HomeMy WebLinkAbout20191233 Ver 2_Crabtree West Buffer Impact Drawings_03_05_2021_20210305-L1-
-HSW-
-Y5--EBCR--EBCR-39.02' RT+59.6445.08' RT+26.8746.04' RT+60.2534.91' RT+35.80Richland Cr
e
ekCrabtree Creek
H14014.00
GREENWAY ENGINEER
HYDRAULICS ENGINEER
PROJECT NO.:
REVISIONS:
NO.DATE
919-996-4785
RALEIGH, NC 27601
SUITE 600
222 W. HARGETT ST,
RALEIGH MUNICIPAL BUILDING
CULTURAL RESOURCES
RECREATION and
PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com
T 919.380.8750
Raleigh, NC 27603
Suite 1100
223 West Street,
Firm License No. C-1051
LISA SCHIFFBAUER, PROJECT MANAGER
CONTACT:
Raleigh, NC 27606
VHB Engineering NC, P.C. (C-3705)
940 Main Campus Drive, Suite 500
DATE: OCTOBER 17, 2019PROFESSIONALENGINEERNORTH CARO
LINA
SEAL
14101
J
HN M
. KAM P ATORH
FUNC. CLASSIFICATION
LEAN ANGLE
DESIGN SPEED
=
=
=
DESIGN DATA PROJECT LENGTHGRAPHIC SCALES
0
PROFILE (HORIZONTAL)PLANS PROFILE (VERTICAL)
0
GREENWAY
20 DEGREES
20 MPH
NORTH CAROLINA
CITY OF RALEIGH
CRABTREE CREEK WEST GREENWAY
FROM EBENEZER CHURCH ROAD TO LINDSAY DRIVE
LOCATION:
1
VICINITY MAPEBENEZER CHURCH RD.DURALEI
GH RD.LI
NDSAY DR.PICARDY DR.POYNER RD.BOXWOOD RD.
WEAVER DR.
-L1--L2--Y2-
-Y1-
-L1-
-L2- STA. 46+30.36
END CONSTRUCTION
-L1- STA. 4+12.68
BEGIN CONSTRUCTION
BEGIN PROJECT
-L1- STA. 63+10.02
END CONSTRUCTION
-L2- STA. 10+80.60
BEGIN CONSTRUCTION
30 15 0 30 60 30 15 30 60
LENGTH OF PROJECT
LENGTH OF BRIDGE
LENGTH OF BOARDWALK
LENGTH OF ASPHALT TRAIL
=
=
=
=
1.80 MI
0.06 MI
0.01 MI
1.73 MI1"=30'1"=30'1"=6'
PARK
STATE
UMSTEAD
4
5
6
7
8
9 10
11
12
13
14
15
6 1236
CRABTREE CREEK
RICHLAND CREEKCOR: 636-99220450-01-17
FA# CMAQ.0520(57)
WBS: 43714.3.8
16
17
NCDOT TIP# C-5604-OD
JANUARY, 2019COURTESTY REVIEW
& EROSION CONTROL
BOARDWALKS, BRIDGES, DRAINAGE,
GRADING, PAVING, RETAINING WALLS,
TYPE OF WORK:
ACCESS
CONSTRUCTION
ACCESS
CONSTRUCTION
ACCESS
CONSTRUCTION
ACCESS
CONSTRUCTION
END PROJECT
ACCESS
CONSTRUCTION
BUFFER IMPACTS PERMIT
SHEET 1 OF 13
BUFFER DRAWING
PARK
STATE
UMSTEAD
LI
NDSAY DR.DURALEI
GH RD.EBENEZER CHURCH RD.PICARDY DR.SITE 1
SITE 2
SITE 3
SITE 4
SITE 5
SITE 6
SITE 7
SITE 8
SITE 9
SITE 10
SITE 11
W/E
252.4
W/E
285.7
262.1
W/E
W/E
272.8
274.9
W/E
W/E
273.1
259.5
W/E
W/E
247.3
232.1
W/E
240.4
W/E
W/E
240.4
EXIST ROWFUNC. CLASSIFICATION
LEAN ANGLE
DESIGN SPEED
=
=
=
DESIGN DATA PROJECT LENGTHGRAPHIC SCALES
0
PROFILE (HORIZONTAL)PLANS PROFILE (VERTICAL)
0
GREENWAY
20 DEGREES
20 MPH
NORTH CAROLINA
CITY OF RALEIGH
CRABTREE CREEK WEST GREENWAY
FROM EBENEZER CHURCH ROAD TO LINDSAY DRIVE
LOCATION:
1
VICINITY MAPEBENEZER CHURCH RD.DURALEI
GH RD.LI
NDSAY DR.PICARDY DR.POYNER RD.BOXWOOD RD.
WEAVER DR.
-L1--L2--Y2-
-Y1-
-L1-
-L2- STA. 46+30.36
END CONSTRUCTION
-L1- STA. 4+12.68
BEGIN CONSTRUCTION
BEGIN PROJECT
-L1- STA. 63+10.02
END CONSTRUCTION
-L2- STA. 10+80.60
BEGIN CONSTRUCTION
30 15 0 30 60 30 15 30 60
LENGTH OF PROJECT
LENGTH OF BRIDGE
LENGTH OF BOARDWALK
LENGTH OF ASPHALT TRAIL
=
=
=
=
1.80 MI
0.06 MI
0.01 MI
1.73 MI1"=30'1"=30'1"=6'
PARK
STATE
UMSTEAD
4
5
6
7
8
9 10
11
12
13
14
15
6 1236
CRABTREE CREEK
RICHLAND CREEKCOR: 636-99220450-01-17
FA# CMAQ.0520(57)
WBS: 43714.3.8
16
17
NCDOT TIP# C-5604-OD
JANUARY, 2019COURTESTY REVIEW
& EROSION CONTROL
BOARDWALKS, BRIDGES, DRAINAGE,
GRADING, PAVING, RETAINING WALLS,
TYPE OF WORK:
ACCESS
CONSTRUCTION
ACCESS
CONSTRUCTION
ACCESS
CONSTRUCTION
ACCESS
CONSTRUCTION
END PROJECT
ACCESS
CONSTRUCTION
BUFFER IMPACTS PERMIT
SHEET 1 OF 13
BUFFER DRAWING
PARK
STATE
UMSTEAD
LI
NDSAY DR.DURALEI
GH RD.EBENEZER CHURCH RD.PICARDY DR.SITE 1
SITE 2
SITE 3
SITE 4
SITE 5
SITE 6
SITE 7
SITE 8
SITE 9
SITE 10
SITE 11
H14014.00
SCALE: 1"=30'
GREENWAY ENGINEER
HYDRAULICS ENGINEER
PROJECT NO.:
REVISIONS:
NO.DATE
919-996-4785
RALEIGH, NC 27601
SUITE 600
222 W. HARGETT ST,
RALEIGH MUNICIPAL BUILDING
CULTURAL RESOURCES
RECREATION and
PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com
T 919.380.8750
Raleigh, NC 27603
Suite 1100
223 West Street,
Firm License No. C-1051
LISA SCHIFFBAUER, PROJECT MANAGER
CONTACT:
Raleigh, NC 27606
VHB Engineering NC, P.C. (C-3705)
940 Main Campus Drive, Suite 500
DATE: OCTOBER 17, 2019PROFESSIONALENGINEERNORTH CARO
LINA
SEAL
14101
J
HN M
. KAM P ATORH
LOT 213
PIN 0786-12-9457
BM 2007, PG 2444-2446
DB 16344, PG 1019
ASSOCIATION INC
UMSTEAD HOMEOWNERS
THE HAMPTONS AT
N/F
LOT 112
PIN 0786-21-7624
BM 2007, PG 2444-2446
DB 16344, PG 1019
ASSOCIATION INC
UMSTEAD HOMEOWNERS
THE HAMPTONS AT
N/F
LOT 111
PIN 0786-22-7860
BM 2008, PG 1009
DB 11903, PG 91
ASSOCIATION INC
UMSTEAD HOMEOWNERS
THE HAMPTONS AT
N/F
EL. = 245.11
-L1- STA. 4+12.68
MATCH EXISTING PATH
BEGIN GRADE
8.9' CLEAR
CHURCH RD
EBENEZER
PI = 5+58.33
EL = 237.83'(-)5
.00
0
0%
VC = 90'
PI = 8+83.33
EL = 239.61'
(+)0.5500%(-)0.9000%
VC = 20'
-L1- STA. 10+88.33
BEGIN BOARDWALK 1
-L1- STA. 11+18.33
END BOARDWALK 1
CL OF GREENWAY
EXISTING GRADE AT
CL OF GREENWAY
PROPOSED GRADE AT
(+) 2.1000%
EL. = 233.60
STA. 11+25.00
BEGIN DITCH RT.
18" HDPE
18" HDPE
SEE DETAIL 6
EMBANKMENT
RIP RAP AT
15" HDPE
5 SY GEOTEXTILE
1 TON
CLASS B RIP RAP
SEE DETAIL 6
EMBANKMENT
RIP RAP AT
SEE DETAIL 6
EMBANKMENT
RIP RAP AT
REMOVEJB w/Slab Lid
15" RCP-III
7 SY GEOTEXTILE
2 TONS
CLASS B RIP RAP
15" HDPE
GEOTEXTILE
EST 10 SY
EST 3 TONS
CLASS B RIP RAP
GEOTEXTILE
EST 5 SY
EST 1 TON
CLASS B RIP RAP
SEE DETAIL 5
DDE =4 CY
20' @ 1.50%
2' BASE TAIL DITCH
SEE DETAIL 3
EST 165 SY GEOTEXTILE
EST 55 TONS
CLASS B RIP RAP
TOE PROTECTION
SEE DETAIL 3
EST 45 SY GEOTEXTILE
EST 15 TONS
CLASS B RIP RAP
TOE PROTECTION SEE SHEET 5MATCHLINE -L1- STA 11+50.0044567891011
230
240
250
260
230
240
250
260-L1-MATCHLINE -L1- STA. 11+50.00 SEE SHEET 5ALLOWABLE IMPACTS ZONE 1
ALLOWABLE IMPACTS ZONE 2
SHEET 2 OF 13
BUFFER DRAWING
SITE 2
SITE 3
SITE 1
SITE 2
CRABTREE CREEK
4+00
5+00
6+00
7+00
8+00
10+0011+00
-L1-
11+00
10+00
9+0015+00
-Y5-TYPE-IIITYPE-IIITYPE-III15+0013+0014+0016+0017+00.02.02.02.01.02+40.00.02
.02+15
.00
.0
2
11'
11'
1
2'
12'
8'
8'
10.5'6'
B
M 2007 PG 1484
TREE CONSERVATION AREA
100' WIDE GREEN
WAY &
ELEV: 234.59'
E: 2082272.420
N: 762725.321
F
C CFC
F
F
C
F
F
FFF F
F C
C
F F
F
FF
F
F
C
C
C
F
F
F
F
C
C
C C
C F
C
C
F F
C
C
CFCF
F
F
F FCCFF
F
F
C FCC
PI = 11+83.33
EL = 236.91'
(-)0.9000%(+)0.5000%
VC = 30'
PI = 12+78.33
EL = 237.39'
(+)0.5000%(-)1.1050%
VC = 40'
PI = 14+13.33
EL = 235.90'
(-)1.1050%(+)2.7000%
VC = 70'
PI = 15+48.33
EL = 239.54'
(+)2.7000%(-)3
.8000%
VC = 30'
PI = 16+08.33
EL = 237.26'(-)3
.8000%(+)0.3515%
VC = 70'
-L1- STA. 14+80.25
BEGIN BRIDGE 1
-L1- STA. 15+32.41
END BRIDGE 1
CL OF GREENWAY
EXISTING GRADE AT
CL OF GREENWAY
PROPOSED GRADE AT
El = 234.125
(+) 0.5000%El = 235.00(+) 0.5000%
(+) 1.0000%
(+) 0.5000%
PI =11+50.00
EL. = 235.50STA. 14+25.00END DITCH RT.EL. = 236.50STA. 18+00.00END DITCH RT.PI =16+50.00EL. = 234.41
STA. 15+32.00
BEGIN DITCH RT.EL. = 234.50STA. 16+00.00BEGIN DITCH LT.H14014.00
SCALE: 1"=30'
GREENWAY ENGINEER
HYDRAULICS ENGINEER
PROJECT NO.:
REVISIONS:
NO.DATE
919-996-4785
RALEIGH, NC 27601
SUITE 600
222 W. HARGETT ST,
RALEIGH MUNICIPAL BUILDING
CULTURAL RESOURCES
RECREATION and
PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com
T 919.380.8750
Raleigh, NC 27603
Suite 1100
223 West Street,
Firm License No. C-1051
LISA SCHIFFBAUER, PROJECT MANAGER
CONTACT:
Raleigh, NC 27606
VHB Engineering NC, P.C. (C-3705)
940 Main Campus Drive, Suite 500
DATE: OCTOBER 17, 2019PROFESSIONALENGINEERNORTH CARO
LINA
SEAL
14101
J
HN M
. KAM P ATORH
SEE DETAIL 1
SPECIAL CUT DITCH
10 SY GEOTEXTILE
3 TONS
CLASS B RIP RAP
( Not to Scale)
RIP RAP AT EMBANKMENT
FROM -L1- STA. 15+25 TO STA. 15+32 RT
DETAIL 6
Grade
Ditch
1.5'
GEOTEXTILE
Geotextile= 10 sy
Type of Liner= 4 TONS,CL I Rip-Rap
10'min.
1.0'min.
SEE DETAIL 1
SPECIAL CUT DITCH
SEE DETAIL 1
SPECIAL CUT DITCH
SEE DETAIL 3
EST 45 SY GEOTEXTILE
EST 15 TONS
CLASS B RIP RAP
TOE PROTECTION
( Not to Scale)
TOE PROTECTION
d
FLATTER2:1 OR
FROM STA. 14+46 TO STA. 14+86 RT -L1-
DETAIL 3
Type of Liner= Class B Rip-Rap
d=1 Ft.
GROUND
NATURAL SLOPE
FILL
GEOTEXTILE
Flatter2:1 or
D2:1( Not to Scale)
SPECIAL CUT DITCH
FROM -L1- STA. 15+32 TO STA. 18+00 RT
FROM -L1- STA. 16+00 TO STA. 22+00 LT
FROM -L1- STA. 11+25 TO STA. 14+25 RT
DETAIL 1
Min. D=1 Ft.
Ground
Natural Slope
Ditch
Front
( Not to Scale)
BANK STABILIZATION
STA 14+88 -L-
DETAIL 13
GEOTEXTILE
Type of Liner= CLASS II RIPRAP
3.0'min.
2.0'
NWS
STA 15+23 -L-
SEE DETAIL 6
EMBANKMENT
RIP RAP AT
RIP RAP
CLASS II
SEE DETAIL 13
EST 140 SY GEOTEXTILE
EST 75 TONS
BANK STABILIZATION
RIP RAP
CLASS II
LOT 112
PIN 0786-21-7624
BM 2007, PG 2444-2446
DB 16344, PG 1019
ASSOCIATION INC
UMSTEAD HOMEOWNERS
THE HAMPTONS AT
N/F
PIN 0786320346
DB 015580, PG 00928
CITY OF RALEIGH
N/F
PIN 0786-22-4319
DB 015298, PG 00731
JENNIFER A. KEUS
MICHAEL A. KEUS &
N/F
PT Sta. 11+62.92
PC Sta. 13+62.35
PRC Sta. 14+10.98
PC Sta. 15+49.45
PC Sta. 18+01.16
PRC Sta. 18+95.08
12+00
13+00
14+00 15+00
16+00
17+00
18+00
PT Sta. 16+57.63
PT Sta. 14+78.29.02.02.0212'12'
BM 2007 PG 1484TREE CONSERVATION AREA100' WIDE GREENWAY &
B
M 2007 P
G 1484
TREE C
O
NSER
V
ATI
O
N
A
RE
A
75' WI
DE
G
REE
N
WA
Y &ELEV: 237.76'
E: 2082369.914
N: 762693.756
ELEV: 236.42'
E: 2082468.510
N: 762661.142
MATCHLINE -L1- STA 11+50.00 SEE SHEET 4MATCHLI
NE
-L1- STA 19+00.00 SEE SHEET 651213141516171819
220
230
240
250
260
220
230
240
250
260-L1-MATCHLINE -L1- STA. 19+00.00 SEE SHEET 6MATCHLINE -L1- STA. 11+50.00 SEE SHEET 4ALLOWABLE IMPACTS ZONE 1
ALLOWABLE IMPACTS ZONE 2
SHEET 3 OF 13
BUFFER DRAWING
SITE 3
SITE 4
SITE 4
CRABTREE CREEK
RI
C
H
L
A
N
D
C
R
E
E
K
F
C
F
C
F
C
F
CF
F
C
F
CC
C
C
F
C
F
C
F
F
F
C
W
PIN 0786320346
DB 015580, PG 00928
CITY OF RALEIGH
N/F
PIN 0786-21-7624
BM 2007, PG 2444-2446
DB 11903, PG 91
COMPANY, LLC
THE HAMPTONS DEVELOPMENT
N/F
(BM 1985, PG 1303)
40' SANITARY SEWER EASEMENT
PI = 23+55.00
EL = 241.66'
VC = 30'
PI = 24+05.00
EL = 239.66'
VC = 70'
(+)1.2000%(-)4
.0000%(+)0.5000%
PI = 20+65.00
EL = 238.87'
(+)0.3515%
VC = 50'
PI = 21+35.00
EL = 241.18'
(+)3.3000%(-)1.5000%
VC = 80'
PI = 22+15.00
EL = 239.98'
(+)1.2000%
VC = 50'
CL OF GREENWAY
EXISTING GRADE AT
CL OF GREENWAY
PROPOSED GRADE AT
El = 238.80(+) 0.5000%
(+) 0.8000%El = 240.00(+) 0.5000%
(+) 0.5000%PI =26+50.00PI =25+00.00EL. = 237.98
STA. 23+37.00
BEGIN DITCH RT.EL. = 238.50STA. 22+00.00END DITCH LT.EL. = 238.16STA. 23+32.00BEGIN DITCH LT.EL. = 239.00STA. 25+00.00END DITCH LT.EL. = 236.50PI =20+00.00(+) 1.0000%
-L1- STA. 22+82.92
BEGIN BRIDGE 2
-L1- STA. 23+35.08
END BRIDGE 2
H14014.00
SCALE: 1"=30'
GREENWAY ENGINEER
HYDRAULICS ENGINEER
PROJECT NO.:
REVISIONS:
NO.DATE
919-996-4785
RALEIGH, NC 27601
SUITE 600
222 W. HARGETT ST,
RALEIGH MUNICIPAL BUILDING
CULTURAL RESOURCES
RECREATION and
PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com
T 919.380.8750
Raleigh, NC 27603
Suite 1100
223 West Street,
Firm License No. C-1051
LISA SCHIFFBAUER, PROJECT MANAGER
CONTACT:
Raleigh, NC 27606
VHB Engineering NC, P.C. (C-3705)
940 Main Campus Drive, Suite 500
DATE: OCTOBER 17, 2019PROFESSIONALENGINEERNORTH CARO
LINA
SEAL
14101
J
HN M
. KAM P ATORH
SEE DETAIL 1
SPECIAL CUT DITCH
SEE DETAIL 6
EMBANKMENT
RIP RAP AT
SEE DETAIL 6
EMBANKMENT
RIP RAP AT
SEE DETAIL 1
SPECIAL CUT DITCH
( Not to Scale)
RIP RAP AT EMBANKMENT
FROM -L1- STA. 23+24 TO STA. 23+37 RT
FROM -L1- STA. 23+18 TO STA. 23+32 LT
DETAIL 6
Grade
Ditch
1.5'
GEOTEXTILE
Geotextile= 10 sy
Type of Liner= 4 TONS,CL I Rip-Rap
10'min.
1.0'min.Flatter2:1 or
D2:1( Not to Scale)
SPECIAL CUT DITCH
FROM -L1- STA. 23+37 TO STA. 31+20 RT
FROM -L1- STA. 23+32 TO STA. 25+00 LT
FROM -L1- STA. 16+00 TO STA. 22+00 LT
DETAIL 1
Min. D=1 Ft.
Ground
Natural Slope
Ditch
Front
RIP RAP
CLASS II
SEE DETAIL 13
EST 90 SY GEOTEXTILE
EST 45 TONS
BANK STABILIZATION
RIP RAP
CLASS II
( Not to Scale)
BANK STABILIZATION
STA 22+91 -L-
DETAIL 13
GEOTEXTILE
Type of Liner= CLASS II RIPRAP
3.0'min.
2.0'
NWS
STA 23+26 -L-STA 27+00.00 SEE SHEET 7MATCHLINE -L1-6
220
230
240
250
260
220
230
240
250
260
19 20 21 22 23 24 25 26
-L1-MAT
C
HLI
NE -L1- ST
A 19+00.00 SEE S
HEET 5
27MATCHLINE -L1- STA. 27+00.00 SEE SHEET 7MATCHLINE -L1- STA. 19+00.00 SEE SHEET 5ALLOWABLE IMPACTS ZONE 1
ALLOWABLE IMPACTS ZONE 2
SHEET 4 OF 13
BUFFER DRAWING
SITE 4
SITE 4
SITE 5
RICHLAND CREEK
PRC Sta. 19+78.45
PRC Sta. 20+32.01
PT Sta. 20+68.40
PT Sta. 22+79.44
PC Sta. 21+79.15
20+00
21+00
22+00
2
3
+0
0
PC Sta. 23+36.13
24+00
PRC Sta. 24+26.46
25+00
26+00
PCC Sta. 26+52.14
PCC Sta. 26+84.91
12'12'BM 2007 PG 1484
TREE CONSERVATION AREA
75' WIDE GREENWAY &CFCFF
C
F
F
F
F
C
C
C
C
C
C
F
C
F
F
C
C
CC
PIN 0786-21-7624
BM 2007, PG 2444-2446
DB 11903, PG 91
COMPANY, LLC
THE HAMPTONS DEVELOPMENT
N/F
(BM 1985, PG 1303)
40' SANITARY SEWER EASEMENT
(168.9 ACRES PER RECORDS)
PIN 0786-34-9208
DB 1592, PG 361
AGGREGATES, INC
BENCHMARK CAROLINA
N/F
PI = 28+25.00
EL = 241.76'
VC = 20'
PI = 29+30.00
EL = 243.23'
VC = 20'
PI = 31+55.00
EL = 242.67'
VC = 30'
(+)0.5000%(+)1.4000%
(+)1.4000%(-)0.2500%(-)0.2500%
(+)1.3000%
-L1- STA. 31+13.00
BEGIN BOARDWALK 2
-L1- STA. 31+33.00
END BOARDWALK 2
CL OF GREENWAY
EXISTING GRADE AT
CL OF GREENWAY
PROPOSED GRADE AT
El = 241.20(+) 0.6000%
(+) 1.0000%El = 242.20(-) 0.5000%
(+) 1.2000%EL. = 241.35STA. 31+20.00END DITCH RT.EL. = 241.30
STA. 31+25.00
BEGIN DITCH LT.PI =29+50.00PI =28+50.00H14014.00
SCALE: 1"=30'
GREENWAY ENGINEER
HYDRAULICS ENGINEER
PROJECT NO.:
REVISIONS:
NO.DATE
919-996-4785
RALEIGH, NC 27601
SUITE 600
222 W. HARGETT ST,
RALEIGH MUNICIPAL BUILDING
CULTURAL RESOURCES
RECREATION and
PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com
T 919.380.8750
Raleigh, NC 27603
Suite 1100
223 West Street,
Firm License No. C-1051
LISA SCHIFFBAUER, PROJECT MANAGER
CONTACT:
Raleigh, NC 27606
VHB Engineering NC, P.C. (C-3705)
940 Main Campus Drive, Suite 500
DATE: OCTOBER 17, 2019PROFESSIONALENGINEERNORTH CARO
LINA
SEAL
14101
J
HN M
. KAM P ATORH
2
8+
00
2
9
+
0
0
30+00PRC Sta. 30+48.05
31+00
PT Sta. 31+14.39
32+00PRC Sta. 37+75.79PCC Sta. 37+16.57PI Sta. 42+75.83.02.0212'12'BM
2
0
0
7 PG
1
4
8
4TREE CONSERVATI
ON AREA7
5' WI
DE GREENWAY &SEE DETAIL 6
EMBANKMENT
RIP RAP AT
SEE DETAIL 6
EMBANKMENT
RIP RAP AT
Flatter2:1 or
D2:1( Not to Scale)
SPECIAL CUT DITCH
FROM -L1- STA. 31+25 TO STA. 33+50 LT.
FROM -L1- STA. 23+37 TO STA. 31+20 RT.
DETAIL 1
Min. D=1 Ft.
Ground
Natural Slope
Ditch
Front
SEE DETAIL 1
SPECIAL CUT DITCH
SEE DETAIL 1
SPECIAL CUT DITCH
( Not to Scale)
RIP RAP AT EMBANKMENT
FROM -L1- STA. 31+16 TO STA. 31+25 RT
FROM -L1- STA. 31+19 TO STA. 31+30 LT
DETAIL 6
Grade
Ditch
1.5'
GEOTEXTILE
Geotextile= 10 sy
Type of Liner= 4 TONS,CL I Rip-Rap
10'min.
1.0'min.SEE SHEET 6MATCHLINE -L1- STA 27+00.00230
240
250
27 28 29 30 31 32 33
230
240
250
7
220
260
220
260-L1-MATCHLINE -L1- STA 33+00.00 SEE SHEET 8SEE SHEET 8MATCHLINE -L1- STA 33+00.00MATCHLINE -L1- STA 27+00.00 SEE SHEET 6ALLOWABLE IMPACTS ZONE 1
ALLOWABLE IMPACTS ZONE 2
SHEET 5 OF 13
BUFFER DRAWING
SITE 6
SITE 5
SITE 5
RICHLAND CREEK
C
C
C
F
C FCFF
C
C
F
F C
C
C
PIN 0786-21-7624
BM 2007, PG 2444-2446
DB 11903, PG 91
COMPANY, LLC
THE HAMPTONS DEVELOPMENT
N/F
(16.52 ACRES PER RECORDS)
PIN 0786-30-8563
BM 1990, PG 765
DB 14831, PG 744
SOUTHEAST, LLC
HANSON AGGREGATES
N/F
(BM 1985, PG 1303)
40' SANITARY SEWER EASEMENT
(168.9 ACRES PER RECORDS)
PIN 0786-34-9208
DB 1592, PG 361
AGGREGATES, INC
BENCHMARK CAROLINA
N/F
PC Sta. 33+35.67
PT Sta. 33+83.68
PI Sta. 34+15.84
3
4
+0
0 35+00PC Sta. 35+06.41
PRC Sta. 35+64.61
36+0037+003
8
+
0
0
39+00
40+00
PCC Sta. 37+16.57
45
+
00
41+00
42+00
4
3
+
0
0
44+00
46+0047+0048+0049+00
50+00 51+0052+0053+00 54+00
B
M 2007 PG 1484
TREE CONSERVATION AREA
75' WIDE GREEN
WAY &
PI = 34+35.00
EL = 246.31'
VC = 20'
(+)1.3000%
-L1- STA. 34+61.92
BEGIN BRIDGE 3
-L1- STA. 35+04.08
END BRIDGE 3
CL OF GREENWAY
EXISTING GRADE AT
CL OF GREENWAY
PROPOSED GRADE AT
EL. = 244.00
STA. 33+50
END DITCH LT.
CL OF GREENWAY
EXISTING GRADE AT
CL OF GREENWAY
PROPOSED GRADE AT
-L1- STA. 39+79.83
BEGIN BOARDWALK 3
(-)0.8786%
PI = 36+23.35
EL = 244.65'
VC = 129'
PI = 37+95.22
EL = 252.82'
VC = 40'
VC = 20'
EL = 251.98'
PI = 37+53.00
(+)5.6500%
(+)2.0000%
(+)8.3300%
(+)2.0000%
VC = 20'
EL = 265.98'
PI = 39+53.21 (+)3.0000%(+)4.0000%(+)5.0000%(+)6.0000%
PI = 40+01.84
EL = 266.95'
PI = 40+21.84
EL = 267.55'
PI = 40+41.84
EL = 268.35'
PI = 40+61.84
EL = 269.35'
H14014.00
SCALE: 1"=30'
GREENWAY ENGINEER
HYDRAULICS ENGINEER
PROJECT NO.:
REVISIONS:
NO.DATE
919-996-4785
RALEIGH, NC 27601
SUITE 600
222 W. HARGETT ST,
RALEIGH MUNICIPAL BUILDING
CULTURAL RESOURCES
RECREATION and
PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com
T 919.380.8750
Raleigh, NC 27603
Suite 1100
223 West Street,
Firm License No. C-1051
LISA SCHIFFBAUER, PROJECT MANAGER
CONTACT:
Raleigh, NC 27606
VHB Engineering NC, P.C. (C-3705)
940 Main Campus Drive, Suite 500
DATE: OCTOBER 17, 2019PROFESSIONALENGINEERNORTH CARO
LINA
SEAL
14101
J
HN M
. KAM P ATORH
10 SY GEOTEXTILE
3 TONS
CLASS B RIP RAP
DRAIN
GRADE TO
10 SY GEOTEXTILE
3 TONS
CLASS B RIP RAP
18" HDPE
SEE DETAIL 8
BERM DITCH
EST 399 SY GEOTEXTILE
EST 248 TONS
CLASS II RIP RAP
SEE DETAIL 9
BERM DITCH
Flatter2:1 or
D2:1( Not to Scale)
SPECIAL CUT DITCH
FROM -L1- STA. 31+25 TO STA. 33+50 LT.
DETAIL 1
Min. D=0.5 Ft.
Ground
Natural Slope
Ditch
Front
SEE DETAIL 1
SPECIAL CUT DITCH
b
( Not to Scale)
D 2:1
BERM 'V' DITCH
DETAIL 8
Ground
Natural
RDWY
FROM -L1- STA. 45+50 TO STA. 47+50 LTVAR.
b=0 Ft.
Min. D=1 Ft.
VAR.STAKESLOPE0.0'
D2:1( Not to Scale)
BERM DITCH
FROM -L1- STA. 42+76 TO STA. 45+50 LT
VAR.
DETAIL 9
VAR.
Max. d=1 Ft.
Min. D=1 Ft.
Type of Liner= Class II Rip Rap
d
Geotextile
VAR.
SEE DETAIL 1
SPECIAL CUT DITCH
SEE DETAIL 1
SPECIAL CUT DITCH
RIP RAP
CLASS II
RIP RAP
CLASS II
SEE DETAIL 13
EST 90 SY GEOTEXTILE
EST 45 TONS
BANK STABILIZATION
( Not to Scale)
BANK STABILIZATION
STA 34+71 -L-
DETAIL 13
GEOTEXTILE
Type of Liner= CLASS II RIPRAP
3.0'min.
2.0'
NWS
STA 34+95 -L-
33 34 35 36 37 38 39 8
240
250
260
270
240
250
260
270
40 41
-L1-STA 54+00.00 SEE SHEET 9MATCHLI
NE
-L1-MATCHLINE -L1- STA. 41+00.00 SEE SHEET 8AMATCHLINE -L1- STA. 33+00.00 SEE SHEET 7SEE SHEET 7
STA 33+00.00
MATCHLINE -L1-
ALLOWABLE IMPACTS ZONE 1
ALLOWABLE IMPACTS ZONE 2
SHEET 6 OF 13
BUFFER DRAWING
SITE 6
SITE 7
RI
CHLAND CREEKC
C
C
F
C
F
F
C FCFFCCF
F
F CF
F
C
C
C
C
C
C CCCFF CFCFCFCFCCCFFF
F
F
F
C
C
F
F
F
F
C
CC
FCF
F
F
F
259.5
W/E
W/E
247.3
240.4
W/E
W/E
240.4
(BOOK OF MAPS 1990, PAGE 410)40' SANI
TARY SEW
ER EASEM
ENT(168.9 ACRES PER RECORDS)
PIN 0786-34-9208
DB 1592, PG 361
AGGREGATES, INC
BENCHMARK CAROLINA
N/F
H14014.00
SCALE: 1"=30'
GREENWAY ENGINEER
HYDRAULICS ENGINEER
PROJECT NO.:
REVISIONS:
NO.DATE
919-996-4785
RALEIGH, NC 27601
SUITE 600
222 W. HARGETT ST,
RALEIGH MUNICIPAL BUILDING
CULTURAL RESOURCES
RECREATION and
PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com
T 919.380.8750
Raleigh, NC 27603
Suite 1100
223 West Street,
Firm License No. C-1051
LISA SCHIFFBAUER, PROJECT MANAGER
CONTACT:
Raleigh, NC 27606
VHB Engineering NC, P.C. (C-3705)
940 Main Campus Drive, Suite 500
DATE: OCTOBER 17, 2019PROFESSIONALENGINEERNORTH CARO
LINA
SEAL
14101
J
HN M
. KAM P ATORH
MATCHLINE -L2- STA 21+50.00 SEE SHEET 1211
ALLOWABLE IMPACTS ZONE 1
ALLOWABLE IMPACTS ZONE 2
SHEET 7 OF 13
BUFFER DRAWING
10+0011+0012
+0
0
13+00
1
4
+
0
0 15+0016+00 17+0018+00
19+0020
+00
21
+00
MATCHLINE -L2- STA 21+50.00 SEE SHEET 1211
ALLOWABLE IMPACTS ZONE 1
ALLOWABLE IMPACTS ZONE 2
SHEET 7 OF 13
BUFFER DRAWING
2GI
SEE DETAIL 7
CONCRETE DITCH
SEE DETAIL 6
EMBANKMENT
RIP RAP AT
18" HDPE
10 SY GEOTEXTILE
3 TONS
CLASS B RIP RAP
1102
1103
SEE DETAIL 5
DDE =7 CY
20' @ 1.0%
2' BASE TAIL DITCH
EST 92 SY GEOTEXTILE
EST 32 TONS
CLASS B RIP RAP
SEE DETAIL 3
TOE PROTECTION
EST 243 SY GEOTEXTILE
EST 85 TONS
CLASS B RIP RAP
SEE DETAIL 3
TOE PROTECTION
EST 185 SY GEOTEXTILE
EST 65 TONS
CLASS B RIP RAP
SEE DETAIL 10
BERM DITCH
SEE DET
AIL 11DDE =8
C
Y14' @ 0.71
%4'
B
ASE T
AIL DIT
C
HB
2:12:1D
( Not to Scale)
2' BASE TAIL DITCH
-L2- STA. 18+21 LT.
DETAIL 5
B=2 Ft.
Min. D=1 Ft.
Ground
Natural
Ground
Natural
FROM STA. 17+15 TO STA. 19+11 RT. -L2-
DETAIL 7
BEHIND RETAINING WALL
CONCRETE DITCH
~
SEIRAV
D
B
4"
1:2
( Not to Scale)
GROUND
NATURAL
WALL
RETAINING
BREAKER
BOND
B= 1.0'
D= 1.0'
VAR.STAKESLOPE5.0'5.0'
D
2:1LIMITSCLEARING( Not to Scale)
BERM DITCH
10.0' V.C.
FROM STA. 20+00 TO STA. 21+50 RT. -L2-
6'
DETAIL 10
4'
Max. d=1.5 Ft.
Min. D=1 Ft.
Type of Liner= Class B Rip Rap
d
Geotextile
SITE 8
SITE 8
CRABTREE CREEKSITE 8
SITE 8
CRABTREE CREEK( Not to Scale)
TOE PROTECTION
d
FLATTER2:1 OR
FROM STA. 11+00 TO STA. 11+75 RT. -L2-
FROM STA. 10+95 TO STA. 12+85 LT. -L2-
DETAIL 3
Type of Liner= Class B Rip-Rap
d=1 Ft.
GROUND
NATURAL SLOPE
FILL
GEOTEXTILE
( Not to Scale)
RIP RAP AT EMBANKMENT
FROM STA. 18+20 TO STA. 18+33 LT -L2-
DETAIL 6
Grade
Ditch 1.5'
GEOTEXTILE
Geotextile= 10 sy
Type of Liner= 4 TONS,CL I Rip-Rap
10'min.
1.0'min.
C
F
FFFFCFF
C
C
CCCCCFF
CC
F
F
122223242526272829
210
220
230
240
250
210
220
230
240
250
MATCHLINE -L2- STA. 21+50.00 SEE SHEET 11AMATCHLINE -L2- STA. 29+50.00 SEE SHEET 13MATCHLINE -L2- STA 29+50.00 SEE SHEET 13MATCHLINE -L2- STA 21+50.00 SEE SHEET 11ALLOWABLE IMPACTS ZONE 1
ALLOWABLE IMPACTS ZONE 2
SHEET 8 OF 13
BUFFER DRAWING
CL OF GREENWAY
EXISTING GRADE AT
CL OF GREENWAY
PROPOSED GRADE AT
PI = 24+51.49
EL = 241.00'
(+)0.0000%
VC = 50'
PI = 27+57.03
EL = 241.00'
(-)3
.0000%
VC = 40'
(-)3
.0000%
PI = 22+17.63
EL = 232.35'
(-)0.4000%(+)3.7000%
VC = 250'
36" HDPEEl = 233.40El = 233.40PI =21+50.00(-) 8.8000%PI =22+00.00
El = 229.00
(+) 1.6000%PI =23+25.00El = 231.00(+) 8.0000%PI =24+00.00El = 237.00(+) 8.4000%EL. = 239.10STA. 24+25END DITCH RT.(+) 6.2500%El = 231.00PI =27+00.00EL. = 230.00
STA. 26+84.00
BEGIN DITCH LT.(+) 36.0000%(+) 20.0000%
(
-
) 6.2300%(-) 15.3200%El = 254.43PI =27+75.000(-)
1
0.
9
2
0
0
%(-) 19.5400%PI =28+00.000El = 250.60PI =28+25.000El = 247.88PI =28+50.000El = 242.99PI =28+75.000El = 238.81(-) 14.8400
%(-) 16.7200
%(-
) 3
.6000%PI =29+00.000El = 235.10PI =29+25.000El = 234.20CLEARANCE
VERTICAL
6'
EL. = 236.32
-L2- STA. 23+24.33
-L2- STA. 23+24.33=
-L2- STA. 25+00.37
BEGIN BRIDGE 4
-L2- STA. 27+15.37
END BRIDGE 4
48" SANITARY SEWER PIPE
EL. = 240.00
STA. 27+25.00
END DITCH LT.
H14014.00
SCALE: 1"=30'
GREENWAY ENGINEER
HYDRAULICS ENGINEER
PROJECT NO.:
REVISIONS:
NO.DATE
919-996-4785
RALEIGH, NC 27601
SUITE 600
222 W. HARGETT ST,
RALEIGH MUNICIPAL BUILDING
CULTURAL RESOURCES
RECREATION and
PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com
T 919.380.8750
Raleigh, NC 27603
Suite 1100
223 West Street,
Firm License No. C-1051
LISA SCHIFFBAUER, PROJECT MANAGER
CONTACT:
Raleigh, NC 27606
VHB Engineering NC, P.C. (C-3705)
940 Main Campus Drive, Suite 500
DATE: OCTOBER 17, 2019PROFESSIONALENGINEERNORTH CARO
LINA
SEAL
14101
J
HN M
. KAM P ATORH
SITE 8
SITE 9
CRABTREE CREEK
PIN 0786-51-9537
DB 16646, PG 1631
FOUNDATION INC
CITY OF OAKS
N/F(BO
O
K
O
F M
A
P
S 1990, PAG
E 410
)40' SAN
ITARY
S
EW
ER
EA
S
EM
EN
T
(15.34 ACRES PER RECORDS)
PIN 0786-62-0033
DB 15551, PG 1993
SOUTHEAST, INC
HANSON AGGREGATES
N/F
36" HDPE
28 SY GEOTEXTILE
11 TONS
CLASS B RIP RAP
SEE DETAIL 6
EMBANKMENT
RIP RAP AT
SEE DETAIL 6
EMBANKMENT
RIP RAP AT
1201
EST 262 SY GEOTEXTILE
EST 87 TONS
CLASS B RIP RAP
SEE DETAIL 4
SPECIAL CUT DITCH
EST 25 SY GEOTEXTILE
EST 10 TONS
CLASS B RIP RAP
SEE DETAIL 3
TOE PROTECTION
EST 43 SY GEOTEXTILE
EST 15 TONS
CLASS B RIP RAP
SEE DETAIL 4
SPECIAL CUT DITCH
EST 262 SY GEOTEXTILE
EST 85 TONS
CLASS B RIP RAP
SEE DETAIL 4
SPECIAL CUT DITCH
EST 185 SY GEOTEXTILE
EST 65 TONS
CLASS B RIP RAP
SEE DETAIL 10
BERM DITCH
SEE DETAIL 11
DDE =8 CY
14' @ 0.71%
4' BASE TAIL DITCH
2:1D Flatter2:1 or
d
( Not to Scale)
SPECIAL CUT DITCH
FROM STA. 29+00 TO STA. 31+43 LT -L2-
FROM STA. 26+84 TO STA. 27+25 LT -L2-
FROM STA. 21+50 TO STA. 24+25 RT -L2-
DETAIL 4
Max. d=1 Ft.
Min. D=1 Ft.
Type of Liner= Class B Rip-Rap
Slope
Ditch
Front
Ground
Natural
Geotextile
EST 157 SY GEOTEXTILE
EST 53 TONS
CLASS B RIP RAP
SEE DETAIL 12
BERM DITCH
VAR.STAKESLOPE5.0'5.0'
D2:1LIMITSCLEARING( Not to Scale)
BERM DITCH
10.0' V.C.
FROM STA. 20+00 TO STA. 21+50 RT -L2-
6'
DETAIL 10
4'
Max. d=1.5 Ft.
Min. D=1 Ft.
Type of Liner= Class B Rip Rap
d
Geotextile
VAR.STAKESLOPE5.0'
D2:1LIMITSCLEARING( Not to Scale)
BERM DITCH
FROM STA. 27+50 TO STA. 29+00 LT -L2-
?
DETAIL 12
?
Max. d=1 Ft.
Min. D=1 Ft.
Type of Liner= Class B Rip Rap
d
Geotextile
RIP RAP
CLASS II
RIP RAP
CLASS II
( Not to Scale)
TOE PROTECTION
d
FLATTER2:1 OR
FROM STA. 24+90 TO STA. 25+05 RT -L2-
DETAIL 3
Type of Liner= Class B Rip-Rap
d=1 Ft.
GROUND
NATURAL SLOPE
FILL
GEOTEXTILE
( Not to Scale)
RIP RAP AT EMBANKMENT
FROM STA. 26+78 TO STA. 26+85 LT -L2-
FROM STA. 21+93 TO STA. 22+11 LT -L2-
DETAIL 6
Grade
Ditch
1.5'
GEOTEXTILE
Geotextile= 10 sy
Type of Liner= 4 TONS,CL I Rip-Rap
10'min.
1.0'min.
B
2:12:1D
( Not to Scale)
4' BASE TAIL DITCH
STA. 22+00 LT -L2-
DETAIL 11
B=4 Ft.
Min. D=1 Ft.
Ground
Natural
Ground
Natural
22+00 25+0023+00
24
+00
26+00 28+0029+0027+00
39.02' RT
+59.64
45.08' RT
+26.87 46.04' RT
+60.25
34.91' RT
+35.80
ELEV: 232.76'
E: 2085915.929
N: 761861.471
C
F
C
F
CF
C
F
C
F
C
F
C
CFFCFF
W
(BOOK OF MAPS 1990, PAGE 410)40' SANITARY SEWER EASEMENT
(15.34 ACRES PER RECORDS)
PIN 0786-62-0033
DB 15551, PG 1993
SOUTHEAST, INC
HANSON AGGREGATES
N/F
CL OF GREENWAY
EXISTING GRADE AT
CL OF GREENWAY
PROPOSED GRADE AT
PI = 29+40.12
EL = 235.51'
(-)1.7000%
VC = 50'
PI = 32+10.40
EL = 230.91'
(-)1.7000%(+)0.7500%
VC = 100'
PI = 34+95.40
EL = 233.05'
(+)0.7500%(-)0.5500%
VC = 50'
(-) 1.6000%PI =31+25.000El = 231.00-L2- STA. 35+80.40
END BOARDWALK 4
-L2- STA. 35+50.40
BEGIN BOARDWALK 4
EL = 230.20STA. 31+43.00END DITCH LT.(-) 4.
4
444%
H14014.00
SCALE: 1"=30'
GREENWAY ENGINEER
HYDRAULICS ENGINEER
PROJECT NO.:
REVISIONS:
NO.DATE
919-996-4785
RALEIGH, NC 27601
SUITE 600
222 W. HARGETT ST,
RALEIGH MUNICIPAL BUILDING
CULTURAL RESOURCES
RECREATION and
PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com
T 919.380.8750
Raleigh, NC 27603
Suite 1100
223 West Street,
Firm License No. C-1051
LISA SCHIFFBAUER, PROJECT MANAGER
CONTACT:
Raleigh, NC 27606
VHB Engineering NC, P.C. (C-3705)
940 Main Campus Drive, Suite 500
DATE: OCTOBER 17, 2019
EST 315 SY GEOTEXTILE
EST 105 TONS
CLASS B RIP RAP
SEE DETAIL 4
SPECIAL CUT DITCH 2:1D Flatter2:1 or
d
( Not to Scale)
SPECIAL CUT DITCH
FROM STA. 29+00 TO STA. 31+43 LT. -L2-
FROM STA. 26+84 TO STA. 27+25 LT. -L2-
FROM STA. 21+50 TO STA. 24+25 RT. -L2-
DETAIL 4
Max. d=1 Ft.
Min. D=1 Ft.
Type of Liner= Class B Rip-Rap
Slope
Ditch
Front
Ground
Natural
Geotextile
3
0
+0
0
35+00
3
1
+0
0
32+00
33+00
34+00
36+00
37+00.02.02ELEV: 231.05'
E: 2086060.499
N: 761646.008CFFC
C
C
F
C
F
F
F
F
C
C
C
F
C
F C
C
F
C
F
F
F
F
F
F C F F
F
WETLAND L MATCHLINE -L2- STA 37+50.00 SEE SHEET 1413
220
230
240
250
210
250
240
230
220
210
30 31 32 33 34 35 36 37
-L2-MATCHLINE -L2- STA 37+50.00 SEE SHEET 14MATCHLINE -L2- STA 29+50.00 SEE SHEET 12MATCHLINE -L2- STA 29+50.00 SEE SHEET 12ALLOWABLE IMPACTS ZONE 1
ALLOWABLE IMPACTS ZONE 2
SHEET 9 OF 13
BUFFER DRAWING
SITE 9
SITE 9 SITE 10
CRABTREE CREEK
4
0
+
0
038+0039+0011+00
44+00
-L2-
CRABTREE CREEK C/L.02.0
2
CRABTREE CREEK C/L12+00
-L2_REV-
-L2-
500 YR BASE FLOOD EL.=252'
100 YR BASE FLOOD EL.=244'
RIM EL.=246.86'
GROUND EL.=232.30'
500 YR BASE FLOOD EL.=252'
100 YR BASE FLOOD EL.=244'
RIM EL.=246.68'
GROUND EL.=231.22'
ELEV: 232.40'
E: 2086715.232
N: 761161.153
ELEV: 230.90'
E: 2086908.717
N: 761151.456FFCCF
CFFFCC
F
C
C
F
F
F
F
F
F
C
C
C
C
F
C
F
F
F
LOT 290
PIN 0786-61-6334
BM 1969, PG 68
DB 8482, PG 1296
L. HUNTER TURNAGE
N/F
LOT 289
PIN 1786-61-7266
DB 9367, PG 1331
LORI ANN KING
CHARLES R. KING &
N/F
LOT 288
PIN 1786-61-9227
DB 10019, PG 313
KHALED A. HARFOUSH
N/F
LOT 287
PIN 0786-71-0351
DB 15666, PG 797
ELIZABETH ANN CRAIG
JOSHUA RAY CRAIG &
N/F
(BOOK OF MAPS 1990, PAGE 542)
20' SANITARY SEWER EASEMENT
(BOOK OF MAPS 1990, PAGE 410)
40' SANITARY SEWER EASEMENT
CL OF GREENWAY
EXISTING GRADE AT
CL OF GREENWAY
PROPOSED GRADE AT
(-)0.5500%(+)1.2000%
(+)1.2000%(-)0.5000%
18" HDPE
18" HDPE
PI = 44+85.00
EL = 230.16'
(-)0.5000%
VC = 80'
H14014.00
SCALE: 1"=30'
GREENWAY ENGINEER
HYDRAULICS ENGINEER
PROJECT NO.:
REVISIONS:
NO.DATE
919-996-4785
RALEIGH, NC 27601
SUITE 600
222 W. HARGETT ST,
RALEIGH MUNICIPAL BUILDING
CULTURAL RESOURCES
RECREATION and
PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com
T 919.380.8750
Raleigh, NC 27603
Suite 1100
223 West Street,
Firm License No. C-1051
LISA SCHIFFBAUER, PROJECT MANAGER
CONTACT:
Raleigh, NC 27606
VHB Engineering NC, P.C. (C-3705)
940 Main Campus Drive, Suite 500
DATE: OCTOBER 17, 2019
18" HDPE
18" HDPE
SEE DETAIL 6
EMBANKMENT
RIP RAP AT
SEE DETAIL 6
EMBANKMENT
RIP RAP AT
MATCHLINE -L2- STA 37+50.00 SEE SHEET 1314
220
230
240
250
210
220
230
240
250
210
37 38 39 40 41 42 43 44 MATCHLINE -L2- STA 45+00.00 SEE SHEET 15MATCHLINE -L2- STA 37+50.00 SEE SHEET 13MAT
CHLI
NE -
L
2-
S
T
A
4
5
+
0
0.
0
0
S
E
E
S
HE
E
T
1
5
ALLOWABLE IMPACTS ZONE 1
ALLOWABLE IMPACTS ZONE 2
SHEET 10 OF 13
BUFFER DRAWING
PI = 37+90.40
EL = 231.43'
VC = 100'
PI = 39+20.40
EL = 232.99'
VC = 150'
SITE 10
SITE 10
( Not to Scale)
RIP RAP AT EMBANKMENT
FROM STA. 42+84 TO STA. 42+97 RT -L2-
FROM STA. 39+11 TO STA. 39+26 RT -L2-
DETAIL 6
Grade
Ditch 1.5'
GEOTEXTILE
Geotextile= 10 sy
Type of Liner= 4 TONS,CL I Rip-Rap
10'min.
1.0'min.
-L2-
W
W
W
LOT 286
PIN 0786-71-1358
DB 15033, PG 273
CHARLES S. NICHOLS
JULIA G. HAFER &
N/F
LOT 285
PIN 0786-71-3423
DB 3161, PG 815
JOYE W. VOSHELL
ROBERT W. VOSHELL &
N/F
(BOOK OF MAPS 1990, PAGE 542)20' SANITARY SEWER EASEMENT(BOOK OF MAPS 1990, PAGE 410)40' SANITARY SEWER EASEMENT46+0047+0012'
EL. = 250.36
-PLCON- STA. 14+85.00
END GRADE
EL. = 240.71
-PLCON- STA. 10+20.00
BEGIN GRADE
-PLCON- STA. 10+39.92
BEGIN BOARDWALK 5
-PLCON- STA. 14+65.08
END BOARDWALK 6
CLEARANCE
VERTICAL
9' SEWERSANITARYSEWERSANITARYCLEARANCE
VERTICAL
8'
-L2-
PI = 13+48.00
EL = 245.67'
PI = 14+00.00
EL = 247.38'(+)4.00%
(+)3.00%
(+)1.50%
(+)1.50%
PI = 10+30.00
EL = 240.90'
(+)1.98%
PI = 14+65.00
EL = 249.83'
(+)2.64%
EL. = 243.60
-PLCON- STA. 12+08.92
BEGIN BRIDGE 5 *
EL. = 243.60
-PLCON- STA. 12+09.92
END BOARDWALK 5 *
EL. = 245.10
-PLCON- STA. 13+10.08
BEGIN BOARDWALK 6 *
EL. = 245.10
-PLCON- STA. 13+11.08
END BRIDGE 5 *
* BOARDWALK & BRIDGE OVERLAP ONE FOOT.
H14014.00
SCALE: 1"=30'
GREENWAY ENGINEER
HYDRAULICS ENGINEER
PROJECT NO.:
REVISIONS:
NO.DATE
919-996-4785
RALEIGH, NC 27601
SUITE 600
222 W. HARGETT ST,
RALEIGH MUNICIPAL BUILDING
CULTURAL RESOURCES
RECREATION and
PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com
T 919.380.8750
Raleigh, NC 27603
Suite 1100
223 West Street,
Firm License No. C-1051
LISA SCHIFFBAUER, PROJECT MANAGER
CONTACT:
Raleigh, NC 27606
VHB Engineering NC, P.C. (C-3705)
940 Main Campus Drive, Suite 500
DATE: OCTOBER 17, 2019PROFESSIONALENGINEERNORTH CARO
LINA
SEAL
14101
J
HN M
. KAM P ATORH
CL OF GREENWAY
EXISTING GRADE AT
CL OF GREENWAY
PROPOSED GRADE AT
EL. = 231.79
-L2- STA. 46+90.95
TIE TO EXISTING GREENWAY
END GRADE-PLC0N-(+)1.4095%
PI = 46+00.00
EL = 231.79'
(+)1.4095%(+)0.0000%
VC = 150'
RETAIN
1546471045
220
230
240
250
260
220
230
240
250
260-PLCON-
MATCHLINE -L2- STA 45+00.00 SEE SHEET 14
-L2-
220
230
240
250
260
11 12 13 14 15
ALLOWABLE IMPACTS ZONE 1
ALLOWABLE IMPACTS ZONE 2
SHEET 11 OF 13
BUFFER DRAWING
SITE 10
SITE 11
CRABTREE CREEKFFCCFFFFCFCFCFFFF FFF
17
ALLOWABLE IMPACTS ZONE 1
ALLOWABLE IMPACTS ZONE 2SHEET 12 OF 13
BUFFER DRAWING
H14014.00
SCALE: 1"=30'
GREENWAY ENGINEER
HYDRAULICS ENGINEER
PROJECT NO.:
REVISIONS:
NO.DATE
919-996-4785
RALEIGH, NC 27601
SUITE 600
222 W. HARGETT ST,
RALEIGH MUNICIPAL BUILDING
CULTURAL RESOURCES
RECREATION and
PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com
T 919.380.8750
Raleigh, NC 27603
Suite 1100
223 West Street,
Firm License No. C-1051
LISA SCHIFFBAUER, PROJECT MANAGER
CONTACT:
Raleigh, NC 27606
VHB Engineering NC, P.C. (C-3705)
940 Main Campus Drive, Suite 500
DATE: OCTOBER 17, 2019PROFESSIONALENGINEERNORTH CARO
LINA
SEAL
14101
J
HN M
. KAM P ATORH
SITE 1
4+00
5+00
6+00
7+00
8+00
11+00
-L1-
11+00
12+00
13+00
14+00
15+00
16+00
10+00
9+00-Y5-
CRABTREE CREEK C/LTYPE-IIIGREU TL-315+0016+0017+0018+00-EBCR-.02.02.02.
0
1
.00.01.02.02.01
.00
.01
.0
2
.02
.01
.0
0
.01.02
.02500 YR BASE FLOOD EL.=256'
100 YR BASE FLOOD EL.=249'
RIM EL.=246.74'
GROUND EL.=244.43'
500 YR BASE FLOOD EL.=256'
100 YR BASE FLOOD EL.=249'
RIM EL.=UNKNOWN
GROUND EL.=249.06'
500 YR BASE FLOOD EL.=254'
100 YR BASE FLOOD EL.=248'
RIM EL.=UNKNOWN
GROUND EL.=290.55'
500 YR BASE FLOOD EL.=257'
100 YR BASE FLOOD EL.=251'
RIM EL.=UNKNOWN
GROUND EL.=274.84'
500 YR BASE FLOOD EL.=259'
100 YR BASE FLOOD EL.=257'
RIM EL.=UNKNOWN
GROUND EL.=252.90'
500 YR BASE FLOOD EL.=257'
100 YR BASE FLOOD EL.=249'
RIM EL.=UNKNOWN
GROUND EL.=241.51'
F
C CFC
F
C
F
C
F FFCCCCFFFFCC
C
C
F
F
F
FC CC
C
F
F
F
C
C C
C F
C
C
F F
F
CCCC
W
LOT 111
PIN 0786-22-7860
BM 2008, PG 1009
DB 11903, PG 91
ASSOCIATION INC
UMSTEAD HOMEOWNERS
THE HAMPTONS AT
N/F
LOT 111
PIN 0786-22-7860
BM 2008, PG 1009
DB 11903, PG 91
ASSOCIATION INC
UMSTEAD HOMEOWNERS
THE HAMPTONS AT
N/F
17
ALLOWABLE IMPACTS ZONE 1
ALLOWABLE IMPACTS ZONE 2SHEET 12 OF 13
BUFFER DRAWING
DI
15" HDPE
5 SY GEOTEXTILE
1 TON
CLASS B RIP RAP
SEE DETAIL 6
EMBANKMENT
RIP RAP AT
JB w/Slab Lid
7 SY GEOTEXTILE
2 TONS
CLASS B RIP RAP
15" HDPE
AND TIE TO JB
SECTION OF 15" CSP
REPLACE DAMAGED
SEE DETAIL 5
DDE =4 CY
20' @ 1.50%
2' BASE TAIL DITCH
( Not to Scale)
RIP RAP AT EMBANKMENT
FROM -Y5- STA. 12+91 TO STA. 12+99 RT
DETAIL 6
Grade
Ditch
1.5'
GEOTEXTILE
Geotextile= 10 sy
Type of Liner= 4 TONS,CL I Rip-Rap
10'min.
1.0'min.
B
2:12:1D
( Not to Scale)
2' BASE TAIL DITCH
-Y5- STA. 11+31 TO STA. 11+50 RT
DETAIL 5
B=2 Ft.
Min. D=1 Ft.
Ground
Natural
Ground
Natural
SITE 1
ROAD CROSSING BRIDGEPARALLEL IMPACTZONE 1 (ft2)ZONE 2 (ft2)TOTAL (ft2)ZONE 1 (ft2)ZONE 2 (ft2)TOTAL (ft2)ZONE 1 (ft2)ZONE 2 (ft2)1 N/A-Y5- STA. 10+00 TO STA. 13+33 LT. & RT.X 2733 4635 73682 N/A-L1- STA. 3+92 TO STA. 10+90 LT. & RT.X 10045 12124 221693 N/A-L1- STA. 11+09 TO STA. 14+85 LT. & RT.X 4729 4563 92924 N/A-L1- STA. 15+21 TO STA. 22+86 LT. & RT.X 4012 10924 149365 N/A-L1- STA. 23+30 TO STA. 31+28 LT. & RT.X 11889 13194 250836 N/A-L1- STA. 31+09 TO STA. 34+67 LT. & RT.X 5214 6483 116977 N/A-L1- STA. 34+97 TO STA. 37+27 LT. & RT.X 4068 4839 89078 N/A-L2- STA. 16+51 TO STA. 26+03 LT. & RT.X 17484 15614 330989 N/A-L2- STA. 26+82 TO STA. 35+55 LT. & RT.X 6549 12160 1870910 N/A-L2- STA. 35+62 TO STA. 47+23 LT. & RT.X 20654 15625 3627911 N/A-PLCON- STA. 13+10 TO STA. 14+95 LT. & RT.X 473 1279 1752TOTAL:87850 101440 189290 SHEET 13 OF 13PROJECT: C-5604-OD 3/1/2021CRABTREE CREEK WEST GREENWAY WAKE COUNTYIMPACTBUFFER IMPACTS SUMMARYTYPESITE NO. STRUCTURE SIZE / TYPE STATION (MAP ID)ALLOWABLE MITIGABLEBUFFER REPLACEMENTRev. May 2006