 LISA SCHIFFBAUER, PROJECT MANAGER CONTACT: Raleigh, NC 27606 VHB Engineering NC, P.C. (C-3705) 940 Main Campus Drive, Suite 500 DATE: OCTOBER 17, 2019PROFESSIONALENGINEERNORTH CARO LINA SEAL 14101 J HN M . KAM P ATORH CL OF GREENWAY EXISTING GRADE AT CL OF GREENWAY PROPOSED GRADE AT EL. = 231.79 -L2- STA. 46+90.95 TIE TO EXISTING GREENWAY END GRADE-PLC0N-(+)1.4095% PI = 46+00.00 EL = 231.79' (+)1.4095%(+)0.0000% VC = 150' RETAIN 12'FFCCFFFFCFCFCFFFF FFFFCFF(BOOK OF MAPS 1990, PAGE 410)40' SANITARY SEWER EASEMENTRETAIN S 15" DIP INV=219.81'STREAM GWETLAND H1546471045 220 230 240 250 260 220 230 240 250 260-PLCON- MATCHLINE -L2- STA 45+00.00 SEE SHEET 14 -L2- 220 230 240 250 260 11 12 13 14 15 WETLAND DENOTES FILL INFF CLEARING DENOTES MECHANIZED* * * * ** * ** * *SHEET 18 OF 24 PERMIT DRAWING SITE 13 SITE 13 CRABTREE CREEK 225225225225225225225225230230230230 2 3 0 230230230230230 2352 3 5 235235235235 2352 3 5235 240240240240240240 240240 245 245 245245245245245245245 245 250250250250 250250 2502502502552 5 5 255255255255255 255 255255260260260260260 260 265265265 270270275275280W W W LOT 286 PIN 0786-71-1358 DB 15033, PG 273 CHARLES S. NICHOLS JULIA G. HAFER & N/F LOT 285 PIN 0786-71-3423 DB 3161, PG 815 JOYE W. VOSHELL ROBERT W. VOSHELL & N/F PC Sta. 45+90.21 PT Sta. 46+28.53 PC Sta. 46+66.36 PRC Sta. 46+88.81 PT Sta. 47+18.22 POT Sta. 47+83.07 46+0047+00POT Sta. 10+00.00 PI Sta. 10+35.00 PI Sta. 11+90.00 PI Sta. 13+45.00 .02 .02 POT Sta. 14+95.00 12' ELEV: 230.98' E: 2087290.732 N: 761270.901 ELEV: 254.00' E: 2087193.401 N: 761636.715 EL. = 250.36 -PLCON- STA. 14+85.00 END GRADE EL. = 240.71 -PLCON- STA. 10+20.00 BEGIN GRADE -PLCON- STA. 10+39.92 BEGIN BOARDWALK 5 -PLCON- STA. 14+65.08 END BOARDWALK 6 CLEARANCE VERTICAL 9' SEWERSANITARYSEWERSANITARYCLEARANCE VERTICAL 8' -L2- PI = 13+48.00 EL = 245.67' PI = 14+00.00 EL = 247.38'(+)4.00% (+)3.00% (+)1.50% (+)1.50% PI = 10+30.00 EL = 240.90' (+)1.98% PI = 14+65.00 EL = 249.83' (+)2.64% EL. = 243.60 -PLCON- STA. 12+08.92 BEGIN BRIDGE 5 * EL. = 243.60 -PLCON- STA. 12+09.92 END BOARDWALK 5 * EL. = 245.10 -PLCON- STA. 13+10.08 BEGIN BOARDWALK 6 * EL. = 245.10 -PLCON- STA. 13+11.08 END BRIDGE 5 * * BOARDWALK & BRIDGE OVERLAP ONE FOOT. H14014.00 SCALE: 1"=30' GREENWAY ENGINEER HYDRAULICS ENGINEER PROJECT NO.: REVISIONS: NO.DATE 919-996-4785 RALEIGH, NC 27601 SUITE 600 222 W. HARGETT ST, RALEIGH MUNICIPAL BUILDING CULTURAL RESOURCES RECREATION and PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com T 919.380.8750 Raleigh, NC 27603 Suite 1100 223 West Street, Firm License No. C-1051 LISA SCHIFFBAUER, PROJECT MANAGER CONTACT: Raleigh, NC 27606 VHB Engineering NC, P.C. (C-3705) 940 Main Campus Drive, Suite 500 DATE: OCTOBER 17, 2019PROFESSIONALENGINEERNORTH CARO LINA SEAL 14101 J HN M . KAM P ATORH CL OF GREENWAY EXISTING GRADE AT CL OF GREENWAY PROPOSED GRADE AT EL. = 231.79 -L2- STA. 46+90.95 TIE TO EXISTING GREENWAY END GRADE-PLC0N-(+)1.4095% PI = 46+00.00 EL = 231.79' (+)1.4095%(+)0.0000% VC = 150' RETAIN FFCCFFFFCFCFCFFFF FFFS 15" DIP INV=219.81'STREAM GWETLAND H12'225225230FCFF(BOOK OF MAPS 1990, PAGE 410)40' SANITARY SEWER EASEMENTRETAIN SS 15" DIP INV=219.81'STREAM GWETLAND H1546471045 220 230 240 250 260 220 230 240 250 260-PLCON- MATCHLINE -L2- STA 45+00.00 SEE SHEET 14 -L2- 220 230 240 250 260 11 12 13 14 15 WETLAND DENOTES FILL INFF CLEARING DENOTES MECHANIZED* * * * ** * ** * *SHEET 19 OF 24 PERMIT DRAWING SITE 13 SITE 13 CRABTREE CREEK 17 S S SURFACE WATER DENOTES IMPACTS IN SHEET 20 OF 24 PERMIT DRAWING H14014.00 SCALE: 1"=30' GREENWAY ENGINEER HYDRAULICS ENGINEER PROJECT NO.: REVISIONS: NO.DATE 919-996-4785 RALEIGH, NC 27601 SUITE 600 222 W. HARGETT ST, RALEIGH MUNICIPAL BUILDING CULTURAL RESOURCES RECREATION and PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com T 919.380.8750 Raleigh, NC 27603 Suite 1100 223 West Street, Firm License No. C-1051 LISA SCHIFFBAUER, PROJECT MANAGER CONTACT: Raleigh, NC 27606 VHB Engineering NC, P.C. (C-3705) 940 Main Campus Drive, Suite 500 DATE: OCTOBER 17, 2019PROFESSIONALENGINEERNORTH CARO LINA SEAL 14101 J HN M . KAM P ATORH SITE 14 SITE 14 PT Sta. 4+46.75 PC Sta. 3+78.33 PC Sta. 6+93.22 4+00 5+00 6+00 7+00 8+00 10+0011+00 -L1- 11+00 12+00 13+00 14+00 15+00 16+00 10+00 9+00-Y5- CRABTREE CREEK C/LTYPE-IIIGREU TL-315+00POT S ta . 19+00 .00 16+0017+0018+00-EBCR--Y3- PC Sta. 12+70.78 -Y3- POT Sta. 16+02.43 500 YR BASE FLOOD EL.=256' 100 YR BASE FLOOD EL.=249' RIM EL.=246.74' GROUND EL.=244.43' 500 YR BASE FLOOD EL.=256' 100 YR BASE FLOOD EL.=249' RIM EL.=UNKNOWN GROUND EL.=249.06' 500 YR BASE FLOOD EL.=254' 100 YR BASE FLOOD EL.=248' RIM EL.=UNKNOWN GROUND EL.=290.55' 500 YR BASE FLOOD EL.=257' 100 YR BASE FLOOD EL.=251' RIM EL.=UNKNOWN GROUND EL.=274.84' 500 YR BASE FLOOD EL.=259' 100 YR BASE FLOOD EL.=257' RIM EL.=UNKNOWN GROUND EL.=252.90' 500 YR BASE FLOOD EL.=257' 100 YR BASE FLOOD EL.=249' RIM EL.=UNKNOWN GROUND EL.=241.51' (SEE DETAIL SHEET S-18) RAILS WOOD APPROACH B M 2007 PG 1484 TREE CONSERVATION AREA 100' WIDE GREEN WAY & F C CFC F C F C F FFCCCCFFFFCC C C F F F FC CC C F F F C C C C F C C F F C CFCF FC F CCCC W LOT 111 PIN 0786-22-7860 BM 2008, PG 1009 DB 11903, PG 91 ASSOCIATION INC UMSTEAD HOMEOWNERS THE HAMPTONS AT N/F LOT 111 PIN 0786-22-7860 BM 2008, PG 1009 DB 11903, PG 91 ASSOCIATION INC UMSTEAD HOMEOWNERS THE HAMPTONS AT N/F 17 S S SURFACE WATER DENOTES IMPACTS IN SHEET 20 OF 24 PERMIT DRAWING DI 15" HDPE 5 SY GEOTEXTILE 1 TON CLASS B RIP RAP SEE DETAIL 6 EMBANKMENT RIP RAP AT JB w/Slab Lid 7 SY GEOTEXTILE 2 TONS CLASS B RIP RAP 15" HDPE AND TIE TO JB SECTION OF 15" CSP REPLACE DAMAGED SEE DETAIL 5 DDE =4 CY 20' @ 1.50% 2' BASE TAIL DITCH ( Not to Scale) RIP RAP AT EMBANKMENT FROM -Y5- STA. 12+91 TO STA. 12+99 RT DETAIL 6 Grade Ditch 1.5' GEOTEXTILE Geotextile= 10 sy Type of Liner= 4 TONS,CL I Rip-Rap 10'min. 1.0'min. B 2:12:1D ( Not to Scale) 2' BASE TAIL DITCH -Y5- STA. 11+31 TO STA. 11+50 RT DETAIL 5 B=2 Ft. Min. D=1 Ft. Ground Natural Ground Natural SITE 14 SITE 14 13+00 PC Sta. 14+40.41 DI 15" HDPE SEE DETAIL 6 EMBANKMENT RIP RAP AT F F 235235235235235235 235235235235235235 235235235235 235 235 235 235235235 235 240240240240240240240 240 240240 240 240 2402 4 0 240240 245245245245245245245245245 245 245 245 245 245245 245 245 250250250250250 250 250 250 250 250 250255255255255255 255255 255 255 255255255260260260 260 260260 260 260265 265265265 265 265 2 6 5265270 2 7 0 270270 270 2702 7 5 275 275 2 7 5 2 7 5 280 2 8 0 280 2 8 0 285 300 17 S S SURFACE WATER DENOTES IMPACTS IN SHEET 21 OF 24 PERMIT DRAWING H14014.00 SCALE: 1"=30' GREENWAY ENGINEER HYDRAULICS ENGINEER PROJECT NO.: REVISIONS: NO.DATE 919-996-4785 RALEIGH, NC 27601 SUITE 600 222 W. HARGETT ST, RALEIGH MUNICIPAL BUILDING CULTURAL RESOURCES RECREATION and PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com T 919.380.8750 Raleigh, NC 27603 Suite 1100 223 West Street, Firm License No. C-1051 LISA SCHIFFBAUER, PROJECT MANAGER CONTACT: Raleigh, NC 27606 VHB Engineering NC, P.C. (C-3705) 940 Main Campus Drive, Suite 500 DATE: OCTOBER 17, 2019PROFESSIONALENGINEERNORTH CARO LINA SEAL 14101 J HN M . KAM P ATORH SITE 14 SITE 14 PT Sta. 4+46.75 PC Sta. 3+78.33 PC Sta. 6+93.22 4+00 5+00 6+00 7+00 8+00 10+0011+00 -L1- 11+00 12+00 13+00 14+00 15+00 16+00 10+00 9+00-Y5- CRABTREE CREEK C/LTYPE-IIIGREU TL-315+00POT S ta . 19+00 .00 16+0017+0018+00-EBCR--Y3- PC Sta. 12+70.78 -Y3- POT Sta. 16+02.43 500 YR BASE FLOOD EL.=256' 100 YR BASE FLOOD EL.=249' RIM EL.=246.74' GROUND EL.=244.43' 500 YR BASE FLOOD EL.=256' 100 YR BASE FLOOD EL.=249' RIM EL.=UNKNOWN GROUND EL.=249.06' 500 YR BASE FLOOD EL.=254' 100 YR BASE FLOOD EL.=248' RIM EL.=UNKNOWN GROUND EL.=290.55' 500 YR BASE FLOOD EL.=257' 100 YR BASE FLOOD EL.=251' RIM EL.=UNKNOWN GROUND EL.=274.84' 500 YR BASE FLOOD EL.=259' 100 YR BASE FLOOD EL.=257' RIM EL.=UNKNOWN GROUND EL.=252.90' 500 YR BASE FLOOD EL.=257' 100 YR BASE FLOOD EL.=249' RIM EL.=UNKNOWN GROUND EL.=241.51' (SEE DETAIL SHEET S-18) RAILS WOOD APPROACH B M 2007 PG 1484 TREE CONSERVATION AREA 100' WIDE GREEN WAY & F C CFC F C F C F FFCCCCFFFFCC C C F F F FC CC C F F F C C C C F C C F F C CFCF FC F CCCC W LOT 111 PIN 0786-22-7860 BM 2008, PG 1009 DB 11903, PG 91 ASSOCIATION INC UMSTEAD HOMEOWNERS THE HAMPTONS AT N/F LOT 111 PIN 0786-22-7860 BM 2008, PG 1009 DB 11903, PG 91 ASSOCIATION INC UMSTEAD HOMEOWNERS THE HAMPTONS AT N/F 17 S S SURFACE WATER DENOTES IMPACTS IN SHEET 21 OF 24 PERMIT DRAWING DI 15" HDPE 5 SY GEOTEXTILE 1 TON CLASS B RIP RAP SEE DETAIL 6 EMBANKMENT RIP RAP AT JB w/Slab Lid 7 SY GEOTEXTILE 2 TONS CLASS B RIP RAP 15" HDPE AND TIE TO JB SECTION OF 15" CSP REPLACE DAMAGED SEE DETAIL 5 DDE =4 CY 20' @ 1.50% 2' BASE TAIL DITCH ( Not to Scale) RIP RAP AT EMBANKMENT FROM -Y5- STA. 12+91 TO STA. 12+99 RT DETAIL 6 Grade Ditch 1.5' GEOTEXTILE Geotextile= 10 sy Type of Liner= 4 TONS,CL I Rip-Rap 10'min. 1.0'min. B 2:12:1D ( Not to Scale) 2' BASE TAIL DITCH -Y5- STA. 11+31 TO STA. 11+50 RT DETAIL 5 B=2 Ft. Min. D=1 Ft. Ground Natural Ground Natural 235 240 SITE 14 SITE 14 13+00 PC Sta. 14+40.41 DI 15" HDPE SEE DETAIL 6 EMBANKMENT RIP RAP AT F F 220 230 240 210 220 230 240 210 -L2- 42+75 WETWET CLEARINGMECHANIZEDFILLPERMANENT SHEET 22 OF 24 PERMIT DRAWING 229.37 0.02 3:1S.S.228.77 2:1 S.S.225.55 H14014.00 SCALE: 1"=30' GREENWAY ENGINEER HYDRAULICS ENGINEER PROJECT NO.: REVISIONS: NO.DATE LISA POTTS, PROJECT MANAGER CONTACT:GREENWAYCRABTREE CREEK WEST 919-996-4785 RALEIGH, NC 27601 SUITE 600 222 W. HARGETT ST, RALEIGH MUNICIPAL BUILDING CULTURAL RESOURCES RECREATION and PARKS,EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com T 919.380.8750 Raleigh, NC 27603 Suite 1100 223 West Street, Firm License No. C-1051 Raleigh, NC 27606 VHB Engineering NC, P.C. (C-3705) 940 Main Campus Drive, Suite 500 A NILO RAC HTRO NLA NOISSEFORP REENIGNEAND REW . O UNGYP 034407 SEAL DATE: OCTOBER 17, 2019 220 230 240 210 220 230 240 210 -L2- 45+32 WETWET CLEARINGMECHANIZEDPERMANENT FILLSHEET 23 OF 24 PERMIT DRAWING 228.90 3:1 3:10.02 S.S.228.57S.S.228.53 H14014.00 SCALE: 1"=30' GREENWAY ENGINEER HYDRAULICS ENGINEER PROJECT NO.: REVISIONS: NO.DATE LISA POTTS, PROJECT MANAGER CONTACT:GREENWAYCRABTREE CREEK WEST 919-996-4785 RALEIGH, NC 27601 SUITE 600 222 W. HARGETT ST, RALEIGH MUNICIPAL BUILDING CULTURAL RESOURCES RECREATION and PARKS,EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com T 919.380.8750 Raleigh, NC 27603 Suite 1100 223 West Street, Firm License No. C-1051 Raleigh, NC 27606 VHB Engineering NC, P.C. (C-3705) 940 Main Campus Drive, Suite 500 A NILO RAC HTRO NLA NOISSEFORP REENIGNEAND REW . O UNGYP 034407 SEAL DATE: OCTOBER 17, 2019 Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts StreamNo. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 1 5+41/5+52 -L1- LT. STABILIZATION < 0.01 8 2 11+14/11+27 -L1- RT. STABILIZATION < 0.01 < 0.01 11 23 3 15+24/15+35 -L1- RT. STABILIZATION 0.02 0.02 40 34 4 22+90 /23+30 -L1- STABILIZATION < 0.01 < 0.01 38 29 5 31+00/31+56 -L1- STABILIZATION < 0.01 < 0.01 11 42 6 34+69/35+09 -L1- STABILIZATION< 0.01 < 0.01 28 277 18+16/18+31 -L2- LT. STABILIZATION < 0.01 11 8 21+93/22+16 -L2- LT. STABILIZATION < 0.01 22 9 26+77/26+89 -L2- LT. STABILIZATION < 0.01 8 10 39+11/39+26 -L2- RT. STABILIZATION < 0.01 13 11 42+55/43+01 -L2- LT. 18" HDPE < 0.01 < 0.01 12 42+84/42+97 -L2- RT. STABILIZATION < 0.01 13 13 45+25/45+43 -L2- LT. EXIST.15" DIP < 0.01 14 12+88/13+00 -Y5- RT. STABILIZATION < 0.01 12 TOTALS*: 0.008 0.004 0.050 0.030 215 155 0*Rounded totals are sum of actual impactsNOTES:Revised 2018 Feb SHEET 24 OF 24 WETLAND AND SURACE WATER IMPACTS SUMMARYWETLAND IMPACTS SURFACE WATER IMPACTSWAKE COUNTYCRABTREE CREEK WEST GREENWAY NC DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYS03/04/2021