HomeMy WebLinkAbout20191233 Ver 2_C-5604OD Crabtree Creek Greenway_20210305Ri
chl
and Cr
eekCrabtree Creek
H14014.00
GREENWAY ENGINEER
HYDRAULICS ENGINEER
PROJECT NO.:
REVISIONS:
NO.DATE
919-996-4785
RALEIGH, NC 27601
SUITE 600
222 W. HARGETT ST,
RALEIGH MUNICIPAL BUILDING
CULTURAL RESOURCES
RECREATION and
PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com
T 919.380.8750
Raleigh, NC 27603
Suite 1100
223 West Street,
Firm License No. C-1051
LISA SCHIFFBAUER, PROJECT MANAGER
CONTACT:
Raleigh, NC 27606
VHB Engineering NC, P.C. (C-3705)
940 Main Campus Drive, Suite 500
DATE: JUNE 22, 2020
ICVICVICV
TPED
T
TT
T
T
EB
FOWP
4TREE
4LI
4LI
4LI
4LI
4LI
4LI
6TREE
4TREE
4TREE
4TREE
274274
269
W/E
252.4
W/E
285.7
262.1
W/E
W/E
272.8
274.9
W/E
W/E
273.1
259.5
W/E
W/E
247.3
232.1
W/E
240.4
W/E
W/E
240.4
EXIST ROWFUNC. CLASSIFICATION
LEAN ANGLE
DESIGN SPEED
=
=
=
DESIGN DATA
PROJECT LENGTH
GRAPHIC SCALES
0
PROFILE (HORIZONTAL)PLANS PROFILE (VERTICAL)
0
NORTH CAROLINA
CITY OF RALEIGH
CRABTREE CREEK WEST GREENWAY
FROM EBENEZER CHURCH ROAD TO LINDSAY DRIVE
LOCATION:
1
VICINITY MAPEBENEZER CHURCH RD.DURALEI
GH RD.LI
NDSAY DR.PICARDY DR.PARK
STATE
UMSTEAD POYNER RD.BOXWOOD RD.
WEAVER DR.
-L1--L2--L1-
-L2- STA. 46+30.36
END CONSTRUCTION
-L1- STA. 4+12.68
BEGIN CONSTRUCTION
BOARDWALK 1
BRIDGE 1
BRIDGE 2
BOARDWALK 2
BRIDGE 3
BEGIN PROJECT
-L1- STA. 63+10.02
END CONSTRUCTION
-L2- STA. 10+80.60
BEGIN CONSTRUCTION
30 15 0 30 60 30 15 30 60
LENGTH OF PROJECT
LENGTH OF BRIDGE
LENGTH OF BOARDWALK
LENGTH OF ASPHALT TRAIL
=
=
=
=
1.80 MI
0.06 MI
0.01 MI
1.73 MI
1"=30'1"=30'1"=6'
PARK
STATE
UMSTEAD
4
5
6
7
8
9 10
11
12
13
14
15
6 1236 LI
NDSAY DR.DURALEI
GH RD.EBENEZER CHURCH RD.PI
CARDY DR.OAK
P
ARK RD.ADLER PASSCRABTREE CREEK
RICHLAND CREEKCLYDEN COVE
BRIDGE 4
BOARDWALK 4
BRIDGE 5
NEIGHBORHOOD CONNECTION
PARKING LOT
16
17
& EROSION CONTROL
BOARDWALKS, BRIDGES, DRAINAGE,
GRADING, PAVING, RETAINING WALLS,
TYPE OF WORK:
ACCESS
CONSTRUCTION
ACCESS
CONSTRUCTION
ACCESS
CONSTRUCTION
ACCESS
CONSTRUCTION
END PROJECT
ACCESS
CONSTRUCTION
INDEX OF SHEETS
BOARDWALK 5
BOARDWALK 6
NCDOT TIP# C-5604-OD
TRANSPORTATION
20 DEGREES
20 MPH
BOARDWALK 3
ANILO
RAC HTRO
NLA
NOISSEFO
RPREENIGNEAND
REW
. O UNGYP
034407
SEAL
ANILO
RAC HTRO
NLA
NOISSEFO
RPREENIGNE
JO
HNM.KA M PRATH14101
SEAL
-L2_REV- STA. 10+00.00
-L2- STA. 41+00.00=
-L2- STA. 43+50.00
-L2_REV- STA. 12+52.44=
-L2-
-HSW-
-Y3-
-Y5-
-L2_REV--PLCON-
CROSS SECTION SHEETSX-1 - X-62
RETAINING WALL DETAILSW-1 - W-5
SUSPENSION BRIDGESS-1 - SS-14
BOARDWALKSSB-1 - SB-16
STRUCTURESS-1 - S-19
MANAGEMENT PLANS
CONSTRUCTIONCMP-1 - CMP-3
UTILITY CONSTRUCTION PLANSC6 - C6.1
AMENITY PLAN SHEETS
SIGNING, DELINEATION, ANDSD-4 - SD-16
AMENITY DETAILSSD-3 - SD 3A
DETAILS
SIGNING/PAVEMENT MARKINGSD-2
SIGNING DETAILSSD-1A -SD-1C
SIGNING/AMENITY SUMMARYSD-1
LANDSCAPE PLANSL1 - L2
TREE SURVEY SHEET TS-1
TREE CONSERVATION AREA SHEETSTCA-1 - TCA-5
GRADING PLANSG4 - G16
EC31/CONST17
EROSION CONTROL PLANSEC4/CONST4 -
EROSION CONTROL DETAILSEC-3A - EC-3J
EROSION CONTROL NOTESEC-3
EROSION CONTROL TITLEEC-1
EXISTING CONDITIONS PLANSE1 - E13
PROFILE SHEETS18 - 27
PLAN SHEETS4 - 17
DRAINAGE SUMMARY3A
ROADWAY SUMMARY3
GUARDRAIL DETAILS2E - 2F
TEMPORARY SHORING DETAIL2D
GREENWAY DETAILS2C
TYPICAL SECTIONS2 - 2B
BUILDING CODE SUMMARY1K - 1L
EXISTING RECORDED PLATS1D - 1J
GENERAL NOTES1B - 1C
PLAN SHEET SYMBOLS1A
TITLE1
COR: 274-PR-CrabtreeWest-XX-XX-XX
FA# CMAQ.0520(57)
WBS: 43714.3.8
6/22/2020
6/22/2020
H14014.00
SCALE: 1"=30'
GREENWAY ENGINEER
HYDRAULICS ENGINEER
PROJECT NO.:
REVISIONS:
NO.DATE
919-996-4785
RALEIGH, NC 27601
SUITE 600
222 W. HARGETT ST,
RALEIGH MUNICIPAL BUILDING
CULTURAL RESOURCES
RECREATION and
PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com
T 919.380.8750
Raleigh, NC 27603
Suite 1100
223 West Street,
Firm License No. C-1051
LISA SCHIFFBAUER, PROJECT MANAGER
CONTACT:
Raleigh, NC 27606
VHB Engineering NC, P.C. (C-3705)
940 Main Campus Drive, Suite 500
ANILO
RAC HTRO
NLA
NOISSEFO
RPREENIGNEAND
REW
. O UNGYP
034407
SEAL
DATE: JUNE 22, 2020
Existing Edge of Pavement
Existing Curb
Proposed Slope Stakes Cut
Proposed Slope Stakes Fill
Existing Metal Guardrail
Existing Cable Guiderail
Proposed Guardrail
Equality Symbol
Pavement Removal
Baseline Control Point
RIGHT OF WAY:
Existing Right of Way Marker
Existing Right of Way Line
h
Existing Control of Access
Proposed Control of Access
Proposed Right of Way Line
C
F
HYDROLOGY:
Stream or Body of Water
Hydro, Pool or Reservoir
Flow Arrow
Disappearing Stream
Spring
;zvW
K
Proposed Lateral, Tail, Head Ditch
False Sump
Proposed Cable Guiderail
MAJOR:
Bridge, Tunnel or Box Culvert
Bridge Wing Wall, Head Wall and End Wall
MINOR:
Head and End Wall
Pipe Culvert
Footbridge
Paved Ditch Gutter
UTILITIES:
ROADS AND RELATED FEATURES:
Existing Power Pole
Proposed Power Pole
P
U/G Power Cable Hand Hole
Power Manhole
Power Line Tower
Power Transformer
Existing Joint Use Pole
Proposed Joint Use Pole
Existing Telephone Pole
Proposed Telephone Pole
Telephone Manhole
Telephone Booth
Telephone Pedestal
U/G Telephone Cable Hand Hole
R
}Tp
Q
l
e
]
/
b
H-Frame Pole O O
POWER:
TELEPHONE:
Telephone Cell Tower
Recorded U/G Power Line
Recorded U/G Telephone Cable
Designated U/G Telephone Cable (S.U.E.*)
Recorded U/G Telephone Conduit
Designated U/G Telephone Conduit (S.U.E.*)
Recorded U/G Fiber Optics Cable
WATER:
Water Meter
Water Valve
Water Hydrant
Recorded U/G Water Line
4
I
H
a
TV:
TV Satellite Dish
TV Pedestal
TV Tower
U/G TV Cable Hand Hole
Recorded U/G TV Cable
Recorded U/G Fiber Optic Cable
Designated U/G Fiber Optic Cable (S.U.E.*)
r
|
I
]
GAS:
Gas Valve
Gas Meter
Recorded U/G Gas Line
n
c
SANITARY SEWER:
Sanitary Sewer Manhole
Sanitary Sewer Cleanout
U/G Sanitary Sewer Line
Recorded SS Forced Main Line
Designated SS Forced Main Line (S.U.E.*)
d
o
A/G Water
Above Ground Gas Line
A/G Gas
Above Ground Water Line
Above Ground Sanitary Sewer A/G Sanitary Sewer
MISCELLANEOUS:
Utility Pole O
F
S
3
Utility Pole with Base
Utility Located Object
Utility Traffic Signal Box
Utility Unknown U/G Line
?
CONC
CONC WW
vvDrainage Box: Catch Basin, DI or JB
Storm Sewer
Storm Sewer Manhole m
U/G Tank; Water, Gas, Oil
A/G Tank; Water, Gas, Oil
BOUNDARIES AND PROPERTY:
State Line
County Line
Township Line
City Line
Reservation Line
Property Line
Existing Iron Pin
Property Corner
Property Monument
Existing Fence Line
g
F
123
Existing Wetland Boundary
Proposed Wetland Boundary
Existing Endangered Animal Boundary
Existing Endangered Plant Boundary
BUILDINGS AND OTHER CULTURE:
Area Outline
Gas Pump Vent or U/G Tank Cap
Church
School
Dam
Sign
Small Mine
Well
V
M
WW
S
x
Foundation
S
Building
y
y
VEGETATION:
Single Tree X
Y
Vineyard
Single Shrub
Hedge
Woods Line
Orchard
Vineyard
RAILROADS:
Standard Gauge
RR Signal Milepost
Switch
RR Abandoned
RR Dismantled
S
FLOW
Designated U/G Power Line (S.U.E.*)
Designated U/G Fiber Optics Cable (S.U.E.*)
Designated U/G Water Line (S.U.E.*)
Designated U/G TV Cable (S.U.E.*)
Designated U/G Gas Line (S.U.E.*)
U/G Test Hole (S.U.E.*)
*S.U.E. = Subsurface Utility Engineering
WLB
EIP BECM
CONC HW
CB
CSX TRANSPORTATION
MILEPOST 35
SWITCH
Cemetery
EXISTING STRUCTURES:
Parcel / Sequence Number
E
AATUR
End of Information E.O.I.
Note: Not to Scale
Abandoned According to Utility Records
WLB
EAB
EPB
R
W
R
W
R
W
C
A
TDE
PDE
PUE
S
P
P
T
T
TC
TC
T FO
T FO
W
W
TV
TV
TV FO
TV FO
G
G
SS
FSS
FSS
?UTL
Jurisdictional Stream JS
Buffer Zone 1
Buffer Zone 2
BZ 1
BZ 2
Wetland
Iron Pin and Cap Marker
TUE
Iron Pin and Cap Marker
Proposed Right of Way Line with
AUE
CRProposed Curb Ramp
STATE OF NORTH CAROLINA
DIVISION OF HIGHWAYS
CONVENTIONAL PLAN SHEET SYMBOLS
Underground Storage Tank, Approx. Loc.
Geoenvironmental Boring
UST
Known Soil Contamination: Area or Site
Potential Soil Contamination: Area or Site
Concrete or Granite R/W Marker
Proposed Right of Way Line with
C
A Concrete C/A Marker
Proposed Control of Access Line with
Water Manhole
1A
TCE
PGE
Proposed Safety Rail
Proposed Chain Link Fence
White Vinyl Fence
Temporary Construction Easement
Temporary Drainage Easement
Permanent Drainage Easement
Permanent Greenway Easement
Permanent Utility Easement
Temporary Utility Easement
Aerial Utility Easement
Conservation Easement
Permanent Easement with
Existing Sanitary Sewer Easement Line
PGE/TCA
Tree Conservation Area
Permanent Greenway Easement /
Right of Entry Line ROE
PTCAPrimary Tree Conservation Area
CRZCritical Root Zone
6/22/2020
H14014.00
SCALE: 1"=30'
GREENWAY ENGINEER
HYDRAULICS ENGINEER
PROJECT NO.:
REVISIONS:
NO.DATE
919-996-4785
RALEIGH, NC 27601
SUITE 600
222 W. HARGETT ST,
RALEIGH MUNICIPAL BUILDING
CULTURAL RESOURCES
RECREATION and
PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com
T 919.380.8750
Raleigh, NC 27603
Suite 1100
223 West Street,
Firm License No. C-1051
LISA SCHIFFBAUER, PROJECT MANAGER
CONTACT:
Raleigh, NC 27606
VHB Engineering NC, P.C. (C-3705)
940 Main Campus Drive, Suite 500
ANILO
RAC HTRO
NLA
NOISSEFO
RPREENIGNEAND
REW
. O UNGYP
034407
SEAL
DATE: JUNE 22, 2020
1B
GENERAL NOTESGENERAL NOTESGENERAL NOTES SEQUENCE OF CONSTRUCTION ACTIVITIES
NOTES
2.
3.
4.
5.
6.
7.
8.
9.
13.
12.
11.
10.
9.
8.
7.
6.
5.
4.
3.
2.
1.1.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
AT THE CONTRACT PRICE FOR "TEMPORARY SHORING".
ANY ADDITIONAL SHORING REQUIRED FOR THE PROJECT NOT SHOWN ON THE PLANS WILL BE PAID FOR
PERMISSION OF THE ENGINEER AND OWNER.
FOR REVIEW. NO DEPARTURES FROM THE CONTRACT DOCUMENTS SHALL BE MADE WITHOUT THE WRITTEN
DEPARTURES AND REASONS THEREOF SHALL BE SUBMITTED TO THE ENGINEER AND OWNER IN WRITING
SPECIFICATIONS OR DRAWINGS ARE DEEMED NECESSARY BY THE CONTRACTOR, DETAILS OF SUCH
ASSOCIATED WITH PROJECT AS SET FORTH IN THESE PLANS. IF DEPARTURES FROM THE
THE ENGINEER AND/OR OWNER DISCLAIM ANY ROLE IN THE CONSTRUCTION MEANS AND METHODS
VERTICAL CLEARANCE.
OF TRAIL OR WITHIN REQUIRED DRAINAGE DITCHES. TRIM UP BRANCHES OF TREES TO PROVIDE 10'
PRIOR TO TREE REMOVAL. CONTRACTOR SHALL REMOVE ALL VEGETATION TO 3' BEYOND ASPHALT EDGE
CONTRACTOR SHALL REVIEW TREE REMOVAL WITH OWNER'S REPRESENTATIVE AND OBTAIN APPROVAL
REPRESENTATIVE AND PROPERTY OWNER PRIOR TO CONSTRUCTION.
CONTRACTOR ACCESS FOR TRAIL CONSTRUCTION SHALL BE CONFIRMED BY CONTRACTOR WITH OWNER'S
ACCORDING TO DETAIL.
CONDITION PRIOR TO DISTURBANCE. CLEAN OUT STORM WATER PIPE ONLY IF NOTED ON PLAN AND
PATTERNS OR STRUCTURES BY THE CONTRACTOR SHALL BE CORRECTED BY THE CONTRACTOR TO
AND PIPING AS THEY CURRENTLY EXIST UNLESS NOTED OTHERWISE. ANY DISTURBANCE OF THE
CONTRACTOR SHALL MAINTAIN ALL ABOVE AND BELOW GROUND STORM WATER DRAINAGE AND PATTERNS
OTHER OBSTACLES ETC SHALL BE APPROVED BY CITY OF RALEIGH.
EXISTING CONDITIONS PRIOR TO CONSTRUCTION. DEVIATION FROM ALIGNMENT DUE TO LARGE TREES OR
STATIONING IS APPROXIMATE. CONTRACTOR SHALL VERIFY ALL STATIONING FOR APPLICABILITY TO
TO CONSTRUCTION MEETING.
OWNER'S REPRESENTATIVE PRIOR TO CONSTRUCTION. ANY DISCREPANCIES SHALL BE RESOLVED PRIOR
CONTRACTOR SHALL STAKE CENTERLINE OF TRAIL ACCORDING TO PLANS AND OBTAIN APPROVAL FROM
MADE TO MAINTAIN STORM WATER DRAINAGE DURING CONSTRUCTION.
DOES NOT REMAIN OUT OF SERVICE FOR LONGER THAN 12 HOURS AT A TIME. PROVISIONS SHALL BE
PIPING ARE IMMEDIATELY PUT INTO SERVICE. CONTRACTOR SHALL ENSURE THAT STORM DRAINAGE
IN SUCH A MANNER THAT THE OLD PIPE AND STRUCTURES ARE REMOVED AND NEW STRUCTURES AND
DEMOLITION, AND SUBSEQUENT CONSTRUCTION OF STORM DRAINAGE FACILITIES SHALL BE PERFORMED
TRAFFIC AWAY FROM HAZARDOUS AREAS.
CONSTRUCTION MUST BE REPLACED AT THE END OF EACH WORK PERIOD TO DIRECT PEDESTRIAN
CONSTRUCTION/SAFETY FENCING REMOVED TO FACILITATE ACCESS BY THE CONTRACTOR FOR
EQUIPMENT AND SUPPLIES RETURNED TO THE CONSTRUCTION STAGING AREA.
ANY EXCAVATION MUST BE FILLED IN AND TAMPED AT THE CONCLUSION OF EACH WORK PERIOD, AND
THE SATISFACTION OF THE OWNER, PRIOR TO DEMOBILIZATION AT THE CONCLUSION OF THE PROJECT.
CONTRACTOR SHALL RESTORE ALL LAY DOWN AND STAGING AREAS TO ORIGINAL CONDITIONS AND TO
CALL NC811 @ 1-800-632-4949 FOR UTILITY LOCATION PRIOR TO ANY EARTHWORK.
CONSTRUCTION SHALL BE REPAIRED BY CONTRACTOR.
UTILITIES TO REMAIN SHALL BE PROTECTED BY THE CONTRACTOR. ANY UTILITIES DAMAGED DURING
CONTRACTOR SHALL LOCATE ALL UTILITIES AND UTILITY ELEVATIONS PRIOR TO CONSTRUCTION. ALL
REPRESENTATIVE IMMEDIATELY.
BEGINNING RELATED CONSTRUCTION. ANY DISCREPANCIES SHALL BE REPORTED TO THE OWNER'S
AVAILABLE RECORD DRAWINGS. THE CONTRACTOR SHALL VERIFY FIELD CONDITIONS PRIOR TO
EXISTING UTILITIES AND STRUCTURES SHOWN BOTH UNDERGROUND AND ABOVE ARE BASED ON THE BEST
RELOCATION OF EXISTING UTILITIES TO BE COORDINATED WITH THE LOCAL UTILITY PROVIDER(S).
REMOVED FROM THE SITE ON A DAILY BASIS.
MATERIALS OR RUBBISH CAUSED BY HIM, HIS EMPLOYEES, OR HIS WORK. ALL DEBRIS SHALL BE
THE CONTRACTOR SHALL, AT ALL TIMES, KEEP THE PREMISES FREE FROM ACCUMULATIONS OF WASTE
NO GRADING IS TO OCCUR IN THE TREE PROTECTION AREAS OR TREE CRITICAL ROOT ZONES.
SHALL BE INSTALLED PRIOR TO PRE-CONSTRUCTION MEETING.
PRE-CONSTRUCTION MEETING PRIOR TO LAND DISTURBANCE. TREE PROTECTION FENCING CAN AND
CONTACT CITY OF RALEIGH PARKS, RECREATION, AND CULTURAL RESOURCES DEPARTMENT TO SET UP A
TO BE REMOVED FROM REMAINING VEGETATION.
INCLUDING TREE REMOVAL, IN SUCH A MANNER AS TO CLEARLY AND ADEQUATELY SEPARATE ALL TREES
ALL TREE PROTECTION FENCING SHALL BE INSTALLED PRIOR TO LAND DISTURBANCE OPERATIONS
DEMOLITION TO OBTAIN A CLEAN EDGE.
WHERE ASPHALT SECTION IS REMOVED, CONTRACTOR SHALL USE A SAW CUT AT THE LIMITS OF
INSPECTIONS, CERTIFICATIONS, PERMITS, EQUIPMENT, ETC. THAT MAY BE REQUIRED.
APPLICABLE STATE, COUNTY, AND LOCAL CODES. THE CONTRACTOR SHALL OBTAIN AND PAY FOR ALL
ALL DEMOLITION AND SUBSEQUENT CONSTRUCTION TO BE IN ACCORDANCE WITH PERMITS ISSUED AND
ALL DEMOLITION SHALL BE APPROVED BY CITY OF RALEIGH.
STRUCTURES, UNLESS NOTED OTHERWISE IN THESE PLANS OR ASSOCIATED SPECIFICATIONS.
APPLICABLE REQUIREMENTS OF THE JANUARY 2018 NCDOT STANDARD SPECIFICATIONS FOR ROADS AND
THE CONTRACTOR SHALL PERFORM ALL CONSTRUCTION ACTIVITIES IN ACCORDANCE WITH THE
CONTROL DEVICES.
CONTRACTOR IS REQUIRED TO MAINTAIN A WEEKLY WRITTEN REPORT OF SEDIMENT AND EROSION
OFFICER. OBTAIN CERTIFICATE OF COMPLIANCE.
WHEN VEGETATION HAS BECOME ESTABLISHED, CALL FOR FINAL SITE INSPECTION BY ENVIRONMENTAL
TEMPORARY EROSION CONTROL MEASURES, SMOOTH AREA AND APPLY APPROPRIATE GRASS.
SEDIMENT FROM SEDIMENT TRAPPING MEASURES AND SPREAD EVENLY ACROSS THE SITE. THEN REMOVE
AFTER COMPLETION OF CONSTRUCTION AND THE SITE IS STABILIZED, REMOVE ALL ACCUMULATED
REQUIRED TO ESTABLISH AND MAINTAIN A VIGOROUS STAND OF GRASS.
BE INSTALLED FOR ALL AREAS AT FINAL GRADE AND IN SEASON. FERTILIZE, WATER AND RESEED AS
LANDSCAPING. SEED ALL AREAS WITHIN 14 DAYS OF COMPLETING ACTIVITY. PERMANENT GRASS SHALL
AS AREAS ARE BROUGHT UP TO FINISH GRADE, SPREAD TOPSOIL OVER ALL AREAS TO RECEIVE TURF OR
PLACE TEMPORARY SEEDING ON ALL DISTURBED AREAS THAT WILL BE IDLE 14 DAYS OR LONGER.
RAINFALL (0.5 INCHES OR GREATER) AND DOCUMENT WITH INSPECTION REPORTS.
INSPECT AND MAINTAIN ALL EROSION CONTROL MEASURES EVERY 7 DAYS AND AFTER EACH SIGNIFICANT
INSURE THAT SEDIMENT LADEN WATER IS DIRECTED TO SEDIMENT CONTROL DEVICES.
BEGIN GRADING & CLEARING AND GRUBBING. MAINTAIN DEVICES AS NEEDED. ROUGH GRADE SITE.
PROPOSED LIMITS OF DISTURBANCE.
TOPSOIL AND STONE BASE REMOVAL AND/OR STORAGE AREAS SHALL BE CONTAINED WITHIN THE
ENVIRONMENTAL INSPECTOR AND OBTAIN CERTIFICATE OF COMPLIANCE.
CLEAR ONLY AS NECESSARY TO INSTALL THESE DEVICES. CALL FOR ON-SITE INSPECTION BY CITY
APPROVED PLANS.
SILT FENCE OUTLETS SHALL BE INSTALLED PER FIELD LOCATED LOW POINTS AND AS SHOWN ON
INSTALL TREE PROTECTION FENCING, SILT FENCE, COMBINATION FENCE, AND SILT FENCE OUTLETS.
DETERMINE AND MARK LIMITS OF DISTURBANCE.
RALEIGH DEVELOPMENT SERVICES DEPARTMENT.
DISCUSSED WITH CITY OF RALEIGH PRIOR TO THE START OF CONSTRUCTION. CONTACT THE CITY OF
EC-15, EC-16, EC-18, EC-24, EC-25, EC-29, & EC-30. OTHER STAGING AREAS WILL NEED TO BE
INSTALL CONSTRUCTION ENTRANCES AS NEEDED AT LOCATIONS SHOWN ON SHEETS EC-4, EC-10, EC-11,
SCHEDULE A MEETING.
QUALITY SECTION OF NCDEQ BEFORE LAND DISTURBING ACTIVITIES BEGIN. CALL 919-791-4200 TO
ACTIVITIES. A MANDATORY PRE-CONSTRUCTION MEETING SHALL ALSO BE REQUIRED WITH THE LAND
A PRECONSTRUCTION CONFERENCE SHALL BE HELD PRIOR TO THE START OF ANY CONSTRUCTION
6/22/2020
H14014.00
SCALE: 1"=30'
GREENWAY ENGINEER
HYDRAULICS ENGINEER
PROJECT NO.:
REVISIONS:
NO.DATE
919-996-4785
RALEIGH, NC 27601
SUITE 600
222 W. HARGETT ST,
RALEIGH MUNICIPAL BUILDING
CULTURAL RESOURCES
RECREATION and
PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com
T 919.380.8750
Raleigh, NC 27603
Suite 1100
223 West Street,
Firm License No. C-1051
LISA SCHIFFBAUER, PROJECT MANAGER
CONTACT:
Raleigh, NC 27606
VHB Engineering NC, P.C. (C-3705)
940 Main Campus Drive, Suite 500
ANILO
RAC HTRO
NLA
NOISSEFO
RPREENIGNEAND
REW
. O UNGYP
034407
SEAL
DATE: JUNE 22, 2020
EROSION CONTROL NOTES
EROSION PROVISION
MISC - WETLANDS. TREES. STORM PIPING
COMPACTION NOTES
NOTES
D.
C.
B.
A.
MULCHING AND MATTING
SEEDING
TECHNICIAN.
COMPACTION IS OBTAINED, FIELD DENSITY TESTING SHOULD BE PERFORMED IN EACH LIFT BY A SOILS
OF THE STANDARD PROCTOR MAXIMUM DRY DENSITY. TO CONFIRM THAT THE SPECIFIED DEGREE OF
TEST. HOWEVER, THE UPPER 12 INCHES OF THE FILL PLACED SHOULD BE COMPACTED TO 98 PERCENT
WITHIN 2 PERCENT OF THE OPTIMUM MOISTURE AS DEFINED BY THE STANDARD PROCTOR COMPACTION
LESS (LOOSE MEASURE), AND COMPACTED TO AT LEAST 95 PERCENT OF MAXIMUM DRY DENSITY AND
STRUCTURAL FILL BENEATH THE PAVED AREAS SHOULD BE PLACED IN UNIFORM LIFTS OF 8 INCHES OR
PROTECTION
INCHES OF SOIL DEPTH.
APPLY WATER WITH A FINE SPRAY IMMEDIATELY AFTER EACH AREA HAS BEEN MULCHED. SATURATE TO 4
WHICH CAN BE MULCHED ON SAME DAY.
IMMEDIATELY FOLLOWING SEEDING APPLY MULCH OR MATTING. DO NOT SEED AREAS IN EXCESS OF THAT
PER FOOT OF WIDTH. UPON COMPLETION OF ROLLING, WATER AREA WITH A FINE SPRAY.
WITH A ROLLER, NOT LESS THAN 18 INCHES IN DIAMETER AND WEIGHING NOT MORE THAN 210 POUNDS
DO NOT SEED WHEN GROUND IS EXCESSIVELY WET OR EXCESSIVELY DRY. AFTER SEEDING, ROLL AREA
PROVIDE EVEN DISTRIBUTION OF SEED.
ROLLER-SEEDER, APPROVED HAND OPERATED MECHANICAL SEEDER, OR OTHER APPROVED METHODS TO
ACCOMPLISH SEEDING BY MEANS OF AN APPROVED POWER-DRAWN SEED DRILL, COMBINATION CORRUGATED
1C
2018 NCDOT ROADWAY ENGLISH STD. DRAWINGS
WILL BE DEDUCTED FROM RETAINAGE OR OTHER MONIES DUE THE CONTRACTOR OR HIS CONTRACT.
OF THE COSTS THAT WOULD HAVE BEEN INCURRED HAD THE WORK BEEN PERFORMED BY THE CONTRACTOR
ANY COSTS INCURRED BY THE CITY FOR WORK PERFORMED BY OTHERS AS PROVIDED ABOVE IN EXCESS
SEDIMENTATION CONTROL VIOLATIONS.
CONTRACTOR. SUCH COSTS WILL INCLUDE CIVIL PENALTIES ASSESSED FOR SOIL EROSION AND
TO THE FAILURE OF THE CONTRACTOR TO COMPLY WITH THESE PROVISIONS WILL BE BORNE BY THE
MADE TO THE CONTRACTOR FOR WORK PERFORMED BY OTHERS. ANY COSTS INCURRED BY THE CITY DUE
ENGINEER MAY PROCEED TO HAVE THE WORK PERFORMED WITH OTHER FORCES. NO PAYMENT WILL BE
WORK WITHIN 24 HOURS AFTER RECEIPT OF SUCH NOTICE WITH ADEQUATE FORCES AND EQUIPMENT, THE
THAT THE CONTRACTOR FAILS TO BEGIN SUCH REMEDIAL ACTION OR FAILS TO BEGIN EROSION CONTROL
INSPECTOR OR DEQ NOTIFYING THE CONTRACTOR TO COMPLY WITH THESE PROVISIONS. IN THE EVENT
CONTROL PLAN OR TO PERFORM EROSION CONTROL WORK AS DIRECTED WILL RESULT IN THE ENGINEER,
FAILURE ON THE PART OF THE CONTRACTOR TO COMPLY WITH THE PROVISIONS OF THE EROSION
THE SEDIMENT POLLUTION CONTROL ACT OF 1973 AND THE 1974 AMENDMENTS TO THE ACT.
RESERVOIRS, OTHER WATER IMPOUNDMENTS, GROUND SURFACES, OR OTHER PROPERTY AS REQUIRED BY
CONTRACT TO PREVENT THE EROSION OF SOIL AND THE SEDIMENTATION OF STREAMS, LAKES,
THE CONTRACTOR SHALL BE REQUIRED TO TAKE EVERY REASONABLE PRECAUTION THROUGHOUT THE
RECOMMENDATIONS OR AS DIRECTED FOR GRADING, COMPLETION AND PAVEMENT DESIGN, ETC.
CONTRACTOR SHALL OBTAIN A COPY OF EACH SUBSURFACE INVESTIGATION REPORT AND FOLLOW THE
A COPY OF THE APPROVED PLANS MUST BE ON FILE AT THE JOB SITE.
NOTED.
FEES AND RESTORATION COSTS ARE THE RESPONSIBILITY OF THE CONTRACTOR UNLESS OTHERWISE
CONSTRUCTION, MAINTENANCE, REMOVAL OF ALL EROSION CONTROL DEVICES, ALL FINES, LEGAL
INSPECTIONS DEPARTMENT.
REPRESENTATIVE OF THE STATE/COUNTY STORM WATER MANAGEMENT SECTION AND THE LOCAL
ADDITIONAL MEASURES TO CONTROL EROSION AND SEDIMENT MAY BE REQUIRED BY A LOCAL
THAT ARE 4:1 OR STEEPER, MULCH WILL BE ANCHORED.
DURING UNSUITABLE GROWING SEASONS, MULCH WILL BE USED AS A TEMPORARY COVER ON SLOPES
GRADING.
ALL GRADED SLOPES MUST BE SEEDED AND MULCHED WITHIN 14 CALENDAR DAYS OF COMPLETION OF
REQUIRED AS PART OF THE CONSTRUCTION SEQUENCE SHOWN ON THE PLAN.
TO ACHIEVE EROSION CONTROL IN LARGE DENUDED AREAS AND ESPECIALLY WHEN SPECIFICALLY
STABILIZATION IS THE BEST FORM OF EROSION CONTROL. TEMPORARY SEEDING IS NECESSARY
EROSION CONTROL ORDINANCE AND IS SUBJECT TO FINE.
ANY GRADING BEYOND THE LIMITS SHOWN ON THE PLAN IS A VIOLATION OF THE STATE/COUNTY
ON-SITE BURIAL PITS ARE NOT ACCEPTABLE.
SEE CONTRACT DOCUMENTS AND SHEET EC-03 FOR SEEDING SPECIFICATIONS.
ACREAGE OF PERMANENT AND TEMPORARY SEEDING IS 18 ACRES.
TOTAL ACREAGE OF DISTURBED AREA IS 11.1 ACRES.
GRADES UNLESS OTHERWISE NOTED ON THE PROFILE.
ALL PROPOSED CONCRETE WALKWAYS, ASPHALT TRAILS, ETC. WILL BE CONSTRUCTED TO EXISTING
CMP PIPING SHALL HAVE ASPHALT COATING INSIDE AND OUT WHEN DESIGNATED (SEE SPECS).
ON ALL STORM PIPING, BURY INVERTS ONLY AS NEEDED.
DRAINAGE SUMMARY SHEET.
ALL STORM PIPING SHALL BE HDPE DBL WALL-SMOOTH INTERIOR EXCEPT WHERE OTHERWISE NOTED. SEE
CONTRACTOR'S EXPENSE.
DETERMINED BY THE OWNER, REPLANTING MAY BE ORDERED AT A COMPENSATORY RATE AT THE
REQUIRED, CONTACT DESIGNER FOR FIELD ADJUSTMENT. IF EGREGIOUS VIOLATIONS OCCUR AS
SAVE ALL PROMINENT EXISTING TREES PLUS EXISTING TREES AS FLAGGED. IF JUDGMENT IS
AND MATCH PIPING TO DITCH CENTERLINE.
LOCATION OF PIPING FOR DITCHES IS APPROXIMATE. CONTRACTOR SHALL FIELD VERIFY LOCATION
WETLAND LOCATION/DELINEATION BY ECOLOGICAL ENGINEERING (VHB) DATED 9/22/2014 & 9/23/2014.
BOARDWALK. WETLAND LOCATION WILL DETERMINE BOARDWALKS STARTING/STOPPING LOCATION.
CONTRACTOR TO VERIFY ACTUAL WETLAND BOUNDARY IN THE FIELD PRIOR TO CONSTRUCTION OF
APPLICABLE, ROCK BLASTING PROVISION.
EXCAVATION ON THE PROJECT. SEE SECTION 220 OF THE STANDARD SPECIFICATIONS AND IF
ROCK IS ANTICIPATED BETWEEN -L2- STA. 12+00 TO STA. 18+00. BLASTING MAY BE REQUIRED FOR
ROCK
Drainage Ditches with Class 'B' Rip Rap
Guide for Rip Rap at Pipe Outlets
Rip Rap in Channels
Structure Anchor Units
Guardrail Installation
Guardrail Placement
Concrete Paved Ditches
Driveway Turnout - Radius Type
Concrete Sidewalk
Concrete Junction Box - 12" thru 66" Pipe
Frames and Wide Slot Sag Grates
Concrete Grated Drop Inlet Type 'B' - 12" thru 36" Pipe
Drop Inlet Frame and Grates - for use with Std. Dwg.s 840.14 and 840.15
Brick Drop Inlet - 12" thru 30" Pipe
Concrete Drop Inlet - 12" thru 30" Pipe
Method of Shoulder Construction - High Side of Superelevated Curve - Method I
Method of Pipe Installation - Method 'A'
Rock Plating
Guide for Berm Ditch Construction
Method of Obtaining Superelevation - Two Lane Pavement
Guide for Grading Subgrade - Secondary and Local
Method of Clearing - Method II
TITLE
A.
D.
C.
B.
3.
2.
1.
A.
APPROPRIATE MEANS. MAINTAIN AND PROTECT SLOPES FROM WEATHER-DAMAGE.
PROTECT SEEDED AREAS FROM DAMAGE BY BARRICADES, SIGNS, AND OTHER
APPROVED PLANS.
EXCELSIOR MATTING SHALL MEET NCDOT STANDARD SPECIFICATIONS AND SHALL BE INSTALLED PER
OTHER TYPES OF MULCH AND ANCHORING METHODS MAY BE USED UPON APPROVAL BY THE ENGINEER.
TACKING STRAW MULCH.
GRADE RC-2 OR OTHER APPROVED EQUAL. AN APPROVED JUTE MESH OR NET MAY BE USED IN LIEU OF
FOR TACK USE AN ASPHALT TIE-DOWN OF EMULSIFIED ASPHALT GRADE AE-E OR CUT-BACK ASPHALT
USE TACK TO PREVENT DISRUPTION OF MULCH.
AT 5 FOOT INTERVALS, IMMEDIATELY AFTER SEEDING.
SLOPES GREATER THAN 5:1 MULCH WITH MATTING. PIN MATTING TO THE GROUND WITH WIRE STAPLES
RATE OF NOT LESS THAN 92 LBS. PER 1000 SQ.FT.
SLOPES FROM 5:1 OR FLATTER BY SPREADING A LIGHT COVER OF MULCH OVER SEEDED AREA AT THE
THAN THE FOLLOWING:
APPLY MULCH OR MATTING AS REQUIRED TO RETAIN SOIL AND GRASS, BUT NO LESS
SPECIFICATIONS.
ADDITIONAL NCDOT STANDARDS NOT ON THE LIST ABOVE MAY BE REQUIRED AS PER PLAN DETAILS AND
876.04
876.02
876.01
862.03
862.02
862.01
850.01
848.02
848.01
840.31
840.22
840.18
840.16
840.15
840.14
DIVISION 8 - INCIDENTALS
560.01
DIVISION 5 - SUBGRADE, BASES AND SHOULDERS
300.01
DIVISION 3 - PIPE CULVERTS
275.01
240.01
225.04
225.02
200.02
DIVISION 2 - EARTHWORK
STD.NO.
APPLICABLE TO THIS PROJECT AND BY REFERENCE HEREBY ARE CONSIDERED A PART OF THESE PLANS:
BRANCH - N.C. DEPARTMENT OR TRANSPORTATION - RALEIGH, N.C., DATED JANUARY 2018 ARE
THE FOLLOWING ROADWAY STANDARDS AS APPEAR IN "ROADWAY STANDARD DRAWINGS" HIGHWAY DESIGN PROFESSIONA
LE
NG INEERNORTH CARO
LINA
SEAL
14101
J
HN M
. KAM P ATORH
6/22/2020
6/22/2020
H14014.00
SCALE: 1"=30'
GREENWAY ENGINEER
HYDRAULICS ENGINEER
PROJECT NO.:
REVISIONS:
NO.DATE
919-996-4785
RALEIGH, NC 27601
SUITE 600
222 W. HARGETT ST,
RALEIGH MUNICIPAL BUILDING
CULTURAL RESOURCES
RECREATION and
PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com
T 919.380.8750
Raleigh, NC 27603
Suite 1100
223 West Street,
Firm License No. C-1051
LISA SCHIFFBAUER, PROJECT MANAGER
CONTACT:
Raleigh, NC 27606
VHB Engineering NC, P.C. (C-3705)
940 Main Campus Drive, Suite 500
ANILO
RAC HTRO
NLA
NOISSEFO
RPREENIGNEAND
REW
. O UNGYP
034407
SEAL
DATE: JUNE 22, 2020
1D
6/22/2020
H14014.00
SCALE: 1"=30'
GREENWAY ENGINEER
HYDRAULICS ENGINEER
PROJECT NO.:
REVISIONS:
NO.DATE
919-996-4785
RALEIGH, NC 27601
SUITE 600
222 W. HARGETT ST,
RALEIGH MUNICIPAL BUILDING
CULTURAL RESOURCES
RECREATION and
PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com
T 919.380.8750
Raleigh, NC 27603
Suite 1100
223 West Street,
Firm License No. C-1051
LISA SCHIFFBAUER, PROJECT MANAGER
CONTACT:
Raleigh, NC 27606
VHB Engineering NC, P.C. (C-3705)
940 Main Campus Drive, Suite 500
ANILO
RAC HTRO
NLA
NOISSEFO
RPREENIGNEAND
REW
. O UNGYP
034407
SEAL
DATE: JUNE 22, 2020
1E
BKBM2019PG00364 BKBM2019PG00365 BKBM2019PG00366
BKBM2019PG00362 BKBM2019PG00363
6/22/2020
H14014.00
SCALE: 1"=30'
GREENWAY ENGINEER
HYDRAULICS ENGINEER
PROJECT NO.:
REVISIONS:
NO.DATE
919-996-4785
RALEIGH, NC 27601
SUITE 600
222 W. HARGETT ST,
RALEIGH MUNICIPAL BUILDING
CULTURAL RESOURCES
RECREATION and
PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com
T 919.380.8750
Raleigh, NC 27603
Suite 1100
223 West Street,
Firm License No. C-1051
LISA SCHIFFBAUER, PROJECT MANAGER
CONTACT:
Raleigh, NC 27606
VHB Engineering NC, P.C. (C-3705)
940 Main Campus Drive, Suite 500
ANILO
RAC HTRO
NLA
NOISSEFO
RPREENIGNEAND
REW
. O UNGYP
034407
SEAL
DATE: JUNE 22, 2020
1F
BK015580PG00935 BK015580PG00936
6/22/2020
H14014.00
SCALE: 1"=30'
GREENWAY ENGINEER
HYDRAULICS ENGINEER
PROJECT NO.:
REVISIONS:
NO.DATE
919-996-4785
RALEIGH, NC 27601
SUITE 600
222 W. HARGETT ST,
RALEIGH MUNICIPAL BUILDING
CULTURAL RESOURCES
RECREATION and
PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com
T 919.380.8750
Raleigh, NC 27603
Suite 1100
223 West Street,
Firm License No. C-1051
LISA SCHIFFBAUER, PROJECT MANAGER
CONTACT:
Raleigh, NC 27606
VHB Engineering NC, P.C. (C-3705)
940 Main Campus Drive, Suite 500
ANILO
RAC HTRO
NLA
NOISSEFO
RPREENIGNEAND
REW
. O UNGYP
034407
SEAL
DATE: JUNE 22, 2020
1G
6/22/2020
H14014.00
SCALE: 1"=30'
GREENWAY ENGINEER
HYDRAULICS ENGINEER
PROJECT NO.:
REVISIONS:
NO.DATE
919-996-4785
RALEIGH, NC 27601
SUITE 600
222 W. HARGETT ST,
RALEIGH MUNICIPAL BUILDING
CULTURAL RESOURCES
RECREATION and
PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com
T 919.380.8750
Raleigh, NC 27603
Suite 1100
223 West Street,
Firm License No. C-1051
LISA SCHIFFBAUER, PROJECT MANAGER
CONTACT:
Raleigh, NC 27606
VHB Engineering NC, P.C. (C-3705)
940 Main Campus Drive, Suite 500
ANILO
RAC HTRO
NLA
NOISSEFO
RPREENIGNEAND
REW
. O UNGYP
034407
SEAL
DATE: JUNE 22, 2020
1H
6/22/2020
1I
H14014.00
SCALE: 1"=30'
GREENWAY ENGINEER
HYDRAULICS ENGINEER
PROJECT NO.:
REVISIONS:
NO.DATE
919-996-4785
RALEIGH, NC 27601
SUITE 600
222 W. HARGETT ST,
RALEIGH MUNICIPAL BUILDING
CULTURAL RESOURCES
RECREATION and
PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com
T 919.380.8750
Raleigh, NC 27603
Suite 1100
223 West Street,
Firm License No. C-1051
LISA SCHIFFBAUER, PROJECT MANAGER
CONTACT:
Raleigh, NC 27606
VHB Engineering NC, P.C. (C-3705)
940 Main Campus Drive, Suite 500
ANILO
RAC HTRO
NLA
NOISSEFO
RPREENIGNEAND
REW
. O UNGYP
034407
SEAL
DATE: JUNE 22, 2020
6/22/2020
1J
H14014.00
SCALE: 1"=30'
GREENWAY ENGINEER
HYDRAULICS ENGINEER
PROJECT NO.:
REVISIONS:
NO.DATE
919-996-4785
RALEIGH, NC 27601
SUITE 600
222 W. HARGETT ST,
RALEIGH MUNICIPAL BUILDING
CULTURAL RESOURCES
RECREATION and
PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com
T 919.380.8750
Raleigh, NC 27603
Suite 1100
223 West Street,
Firm License No. C-1051
LISA SCHIFFBAUER, PROJECT MANAGER
CONTACT:
Raleigh, NC 27606
VHB Engineering NC, P.C. (C-3705)
940 Main Campus Drive, Suite 500
ANILO
RAC HTRO
NLA
NOISSEFO
RPREENIGNEAND
REW
. O UNGYP
034407
SEAL
DATE: JUNE 22, 2020
6/22/2020
1K
H14014.00
SCALE: 1"=30'
GREENWAY ENGINEER
HYDRAULICS ENGINEER
PROJECT NO.:
REVISIONS:
NO.DATE
919-996-4785
RALEIGH, NC 27601
SUITE 600
222 W. HARGETT ST,
RALEIGH MUNICIPAL BUILDING
CULTURAL RESOURCES
RECREATION and
PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com
T 919.380.8750
Raleigh, NC 27603
Suite 1100
223 West Street,
Firm License No. C-1051
LISA SCHIFFBAUER, PROJECT MANAGER
CONTACT:
Raleigh, NC 27606
VHB Engineering NC, P.C. (C-3705)
940 Main Campus Drive, Suite 500
ANILO
RAC HTRO
NLA
NOISSEFO
RPREENIGNEAND
REW
. O UNGYP
034407
SEAL
DATE: JUNE 22, 2020
6/22/2020
1L
H14014.00
SCALE: 1"=30'
GREENWAY ENGINEER
HYDRAULICS ENGINEER
PROJECT NO.:
REVISIONS:
NO.DATE
919-996-4785
RALEIGH, NC 27601
SUITE 600
222 W. HARGETT ST,
RALEIGH MUNICIPAL BUILDING
CULTURAL RESOURCES
RECREATION and
PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com
T 919.380.8750
Raleigh, NC 27603
Suite 1100
223 West Street,
Firm License No. C-1051
LISA SCHIFFBAUER, PROJECT MANAGER
CONTACT:
Raleigh, NC 27606
VHB Engineering NC, P.C. (C-3705)
940 Main Campus Drive, Suite 500
ANILO
RAC HTRO
NLA
NOISSEFO
RPREENIGNEAND
REW
. O UNGYP
034407
SEAL
DATE: JUNE 22, 2020
6/22/2020
POINT
GRADE
C1
CL
J1
2'
GROUND
ORIGINAL
2'
GRADE TO THIS LINE
0.02 0.02 0.02 0.02
V12:12'
8"
12'
CHAIN BEGIN STATION END STATION
C1
J1
PAVEMENT SCHEDULE
NTS
V1
PROPOSED 6" AGGREGATE BASE COURSE
TYPICAL SECTION #1 - 12' ASPHALT GREENWAY TRAIL
FLATTER2:1 or
2:1 MAX.
2
4+12.68
51+00.00 63+70.29
-L1-
-L1-
-L1-
-L1-
-L1-
-L1-
-L2-
GROUND
ORIGINAL
COMPACTED SUBGRADEUPHILL SIDE CREEK SIDE
-L1-
POINT
GRADE
CL
2'
GROUND
ORIGINAL
2'
GRADE TO THIS LINE
0.02 0.02 0.02 0.02
2:12'12'
FLATTER2:1 or
2:1 MAX.
GROUND
ORIGINAL
COMPACTED SUBGRADE
UPHILL SIDE CREEK SIDE
TYPICAL SECTION #2 - 12' CONCRETE GREENWAY TRAIL
A1
T
T
2'
0.02
GROUND
ORIGINAL
GROUND
ORIGINAL
0.02
T
J1
2'
0.02
GROUND
ORIGINAL
J1
A1
SHOULDER
SEEDED
GRADE
CONTRACTOR
SHOULDER
SEEDED
GRADE
CONTRACTOR
C2
110 LBS. PER SQ. YD. IN EACH OF TWO LAYERS
COURSE, TYPE S9.5B, AT AN AVERAGE RATE OF
PROPOSED APPROX. 2" ASPHALT CONCRETE SURFACE
-L1-,-L2-
CREEK SIDEUPHILL SIDE
-L1-
165 LBS. PER SQ. YD., IN EACH OF TWO LAYERS
COURSE, TYPE S9.5B, AT AN AVERAGE RATE OF
PROPOSED APPROX. 3" ASPHALT CONCRETE SURFACE
S 4" CONCRETE SIDEWALK
41+00.00-L2-
14+50.14 17+15.00-L2-
19+11.00-L2-
SHOULDER
SEEDED
GRADE
CONTRACTOR
CL
INSET 3
*PROVIDE A SAFETY RAIL FOR THE
FOLLOWING CIRCUMSTANCES:
SLOPE ≥ 3:1 AND DROP OF 6'
SLOPE ≥ 2:1 AND DROP OF 4'
SLOPE ≥ 1:1 AND DROP OF 1'
SHOULDER
SEEDED
GRADE
CONTRACTOR
SHOULDER
SEEDED
GRADE
CONTRACTOR
10+80.34 12+78.42-L2-
J2
J2 J2
10+78.33 (BEGIN APPR. SLAB)
11+28.33 (END APPR. SLAB)14+71.25 (BEGIN APPR. SLAB)
15+41.41 (END APPR. SLAB)22+73.92 (BEGIN APPR. SLAB)
23+44.08 (END APPR. SLAB)31+03.00 (BEGIN APPR. SLAB)
31+43.00 (END APPR. SLAB)34+52.92 (BEGIN APPR. SLAB)
END STATIONBEGIN STATIONCHAIN
39+79.83 (BEGIN BOARDWALK 3)
42+81.83 (END BOARDWALK 3)51+00.00 (TRANS. TO ASPHALT)
4' SHOULDER
3:1WIDE SHOULDER
INSET 2
*USE WHERE CONDITIONS PERMIT
THE USE OF A 4' SHOULDER
SHOULDER
SEEDED
GRADE
CONTRACTOR
J22:1 MAX.
1'
2'SAFETY RAIL
6'
J2J1
4' SHOULDER
WIDE SHOULDER
INSET 1
*USE WHERE CONDITIONS PERMIT
THE USE OF A 4' SHOULDER
2:1 MAX.
SHOULDER
SEEDED
GRADE
CONTRACTOR
J2
24+90.37 (BEGIN APPR. SLAB)
35+40.40 (BEGIN APPR. SLAB)
35+90.40 (END APPR. SLAB)
VARIABLE DEPTH AGGREGATE BASE COURSE
EARTH MATERIAL
27+25.37 (END APPR. SLAB)
J1
APPLIES TO:
TYPICAL SECTION #1 & #2 - BOTH SIDES
TYPICAL SECTION #3 - RIGHT SIDE
TYPICAL SECTION #4 - LEFT SIDE
APPLIES TO:
TYPICAL SECTION #1 & #2 - BOTH SIDES
TYPICAL SECTION #3 - RIGHT SIDE
TYPICAL SECTION #4 - LEFT SIDE
APPLIES TO:
TYPICAL SECTION #1 & #2 - BOTH SIDES
TYPICAL SECTION #4 - LEFT SIDE
TYPICAL SECTION #7 - RIGHT SIDE
J2
J2
-AFTER THE STONE BASE PRIOR TO PAVING
-AFTER THE FINISHED SUBGRADE PRIOR TO STONE BASE
-PRIOR TO PLACING FILL IN LOW AREAS
AGENCY AT THE FOLLOWING THREE STAGES OF TRAIL CONSTRUCTION:
PROOFROLLING SHALL OCCUR IN THE PRESENCE OF THE OWNER'S TESTING4.
DISTURBED BY CONSTRUCTION.
CONTRACTOR IS RESPONSIBLE FOR RE-ESTABLISHING ALL SLOPES3.
SHOULDERS TO MATCH CROSS SLOPE OF GREENWAY TRAIL.2.
FOR DIRECTION OF SLOPE.
CROSS SLOPE DIRECTION VARIES. SEE PLAN VIEW AND CROSS SECTIONS1.
NOTES:
" PORTLAND CEMENT CONCRETE PAVEMENT2
14
"2
110
35+04.08 (END BRIDGE 3)
-L1-,-L2-,-L2_REV-
12+52.4410+00.00
43+50.00 46+90.95-L2-
-L2_REV-
GEOTEXTILE FOR PAVEMENT STABILIZATION
H14014.00
SCALE: 1"=30'
GREENWAY ENGINEER
HYDRAULICS ENGINEER
PROJECT NO.:
REVISIONS:
NO.DATE
919-996-4785
RALEIGH, NC 27601
SUITE 600
222 W. HARGETT ST,
RALEIGH MUNICIPAL BUILDING
CULTURAL RESOURCES
RECREATION and
PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com
T 919.380.8750
Raleigh, NC 27603
Suite 1100
223 West Street,
Firm License No. C-1051
LISA SCHIFFBAUER, PROJECT MANAGER
CONTACT:
Raleigh, NC 27606
VHB Engineering NC, P.C. (C-3705)
940 Main Campus Drive, Suite 500
ANILO
RAC HTRO
NLA
NOISSEFO
RPREENIGNEAND
REW
. O UNGYP
034407
SEAL
DATE: JUNE 22, 2020
6/22/2020
T
MAX2:1
POINT
GRADE
MAX2:1
CHAIN BEGIN STATION END STATION
13+80.35
17+15.00 19+11.00
-L2-
-L2-
2A
NTS
12+78.42 13+71.22-L2-
8'
4"
0.020.02
1'1'
COMPACTED SUBGRADE
CL
GROUND
ORIGINAL
GROUND
ORIGINAL
CHAIN BEGIN STATION END STATION
10+12.91 11+94.00
-HSW-
-HSW-
GROUND
ORIGINAL
3:1RAIL
SAFETY
2'
GROUND
ORIGINAL 2:1 MAX.
2:1 MAX
ORIGINAL GROUND
T
HEIGHT VARIES.
RETAINING WALL,
SEGMENTAL GRAVITY
POINT
GRADE
2'
GRADE TO THIS LINE
0.020.020.02
12'
COMPACTED SUBGRADE
CL
A1
TYPICAL SECTION #4 - 12' CONCRETE GREENWAY TRAIL W/ CUT WALL (RIGHT SIDE)
SHOULDER
PAVED
POINT
GRADE
2'
2'
GRADE TO THIS LINE
0.020.020.020.02
12'
COMPACTED SUBGRADE
CL
HEIGHT VARIES.
RETAINING WALL,
SEGMENTAL GRAVITY
-L2-
(SEE DETAIL SHEET 2B)
CONCRETE FOOTING
3:1
GROUND
ORIGINAL
TYPICAL SECTION #3 - 12' CONCRETE GREENWAY TRAIL W/ FILL WALL (LEFT SIDE)
A1
CHAIN BEGIN STATION END STATION
SEE SPECS
APPLICATION
ALT. GRAFFITI RESISTANT
SHOULDER
SEEDED
GRADE
CONTRACTOR
SEE SPECS
APPLICATION
ALT. GRAFFITI RESISTANT
0.02 0.02
-L2-
TYPICAL SECTION #6 - 8' CONCRETE SIDEWALK
S
SHOULDER
SEEDED
GRADE
CONTRACTOR
SHOULDER
SEEDED
GRADE
CONTRACTOR
1'
C1
J1
PAVEMENT SCHEDULE
V1
PROPOSED 6" AGGREGATE BASE COURSE
T
A1
C2
110 LBS. PER SQ. YD. IN EACH OF TWO LAYERS
COURSE, TYPE S9.5B, AT AN AVERAGE RATE OF
PROPOSED APPROX. 2" ASPHALT CONCRETE SURFACE
165 LBS. PER SQ. YD., IN EACH OF TWO LAYERS
COURSE, TYPE S9.5B, AT AN AVERAGE RATE OF
PROPOSED APPROX. 3" ASPHALT CONCRETE SURFACE
S 4" CONCRETE SIDEWALK
J2
14+50.14
SHOULDER
SEEDED
GRADE
CONTRACTOR
SHOULDER
SEEDED
GRADE
CONTRACTOR
POINT
GRADE
2'
GRADE TO THIS LINE
0.020.020.020.02
12'
COMPACTED SUBGRADE
CL
HEIGHT VARIES.
RETAINING WALL,
SEGMENTAL GRAVITY
-L2-
(SEE DETAIL SHEET 2B)
CONCRETE FOOTING
A1
SHOULDER
SEEDED
GRADE
CONTRACTOR
1'
2:1 MAX
T
GROUND
ORIGINAL
2:1 MAX
ORIGINAL GROUND
T
HEIGHT VARIES.
RETAINING WALL,
SEGMENTAL GRAVITY
SEE SPECS
APPLICATION
ALT. GRAFFITI RESISTANT
2'
SHOULDER
PAVED
CHAIN BEGIN STATION END STATION
13+71.22-L2-13+80.35
TYPICAL SECTION #5 - 12' CONCRETE GREENWAY TRAIL W/ FILL & CUT WALL
VARIABLE DEPTH AGGREGATE BASE COURSE
EARTH MATERIAL
J1
J1
J1
J2
J2
-AFTER THE STONE BASE PRIOR TO PAVING
-AFTER THE FINISHED SUBGRADE PRIOR TO STONE BASE
-PRIOR TO PLACING FILL IN LOW AREAS
AGENCY AT THE FOLLOWING THREE STAGES OF TRAIL CONSTRUCTION:
PROOFROLLING SHALL OCCUR IN THE PRESENCE OF THE OWNER'S TESTING4.
DISTURBED BY CONSTRUCTION.
CONTRACTOR IS RESPONSIBLE FOR RE-ESTABLISHING ALL SLOPES3.
SHOULDERS TO MATCH CROSS SLOPE OF GREENWAY TRAIL.2.
FOR DIRECTION OF SLOPE.
CROSS SLOPE DIRECTION VARIES. SEE PLAN VIEW AND CROSS SECTIONS1.
NOTES:
" PORTLAND CEMENT CONCRETE PAVEMENT2
14
"2
110
"2
110
"2
110
4'
BERM
0.02
SEE SPECS
APPLICATION
ALT. GRAFFITI RESISTANT
2:1 MAX
T
GROUND
ORIGINAL
4'
BERM
0.02
48" SAFETY RAIL
48" SAFETY RAIL
GEOTEXTILE FOR PAVEMENT STABILIZATION
H14014.00
SCALE: 1"=30'
GREENWAY ENGINEER
HYDRAULICS ENGINEER
PROJECT NO.:
REVISIONS:
NO.DATE
919-996-4785
RALEIGH, NC 27601
SUITE 600
222 W. HARGETT ST,
RALEIGH MUNICIPAL BUILDING
CULTURAL RESOURCES
RECREATION and
PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com
T 919.380.8750
Raleigh, NC 27603
Suite 1100
223 West Street,
Firm License No. C-1051
LISA SCHIFFBAUER, PROJECT MANAGER
CONTACT:
Raleigh, NC 27606
VHB Engineering NC, P.C. (C-3705)
940 Main Campus Drive, Suite 500
ANILO
RAC HTRO
NLA
NOISSEFO
RPREENIGNEAND
REW
. O UNGYP
034407
SEAL
DATE: JUNE 22, 2020
6/22/2020
TRUSS, TYP
STRUCTURAL STEEL
CL
4'-0" MINIMUM12'-0" CLEAR CL
6'6'
12'-0" CLEAR
DECK
4" CONCRETE48"2B
BRIDGE TYPICAL SECTION #1
BOARDWALK TYPICAL SECTION #2
4" CONCRETE DECK
POINT
GRADE
2'
GRADE TO THIS LINE
0.020.020.020.02
11'
COMPACTED SUBGRADE
SHOULDER
SEEDED
GRADE
CONTRACTOR
SHOULDER
SEEDED
GRADE
CONTRACTOR
-Y3-
11'
CL
2:1FLATTER2:1 orGROUND
ORIGINAL
GROUND
ORIGINAL2:1 MAX.
C2
T
HEIGHT VARIES.
RETAINING WALL,
SEGMENTAL GRAVITY
2:1 M
A
X
T
GROUND
ORIGINAL
(SEE DETAIL SHEET 2B)
CONCRETE FOOTING
POINT
GRADE
2'
GRADE TO THIS LINE
0.020.020.020.02
8'11'
COMPACTED SUBGRADE
SHOULDER
SEEDED
GRADE
CONTRACTOR
SHOULDER
SEEDED
GRADE
CONTRACTOR
-Y3-
11'
CL
2:1FLATTER2:1 orGROUND
ORIGINAL
T
10+75.92 12+12.20-Y3-
2'-6"
SIDEWALK
2'
1'
S
CHAIN BEGIN STATION END STATION
10+15.34 10+75.92-Y3-
CHAIN BEGIN STATION END STATION
12+12.20 15+46.26-Y3-
8'2'-6"
SIDEWALK
SHOULDER
SEEDED
2'
S
-L1-,-L2-,-PLCON-
-L1-,-L2-,-PLCON-
SEE SPECS
APPLICATION
ALT. GRAFFITI RESISTANT
SHOULDER
SEEDED
GRADE
CONTRACTOR
1'-6"
C1
J1
PAVEMENT SCHEDULE
V1
PROPOSED 6" AGGREGATE BASE COURSE
T
A1
C2
110 LBS. PER SQ. YD. IN EACH OF TWO LAYERS
COURSE, TYPE S9.5B, AT AN AVERAGE RATE OF
PROPOSED APPROX. 2" ASPHALT CONCRETE SURFACE
165 LBS. PER SQ. YD., IN EACH OF TWO LAYERS
COURSE, TYPE S9.5B, AT AN AVERAGE RATE OF
PROPOSED APPROX. 3" ASPHALT CONCRETE SURFACE
S 4" CONCRETE SIDEWALK
J2
1'-6"
J2
J2
SEE BRIDGE PLANS FOR STATIONS
SEE BOARDWALK PLANS FOR STATIONS
TYPICAL SECTION #7 PARKING LOT
TYPICAL SECTION #8 PARKING LOT
EARTH MATERIAL
VARIABLE DEPTH AGGREGATE BASE COURSE 9"
J1
9"
C2
J1
-AFTER THE STONE BASE PRIOR TO PAVING
-AFTER THE FINISHED SUBGRADE PRIOR TO STONE BASE
-PRIOR TO PLACING FILL IN LOW AREAS
AGENCY AT THE FOLLOWING THREE STAGES OF TRAIL CONSTRUCTION:
PROOFROLLING SHALL OCCUR IN THE PRESENCE OF THE OWNER'S TESTING4.
DISTURBED BY CONSTRUCTION.
CONTRACTOR IS RESPONSIBLE FOR RE-ESTABLISHING ALL SLOPES3.
SHOULDERS TO MATCH CROSS SLOPE OF GREENWAY TRAIL.2.
FOR DIRECTION OF SLOPE.
CROSS SLOPE DIRECTION VARIES. SEE PLAN VIEW AND CROSS SECTIONS1.
NOTES:
" PORTLAND CEMENT CONCRETE PAVEMENT2
14
4'
BERM
0.02
48" SAFETY RAIL
5'*5'*
10'-0" CLEAR*
10'-0" CLEAR*
* USE FOR BOARDWALK 5 & 6 AND BRIDGE 5
NOTE: USE 6" OF ABC FOR DIRT PATH
GEOTEXTILE FOR PAVEMENT STABILIZATION
H14014.00
SCALE: 1"=30'
GREENWAY ENGINEER
HYDRAULICS ENGINEER
PROJECT NO.:
REVISIONS:
NO.DATE
919-996-4785
RALEIGH, NC 27601
SUITE 600
222 W. HARGETT ST,
RALEIGH MUNICIPAL BUILDING
CULTURAL RESOURCES
RECREATION and
PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com
T 919.380.8750
Raleigh, NC 27603
Suite 1100
223 West Street,
Firm License No. C-1051
LISA SCHIFFBAUER, PROJECT MANAGER
CONTACT:
Raleigh, NC 27606
VHB Engineering NC, P.C. (C-3705)
940 Main Campus Drive, Suite 500
ANILO
RAC HTRO
NLA
NOISSEFO
RPREENIGNEAND
REW
. O UNGYP
034407
SEAL
DATE: JUNE 22, 2020
6/22/2020
2C
51'-6"4"1'-0"
A
A
6'-6"
B
C
C
B
FINISHED GRADE
CONCRETE FOOTING
GRAVEL BASE48"6
8'-0" CTR TO CTR
7'-7" FACE TO FACE
5" SQ POST
" RAIL2
1" X 52
11
"2
110
2"
54"
"2
114
PYRAMID POST CAP
4"1'-0"1'-6"3. SAFETY RAIL OFFSET FROM EOP WILL VARY. FIELD LOCATE.
2. FOOTING WIDTH TO BE (2X) POST WIDTH. MINIMUM DEPTH 30".
1. FENCE TO BE THREE-RAIL WHITE VINYL FENCE WITH NOMINAL 8' SECTION LENGTH
GENERAL NOTES
VINYL SAFETY FENCE
3
GALVANIZED CHAIN LINK FENCE
GROUND WIRE
8' MAX. POST SPACING
3'-O" 6" MIN.3" " O.D. TOP RAIL2
11
POST
3" O.D. GALVANIZED STEEL END
LINE/INTERMEDIATE POST
2" 0.D. GALVANIZED STEEL
CORNERS
TENSION BAR AT ENDS AND
" TENSION BANDS WITH 4
3" X 4
15
START/STOP SECTION)
TURNBUCKLE (@ EQUAL
" O.D. TRUSS ROD WITH 16
5
BOTTOM RAIL
TIES 24" O.C. ALONG TOP AND
TENSION WIRE
12"
3,000 P.S.I. CONCRETE FOOTING (TYPICAL)
EARTHSEE PLANS FOR SPECIFIC HEIGHT3'-0" 8' CHAIN
" MESH GALVANIZED STEEL 4
12
4
GALVANIZED CHAIN LINK FENCE
GROUND WIRE
8' MAX. POST SPACING
3'-O" 6" MIN.3" " O.D. TOP RAIL2
11
POST
3" O.D. GALVANIZED STEEL END
LINE/INTERMEDIATE POST
2" 0.D. GALVANIZED STEEL
CORNERS
TENSION BAR AT ENDS AND
" TENSION BANDS WITH 4
3" X 4
15
START/STOP SECTION)
TURNBUCKLE (@ EQUAL
" O.D. TRUSS ROD WITH 16
5
BOTTOM RAIL
TIES 24" O.C. ALONG TOP AND
TENSION WIRE
12"
3,000 P.S.I. CONCRETE FOOTING (TYPICAL)
EARTHSEE PLANS FOR SPECIFIC HEIGHT 6' CHAIN
" MESH GALVANIZED STEEL 4
12
(TYP)
PITCHED
(TYP)
PITCHED
2
GREENWAY ENTRANCE
STOP SIGN
PLAN VIEW
OTHERWISE NOTED
5FT RADIUS UNLESS
CONCRETE/ASHPALT
TIE TO EXISTING
CONCRETE SURFACE
WHEN TIEING TO
1/2" EXPANSION JOINT
(SEE DETAIL 2, SHEET SD-2)
MARKING
2" YELLOW PAVEMENT
BY CONTRACTOR
TRANSPORT AND PLACEMENT
BY CONTRACTOR
BOULDERS TO BE SUPPLIED
BOULDER (TYP.)
6"
SEE DETAIL 3, SHEET SD-3
HINGED BOLLARD5' MIN.GREENWAY TRAIL
CENTERLINE STRIPING
4" YELLOW
SEE DETAIL 1
TRUNCATED DOME PAVERS
9'x2' DETECTABLE WARNING,
SIDEWALK
SURFACE (TYP)
DETECTABLE WARNING
DEPRESSED 2'-6"
CURB & GUTTER
6" W X 12"D CONCRETE CURB
2
3
1
4
TYPE N-2 (TEE INTERSECTION)
1/2" EXPANSION
JOINT (TYP)
R=1' (TYP)
PAY LIMITS FOR CURB RAMP
1/2" EXPANSION
JOINT (TYP)
NON-W ALK
SURFACE
6'(TYP)
4' M IN.
3. DOUBLE WHEELCHAIR RAMPS ARE TO BE INSTALLED AT ALL PUBLIC STREET INTERSECTIONS
5. NO SLOPE ON THE SIDEWALK ACCESS RAMP SHALL EXCEED 1"/FT (12:1) IN RELATIONSHIP TO
6. IN NO CASE SHALL THE WIDTH OF THE SIDEWALK ACCESS RAMP BE LESS THAN 48"
7. USE CLASS A (3000 PSI) CONCRETE WITH A SIDEWALK FINISH IN ORDER TO OBTAIN A ROUGH
9. CURB RAMPS SHOULD BE PLACED PARALLEL TO THE DIRECTION OF TRAVEL.
OR AS DIRECTED BY THE ENGINEER. SIDEWALK ACCESS RAMPS SHALL BE LOCATED AS
THE GRADE OF THE STREET.
THE CITY OF RALEIGH WHERE EXISTING LIGHT POLES, FIRE HYDRANTS, DROP INLETS, ETC. AFFECT
2. CURB RAMPS SHALL BE PROVIDED AT LOCATIONS AS SHOWN ON THE PLANS
1. CITY OF RALEIGH STANDARD CURB RAMPS HAVE BEEN DEVELOPED IN ACCORDANCE WITH THE
AMERICANS WITH DISABILITIES ACT (ADA) AND PUBLIC RIGHT OF WAY ACCESS GUIDELINES (PROWAG).
WHERE SIDEWALK IS REQUIRED.
NONSKID SURFACE.
INDICATED IN THE DETAIL, HOWEVER, THE LOCATION MAY BE ADJUSTED IN COORDINATION WITH
PLACEMENT.
ALL RAMPS SHALL BE INSTALLED THE SAME WIDTH AS THE SIDEWALK.
8. A 1/2" EXPANSION JOINT INSTALLED FULL DEPTH WILL BE REQUIRED WHERE THE CONCRETE
EXISTING CONCRETE.
SIDEWALK ACCESS RAMP JOINS THE CURB AND ALSO WHERE NEW CONCRETE ABUTS
4. THE WALKING SURFACE SHALL BE SLIP RESISTANT. THE COLOR FOR THE DETECTABLE WARNING
AREA SHALL BE YELLOW FOR CONTRAST.
CURB RAMPS GENERAL NOTES
1
CURB RAMPS
2' DETECTABLE
STANDARD 2'- 6"
CURB & GUTTER
DEPRESSED CURB
SEE NOTE #1
WARNING DOMES
PRECAST CLASS "B"
CONCRETE
2.4"
.20"
0.9" TO
1.4"
2"
MIN.
0.65"2'-0" LENGTHDIAMETER
OF THE BASE
NO MORE THAN 65%
LESS THAN 50% TO
TOP DIAMETER OF NO
0.45" R TO 0.70" R
BASE DIAMETER
WITH DETECTABLE WARNING PAVERS
DOMES CONCRETE PAVER
DETECTABLE WARNING
1/4"/FT
4' MIN LANDING
RAMP SECTION
SLOPE 12:1 MAX (6' MIN.)
12"
FLARES, ETC.
WITH SAME POUR AS RAMP,
FOR WARNING DOMES TO BE
4" CONCRETE FOUNDATION
LIGHT ON DARK , OR DARK ON LIGHT SEQUENCE COVERING THE
DETECTABLE WARNING AREA.
9' WIDTH
NOTE:
1. OBTAIN 70% CONTRAST VISIBILITY WITH ADJOINING SURFACE , EITHER
7
TRUNCATED DOME PAVERS
1.6" TO
ASPHALT
TRA
IL
2. CHARCOAL DOME PAVER COLOR TO BE APPROVED BY OWNER
*SEE DETAIL 8 ON THIS SHEET FOR TRANSITION
METAL SAFETY FENCE
2'-6"
2'-6"
2'-6" 2'-6"FACE OF CURB
10'-0"
AA
30"
BB
7" CC
A B C
LIP OF GUTTER
C A B
SECTION C-C
SECTION B-B
SECTION A-A
BACK OF CURB
2'-6"
JOINT
7"
FACE OF CURB
JOINT 10'-0"
5'-0"
1/2 " EXPANSION
1/2 " EXPANSION
7"
2'-6"2'-6"2'-6"2'-0"6"1"7 1/2"
8 3/4"1"7"
7"
12"
12"
REQUIRED TRANSITION LENGTH
10"
10"
PLAN VIEW
8
CURB TRANSITION TO VALLEY GUTTER 9
DECORATIVE FENCE
5. SAFETY RAIL OFFSET FROM EOP WILL VARY. SEE TYPICAL SECTIONS FOR PLACEMENT.
PER SPECIFICATIONS.
4. ALL METAL SHALL BE GALVANIZED UNLESS SPECIFIED AS "BLACK POWDER COATED"
" FILLET WELD. 2
13. ALL JOINTS TO HAVE A
2. TYPE OF PIPE TO BE USED IS 1-5/8" MAX. O.D. GALVANIZED STEEL PIPE
1. ALL CONCRETE TO BE 3600 PSI COMPRESSIVE STRENGTH
GENERAL NOTES
H14014.00
SCALE: 1"=30'
GREENWAY ENGINEER
HYDRAULICS ENGINEER
PROJECT NO.:
REVISIONS:
NO.DATE
919-996-4785
RALEIGH, NC 27601
SUITE 600
222 W. HARGETT ST,
RALEIGH MUNICIPAL BUILDING
CULTURAL RESOURCES
RECREATION and
PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com
T 919.380.8750
Raleigh, NC 27603
Suite 1100
223 West Street,
Firm License No. C-1051
LISA SCHIFFBAUER, PROJECT MANAGER
CONTACT:
Raleigh, NC 27606
VHB Engineering NC, P.C. (C-3705)
940 Main Campus Drive, Suite 500
ANILO
RAC HTRO
NLA
NOISSEFO
RPREENIGNEAND
REW
. O UNGYP
034407
SEAL
DATE: JUNE 22, 2020
6/22/2020
2D
TRANSITION NOT TO BE LOCATED WITHIN
THE CURB RADIUS.
NOTES:
H14014.00
SCALE: 1"=30'
GREENWAY ENGINEER
HYDRAULICS ENGINEER
PROJECT NO.:
REVISIONS:
NO.DATE
919-996-4785
RALEIGH, NC 27601
SUITE 600
222 W. HARGETT ST,
RALEIGH MUNICIPAL BUILDING
CULTURAL RESOURCES
RECREATION and
PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com
T 919.380.8750
Raleigh, NC 27603
Suite 1100
223 West Street,
Firm License No. C-1051
LISA SCHIFFBAUER, PROJECT MANAGER
CONTACT:
Raleigh, NC 27606
VHB Engineering NC, P.C. (C-3705)
940 Main Campus Drive, Suite 500
ANILO
RAC HTRO
NLA
NOISSEFO
RPREENIGNEAND
REW
. O UNGYP
034407
SEAL
DATE: JUNE 22, 2020
6/22/2020
2E
H14014.00
SCALE: 1"=30'
GREENWAY ENGINEER
HYDRAULICS ENGINEER
PROJECT NO.:
REVISIONS:
NO.DATE
919-996-4785
RALEIGH, NC 27601
SUITE 600
222 W. HARGETT ST,
RALEIGH MUNICIPAL BUILDING
CULTURAL RESOURCES
RECREATION and
PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com
T 919.380.8750
Raleigh, NC 27603
Suite 1100
223 West Street,
Firm License No. C-1051
LISA SCHIFFBAUER, PROJECT MANAGER
CONTACT:
Raleigh, NC 27606
VHB Engineering NC, P.C. (C-3705)
940 Main Campus Drive, Suite 500
ANILO
RAC HTRO
NLA
NOISSEFO
RPREENIGNEAND
REW
. O UNGYP
034407
SEAL
DATE: JUNE 22, 2020
6/22/2020
2F
H14014.00
SCALE: 1"=30'
GREENWAY ENGINEER
HYDRAULICS ENGINEER
PROJECT NO.:
REVISIONS:
NO.DATE
919-996-4785
RALEIGH, NC 27601
SUITE 600
222 W. HARGETT ST,
RALEIGH MUNICIPAL BUILDING
CULTURAL RESOURCES
RECREATION and
PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com
T 919.380.8750
Raleigh, NC 27603
Suite 1100
223 West Street,
Firm License No. C-1051
LISA SCHIFFBAUER, PROJECT MANAGER
CONTACT:
Raleigh, NC 27606
VHB Engineering NC, P.C. (C-3705)
940 Main Campus Drive, Suite 500
ANILO
RAC HTRO
NLA
NOISSEFO
RPREENIGNEAND
REW
. O UNGYP
034407
SEAL
DATE: JUNE 22, 2020
6/22/2020
H14014.00
SCALE: 1"=30'
GREENWAY ENGINEER
HYDRAULICS ENGINEER
PROJECT NO.:
REVISIONS:
NO.DATE
919-996-4785
RALEIGH, NC 27601
SUITE 600
222 W. HARGETT ST,
RALEIGH MUNICIPAL BUILDING
CULTURAL RESOURCES
RECREATION and
PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com
T 919.380.8750
Raleigh, NC 27603
Suite 1100
223 West Street,
Firm License No. C-1051
LISA SCHIFFBAUER, PROJECT MANAGER
CONTACT:
Raleigh, NC 27606
VHB Engineering NC, P.C. (C-3705)
940 Main Campus Drive, Suite 500
ANILO
RAC HTRO
NLA
NOISSEFO
RPREENIGNEAND
REW
. O UNGYP
034407
SEAL
DATE: JUNE 22, 2020
3
SAFETY FENCE AND RAIL SUMMARY
ALIGNMENT COMMENTSLENGTH
TOTAL
-HSW-RT 10+50
(LT / RT)
SIDE
BEGIN
STATION OFFSET OFFSETSTATION
END
5'11+22 5'METAL SAFETY FENCE
TYPE
-Y3-RT 10+46 49.0'
71.5'
LT 36+75 37+77-L1-
-L1-
-L1-
8' CHAIN LINK FENCE-L2-
-L2-
-L2-
-L2-
-L2-
RT 39+68
RT 42+82 47+74
LT
11+00
16+61
LT
11+50
14+25
RT
10+97
12+74
15+76
24+24
RT
RT
14+50
19+11
7'7'
8'7'
7'7'
7'7'
7'7'
6' CHAIN LINK FENCE
16.4'18.2'
7'7'
30.0'
FENCE TO REMAIN OUT OF FLOODWAY
240.5'
500.5'
272.0'
338.0'
136.5'
143.0'
488.0'
123.5'
LT VINYL SAFETY FENCE 1,776DURALEIGH RD RUNS BETWEEN L1 & L2
-HSW-LT
10+50 5'10+50
25.0'
40'
DECORATIVE FENCE
DECORATIVE FENCERT-HSW-
10+50 5'10+50 30'
35.0'
12+96
-L1-LT 7'7'VINYL SAFETY FENCE 48.0'5+25 5+73
-L1-LT 7'7'VINYL SAFETY FENCE 48.0'28+25 28+73
37+01
-L1-LT 59+25 7'60+30 7'VINYL SAFETY FENCE 104.0'
-Y5-11+47RT10+00 152.0'
-Y5-13+25RT12+50 80.0'
-Y5-14+53LT13+75 80.0'
4'4'VINYL SAFETY FENCE
4'4'VINYL SAFETY FENCE
4'4'VINYL SAFETY FENCE
TIE RAIL INTO BOARDWALK
-L1-LT 39+48 7'7'45.5'
8'
22.5'
TIE RAIL INTO BOARDWALK
11+945'11+32RT-HSW-5'
299.0'
39+80
METAL SAFETY FENCE
METAL SAFETY FENCE
METAL SAFETY FENCE
METAL SAFETY FENCE
METAL SAFETY FENCE
METAL SAFETY FENCE
METAL SAFETY FENCE
METAL SAFETY FENCE
METAL SAFETY FENCE
BLACK POWDER COATED
CONNECTS TO -Y3- BLACK POWDER COATED
CONNECTS TO -HSW- BLACK POWDER COATED
6/22/2020
H14014.00
SCALE: 1"=30'
GREENWAY ENGINEER
HYDRAULICS ENGINEER
PROJECT NO.:
REVISIONS:
NO.DATE
919-996-4785
RALEIGH, NC 27601
SUITE 600
222 W. HARGETT ST,
RALEIGH MUNICIPAL BUILDING
CULTURAL RESOURCES
RECREATION and
PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com
T 919.380.8750
Raleigh, NC 27603
Suite 1100
223 West Street,
Firm License No. C-1051
LISA SCHIFFBAUER, PROJECT MANAGER
CONTACT:
Raleigh, NC 27606
VHB Engineering NC, P.C. (C-3705)
940 Main Campus Drive, Suite 500
DATE: JUNE 22, 2020
3A
LIST OF PIPES, ENDWALLS, ETC. (FOR PIPES 48" & UNDER)
COMPUTED BY:
CHECKED BY:
DATE:
DATE:7/19/2019
7/19/2019VHB
VHB
See "Standard Specifications For Roads and Structures, Section 300-5".
Note: Invert Elevations are for Bid Purposes only and shall not be used for project construction stakeout.G.D.I. FRAME WITH TWO GRATES STD. 840.22G.D.I. (N.S.) FRAME WITH TWO GRATES STD. 840.24SIZE A BQUANTITIESFOR DRAINAGESTRUCTURESENDWALLS
STATION
STRUCTURE NO.R.C.P.C.S.P.PER EACH (0' THRU 5.0')5.0' THRU 10.0'10.0' AND ABOVE* TOTAL L.F. FOR PAYQUANTITY SHALL BE COL.'A' + (1.3 X COL.'B')FROMTOTYPE OF GRATE
FE GC.B. STD. 840.01 OR STD. 840.02ABBREVIATIONS
LOCATION (LT,RT, OR CL)REMARKS
12"15"18"24"30"36"42"48"
STANDARD 840.03
AND HOOD
FRAME, GRATES
CU. YDS.
OR GAUGE
THICKNESS
*FT.
LIN.TOP ELEVATIONINVERT ELEVATIONINVERT ELEVATIONSLOPE CRITICALOTHERWISE)
NOTED
(UNLESS
STD. 838.80
OR
STD. 838.11
STD. 838.01,
C.B.
N.D.I.
D.I.
J.B.
M.H.
CATCH BASIN
NARROW DROP INLET
DROP INLET
JUNCTION BOX
MANHOLE
TRAFFIC BEARING DROP INLETT.B.D.I.
T.B.J.B.TRAFFIC BEARING JUNCTION BOX
G.D.I.GRATED DROP INLET
G.D.I. (N.S.)
(NARROW SLOT)
GRATED DROP INLET
48"42"36"30"24"18"15"DROP INLETCATCH BASINSECTIONTRANSITIONALCONCRETE(RCP, CSP, CAAP, HDPE, or PVC)
DRAINAGE PIPE
CORR. STEEL ELBOWS NO. & SIZECONC. COLLARS CL. "B" C.Y. STD 840.72CONC. & BRICK PIPE PLUG, C.Y. STD. 840.71DO NOT USE RCPDO NOT USE CSPDO NOT USE CAAPDO NOT USE HDPE(CLASS III)
R.C. PIPE
**" R. C. PIPE (CLASS V)**" R. C. PIPE CULVERTS, CONTRACTOR DESIGN PIPE**" R. C. PIPE CULVERTS, CONTRACTOR DESIGN PIPE15" SIDE DRAIN PIPE18" SIDE DRAIN PIPEPIPE REMOVAL LIN.FT.D.I. STD. 840.14 OR STD. 840.15D.I. FRAME WITH GRATE STD. 840.1612+93 -Y5-LT.0401 240.3 238.1 1 1 1
12+93 -Y5-LT.0401 0402 238.1 235.8 26
04035+40 -L1-235.0 231.0 39
11+12 -HSW-
CL
CL 0404 27265.8 262.0
0405
04060405
11+61 -Y3-LT.
LT.11+61 -Y3-
243.7 240.7
240.7 239.2 16
1 CONCRETE JUNCTION BOX STD. 840.311
11+62 -Y5-LT.0407 241.0 237.6
11+62 -Y5-LT.0407 0408 237.6 237.3 20
1 1
60 REMOVE EXISTING DRIVE PIPE
5
TIE NEW JB TO EXISTING 15" CMP OUTLET
& TIE TO NEW JB
REPLACE DAMAGED SECTION OF 15" CMP
36+50 -L1-CL 0801 244.0 243.6
37TOTALS51 16 4 60112
59+18 -L1-CL 0901 337.9 334.7 37
27
18+21 -L2-LT.1102 238.4 232.4
18+21 -L2-LT.1102 1103 232.4 232.2 21
187
1 1
1CONCRETE GRATED DROP INLET TYPE 'B' STD. 840.181
1
22+00 -L2-CL 1201 229.0 228.7 35
35
39+22 -L2-CL 1401 229.9 229.5 34
CL 1402 226.7 226.5 39
1.0
1.0
12+00 -L2- REV
PROFESSIONA
LE
NG INEERNORTH CARO
LINA
SEAL
14101
J
HN
M
. KAM P ATORH
6/22/2020
235235235235235235
2352352352352352352352352
35
2
3
5
235
235
240240240240240240240 240240240240
240
240
240240240245245245245245
2452
4
5
245
245
250250250250250250255255255255255255260260260260260260265
265265265265270270270275275275275
275275275275
280H14014.00
SCALE: 1"=30'
GREENWAY ENGINEER
HYDRAULICS ENGINEER
PROJECT NO.:
REVISIONS:
NO.DATE
919-996-4785
RALEIGH, NC 27601
SUITE 600
222 W. HARGETT ST,
RALEIGH MUNICIPAL BUILDING
CULTURAL RESOURCES
RECREATION and
PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com
T 919.380.8750
Raleigh, NC 27603
Suite 1100
223 West Street,
Firm License No. C-1051
LISA SCHIFFBAUER, PROJECT MANAGER
CONTACT:
Raleigh, NC 27606
VHB Engineering NC, P.C. (C-3705)
940 Main Campus Drive, Suite 500
ANILO
RAC HTRO
NLA
NOISSEFO
RPREENIGNEAND
REW
. O UNGYP
034407
SEAL
DATE: JUNE 22, 2020
ICV
ICV
ICV
TPED
T
T
T
T
T
EB
FOWP
4TREE
4LI
4LI
4LI
4LI
4LI
4LI
6TREE
4TREE
4TREE
4TREE274274
2
6
9
RIP
RAP
RIP
RAP
WOODED
AREA
WOODED
AREA
WOODED
AREA SE
G
M
E
N
T
E
D B
L
O
C
K W
A
L
L
PERGOLA
SUPPORT
COLUMN
(TYP
.)
ASPHALT
PARKING
PARK
STOP
(TYP
.)
LANDSCAPE
AREA
EXIST ROWLOT 213
PIN 0786-12-9457
BM 2007, PG 2444-2446
DB 16344, PG 1019
ASSOCIATION INC
UMSTEAD HOMEOWNERS
THE HAMPTONS AT
N/F
LOT 112
PIN 0786-21-7624
BM 2007, PG 2444-2446
DB 16344, PG 1019
ASSOCIATION INC
UMSTEAD HOMEOWNERS
THE HAMPTONS AT
N/F
LOT 111
PIN 0786-22-7860
BM 2008, PG 1009DB 11903, PG 91ASSOCIATION INCUMSTEAD HOMEOWNERSTHE HAMPTONS ATN/F SEE SHEET 5MATCHLINE -L1- STA 11+50.004
-Y5- SUPERELEVATION INCREMENT SPACING IS 10' UNLESS OTHERWISE NOTED.
-Y3- SUPERELEVATION INCREMENT SPACING IS 10' UNLESS OTHERWISE NOTED.
-L1- SUPERELEVATION INCREMENT SPACING IS 7.5' UNLESS OTHERWISE NOTED.
SEE SHEET 17
MATCHLINE
SEE SHEETS SD-1 THRU SD-16 FOR SIGNING, DELINEATION, AND AMENITIES
SEE SHEET 18 FOR PROFILE -L1- STA. 4+12.68 TO 11+50.00
SEE SHEETS 16 & 26 FOR PARKING LOT DESIGN DETAILS
SEE SHEET L1 FOR LANDSCAPE PLANS PROFESSIONA
LE
NG INEERNORTH CARO
LINA
SEAL
14101
J
HN M
. KAM P ATORHGREU TL-3-L1- STA. 4+12.68
MATCH EXISTING PATH
BEGIN PROJECT
-L1- STA. 10+78.33
BEGIN APPROACH SLAB
-L1- STA. 10+88.33
BEGIN BOARDWALK 1
END APPROACH SLAB
-L1- STA. 11+18.33
BEGIN APPROACH SLAB
END BOARDWALK 1
-L1- STA. 11+28.33
END APPROACH SLAB
PT Sta. 4+46.75
PC Sta. 3+78.33
PC Sta. 6+93.22
4+00
5+00
6+00
7+00
8+00
10+0011+00
-L1-265' RIGHT TURN LANE TAPER-Y3--H
SW
-9+00-Y3- STA. 12+12 25.16' RT
END RETAINING WALL 4
15+00
-Y3- STA. 10+76 23.5' RT
BEGIN RETAINING WALL 4
CRABTREE CREEK C/L
GREU-TL3TYPE-IIITYPE-IIIGREU TL-3R=21'15+0011+0012+0013+0014+0016+00-EBCR-.02.02.02.01+40.00.02
C
A
T-1-HSW- STA. 10+12.91
MATCH EXISTING PATH
BEGIN CONSTRUCTION
TO BE FIELD LOCATED
KEY FOB
INSTALL GATE WITHTRAILS. TURKEY CREEKCHURCH ROADEBENEZER(SEE DETAIL 5, SHEET 2C)
-HSW- STA. 10+50 5' RT
SAFETY FENCE
BEGIN METAL
(SEE DETAIL 6, SHEET 2C)
-L1- STA. 5+25 7' LT
BEGIN VINYL SAFETY FENCE
(SEE DETAIL 6, SHEET 2C)
-L1- STA. 5+73 7' LT
END VINYL SAFETY FENCE
(SEE DETAIL 5, SHEET 2C)
-Y3- STA. 12+96 49.00' RT
END METAL SAFETY FENCE
(SEE DETAIL 6, SHEET 2C)-Y5- STA. 12+50 4' RTBEGIN VINYL SAFETY FENCE
-Y3- PT Sta. 11+65.55
-Y3- PC Sta. 11+17.54
-Y3- PT Sta. 10+94.47
-HSW- PT Sta. 11+94.00
-HSW- POT Sta. 10+00.00
-HSW- PC Sta. 10+14.22
-HSW- PT Sta. 10+21.77
-HSW- PI Sta. 11+27.42
-HSW- PC Sta. 11+61.68
-Y3- POT Sta. 10+00.00
-Y3- PC Sta. 10+39.23
-Y3- PC Sta. 12+70.78
-Y3- PT Sta. 12+82.20
R=25'
+15
.00
R=25'
-Y3- POT Sta. 16+02.43
-Y3- PT Sta. 15+71.26
-Y3- PC Sta. 15+48.47
.0
2
11'
1
1'
1
2'
12'
8'
8'
10.5'
(SEE DETAIL 7, SHEET 2C)
TRUNCATED DOME PAVERS
(SEE DETAIL SHEET S-18)
RAILS
WOOD APPROACH
SHEET S-18)
(SEE DETAIL
RAILS
WOOD APPROACH
(SEE DETAIL 5, SHEET 2C)
-Y3- STA. 10+46 22.50' RT
-HSW- STA. 11+94 5' RT=
CONTINUATION POINT
METAL SAFETY FENCE
TO STA. 4+81.77 RT
FROM -L1- STA. 4+28.77
EST. 10 SY
ROCK PLATING
(SEE DETAIL 9, SHEET 2C)
FROM OFF. 5' TO OFF. 40' RT
-HSW- STA 10+50,
INSTALL DECORATIVE FENCE
(SEE DETAIL 9, SHEET 2C)
FROM OFF. 5' TO OFF. 30' LT
-HSW- STA 10+50,
INSTALL DECORATIVE FENCE
18" HDPE
0403
SEE DETAIL 6
EMBANKMENT
RIP RAP AT
18" HDPE
0404
SEE DETAIL 6
EMBANKMENT
RIP RAP AT
REMOVEJB w/Slab Lid
15" RCP-III
0405
0406
GEOTEXTILE
EST 10 SY
EST 3 TONS
CLASS B RIP RAP
GEOTEXTILE
EST 5 SY
EST 1 TON
CLASS B RIP RAP
SEE DETAIL 3
EST 165 SY GEOTEXTILE
EST 55 TONS
CLASS B RIP RAP
TOE PROTECTION
SEE DETAIL 3
EST 45 SY GEOTEXTILE
EST 15 TONS
CLASS B RIP RAP
TOE PROTECTION
( Not to Scale)
RIP RAP AT EMBANKMENT
FROM -L1- STA. 11+11 TO STA. 11+26 RT
FROM -L1- STA. 05+43 TO STA. 05+52 LT
DETAIL 6
Grade
Ditch
1.5'
GEOTEXTILE
Geotextile= 10 sy
Type of Liner= 4 TONS,CL I Rip-Rap
10'min.
1.0'min.
( Not to Scale)
TOE PROTECTION
d
FLATTER2:1 OR
FROM -Y3- STA. 10+42 TO STA. 10+75 RT
FROM -Y3- STA. 10+25 TO STA. 11+78 LT
DETAIL 3
Type of Liner= Class B Rip-Rap
d=1 Ft.
GROUND
NATURAL SLOPE
FILL
GEOTEXTILE
F
ROM -
L1- S
T
A. 15
+32
T
O
S
T
A. 18
+00 RT
F
ROM -
L1- S
T
A. 16
+00
T
O
S
T
A. 22
+00
L
T
F
ROM -
L1- S
T
A. 11+25
T
O
S
T
A. 14
+25 RT
B
M 2007 PG 1484
TREE CONSERVATION AREA
100' WIDE GREEN
WAY &
ELEV: 234.59'
E: 2082272.420
N: 762725.321
PI Sta 13
+87.55
R
= 75.00'
-Y3--HSW-
PI Sta 10+73.94
D
L = 55.24'
T = 34.71'
R = 36.00'
PI Sta 11+42.40
D
L = 48.01'
T = 24.86'
R = 75.00'
PI Sta 12+76.65
D
L = 11.42'
T = 5.87'
R = 20.00'
PI Sta 15+61.28
D
L = 22.79'
T = 12.81'
R = 20.00'
L = 32.32'
PI Sta 11+80.54
D
T = 18.87'
R = 25.00'
PI Sta 10+18.93
D
L = 7.55'
T = 4.71'
R = 5.00'
C
F
F
FFF F
F C
C
F F
CC
F
C
F
F
F
F
F FF
FF
F
F
C
C
C
F
F
F
F
C
C
C C
C F
C
C
F F
C
C
CFCF
F
F
F FCCFF
F
F
C FC
6/22/2020
6/22/2020
H14014.00
SCALE: 1"=30'
GREENWAY ENGINEER
HYDRAULICS ENGINEER
PROJECT NO.:
REVISIONS:
NO.DATE
919-996-4785
RALEIGH, NC 27601
SUITE 600
222 W. HARGETT ST,
RALEIGH MUNICIPAL BUILDING
CULTURAL RESOURCES
RECREATION and
PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com
T 919.380.8750
Raleigh, NC 27603
Suite 1100
223 West Street,
Firm License No. C-1051
LISA SCHIFFBAUER, PROJECT MANAGER
CONTACT:
Raleigh, NC 27606
VHB Engineering NC, P.C. (C-3705)
940 Main Campus Drive, Suite 500
ANILO
RAC HTRO
NLA
NOISSEFO
RPREENIGNEAND
REW
. O UNGYP
034407
SEAL
DATE: JUNE 22, 2020MATCHLINE -L1- STA 11+50.00 SEE SHEET 4MATCHLI
NE
-L1- STA 19+00.00 SEE SHEET 65
-L1- SUPERELEVATION INCREMENT SPACING IS 7.5' UNLESS OTHERWISE NOTED.
SEE SHEETS SD-1 THRU SD-16 FOR SIGNING, DELINEATION, AND AMENITIES
PROFESSIONA
LE
NG INEERNORTH CARO
LINA
SEAL
14101
J
HN M
. KAM P ATORH
SEE SHEET 18 FOR PROFILE -L1- STA. 11+50.00 TO 19+00.00
-L1- STA. 14+71.25
BEGIN APPROACH SLAB
-L1- STA. 14+80.25
BEGIN BRIDGE 1
END APPROACH SLAB
-L1- STA. 15+32.41
BEGIN APPROACH SLAB
END BRIDGE 1
PT Sta. 11+62.92
PC Sta. 13+62.35
PRC Sta. 14+10.98
PC Sta. 15+49.45
PC Sta. 18+01.16
PRC Sta. 18+95.08
12+
00
13+
00
14+00 15+00
16+00
17+00
18+00
PT Sta. 16+57.63
PT Sta. 14+78.29
RI
C
HL
AND
C
R
E
E
K
C/L.02.02.02-L1- STA. 15+41.41
END APPROACH SLAB
CRABTREE CREEK C/L
12'12'
MULCHED AREA FOR SIGN
SHEET S-18)(SEE DETAIL
RAILSWOOD APPROACH
(SEE DETAIL SHEET S-18)
WOOD APPROACH RAILS
(SEE DETAIL SHEET S-18)
RAILS
WOOD APPROACH
SEE DETAIL 1
SPECIAL CUT DITCH
10 SY GEOTEXTILE
3 TONS
CLASS B RIP RAP
( Not to Scale)
RIP RAP AT EMBANKMENT
FROM -L1- STA. 15+25 TO STA. 15+32 RT
DETAIL 6
Grade
Ditch
1.5'
GEOTEXTILE
Geotextile= 10 sy
Type of Liner= 4 TONS,CL I Rip-Rap
10'min.
1.0'min.
SEE DETAIL 1
SPECIAL CUT DITCH
SEE DETAIL 1
SPECIAL CUT DITCH
SEE DETAIL 3
EST 45 SY GEOTEXTILE
EST 15 TONS
CLASS B RIP RAP
TOE PROTECTION
( Not to Scale)
TOE PROTECTION
d
FLATTER2:1 OR
FROM STA. 14+46 TO STA. 14+86 RT -L1-
DETAIL 3
Type of Liner= Class B Rip-Rap
d=1 Ft.
GROUND
NATURAL SLOPE
FILL
GEOTEXTILE
Flatter2:1 or
D2:1( Not to Scale)
SPECIAL CUT DITCH
FROM -L1- STA. 15+32 TO STA. 18+00 RT
FROM -L1- STA. 16+00 TO STA. 22+00 LT
FROM -L1- STA. 11+25 TO STA. 14+25 RT
DETAIL 1
Min. D=1 Ft.
Ground
Natural Slope
Ditch
Front
( Not to Scale)
BANK STABILIZATION
STA 14+88 -L-
DETAIL 13
GEOTEXTILE
Type of Liner= CLASS II RIPRAP
3.0'min.
2.0'
NWS
STA 15+23 -L-
SEE DETAIL 6
EMBANKMENT
RIP RAP AT
SEE DETAIL 13
EST 140 SY GEOTEXTILE
EST 75 TONS
BANK STABILIZATION
GEOTEXTILE
EST 69 SY
EST 46 TONS
RIP RAP
CLASS II
GEOTEXTILE
EST 52 SY
EST 35 TONS
RIP RAP
CLASS II
BM 2007 PG 1484TREE CONSERVATION AREA100' WIDE GREENWAY &
B
M 2007 P
G 1484
T
REE
C
O
NSE
R
V
ATI
O
N
A
RE
A
75' WI
DE
G
REE
N
WA
Y &ELEV: 237.76'
E: 2082369.914
N: 762693.756
ELEV: 236.42'
E: 2082468.510
N: 762661.142
T = 65.94'
R = 75.00'
PI Sta 18+55.40
D
PI Sta 16+15.39
D
-L1-
PI Sta 14+50.85
D
L = 67.31'
T = 39.87'
R = 50.00'
PI Sta 13+87.55
D
L = 48.64'
T = 25.21'
R = 75.00'
L = 108.18'L = 93.92'
T = 54.24'
R = 75.00'
PI Sta 19+37.38
D
L = 83.37'
T = 42.30'
R = 200.00'
F
C
F
C
F
C
F
CF
F
C
F
CC
C
C
F
C
F
C
F
F
F
C
6/22/2020
6/22/2020
235235235235235235235235
235
235
235235235 240
240
240240240240240240
240 2402402402452452502552
5
5
260H14014.00
SCALE: 1"=30'
GREENWAY ENGINEER
HYDRAULICS ENGINEER
PROJECT NO.:
REVISIONS:
NO.DATE
919-996-4785
RALEIGH, NC 27601
SUITE 600
222 W. HARGETT ST,
RALEIGH MUNICIPAL BUILDING
CULTURAL RESOURCES
RECREATION and
PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com
T 919.380.8750
Raleigh, NC 27603
Suite 1100
223 West Street,
Firm License No. C-1051
LISA SCHIFFBAUER, PROJECT MANAGER
CONTACT:
Raleigh, NC 27606
VHB Engineering NC, P.C. (C-3705)
940 Main Campus Drive, Suite 500
ANILO
RAC HTRO
NLA
NOISSEFO
RPREENIGNEAND
REW
. O UNGYP
034407
SEAL
DATE: JUNE 22, 2020
W
(BM 1985, PG 1303)
40' SANITARY SEWER EASEMENT
PIN 0786320346
DB 015580, PG 00928
CITY OF RALEIGH
N/F
PIN 0786-21-7624
BM 2007, PG 2444-2446
DB 11903, PG 91
COMPANY, LLC
THE HAMPTONS DEVELOPMENT
N/F STA 27+00.00 SEE SHEET 7MATCHLINE -L1-6MAT
C
HLI
NE -L1- ST
A 19+00.00 SEE S
HEET 5 -L1- SUPERELEVATION INCREMENT SPACING IS 7.5' UNLESS OTHERWISE NOTED.
SEE SHEETS SD-1 THRU SD-16 FOR SIGNING, DELINEATION, AND AMENITIES
PROFESSIONA
LE
NG INEERNORTH CARO
LINA
SEAL
14101
J
HN M
. KAM P ATORH
SEE SHEET 19 FOR PROFILE -L1- STA. 19+00.00 TO 27+00.00
-L1--L1-
PRC Sta. 19+78.45
PRC Sta. 20+32.01
PT Sta. 20+68.40
PT Sta. 22+79.44
PC Sta. 21+79.15
20+00
21+00
22+00
2
3
+0
0
PC Sta. 23+36.13
24+00
PRC Sta. 24+26.46
25+00
26+00
PCC Sta. 26+52.14
PCC Sta. 26+84.91
45.00'R
50.00'R
45.00'R
RICHLAND CREEK C/L
.02.01.00.01.02
.02.01.00
.01.02.02 .02-L1- STA. 22+82.92
BEGIN BRIDGE 2
END APPROACH SLAB
-L1- STA. 23+35.08
BEGIN APPROACH SLAB
END BRIDGE 2
-L1- STA. 22+73.92
BEGIN APPROACH SLAB
-L1- STA. 23+44.08
END APPROACH SLABRICHLAND CREEK C/L
12'12'(SEE DETAIL SHEET S-18)
RAILS
WOOD APPROACH
(SEE DETAIL SHEET S-18)
RAILS
WOOD APPROACH
500 YR FLOOD EL.=261'
100 YR BASE FLOOD EL.=253'
RIM EL.=UNKNOWN
GROUND EL.=242.63'
SEE DETAIL 1
SPECIAL CUT DITCH
SEE DETAIL 6
EMBANKMENT
RIP RAP AT
SEE DETAIL 6
EMBANKMENT
RIP RAP AT
SEE DETAIL 1
SPECIAL CUT DITCH
( Not to Scale)
RIP RAP AT EMBANKMENT
FROM -L1- STA. 23+24 TO STA. 23+37 RT
FROM -L1- STA. 23+18 TO STA. 23+32 LT
DETAIL 6
Grade
Ditch
1.5'
GEOTEXTILE
Geotextile= 10 sy
Type of Liner= 4 TONS,CL I Rip-Rap
10'min.
1.0'min.Flatter2:1 or
D2:1( Not to Scale)
SPECIAL CUT DITCH
FROM -L1- STA. 23+37 TO STA. 31+20 RT
FROM -L1- STA. 23+32 TO STA. 25+00 LT
FROM -L1- STA. 16+00 TO STA. 22+00 LT
DETAIL 1
Min. D=1 Ft.
Ground
Natural Slope
Ditch
Front
SEE DETAIL 13
EST 90 SY GEOTEXTILE
EST 45 TONS
BANK STABILIZATION
( Not to Scale)
BANK STABILIZATION
STA 22+91 -L-
DETAIL 13
GEOTEXTILE
Type of Liner= CLASS II RIPRAP
3.0'min.
2.0'
NWS
STA 23+26 -L-
EST 45 SY GEOTEXTILE
EST 30 TONS
RIP RAP
CLASS II
EST 60 SY GEOTEXTILE
EST 41 TONS
RIP RAP
CLASS II
BM 2007 PG 1484
TREE CONSERVATION AREA
75' WIDE GREENWAY &
PI Sta 20+06.43
D
L = 53.56'
T = 27.98'
R = 75.00'
PI Sta 20+50.57
D
T = 18.56'
R = 75.00'
L = 36.39'
-L1-
PI Sta 22+57.52
D
L = 100.29'
T = 78.37'
R = 50.00'
PI Sta 24+06.79
D
L = 90.34'
T = 70.66'
R = 45.00'
PI Sta 25+42.40
D
L = 225.68'
T = 115.93'
R = 400.00'
PI Sta 26+69.29
D
L = 32.76'
T = 17.15'
R = 45.00'CFCFF
C
F
F
F
F
C
C
C
C
C
C
F
C
F
F
C CCC6/22/2020
6/22/2020
235235235
235
2
3
5
240
240240240240
2
4
0
240240240240240245245245245245245245245245250250250250250255255255255260260260260260265265265270275H14014.00
SCALE: 1"=30'
GREENWAY ENGINEER
HYDRAULICS ENGINEER
PROJECT NO.:
REVISIONS:
NO.DATE
919-996-4785
RALEIGH, NC 27601
SUITE 600
222 W. HARGETT ST,
RALEIGH MUNICIPAL BUILDING
CULTURAL RESOURCES
RECREATION and
PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com
T 919.380.8750
Raleigh, NC 27603
Suite 1100
223 West Street,
Firm License No. C-1051
LISA SCHIFFBAUER, PROJECT MANAGER
CONTACT:
Raleigh, NC 27606
VHB Engineering NC, P.C. (C-3705)
940 Main Campus Drive, Suite 500
ANILO
RAC HTRO
NLA
NOISSEFO
RPREENIGNEAND
REW
. O UNGYP
034407
SEAL
DATE: JUNE 22, 2020
(BM 1985, PG 1303)
40' SANITARY SEWER EASEMENT
PIN 0786-21-7624
BM 2007, PG 2444-2446
DB 11903, PG 91
COMPANY, LLC
THE HAMPTONS DEVELOPMENT
N/F
(168.9 ACRES PER RECORDS)
PIN 0786-34-9208
DB 1592, PG 361
AGGREGATES, INC
BENCHMARK CAROLINA
N/F
SEE SHEET 6MATCHLINE -L1- STA 27+00.007SEE SHEET 8MATCHLINE -L1- STA 33+00.00-L1- SUPERELEVATION INCREMENT SPACING IS 7.5' UNLESS OTHERWISE NOTED.
SEE SHEETS SD-1 THRU SD-16 FOR SIGNING, DELINEATION, AND AMENITIES
PROFESSIONA
LE
NG INEERNORTH CARO
LINA
SEAL
14101
J
HN M
. KAM P ATORH
SEE SHEET 19 FOR PROFILE -L1- STA. 27+00.00 TO 33+00.00
-L1-
2
8+
0
0
2
9
+
0
0
30+00PRC Sta. 30+48.05
31+00
PT Sta. 31+14.39
32+00
RICHLAND CREEK C/L.02.02-L1- STA. 31+13.00
BEGIN BOARDWALK 2
END APPROACH SLAB
-L1- STA. 31+33.00
BEGIN APPROACH SLAB
END BOARDWALK 2
-L1- STA. 31+03.00
BEGIN APPROACH SLAB
-L1- STA. 31+43.00
END APPROACH SLAB
(SEE DETAIL 6, SHEET 2C)
-L1- STA. 28+25 7' LT
BEGIN VINYL SAFETY FENCE
(SEE DETAIL 6, SHEET 2C)
-L1- STA. 28+73 7' LT
END VINYL SAFETY FENCE
SHEET 2C)(SEE DETAIL 5,7' LT-L1-STA. 36+75SAFETY FENCEBEGIN METALSHEET 2C)(SEE DETAIL 5,8' RT-L1-STA. 37+01SAFETY FENCEBEGIN METAL12'12'
(SEE DETAIL SHEET S-18)
WOOD APPROACH RAILS
(SEE DETAIL SHEET S-18)
RAILS
WOOD APPROACH SHEET 2C)(SEE DETAIL 5,6' RT-L1-STA. 39+80.83END METAL SAFETY FENCE500 YR FLOOD EL.=261'
100 YR BASE FLOOD EL.=253'
RIM EL.=246.50'
GROUND EL.=243.86'
SEE DETAIL 6
EMBANKMENT
RIP RAP AT
SEE DETAIL 6
EMBANKMENT
RIP RAP AT
Flatter2:1 or
D2:1( Not to Scale)
SPECIAL CUT DITCH
FROM -L1- STA. 31+25 TO STA. 33+50 LT.
FROM -L1- STA. 23+37 TO STA. 31+20 RT.
DETAIL 1
Min. D=1 Ft.
Ground
Natural Slope
Ditch
Front
SEE DETAIL 1
SPECIAL CUT DITCH
SEE DETAIL 1
SPECIAL CUT DITCH
( Not to Scale)
RIP RAP AT EMBANKMENT
FROM -L1- STA. 31+16 TO STA. 31+25 RT
FROM -L1- STA. 31+19 TO STA. 31+30 LT
DETAIL 6
Grade
Ditch
1.5'
GEOTEXTILE
Geotextile= 10 sy
Type of Liner= 4 TONS,CL I Rip-Rap
10'min.
1.0'min.BM
2
0
0
7 PG
1
4
8
4TREE CONSERVATI
ON AREA7
5' WI
DE GREENWAY &-L1-
PI Sta 28+67.88
L = 363.14'
T = 182.97'
R = 1,200.00'
PI Sta 30+81.77
D
L = 66.34'
T = 33.72'
R = 150.00'
D
C
C
C
F
C FCFF
C
C
F
F C
C
C
6/22/2020
6/22/2020
240
2
4
0
2
40
2402
4
0240240240240
2452452452
4
5
245
245
245250250
250
250
2
5
5
255 2552
5
5
2
60260
260
2602652
6
5
265
265270270270
270
2
7
0
275
275275275
275280
2802802
8
0
280
2802852
8
5
285
2
8
52902
9
0
290
290
290295295
295
295
295 300300
300300300
3
0
0
3
0
0
300 3053053053
0
5
305
3
0
5 305310310310310
3
1
0
310
3103153153153153
1
5
315
315
3
15320320320
320
3
2
0
320325325330 335340340345H14014.00
SCALE: 1"=30'
GREENWAY ENGINEER
HYDRAULICS ENGINEER
PROJECT NO.:
REVISIONS:
NO.DATE
919-996-4785
RALEIGH, NC 27601
SUITE 600
222 W. HARGETT ST,
RALEIGH MUNICIPAL BUILDING
CULTURAL RESOURCES
RECREATION and
PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com
T 919.380.8750
Raleigh, NC 27603
Suite 1100
223 West Street,
Firm License No. C-1051
LISA SCHIFFBAUER, PROJECT MANAGER
CONTACT:
Raleigh, NC 27606
VHB Engineering NC, P.C. (C-3705)
940 Main Campus Drive, Suite 500
ANILO
RAC HTRO
NLA
NOISSEFO
RPREENIGNEAND
REW
. O UNGYP
034407
SEAL
DATE: JUNE 22, 2020
(BM 1985, PG 1303)
40' SANITARY SEWER EASEMENT
PIN 0786-21-7624
BM 2007, PG 2444-2446
DB 11903, PG 91
COMPANY, LLC
THE HAMPTONS DEVELOPMENT
N/F
(16.52 ACRES PER RECORDS)
PIN 0786-30-8563
BM 1990, PG 765
DB 14831, PG 744
SOUTHEAST, LLC
HANSON AGGREGATES
N/F
(168.9 ACRES PER RECORDS)
PIN 0786-34-9208
DB 1592, PG 361
AGGREGATES, INC
BENCHMARK CAROLINA
N/F
8
SEE SHEET 7
STA 33+00.00
MATCHLINE -L1-STA
5
5
+0
0.
0
0 SEE SHEET
9MATCHLINE
-L1-
SEE SHEETS SD-1 THRU SD-16 FOR SIGNING, DELINEATION, AND AMENITIES
PROFESSIONA
LE
NG INEERNORTH CARO
LINA
SEAL
14101
J
HN M
. KAM P ATORH
SEE SHEETS 20 AND 21 FOR PROFILE -L1- STA. 33+00.00 TO 55+00.008:18:1
PC Sta. 33+35.67
PT Sta. 33+83.68
PI Sta. 34+15.84
3
4
+0
0 35+00PC Sta. 35+06.41
PRC Sta. 35+64.61
15.00'R
36+0037+00R 20.00'
PI Sta. 39+73.83
PI Sta. 39+95.83
PT Sta. 39+67.82
PRC Sta. 37+75.79
R 23.00'
3
8
+
0
0
39+00
40+00
-L1-
PCC Sta. 37+16.57
45
+
00
41+00
42+00
4
3
+
0
0
44+00
46+0047+0048+0049+00
50+00 51+0052+0053+00 54+00
PI Sta. 41+87.83
PT Sta. 41+81.83
PC Sta. 43+07.05
PI Sta. 42+75.83
PT Sta. 44+03.83
PC Sta. 44+59.73
PT Sta. 45+75.93
PC Sta. 46+45.37
PRC Sta. 47+65.59
PT Sta. 48+11.20
PC Sta. 50+20.88
PT Sta. 50+88.66
PC Sta. 51+67.71
.
0
2
.01.00.01.02.02.01
.00.01
.02
.02
.02-L1- SUPERELEVATION INCREMENT SPACING IS 7.5' UNLESS OTHERWISE NOTED.
-L1- STA. 34+61.92
BEGIN BRIDGE 3
END APPROACH SLAB
-L1- STA. 51+00.00
BEGIN ASPHALT PATH
END CONCRETE PATH
RI
CHL
AND CRE
E
K C/
L
PC Sta. 40+01.83
SHEET 2C)
(SEE DETAIL 5,
7' LT
-L1-STA. 36+75
SAFETY FENCE
BEGIN METAL
SHEET 2C)
(SEE DETAIL 5,
8' RT
-L1-STA. 37+01
SAFETY FENCE
BEGIN METAL
(SEE DETAIL 5, SHEET 2C)
-L1- STA. 37+77, 7' LT
SAFETY FENCE
END METAL
2C)
SHEET
DETAIL 5,
(SEE
7' LT
-L1-STA. 39+48
SAFETY FENCE
BEGIN METAL
(SEE DETAIL 5, SHEET 2C)
-L1- STA. 47+74 7' RT
END METAL SAFETY FENCE
-L1- STA. 35+04.08
BEGIN CONCRETE PATH
END BRIDGE 3
12'12'
.02
12'
15'
15'
12'
(SEE DETAIL 5, SHEET 2C)
-L1- STA. 42+81.83 7' RT
SAFETY FENCE
BEGIN METAL
-L1- STA. 39+79.83
(SEE DETAIL 5, SHEET 2C)
END METAL SAFETY FENCE 7' LT
BEGIN BOARDWALK 3
END CONCRETE PATH
(SEE
DET
AIL S
HEET S-18)
R
AILSWO
O
D
APPR
O
A
C
H
(SEE DETAIL SHEET S-18)
RAILS
WOOD APPROACH
(SEE DETAIL SHEET S-18)
RAILS
WOOD APPROACH
-L1- STA. 34+52.92
BEGIN APPROACH SLAB
END ASPHALT PATH
SHEET 2C)
(SEE DETAIL 5,
6' RT
-L1-STA. 39+80.83
END METAL SAFETY FENCE
(SEE DETAIL 5, SHEET 2C)
RAIL
METAL APPROACH
-L1- STA. 42+81.83
CONCRETE PATH SEE SB-16
FOR BLOCKOUT IN
BEGIN CONCRETE PATH
END BOARDWALK 3
500 YR FLOOD EL.=261'
100 YR BASE FLOOD EL.=253'
RIM EL.=UNKNOWN
GROUND EL.=245.28'
10 SY GEOTEXTILE
3 TONS
CLASS B RIP RAP
DRAIN
GRADE TO
10 SY GEOTEXTILE
3 TONS
CLASS B RIP RAP
18" HDPE
SEE DETAIL 8
BERM DITCH
EST 399 SY GEOTEXTILE
EST 248 TONS
CLASS II RIP RAP
SEE DETAIL 9
BERM DITCH
Flatter2:1 or
D2:1( Not to Scale)
SPECIAL CUT DITCH
FROM -L1- STA. 31+25 TO STA. 33+50 LT.
DETAIL 1
Min. D=0.5 Ft.
Ground
Natural Slope
Ditch
Front
SEE DETAIL 1
SPECIAL CUT DITCH
0801
b
( Not to Scale)
D 2:1
BERM 'V' DITCH
DETAIL 8
Ground
Natural
RDWY
FROM -L1- STA. 45+50 TO STA. 47+50 LTVAR.
b=0 Ft.
Min. D=1 Ft.
VAR.STAKESLOPE0.0'VAR.
D2:1LIMITSCLEARING( Not to Scale)
BERM DITCH
FROM -L1- STA. 42+76 TO STA. 45+50 LT
VAR.
DETAIL 9
VAR.
Max. d=1 Ft.
Min. D=1 Ft.
Type of Liner= Class II Rip Rap
d
Geotextile
VAR.
SEE DETAIL 1
SPECIAL CUT DITCH
SEE DETAIL 1
SPECIAL CUT DITCH
SEE DETAIL 13
EST 90 SY GEOTEXTILE
EST 45 TONS
BANK STABILIZATION
( Not to Scale)
BANK STABILIZATION
STA 34+71 -L-
DETAIL 13
GEOTEXTILE
Type of Liner= CLASS II RIPRAP
3.0'min.
2.0'
NWS
STA 34+95 -L-
GEOTEXTILE
EST 38 SY
EST 26 TONS
RIP RAP
CLASS II
GEOTEXTILE
EST 48 SY
EST 33 TONS
RIP RAP
CLASS II B
M 2007 PG 1484
TREE CONSERVATION AREA
75' WIDE GREEN
WAY &
-L1-
PI Sta 36+43.02
L = 151.96'
T = 78.41'
R = 250.00'
D
PI Sta 35+39.31
L = 58.19'
T = 32.90'
R = 50.00'
D
R = 125.00'
T = 24.31'
L = 48.02'
PI Sta 33+59.97
D
PI Sta 39+37.26
D
L = 59.22'
T = 220.69'
R = 20.00'
PI Sta 38+74.30
D
L = 192.03'
T = 98.51'
R = 349.25'
PI Sta 43+56.41
D
L = 96.77'
T = 49.35'
R = 200.00'
PI Sta 45+18.24
D
L = 116.20'
T = 58.51'
R = 400.00'
PI Sta 47+05.62
D
L = 120.22'
T = 60.24'
R = 730.00'
PI Sta 50+62.97
D
L = 45.61'
T = 297.39'
R = 15.00'
PI Sta 52+56.35
D
L = 67.78'
T = 235.47'
R = 23.00'
PI Sta 54+19.99
D
L = 450.15'
T = 252.28'
R = 400.00'
PI Sta 57+12.39
D
L = 188.51'
T = 94.53'
R = 1,000.00'
PI Sta 59+87.67
D
L = 360.86'
T = 181.31'
R = 1,500.00'
PI Sta 40+93.65
D
L = 180.00'
T = 91.82'
R = 370.00'
C
C
C
F
C
F
F
C FCFFCCF
F
F CF
F
C
C
C
C
C
C CCCFF CFCFCFCFCCCFFF
F
F
F
C
C
C
C
F
F
F
F
CCC
FCF
F
F
F
6/22/2020
6/22/2020
300305310310310315315315320
320320320320325325325325325330330330330330330335335335335335335340340340340340340340345345345345345345350350350350350
350350
355
H14014.00
SCALE: 1"=30'
GREENWAY ENGINEER
HYDRAULICS ENGINEER
PROJECT NO.:
REVISIONS:
NO.DATE
919-996-4785
RALEIGH, NC 27601
SUITE 600
222 W. HARGETT ST,
RALEIGH MUNICIPAL BUILDING
CULTURAL RESOURCES
RECREATION and
PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com
T 919.380.8750
Raleigh, NC 27603
Suite 1100
223 West Street,
Firm License No. C-1051
LISA SCHIFFBAUER, PROJECT MANAGER
CONTACT:
Raleigh, NC 27606
VHB Engineering NC, P.C. (C-3705)
940 Main Campus Drive, Suite 500
ANILO
RAC HTRO
NLA
NOISSEFO
RPREENIGNEAND
REW
. O UNGYP
034407
SEAL
DATE: JUNE 22, 2020
(16.52 ACRES PER RECORDS)
PIN 0786-30-8563
BM 1990, PG 765
DB 14831, PG 744
SOUTHEAST, LLC
HANSON AGGREGATES
N/F
(16.5
2 ACRES
P
ER RECORDS)
PI
N
0
7
8
6-3
0-8
5
6
3BM
19
9
0,
P
G
7
6
5DB
14
8
3
1,
P
G
7
4
4
S
OUTHEAS
T, LLCHANS
ON AGGREGATESN/F
(168.9 ACRES PER RECORDS)
PIN 0786-34-9208
DB 1592, PG 361
AGGREGATES, INC
BENCHMARK CAROLINA
N/F
9MATCHLINE -L1- STA 60+50.00 SEE SHEET 10MATCHLINE -L1- STA 55+00.00 SEE SHEET 8SEE SHEETS SD-1 THRU SD-16 FOR SIGNING, DELINEATION, AND AMENITIES
PROFESSIONA
LE
NG INEERNORTH CARO
LINA
SEAL
14101
J
HN M
. KAM P ATORH
SEE SHEET 22 FOR PROFILE -L1- STA. 55+00.00 TO 60+50.00
-L1-
60+00
56+00 57+00
58+00
59+00
PRC Sta. 56+17.85
PRC Sta. 58+06.36.02-L1- SUPERELEVATION INCREMENT SPACING IS 7.5' UNLESS OTHERWISE NOTED..02(SEE DETAIL 6, SHEET 2C)
-L1- STA. 59+25 7' LT
BEGIN VINYL SAFETY FENCE
(SEE DETAIL 6, SHEET 2C)
-L1- STA. 60+30 7' LT
END VINYL SAFETY FENCE
12'12'
24" HDPE
11 SY GEOTEXTILE
3 TONS
CLASS B RIP RAP
0901
EST 210 SY GEOTEXTILE
EST 70 TONS
CLASS B RIP RAP
SEE DETAIL 3
TOE PROTECTION
( Not to Scale)
TOE PROTECTION
d
FLATTER2:1 OR
FROM -L1- STA. 59+20 TO STA. 60+60 RT.
DETAIL 3
Type of Liner= Class B Rip-Rap
d=1 Ft.
GROUND
NATURAL SLOPE
FILL
GEOTEXTILE
-L1-
PI Sta 56+52.12
D
L = 188.51'
T = 94.53'
R = 1,000.00'
PI Sta 59+27.40
D
L = 360.86'
T = 181.31'
R = 1,500.00'
C
C
C F
C
F
C
F
F
C F
F
F
F F
6/22/2020
6/22/2020
335340345345350350350355355355355355360360360360360365365365MULTI-USE PATH
EXISTING 8' ASPHALTDURALEIGH ROAD-L1- 63+70.29
MATCH EXISTING ASPHALT PATH
END CONSTRUCTION
61+00 62+0063+00PRC Sta. 61+67.22
PRC Sta. 63+07.03
POT Sta. 63+76.59
PT Sta. 63+66.65.02.01.00.01.02.02.01.00.01.02.02DRIVEWAY APRON
CONSTRUCT 20' WIDE
(SEE DETAIL 6, SHEET 2C)
THE EXISTING BACK OF CURB FROM -L1- TO -L2-
AREA BETWEEN THE EXISTING TRAIL AND
ALONG DURALEIGH RD IN THE GRASS
INSTALL 1,776' VINYL SAFETY FENCE
12'
12'
H14014.00
SCALE: 1"=30'
GREENWAY ENGINEER
HYDRAULICS ENGINEER
PROJECT NO.:
REVISIONS:
NO.DATE
919-996-4785
RALEIGH, NC 27601
SUITE 600
222 W. HARGETT ST,
RALEIGH MUNICIPAL BUILDING
CULTURAL RESOURCES
RECREATION and
PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com
T 919.380.8750
Raleigh, NC 27603
Suite 1100
223 West Street,
Firm License No. C-1051
LISA SCHIFFBAUER, PROJECT MANAGER
CONTACT:
Raleigh, NC 27606
VHB Engineering NC, P.C. (C-3705)
940 Main Campus Drive, Suite 500
ANILO
RAC HTRO
NLA
NOISSEFO
RPREENIGNEAND
REW
. O UNGYP
034407
SEAL
DATE: JUNE 22, 2020
W
(16.52 ACRES PER RECORDS)
PIN 0786-30-8563
BM 1990, PG 765
DB 14831, PG 744
SOUTHEAST, LLC
HANSON AGGREGATES
N/F
(168.9 ACRES PER RECORDS)
PIN 0786-34-9208
DB 1592, PG 361
AGGREGATES, INC
BENCHMARK CAROLINA
N/F
-L1-
PI Sta 62+68.22
D
L = 139.81'
T = 101.00'
R = 75.00'
PI Sta 63+53.11
D
L = 59.62'
T = 46.08'
R = 30.00'MATCHLINE -L1- STA 60+50.00 SEE SHEET 910
-L1- SUPERELEVATION INCREMENT SPACING IS 7.5' UNLESS OTHERWISE NOTED.
SEE SHEETS SD-1 THRU SD-16 FOR SIGNING, DELINEATION, AND AMENITIES
PROFESSIONA
LE
NG INEERNORTH CARO
LINA
SEAL
14101
J
HN M
. KAM P ATORH
SEE SHEET 22 FOR PROFILE -L1- STA. 60+50.00 TO 63+70.29
F
F
C
C F FC
F
C
CCFF
F
C
C
6/22/2020
6/22/2020
2
2
5
2
2
5
225
225225225225
225225225225225230230230230
2
3
0230230
2302302302302302302352352352352352352352352352352352352
3
5
2
3
5
2402402402402402402402402402402
4
0
240
240
240245245245245245245245245245 245245245245245
245
245
245250250250250250250250250250250
250250
250
2
5
0
250250255255255255255255255255255255255255255
255
255
255
255
255260
260 2602602602602 6 0
260260260260260260260260260
2
6
0
260260
260
260
260
2652652652652652652652
6
5
265265
265
2
6
5
265265265265
2702702702702702702
7
0
270 270
270
270
275275275275275275275275
275275 275
28028028028028
0
280
280
280
280
2852852852852852
8
5
285
290290290290
295300BLDGRD
H14014.00
SCALE: 1"=30'
GREENWAY ENGINEER
HYDRAULICS ENGINEER
PROJECT NO.:
REVISIONS:
NO.DATE
919-996-4785
RALEIGH, NC 27601
SUITE 600
222 W. HARGETT ST,
RALEIGH MUNICIPAL BUILDING
CULTURAL RESOURCES
RECREATION and
PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com
T 919.380.8750
Raleigh, NC 27603
Suite 1100
223 West Street,
Firm License No. C-1051
LISA SCHIFFBAUER, PROJECT MANAGER
CONTACT:
Raleigh, NC 27606
VHB Engineering NC, P.C. (C-3705)
940 Main Campus Drive, Suite 500
ANILO
RAC HTRO
NLA
NOISSEFO
RPREENIGNEAND
REW
. O UNGYP
034407
SEAL
DATE: JUNE 22, 2020
259.5
W/E
W/E
247.3
240.4
W/E
W/E
(BOOK OF MAPS 1990, PAGE 410)40' SANI
TARY SEW
ER EASEMENT(28.49 ACRES PER RECORDS)PIN 0786-51-2559DB 1592, PG 361AGGREGATES, INCBENCHMARK CAROLINAN/F
(168.9 ACRES PER RECORDS)
PIN 0786-34-9208
DB 1592, PG 361
AGGREGATES, INC
BENCHMARK CAROLINA
N/F MATCHLINE -L2- STA 21+50.00 SEE SHEET 1211SEE SHEET 23 FOR PROFILE -L2- STA. 10+80.60 TO 21+50.00
SEE SHEETS SD-1 THRU SD-16 FOR SIGNING, DELINEATION, AND AMENITIES PROFESSIONA
LE
NG INEERNORTH CARO
LINA
SEAL
14101
J
HN M
. KAM P ATORH5:15:1 5:15:1
5
:1
-L2-10+0011+0012
+0
0
13+00
1
4
+
0
0 15+0016+00 17+0018+00
19+0020
+
00
21
+
00
PI Sta 10+79.65
D
L = 19.19'
T = 10.41'
R = 20.00'
PI Sta 11+10.13
D
L = 38.84'
T = 21.69'
R = 35.00'
PI Sta 14+48.44
D
L = 24.70'
T = 15.86'
R = 15.50'
PI Sta 11+95.92
D
L = 83.46'
T = 68.65'
R = 40.00'
PI Sta 13+22.08
D
L = 23.71'
T = 15.14'
R = 15.00'
PI Sta 12+98.38
D
L = 23.71'
T = 15.14'
R = 15.00'
PI Sta 12+47.38
D
L = 72.51'
T = 36.65'
R = 200.00'
PI Sta 13+82.51
D
L = 101.94'
T = 51.86'
R = 225.00'
PI Sta 16+28.31
D
L = 41.45'
T = 30.26'
R = 22.00'
PI Sta 16+69.77
D
L = 41.45'
T = 30.26'
R = 22.00'
PI Sta 17+53.14
D
L = 138.55'
T = 72.18'
R = 200.00'
PI Sta 15+41.08
D
L = 116.07'
T = 59.10'
R = 250.00'
PI Sta 14+73.14
D
L = 24.70'
T = 15.86'
R = 15.50'
PI Sta 18+81.47
D
L = 117.52'
T = 61.96'
R = 150.00'DURALEIGH ROADPOT Sta. 10+00.00
PC Sta. 10+69.24PRC Sta. 10+88.43
PRC Sta. 11+27.27
PCC Sta. 12+10.73
PRC Sta. 12+83.23
PCC Sta. 13+06.94
PCC Sta. 13+30.65
PRC Sta. 14+32.59
PCC Sta. 14+57.28
PCC Sta. 14+81.98
PRC Sta. 15+98.06
PCC Sta. 16+39.51
PRC Sta. 16+80.96
PT Sta. 19+37.03
PRC Sta. 18+19.51
15.00'R
22.00'R
40.00'R
8' CHAINLINK FENCE
INSTALL 272 LF OF
15.50'R
-L2-
-L2- STA. 13+80, 8'LT
END RETAINING WALL 1
-L2- 12+78, 8'LT
BEGIN RETAINING WALL 1
-L2- 13+71, 8'RT
BEGIN RETAINING WALL 2
C
R
A
B
T
R
E
E
C
R
E
E
K
C
/L
.02.02.01.00
.01.02
.
0
2
.01.00
.01.02.02
.01.00
.01
.02.02-L2- 10+80.34
BEGIN CONCRETE PATH
BEGIN CONSTRUCTION5:1-L2- STA. 17+15, 8'RT
BEGIN RETAINING WALL 3
40.28' RT
+96.11
50.00' RT
+48.25
47.38' RT
+91.41
37.30' LT
+10.46
40.79' LT
+23.34
(SEE DETAIL 3, SHEET 2C)
STA 10+97.54, OFFSET 16.37' LT
BEGIN 8' CHAINLINK FENCE
(SEE DETAIL 5, SHEET 2C)
-L2- STA. 11+00 7' LT
BEGIN METAL SAFETY FENCE
(SEE DETAIL 5, SHEET 2C)
-L2- STA. 12+74 7' RT
END METAL SAFETY FENCE
(SEE DETAIL 5, SHEET 2C)
-L2- STA. 15+76 7'RT
END METAL SAFETY FENCE
(SEE DETAIL 3, SHEET 2C)
STA 16+60.74, OFFSET 18.19' LT
END 8' CHAINLINK FENCE
(SEE DETAIL 6, SHEET 2C)
THE EXISTING BACK OF CURB FROM L1 TO L2
AREA BETWEEN THE EXISTING TRAIL AND
ALONG DURALEIGH RD IN THE GRASS
INSTALL 1,776' VINYL SAFETY FENCE
(SEE DETAIL 5, SHEET 2C)
-L2- STA. 11+50 7' RT
BEGIN METAL SAFETY FENCE
(SEE DETAIL 5, SHEET 2C)
-L2- STA. 14+25 7' LT
END METAL SAFETY FENCE
(SEE DETAIL 5, SHEET 2C)
BEGIN METAL SAFETY FENCE, 7'RT
-L2- STA. 14+50, 8'RT
END RETAINING WALL 2
12'12'(SEE DETAIL 4, SHEET 2C)
-L2- STA. 19+11, 8'RT
BEGIN 6' CHAINLINK FENCE
END RETAINING WALL 3
TO STA. 20+25 RT
FROM -L2- STA. 19+00
EST. 200 SY
ROCK PLATING
500 YR FLOOD EL.=258'
100 YR BASE FLOOD EL.=248'
RIM EL.=249.81'
GROUND EL.=232.50'
500 YR FLOOD EL.=251'
100 YR BASE FLOOD EL.=246'
RIM EL.=249.20'
GROUND EL.=236.27'
500 YR FLOOD EL.=261'
100 YR BASE FLOOD EL.=255'
RIM EL.=249.26'
GROUND EL.=234.50'
500 YR FLOOD EL.=269'
100 YR BASE FLOOD EL.=253'
RIM EL.=UNKNOWN
GROUND EL.=235.30'
-L2- SUPERELEVATION INCREMENT SPACING IS 7.5' UNLESS OTHERWISE NOTED.
2GI
SEE DETAIL 7
CONCRETE DITCH
SEE DETAIL 6
EMBANKMENT
RIP RAP AT
18" HDPE
10 SY GEOTEXTILE
3 TONS
CLASS B RIP RAP
1102
1103
SEE DETAIL 5
DDE =7 CY
20' @ 1.0%
2' BASE TAIL DITCH
EST 92 SY GEOTEXTILE
EST 32 TONS
CLASS B RIP RAP
SEE DETAIL 3
TOE PROTECTION
EST 243 SY GEOTEXTILE
EST 85 TONS
CLASS B RIP RAP
SEE DETAIL 3
TOE PROTECTION
EST 185 SY GEOTEXTILE
EST 65 TONS
CLASS B RIP RAP
SEE DETAIL 10
BERM DITCH
S
EE DET
AIL 11DDE =8
C
Y14' @ 0.71
%4'
B
ASE T
AIL DIT
C
HB
2:12:1D
( Not to Scale)
2' BASE TAIL DITCH
-L2- STA. 18+21 LT.
DETAIL 5
B=2 Ft.
Min. D=1 Ft.
Ground
Natural
Ground
Natural
FROM STA. 17+15 TO STA. 19+11 RT. -L2-
DETAIL 7
BEHIND RETAINING WALL
CONCRETE DITCH
~
SEIRAV
D
B
4"
1:2
( Not to Scale)
GROUND
NATURAL
WALL
RETAINING
BREAKER
BOND
B= 1.0'
D= 1.0'
VAR.STAKESLOPE5.0'5.0'
D2:1LIMITSCLEARING( Not to Scale)
BERM DITCH
10.0' V.C.
FROM STA. 20+00 TO STA. 21+50 RT. -L2-
6'
DETAIL 10
4'
Max. d=1.5 Ft.
Min. D=1 Ft.
Type of Liner= Class B Rip Rap
d
Geotextile
( Not to Scale)
TOE PROTECTION
d
FLATTER2:1 OR
FROM STA. 11+00 TO STA. 11+75 RT. -L2-
FROM STA. 10+95 TO STA. 12+85 LT. -L2-
DETAIL 3
Type of Liner= Class B Rip-Rap
d=1 Ft.
GROUND
NATURAL SLOPE
FILL
GEOTEXTILE
( Not to Scale)
RIP RAP AT EMBANKMENT
FROM STA. 18+20 TO STA. 18+33 LT -L2-
DETAIL 6
Grade
Ditch
1.5'
GEOTEXTILE
Geotextile= 10 sy
Type of Liner= 4 TONS,CL I Rip-Rap
10'min.
1.0'min.
C
F
FFFFCFF
C
C
CCCCCFF
CC
F
F6/22/2020
6/22/2020
2
2
5225225225225225
225
225225225225225230230230230230
230
230
230230230230230235235235235235235 2352
3
5
235235240240240240240
240240240
240
2452452452452452
45
2452
4
5
24
5
250250250250250250250
250255255255255255
255
255255
2
5
5
260260260260
260
260
260
265265265
265
2
6
5
270270270
270
2
7
0
275275275
275280280H14014.00
SCALE: 1"=30'
GREENWAY ENGINEER
HYDRAULICS ENGINEER
PROJECT NO.:
REVISIONS:
NO.DATE
919-996-4785
RALEIGH, NC 27601
SUITE 600
222 W. HARGETT ST,
RALEIGH MUNICIPAL BUILDING
CULTURAL RESOURCES
RECREATION and
PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com
T 919.380.8750
Raleigh, NC 27603
Suite 1100
223 West Street,
Firm License No. C-1051
LISA SCHIFFBAUER, PROJECT MANAGER
CONTACT:
Raleigh, NC 27606
VHB Engineering NC, P.C. (C-3705)
940 Main Campus Drive, Suite 500
ANILO
RAC HTRO
NLA
NOISSEFO
RPREENIGNEAND
REW
. O UNGYP
034407
SEAL
DATE: JUNE 22, 2020(BO
O
K
O
F
M
A
P
S
1990,
PA
G
E
41
0)40'
SA
N
ITA
RY
S
EW
ER
EA
S
EM
EN
T
PIN 0786-51-9537
DB 16646, PG 1631
FOUNDATION INC
CITY OF OAKS
N/F
(15.34 ACRES PER RECORDS)
PIN 0786-62-0033
DB 15551, PG 1993
SOUTHEAST, INC
HANSON AGGREGATES
N/F
12MATCHLINE -L2- STA 29+50.00 SEE SHEET 13MATCHLINE -L2- STA 21+50.00 SEE SHEET 11SEE SHEETS SD-1 THRU SD-16 FOR SIGNING, DELINEATION, AND AMENITIES
PROFESSIONA
LE
NG INEERNORTH CARO
LINA
SEAL
14101
J
HN M
. KAM P ATORH
SEE SHEET 1I FOR RIGHT-OF-ENTRY AGREEMENT
SEE SHEET 24 FOR PROFILE -L2- STA. 21+50.00 TO 29+50.00
22+00
PC Sta. 22+35.39
PRC Sta. 24+07.22
25+00
PT Sta. 25+00.37
PC Sta. 27+15.37
PT Sta. 27+79.29
PC Sta. 28+96.16
PT Sta. 29+37.88
PI Sta 22+80.19
D
L = 88.95'
T = 44.80'
R = 300.00'
PI Sta 23+68.33
D
L = 82.89'
T = 43.99'
R = 100.00'
PI Sta 24+74.47
D
L = 93.14'
T = 67.25'
R = 50.00'
PI Sta 27+52.53
D
L = 63.92'
T = 37.16'
R = 50.00'
PI Sta 29+17.10
D
L = 41.72'
T = 20.94'
R = 200.00'
23+00
24
+00
26+00 28+0029+0027+00
-L2-
-L2-
-L2- PCC Sta. 23+24.33
-L2- STA. 25+00.37
BEGIN BRIDGE 4
END APPROACH SLAB
-L2- STA. 27+15.37
BEGIN APPROACH SLAB
END BRIDGE 4
CRABTREE CREEK C/L
.02
.
0
1
.00.01.02.02-L2- SUPERELEVATION INCREMENT SPACING IS 7.5' UNLESS OTHERWISE NOTED..02-L2- STA. 24+90.37
BEGIN APPROACH SLAB
END CONCRETE PATH
-L2- STA. 27+25.37
BEGIN ASPHALT PATH
END APPROACH SLAB
39.02' RT
+59.64
45.08' RT
+26.87 46.04' RT
+60.25
34.91' RT
+35.80
(SEE DETAIL 4, SHEET 2C)
-L2- STA. 24+24, 30'RT
END 6' CHAINLINK FENCE
TO STA 24+75 RT
FROM STA 24+25
EST. 240 SY
ROCK PLATING
TO STA 28+00 LT
FROM STA 27+50
EST. 170 SY
ROCK PLATING
MAINTENANCE
SANITARY SEWER
SHORING FOR
PROPOSED TEMPORARY
12'12'(SEE DETAIL 5, SHEET 2C)
RAILS
METAL APPROACH
(SEE DETAIL 5, SHEET 2C)
METAL APPROACH RAILS
500 YR FLOOD EL.=253'
100 YR BASE FLOOD EL.=247'
RIM EL.=236.04'
GROUND EL.=233.41'
500 YR FLOOD EL.=252'100 YR BASE FLOOD EL.=246'RIM EL.=235.22'GROUND EL.=234.13'
36" HDPE
28 SY GEOTEXTILE
11 TONS
CLASS B RIP RAP
SEE DETAIL 6
EMBANKMENT
RIP RAP AT
SEE DETAIL 6
EMBANKMENT
RIP RAP AT
1201
EST 262 SY GEOTEXTILE
EST 87 TONS
CLASS B RIP RAP
SEE DETAIL 4
SPECIAL CUT DITCH
EST 25 SY GEOTEXTILE
EST 10 TONS
CLASS B RIP RAP
SEE DETAIL 3
TOE PROTECTION
EST 43 SY GEOTEXTILE
EST 15 TONS
CLASS B RIP RAP
SEE DETAIL 4
SPECIAL CUT DITCH
EST 262 SY GEOTEXTILE
EST 85 TONS
CLASS B RIP RAP
SEE DETAIL 4
SPECIAL CUT DITCH
EST 185 SY GEOTEXTILE
EST 65 TONS
CLASS B RIP RAP
SEE DETAIL 10
BERM DITCH
SEE DETAIL 11
DDE =8 CY
14' @ 0.71%
4' BASE TAIL DITCH
2:1D Flatter2:1 or
d
( Not to Scale)
SPECIAL CUT DITCH
FROM STA. 29+00 TO STA. 31+43 LT -L2-
FROM STA. 26+84 TO STA. 27+25 LT -L2-
FROM STA. 21+50 TO STA. 24+25 RT -L2-
DETAIL 4
Max. d=1 Ft.
Min. D=1 Ft.
Type of Liner= Class B Rip-Rap
Slope
Ditch
Front
Ground
Natural
Geotextile
EST 157 SY GEOTEXTILE
EST 53 TONS
CLASS B RIP RAP
SEE DETAIL 12
BERM DITCH
VAR.STAKESLOPE5.0'5.0'
D2:1LIMITSCLEARING( Not to Scale)
BERM DITCH
10.0' V.C.
FROM STA. 20+00 TO STA. 21+50 RT -L2-
6'
DETAIL 10
4'
Max. d=1.5 Ft.
Min. D=1 Ft.
Type of Liner= Class B Rip Rap
d
Geotextile
VAR.STAKESLOPE5.0'
D2:1LIMITSCLEARING( Not to Scale)
BERM DITCH
FROM STA. 27+50 TO STA. 29+00 LT -L2-
?
DETAIL 12
?
Max. d=1 Ft.
Min. D=1 Ft.
Type of Liner= Class B Rip Rap
d
Geotextile
GEOTEXTILE
EST 69 SY
EST 46 TONS
RIP RAP
CLASS II
GEOTEXTILE
EST 64 SY
TONS
EST 43
RIP RAP
CLASS II
ELEV: 232.76'
E: 2085915.929
N: 761861.471
( Not to Scale)
TOE PROTECTION
d
FLATTER2:1 OR
FROM STA. 24+90 TO STA. 25+05 RT -L2-
DETAIL 3
Type of Liner= Class B Rip-Rap
d=1 Ft.
GROUND
NATURAL SLOPE
FILL
GEOTEXTILE
( Not to Scale)
RIP RAP AT EMBANKMENT
FROM STA. 26+78 TO STA. 26+85 LT -L2-
FROM STA. 21+93 TO STA. 22+11 LT -L2-
DETAIL 6
Grade
Ditch
1.5'
GEOTEXTILE
Geotextile= 10 sy
Type of Liner= 4 TONS,CL I Rip-Rap
10'min.
1.0'min.
B
2:12:1D
( Not to Scale)
4' BASE TAIL DITCH
STA. 22+00 LT -L2-
DETAIL 11
B=4 Ft.
Min. D=1 Ft.
Ground
Natural
Ground
Natural
C
F
C
F
CF
C
F
C
F
C
F
C
CFFCFF6/22/2020
6/22/2020
225
225
225
225
225
225
225225
225225225225225225225230
230230
230
230
230
230230
230230230230230230230230235235235235235235235235 235
235
235
235 235235
240240240240240
240
240
240
240 240240
245245245245245
245
2
4
5
245
245
245
245
250250250250250
250
250 250 250250250
255255255255255
2
5
5
255
255
260260260260
260
260
260
265265
2 6 5
270
H14014.00
SCALE: 1"=30'
GREENWAY ENGINEER
HYDRAULICS ENGINEER
PROJECT NO.:
REVISIONS:
NO.DATE
919-996-4785
RALEIGH, NC 27601
SUITE 600
222 W. HARGETT ST,
RALEIGH MUNICIPAL BUILDING
CULTURAL RESOURCES
RECREATION and
PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com
T 919.380.8750
Raleigh, NC 27603
Suite 1100
223 West Street,
Firm License No. C-1051
LISA SCHIFFBAUER, PROJECT MANAGER
CONTACT:
Raleigh, NC 27606
VHB Engineering NC, P.C. (C-3705)
940 Main Campus Drive, Suite 500
ANILO
RAC HTRO
NLA
NOISSEFO
RPREENIGNEAND
REW
. O UNGYP
034407
SEAL
DATE: JUNE 22, 2020
W
(BOOK OF MAPS 1990, PAGE 410)40' SANITARY SEWER EASEMENT
(15.34 ACRES PER RECORDS)
PIN 0786-62-0033
DB 15551, PG 1993
SOUTHEAST, INC
HANSON AGGREGATES
N/F
MATCHLINE -L2- STA 37+50.00 SEE SHEET 1413MATCHLINE -L2- STA 29+50.00 SEE SHEET 12SEE SHEETS SD-1 THRU SD-16 FOR SIGNING, DELINEATION, AND AMENITIES
PROFESSIONA
LE
NG INEERNORTH CARO
LINA
SEAL
14101
J
HN M
. KAM P ATORH
SEE SHEET 24 FOR PROFILE -L2- STA. 29+50.00 TO 37+50.00
PC Sta. 29+61.58
3
0
+0
0
PRC Sta. 30+53.56
PCC Sta. 31+24.08
PRC Sta. 33+85.56
35+00
PRC Sta. 36+21.36
PT Sta. 37+32.54
PI Sta 30+08.66
D
L = 91.98'
T = 47.08'
R = 175.00'
PI Sta 30+89.79
D
L = 70.52'
T = 36.23'
R = 125.00'
PI Sta 32+61.26
D
L = 261.48'
T = 137.18'
R = 350.00'
PI Sta 35+08.13
D
L = 235.80'
T = 122.57'
R = 350.00'
PI Sta 36+77.43
D
L = 111.18'
T = 56.06'
R = 350.00'
3
1
+0
0
32+00
33+00
34+00
36+00
37+00
-L2-
-L2-
-L2- STA. 35+50.40
BEGIN BOARDWALK 4
END APPROACH SLAB
-L2- STA. 35+80.40
BEGIN APPROACH SLAB
END BOARDWALK 4
-L2- STA. 35+90.40
END APPROACH SLAB
-L2- STA. 35+40.40
BEGIN APPROACH SLAB
CRABTREE CREEK C/L
-L2- SUPERELEVATION INCREMENT SPACING IS 7.5' UNLESS OTHERWISE NOTED..02.0212'12'
(SEE DETAIL SHEET S-18)
WOOD APPROACH RAILS
500 YR FLOOD EL.=252'
100 YR BASE FLOOD EL.=246'
RIM EL.=235.22'
GROUND EL.=234.13'
500 YR FLOOD EL.=252'
100 YR BASE FLOOD EL.=246'
RIM EL.=247.78'
GROUND EL.=232.16'500 YR FLOOD EL.=251'
100 YR BASE FLOOD EL.=244'
RIM EL.=247.36'
GROUND EL.=232.32'
EST 315 SY GEOTEXTILE
EST 105 TONS
CLASS B RIP RAP
SEE DETAIL 4
SPECIAL CUT DITCH 2:1D Flatter2:1 or
d
( Not to Scale)
SPECIAL CUT DITCH
FROM STA. 29+00 TO STA. 31+43 LT. -L2-
FROM STA. 26+84 TO STA. 27+25 LT. -L2-
FROM STA. 21+50 TO STA. 24+25 RT. -L2-
DETAIL 4
Max. d=1 Ft.
Min. D=1 Ft.
Type of Liner= Class B Rip-Rap
Slope
Ditch
Front
Ground
Natural
Geotextile
ELEV: 231.05'
E: 2086060.499
N: 761646.008CFFC
C
C
F
C
F
F
F
F
C
C
C
F
C
F C
C
F
C
F
F
F
F
F
F C F F
F
6/22/2020
6/22/2020
225
225
225
2252
2
5
225225
225225225225225225225
225230230230
230
230
230
2
3
0
230230230
230
2302302
3
0230
230230
230230230230235235235235235
2
3
5235
235
235 235240240240240240
240
240
245245245
2
4
5
245
245
245
250250250250
250
255255
2
5
5
255
2602
6
0
265270H14014.00
SCALE: 1"=30'
GREENWAY ENGINEER
HYDRAULICS ENGINEER
PROJECT NO.:
REVISIONS:
NO.DATE
919-996-4785
RALEIGH, NC 27601
SUITE 600
222 W. HARGETT ST,
RALEIGH MUNICIPAL BUILDING
CULTURAL RESOURCES
RECREATION and
PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com
T 919.380.8750
Raleigh, NC 27603
Suite 1100
223 West Street,
Firm License No. C-1051
LISA SCHIFFBAUER, PROJECT MANAGER
CONTACT:
Raleigh, NC 27606
VHB Engineering NC, P.C. (C-3705)
940 Main Campus Drive, Suite 500
ANILO
RAC HTRO
NLA
NOISSEFO
RPREENIGNEAND
REW
. O UNGYP
034407
SEAL
DATE: JUNE 22, 2020
(BOOK OF MAPS 1990, PAGE 542)
20' SANITARY SEWER EASEMENT
(BOOK OF MAPS 1990, PAGE 410)
40' SANITARY SEW ER EASEMENT
LOT 290
PIN 0786-61-6334
BM 1969, PG 68
DB 8482, PG 1296
L. HUNTER TURNAGE
N/F
LOT 289
PIN 1786-61-7266
DB 9367, PG 1331
LORI ANN KING
CHARLES R. KING &
N/F
LOT 288
PIN 1786-61-9227
DB 10019, PG 313
KHALED A. HARFOUSH
N/F
LOT 287
PIN 0786-71-0351
DB 15666, PG 797
ELIZABETH ANN CRAIG
JOSHUA RAY CRAIG &
N/F
MATCHLINE -L2- STA 37+50.00 SEE SHEET 1314MATCHLINE -
L
2-
S
T
A
4
5
+
0
0.
0
0
S
E
E
S
HE
E
T
1
5
SEE SHEETS SD-1 THRU SD-16 FOR SIGNING, DELINEATION, AND AMENITIES
PROFESSIONA
LE
NG INEERNORTH CARO
LINA
SEAL
14101
J
HN M
. KAM P ATORH
SEE SHEET 25 FOR PROFILE -L2- STA. 37+50.00 TO 45+00.00
PC Sta. 39+53.11
4
0
+
0
038+0039+0011+00
44+00
-L2-
-L2-
PT Sta. 44+27.68
CRABTREE CREEK C/L.02.
0
2
-L2- SUPERELEVATION INCREMENT SPACING IS 7.5' UNLESS OTHERWISE NOTED.
-L2- SUPERELEVATION INCREMENT SPACING IS 7.5' UNLESS OTHERWISE NOTED.CRABTREE CREEK C/L12'12'
PI Sta 10+25.06
D
L = 50.00'
T = 25.06'
R = 300.00'
PI Sta 11+31.93
D
L = 54.69'
T = 28.05'
R = 100.00'
PI Sta 12+05.64
D
L = 93.87'
T = 47.07'
R = 500.00'
-L2_REV-
-L2- PC Sta. 43+50.00
-L2_REV- PT Sta. 12+52.44 =
PI Sta 43+88.92
L = 77.68'
T = 38.92'
R = 500.00'
D
R = 300.00'
T = 74.95'
L = 146.89'
PI Sta 40+28.06
D
-L2_REV- PC Sta. 10+00.00
-L2- PT Sta. 41+00.00 =
-L2_REV- PT Sta. 10+50.00
-L2_REV- PC Sta. 11+03.88
-L2_REV- PRC Sta. 11+58.57
12+00
-L2_REV-
-L2-
500 YR FLOOD EL.=252'
100 YR BASE FLOOD EL.=244'
RIM EL.=246.86'
GROUND EL.=232.30'
500 YR FLOOD EL.=252'
100 YR BASE FLOOD EL.=244'
RIM EL.=246.68'
GROUND EL.=231.22'
18" HDPE
18" HDPE
SEE DETAIL 6
EMBANKMENT
RIP RAP AT
SEE DETAIL 6
EMBANKMENT
RIP RAP AT
1401
1402
ELEV: 232.40'
E: 2086715.232
N: 761161.153
ELEV: 230.90'
E: 2086908.717
N: 761151.456
( Not to Scale)
RIP RAP AT EMBANKMENT
FROM STA. 42+84 TO STA. 42+97 RT -L2-
FROM STA. 39+11 TO STA. 39+26 RT -L2-
DETAIL 6
Grade
Ditch
1.5'
GEOTEXTILE
Geotextile= 10 sy
Type of Liner= 4 TONS,CL I Rip-Rap
10'min.
1.0'min.FFCCFCFFFCC
F
C
C
F
F
F
F
F
F
C
C
C
C
F
C
F
F
F
6/22/2020
6/22/2020
225225225225225225225225230230230230
2 3 0
230230230230230
2352
3
5 235235235235 2352 3 5235 235240240240240240240 240240240
245
245
245245245245245245245
245
250250250250
250250
2502502502552
5
5
255255255255255
255
255255260260260260260
260
265265265265
270270270275275280280280285H14014.00
SCALE: 1"=30'
GREENWAY ENGINEER
HYDRAULICS ENGINEER
PROJECT NO.:
REVISIONS:
NO.DATE
919-996-4785
RALEIGH, NC 27601
SUITE 600
222 W. HARGETT ST,
RALEIGH MUNICIPAL BUILDING
CULTURAL RESOURCES
RECREATION and
PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com
T 919.380.8750
Raleigh, NC 27603
Suite 1100
223 West Street,
Firm License No. C-1051
LISA SCHIFFBAUER, PROJECT MANAGER
CONTACT:
Raleigh, NC 27606
VHB Engineering NC, P.C. (C-3705)
940 Main Campus Drive, Suite 500
ANILO
RAC HTRO
NLA
NOISSEFO
RPREENIGNEAND
REW
. O UNGYP
034407
SEAL
DATE: JUNE 22, 2020
W
W
W
(BOOK OF MAPS 1990, PAGE 542)20' SANITARY SEWER EASEMENT(BOOK OF MAPS 1990, PAGE 410)40' SANITARY SEWER EASEMENTLOT 286
PIN 0786-71-1358
DB 15033, PG 273
CHARLES S. NICHOLS
JULIA G. HAFER &
N/F
LOT 285
PIN 0786-71-3423
DB 3161, PG 815
JOYE W. VOSHELL
ROBERT W. VOSHELL &
N/F
15
MATCHLINE -L2- STA 45+00.00 SEE SHEET 14
SEE SHEETS SD-1 THRU SD-16 FOR SIGNING, DELINEATION, AND AMENITIES
-L2- SUPERELEVATION INCREMENT SPACING IS 7.5' UNLESS OTHERWISE NOTED.PROFESSIONA
LE
NG INEERNORTH CARO
LINA
SEAL
14101
J
HN M
. KAM P ATORH
SEE SHEET 25 FOR PROFILE -L2- STA. 45+00.00 TO 46+90.95 AND -PLCON-OAK PARK ROAD-L2-
PC Sta. 45+90.21
PI Sta 46+09.39
D
L = 38.32'
T = 19.18'
R = 350.00'
PI Sta 46+77.78
D
L = 22.44'
T = 11.41'
R = 50.00'
PI Sta 47+03.95
D
L = 29.41'
T = 15.15'
R = 50.00'
PT Sta. 46+28.53
PC Sta. 46+66.36
PRC Sta. 46+88.81
PT Sta. 47+18.22
POT Sta. 47+83.07
46+0047+00-PLCON--L2-POT Sta. 10+00.00
PI Sta. 10+35.00
PI Sta. 11+90.00
PI Sta. 13+45.00CRABTREE CREEK C/L.02
.02
-L2- 47+18.22
END CONSTRUCTION
-L2- 46+90.95
TIE TO EXISTING ASPHALT GREENWAY
END ASPHALT PAVEMENT
POT Sta. 14+95.00
C/LCRABTREE CREEKPICARDY DRIVELINDSAY DRIVE
-PLCON- 10+20.00
BEGIN CONSTRUCTION
-PLCON- 14+85.00
END CONSTRUCTION
12'
-PLCON- STA. 10+29.92
BEGIN APPROACH SLAB
END DIRT PATH
-PLCON- 10+39.92
BEGIN BOARDWALK 5
END APPROACH SLAB
-PLCON- 12+08.92
BEGIN BRIDGE 5
-PLCON- 12+09.92
END BOARDWALK 5
-PLCON- 14+65.08
BEGIN APPROACH SLAB
END BOARDWALK 6
-PLCON- STA. 14+75.08
BEGIN DIRT PATH
END APPROACH SLAB
18'(TYP.)
8'8'
500 YR FLOOD EL.=251'
100 YR BASE FLOOD EL.=246'
RIM EL.=232.32'
GROUND EL.=231.31'
RETAIN
ELEV: 230.98'
E: 2087290.732
N: 761270.901
ELEV: 254.00'
E: 2087193.401
N: 761636.715
-PLCON- 13+10.08
BEGIN BOARDWALK 6
-PLCON- 13+11.08
END BRIDGE 5
TRAIL ACCESS
EXISTING 10' WIDE
DIRT PATH
DIRT PATH
772 SF
CONCRETE PAD
PROPOSED
FFCCFFFFCFCFCFFFF FFF6/22/2020
6/22/2020
H14014.00
SCALE: 1"=30'
GREENWAY ENGINEER
HYDRAULICS ENGINEER
PROJECT NO.:
REVISIONS:
NO.DATE
919-996-4785
RALEIGH, NC 27601
SUITE 600
222 W. HARGETT ST,
RALEIGH MUNICIPAL BUILDING
CULTURAL RESOURCES
RECREATION and
PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com
T 919.380.8750
Raleigh, NC 27603
Suite 1100
223 West Street,
Firm License No. C-1051
LISA SCHIFFBAUER, PROJECT MANAGER
CONTACT:
Raleigh, NC 27606
VHB Engineering NC, P.C. (C-3705)
940 Main Campus Drive, Suite 500
ANILO
RAC HTRO
NLA
NOISSEFO
RPREENIGNEAND
REW
. O UNGYP
034407
SEAL
DATE: JUNE 22, 2020
R=100'
R=5'R=3'
R=5'
R=226.97'
R=84.8'
R=5'
R=3'
R=5'R=37.5'
R=17.5'
R=23'
R=3'
R=3'
R=3'R=3'
R=5'
R=5'
R=15'
R=15'6'6'20.5'
20'14.5'14.5'34.5'54.5'54.5'54.5'54.5'34.5'10'
1
2
4
9
19
18
22
25
21
23
24
20
29
28
33
32
41 42
52
40
49
47
48
50
51
53
45
43
44
46
37
36
39
31
27
11
10
13
128
5
6
35
34
38
26
30
14
15
17
16
7
3
R=5'
(TYP.)8.5'
11'11'
11'5'5'(TYP.)19.8'
5'
TRUNCATED DOME PAVERS
2'x9'
TRUNCATED DOME PAVERS
2'x9'
DOME PAVERS
TRUNCATED
2'x9'
(TYP.)
CURB STOPS
CONCRETE
16
SCALE: 1"=20'
SEE SHEET 26 FOR -Y3- AND -HSW- PROFILE PROFESSIONA
LE
NG INEERNORTH CARO
LINA
SEAL
14101
J
HN M
. KAM P ATORHGREU TL-3PT Sta. 4+46.75
-H
SW
-15+00
TYPE-IIITYPE-III15+0014+00C
A
T-1-Y3- PT Sta. 11+65.55
-Y3- PC Sta. 11+17.54
-Y3- PT Sta. 10+94.47
-HSW- PT Sta. 11+94.00
-HSW- POT Sta. 10+00.00
-HSW- PI Sta. 11+27.42
-HSW- PC Sta. 11+61.68
-Y3- PC Sta. 10+39.23
-Y3- PC Sta. 12+70.78
-Y3- PT Sta. 12+82.20 -Y3- PT Sta. 15+71.26
-Y3- PC Sta. 15+48.47
6/22/2020
6/22/2020
235235 235235235235
235
235 235
235240240240240
240 240240
240
240
240240245245245
245245
245
245
245
245250250
250250
250
250
250
250255255
255255 255255 255
255 255255260260260
260
260260
260
265
265265265
265
2 6 5265 2
7
0
270270 270
2
7
5
275
275
2
7
5
280
2
8
0
2802802852
8
5
285
285
2
9
0
290 295300300
H14014.00
SCALE: 1"=30'
GREENWAY ENGINEER
HYDRAULICS ENGINEER
PROJECT NO.:
REVISIONS:
NO.DATE
919-996-4785
RALEIGH, NC 27601
SUITE 600
222 W. HARGETT ST,
RALEIGH MUNICIPAL BUILDING
CULTURAL RESOURCES
RECREATION and
PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com
T 919.380.8750
Raleigh, NC 27603
Suite 1100
223 West Street,
Firm License No. C-1051
LISA SCHIFFBAUER, PROJECT MANAGER
CONTACT:
Raleigh, NC 27606
VHB Engineering NC, P.C. (C-3705)
940 Main Campus Drive, Suite 500
ANILO
RAC HTRO
NLA
NOISSEFO
RPREENIGNEAND
REW
. O UNGYP
034407
SEAL
DATE: JUNE 22, 2020
W
LOT 111
PIN 0786-22-7860
BM 2008, PG 1009
DB 11903, PG 91
ASSOCIATION INC
UMSTEAD HOMEOWNERS
THE HAMPTONS AT
N/F
17
SEE SHEET 4MATCHLINE
SEE SHEETS SD-1 THRU SD-16 FOR SIGNING, DELINEATION, AND AMENITIES
PROFESSIONA
LE
NG INEERNORTH CARO
LINA
SEAL
14101
J
HN M
. KAM P ATORH
SEE SHEET 27 FOR -Y5- PROFILE
11+00
12+00
13+00
14+00
15+00
16+00
10+00
PC Sta. 10+09.19
PT Sta. 10+21.55
PT Sta. 10+49.63
PC Sta. 10+80.51
PT Sta. 11+30.40
PC Sta. 11+48.21
PT Sta. 11+76.82
PC Sta. 11+80.36
PT Sta. 12+12.86
PC Sta. 12+97.39
PT Sta. 13+81.00
PC Sta. 14+40.41
PT Sta. 15+03.14
PT Sta. 15+58.79
PC Sta. 15+42.37
PT Sta. 15+87.71
PC Sta. 15+77.54
PC Sta. 16+31.61
PT Sta.16+46.14
POT Sta.16+55.44
PC Sta. 10+33.93
PROFILE OF -Y5-
HORIZONTAL AND VERTICAL
SEE SHEET 12 & 12A FOR
-Y5-
-Y5-
CRABTREE CREEK C/LTYPE-IIIGREU TL-3POT
S
ta
. 19+00
.00
17+0018+00-EBCR-.02.02.
0
1
.00.01.02.02.01
.00
.01
.0
2
.0
2
.0
1
.0
0
.01.02
.02-Y5- SUPERELEVATION INCREMENT SPACING IS 10' UNLESS OTHERWISE NOTED.
-L1- SUPERELEVATION INCREMENT SPACING IS 7.5' UNLESS OTHERWISE NOTED.POYNER
ROAD
PCC Sta. 13+39.19
POT Sta. 10+00.00
(SEE DETAIL 6, SHEET 2C)
-Y5- STA. 10+00 4' RT
BEGIN VINYL SAFETY FENCE
(SEE DETAIL 6, SHEET 2C)
-Y5- STA. 11+47 4' RT
END VINYL SAFETY FENCE
(SEE DETAIL 6, SHEET 2C)
-Y5- STA. 12+50 4' RT
BEGIN VINYL SAFETY FENCE
(SEE DETAIL 6, SHEET 2C)
-Y5- STA. 13+25 4' RT
END VINYL SAFETY FENCE
SHEET 2C)4' RT (SEE DETAIL 6,
-Y5- STA. 14+53
SAFETY FENCEEND VINYL
(SEE DETAIL 6, SHEET 2C)
-Y5- STA. 13+75 4' LT
BEGIN VINYL SAFETY FENCEROADCHURCHEBENEZER(SEE DETAIL 1, SHEET 2C)
ACCESSIBLE RAMP
INSTALL ADA
6'
6'
(SEE DETAIL 8, SHEET 2C)
TO VALLEY GUTTER
INSTALL CURB TRANSITION
TO STA. 11+75 LT
FROM -Y5- STA. 10+35
EST. 145 SY
ROCK PLATING
500 YR FLOOD EL.=259'
100 YR BASE FLOOD EL.=257'
RIM EL.=UNKNOWN
GROUND EL.=252.90'
500 YR FLOOD EL.=257'
100 YR BASE FLOOD EL.=249'
RIM EL.=UNKNOWN
GROUND EL.=241.51'
500 YR FLOOD EL.=256'
100 YR BASE FLOOD EL.=249'
RIM EL.=246.74'
GROUND EL.=244.43'
500 YR FLOOD EL.=256'
100 YR BASE FLOOD EL.=249'
RIM EL.=UNKNOWN
GROUND EL.=249.06'
500 YR FLOOD EL.=257'
100 YR BASE FLOOD EL.=251'
RIM EL.=UNKNOWN
GROUND EL.=274.84'
500 YR FLOOD EL.=254'
100 YR BASE FLOOD EL.=248'
RIM EL.=UNKNOWN
GROUND EL.=290.55'
DI
15" HDPE
5 SY GEOTEXTILE
1 TON
CLASS B RIP RAP
SEE DETAIL 6
EMBANKMENT
RIP RAP AT
JB w/Slab Lid
7 SY GEOTEXTILE
2 TONS
CLASS B RIP RAP
15" HDPE
AND TIE TO JB
SECTION OF 15" CSP
REPLACE DAMAGED
SEE DETAIL 5
DDE =4 CY
20' @ 1.50%
2' BASE TAIL DITCH
( Not to Scale)
RIP RAP AT EMBANKMENT
FROM -Y5- STA. 12+91 TO STA. 12+99 RT
DETAIL 6
Grade
Ditch
1.5'
GEOTEXTILE
Geotextile= 10 sy
Type of Liner= 4 TONS,CL I Rip-Rap
10'min.
1.0'min.
0408
0407
0401
0402
B
2:12:1D
( Not to Scale)
2' BASE TAIL DITCH
-Y5- STA. 11+31 TO STA. 11+50 RT
DETAIL 5
B=2 Ft.
Min. D=1 Ft.
Ground
Natural
Ground
Natural
= 12.36'
PI Sta 10+16.30
D
D
L
T = 7.11'
R = 10.00'
= 15.70'
PI Sta 10+42.21
D
D
L
T = 8.28'
R = 20.00'
PI Sta 11+07.21
D
D
L = 49.90'
T = 26.70'
R = 56.53'
= 28.61'
PI Sta 11+65.59
D
D
L
T = 17.38'
R = 20.00'
= 32.51'
PI Sta 11+96.87
D
D
L
T = 16.51'
R = 75.00'
PI Sta 13+25.06
D
D
L = 41.80'
T = 27.67'
R = 25.00'
PI Sta 13+66.86
D
D
L = 41.80'
T = 27.67'
R = 25.00'
= 62.73'
PI Sta 91+75.49
D
D
L
T = 7,735.08'
R = 20.00'
= 16.43'
PI Sta 15+50.79
D
D
L
T = 8.43'
R = 30.00'
= 5.13'
PI Sta 15+82.67
D
D
L = 10.17'
T
R = 30.00'
PI Sta 16+39.51
D
D
L = 14.53'
T = 7.89'
R = 15.00'
-Y5-
F
C CFC
F
C
F
C
F FFCCCCFFFFCC
C
C
F
F
F
FC CCCC 6/22/2020
6/22/2020
240270H14014.00
SCALE: 1"=30'
GREENWAY ENGINEER
HYDRAULICS ENGINEER
PROJECT NO.:
REVISIONS:
NO.DATE
LISA POTTS, PROJECT MANAGER
CONTACT:GREENWAYCRABTREE CREEK WEST 919-996-4785
RALEIGH, NC 27601
SUITE 600
222 W. HARGETT ST,
RALEIGH MUNICIPAL BUILDING
CULTURAL RESOURCES
RECREATION and
PARKS,EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com
T 919.380.8750
Raleigh, NC 27603
Suite 1100
223 West Street,
Firm License No. C-1051
Raleigh, NC 27606
VHB Engineering NC, P.C. (C-3705)
940 Main Campus Drive, Suite 500
ANILO
RAC HTRO
NLA
NOISSEFO
RPREENIGNEAND
REW
. O UNGYP
034407
SEAL
DATE: JUNE 22, 2020
EL. = 245.11
-L1- STA. 4+12.68
MATCH EXISTING PATH
BEGIN GRADE
8.9' CLEAR
CHURCH RD
EBENEZER
PI = 5+58.33
EL = 237.83'(-)5.
0
00
0%
VC = 90'
PI = 8+83.33
EL = 239.61'
(+)0.5500%(-)0.9000%
VC = 20'
-L1- STA. 10+88.33
BEGIN BOARDWALK 1
-L1- STA. 11+18.33
END BOARDWALK 1
CL OF GREENWAY
EXISTING GRADE AT
CL OF GREENWAY
PROPOSED GRADE AT
(+) 2.1000%
EL. = 233.60
STA. 11+25.00
BEGIN DITCH RT.
18" HDPE
4 5 6 7 8 9 10 11
230
240
250
260
230
240
250
260
SEE SHEET 4 FOR HORIZONTAL ALIGNMENT OF -L1- STA. 4+12.68 TO 11+50.00MATCHLINE -L1- STA. 11+50.00 SEE BELOW-L1-
PI = 11+83.33
EL = 236.91'
(-)0.9000%(+)0.5000%
VC = 30'
PI = 12+78.33
EL = 237.39'
(+)0.5000%(-)1.1050%
VC = 40'
PI = 14+13.33
EL = 235.90'
(-)1.1050%(+)2.7000%
VC = 70'
PI = 15+48.33
EL = 239.54'
(+)2.7000%(-)3
.8000%
VC = 30'
PI = 16+08.33
EL = 237.26'(-)3
.8000%
(+)0.3515%
VC = 70'
-L1- STA. 14+80.25
BEGIN BRIDGE 1
-L1- STA. 15+32.41
END BRIDGE 1
CL OF GREENWAY
EXISTING GRADE AT
CL OF GREENWAY
PROPOSED GRADE AT
El = 234.125
(+) 0.5000%El = 235.00(+) 0.5000%
(+) 1.0000%
(+) 0.5000%
PI =11+50.00
EL. = 235.50STA. 14+25.00END DITCH RT.EL. = 236.50STA. 18+00.00END DITCH RT.PI =16+50.00EL. = 234.41
STA. 15+32.00
BEGIN DITCH RT.EL. = 234.50STA. 16+00.00BEGIN DITCH LT.12 13 14 15 16 17 18 19
220
230
240
250
260
220
230
240
250
260
MATCHLINE -L1- STA. 11+50.00 SEE ABOVEMATCHLINE -L1- STA. 19+00.00 SEE SHEET 19PROFESSIONA
LE
NG INEERNORTH CARO
LINA
SEAL
14101
J
HN M
. KAM P ATORH
18
SEE SHEET 5 FOR HORIZONTAL ALIGNMENT OF -L1- STA. 11+50.00 TO 19+00.00
-L1-
STA 14+88 -L-
Type of Liner= CLASS II RIPRAP
STA 15+23 -L-
R = 75.00'R = 50.00'R = 75.00'R = 75.00'R = 200.00'
6/22/2020
6/22/2020
H14014.00
SCALE: 1"=30'
GREENWAY ENGINEER
HYDRAULICS ENGINEER
PROJECT NO.:
REVISIONS:
NO.DATE
LISA POTTS, PROJECT MANAGER
CONTACT:GREENWAYCRABTREE CREEK WEST 919-996-4785
RALEIGH, NC 27601
SUITE 600
222 W. HARGETT ST,
RALEIGH MUNICIPAL BUILDING
CULTURAL RESOURCES
RECREATION and
PARKS,EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com
T 919.380.8750
Raleigh, NC 27603
Suite 1100
223 West Street,
Firm License No. C-1051
Raleigh, NC 27606
VHB Engineering NC, P.C. (C-3705)
940 Main Campus Drive, Suite 500
ANILO
RAC HTRO
NLA
NOISSEFO
RPREENIGNEAND
REW
. O UNGYP
034407
SEAL
DATE: JUNE 22, 2020
220
230
240
250
260
220
230
240
250
260
19 20 21 22 23 24 25 26 27
-L1- SUPERELEVATION INCREMENT SPACING IS 7.5' UNLESS OTHERWISE NOTED.
SEE SHEETS SD-1 THRU SD-16 FOR SIGNING, DELINEATION, AND AMENITIES
MATCHLINE -L1- STA. 19+00.00 SEE SHEET 18MATCHLINE -L1- STA. 27+00.00 SEE BELOWPI = 23+55.00
EL = 241.66'
VC = 30'
PI = 24+05.00
EL = 239.66'
VC = 70'
(+)1.2000%(-)4
.00
0
0%
(+)0.5000%
PI = 20+65.00
EL = 238.87'
(+)0.3515%
VC = 50'
PI = 21+35.00
EL = 241.18'
(+)3.3000%(-)1.5000%
VC = 80'
PI = 22+15.00
EL = 239.98'
(+)1.2000%
VC = 50'
CL OF GREENWAY
EXISTING GRADE AT
CL OF GREENWAY
PROPOSED GRADE AT
El = 238.80(+) 0.5000%
(+) 0.8000%El = 240.00(+) 0.5000%
(+) 0.5000%PI =26+50.00PI =25+00.00EL. = 237.98
STA. 23+37.00
BEGIN DITCH RT.EL. = 238.50STA. 22+00.00END DITCH LT.EL. = 238.16STA. 23+32.00BEGIN DITCH LT.EL. = 239.00STA. 25+00.00END DITCH LT.EL. = 236.50PI =20+00.00(+) 1.0000%
-L1- STA. 22+82.92
BEGIN BRIDGE 2
-L1- STA. 23+35.08
END BRIDGE 2
PI = 28+25.00
EL = 241.76'
VC = 20'
PI = 29+30.00
EL = 243.23'
VC = 20'
PI = 31+55.00
EL = 242.67'
VC = 30'
(+)0.5000%(+)1.4000%
(+)1.4000%(-)0.2500%(-)0.2500%
(+)1.3000%
-L1- STA. 31+13.00
BEGIN BOARDWALK 2
-L1- STA. 31+33.00
END BOARDWALK 2
CL OF GREENWAY
EXISTING GRADE AT
CL OF GREENWAY
PROPOSED GRADE AT
El = 241.20(+) 0.6000%
(+) 1.0000%El = 242.20(-) 0.5000%
(+) 1.2000%EL. = 241.35STA. 31+20.00END DITCH RT.EL. = 241.30
STA. 31+25.00
BEGIN DITCH LT.PI =29+50.00PI =28+50.00230
240
250
27 28 29 30 31 32 33
230
240
250
220
260
220
260
MATCHLINE -L1- STA 33+00.00 SEE SHEET 20MATCHLINE -L1- STA 27+00.00 SEE ABOVEPROFESSIONA
LE
NG INEERNORTH CARO
LINA
SEAL
14101
J
HN M
. KAM P ATORH
19
SEE SHEET 6 FOR HORIZONTAL ALIGNMENT OF -L1- STA. 19+00.00 TO 27+00.00
SEE SHEET 7 FOR HORIZONTAL ALIGNMENT OF -L1- STA. 27+00.00 TO 33+00.00
-L1-
-L1-
6/22/2020
6/22/2020
H14014.00
SCALE: 1"=30'
GREENWAY ENGINEER
HYDRAULICS ENGINEER
PROJECT NO.:
REVISIONS:
NO.DATE
LISA POTTS, PROJECT MANAGER
CONTACT:GREENWAYCRABTREE CREEK WEST 919-996-4785
RALEIGH, NC 27601
SUITE 600
222 W. HARGETT ST,
RALEIGH MUNICIPAL BUILDING
CULTURAL RESOURCES
RECREATION and
PARKS,EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com
T 919.380.8750
Raleigh, NC 27603
Suite 1100
223 West Street,
Firm License No. C-1051
Raleigh, NC 27606
VHB Engineering NC, P.C. (C-3705)
940 Main Campus Drive, Suite 500
ANILO
RAC HTRO
NLA
NOISSEFO
RPREENIGNEAND
REW
. O UNGYP
034407
SEAL
DATE: JUNE 22, 2020
PI = 34+35.00
EL = 246.31'
VC = 20'
(+)1.3000%
-L1- STA. 34+61.92
BEGIN BRIDGE 3
-L1- STA. 35+04.08
END BRIDGE 3
CL OF GREENWAY
EXISTING GRADE AT
CL OF GREENWAY
PROPOSED GRADE AT
EL. = 244.00
STA. 33+50
END DITCH LT.
CL OF GREENWAY
EXISTING GRADE AT
CL OF GREENWAY
PROPOSED GRADE AT
-L1- STA. 39+79.83
BEGIN BOARDWALK 3
(-)0.8786%
PI = 36+23.35
EL = 244.65'
VC = 129'
PI = 37+95.22
EL = 252.82'
VC = 40'
VC = 20'
EL = 251.98'
PI = 37+53.00
(+)5.6500%
(+)2.0000%
(+)8.3300%
(+)2.0000%
VC = 20'
EL = 265.98'
PI = 39+53.21 (+)3.0000%(+)4.0000%(+)5.0000%(+)6.0000%
PI = 40+01.84
EL = 266.95'
PI = 40+21.84
EL = 267.55'
PI = 40+41.84
EL = 268.35'
PI = 40+61.84
EL = 269.35'
33 34 35 36 37 38 39
240
250
260
270
240
250
260
270
40 41MATCHLINE -L1- STA. 41+00.00 SEE SHEET 21SEE SHEET 8A FOR PROFILE -L1- STA. 41+00.00 TO 55+00.00
SEE SHEETS SD-1 THRU SD-16 FOR SIGNING, DELINEATION, AND AMENITIES
MATCHLINE -L1- STA. 33+00.00 SEE SHEET 19PROFESSIONA
LE
NG INEERNORTH CARO
LINA
SEAL
14101
J
HN M
. KAM P ATORH
20
SEE SHEET 8 FOR HORIZONTAL ALIGNMENT OF -L1- STA. 33+00.00 TO 55+00.00
-L1-
6/22/2020
6/22/2020
CL OF GREENWAY
PROPOSED GRADE AT
VERTICAL CLEARANCE = 20.95'MAX PIER HEIGHT = 26.51'CL OF GREENWAY
EXISTING GRADE AT
CL OF GREENWAY
PROPOSED GRADE AT
BELOW
PROPOSED GREENWAY
-L1- STA. 42+81.83
END BOARDWALK 3
(+)5.0000%(+)4.0000%(+)6.0000%
(+)3.0000%
(+)8.3300%
(+)2.0000%
(+)8.3300%
EL. = 309.90
STA. 47+50
END DITCH LT.
(+) 0.8000%
PI =46+50.000
El = 309.10
(+) 4.4000%
PI =46+00.000
El = 306.90
(+) 1.2000%PI =45+50.000El = 306.30(+) 9.2000%PI =44+75.000El = 299.40(+) 6.4000%PI =44+25.000El = 296.20(+) 8.8000%El = 291.80PI =43+75.000(+) 13.6000%PI =43+50.000El = 288.40(+) 18.8000%
(+) 12.5000%PI =43+00.000El = 279.00EL. = 276.00
STA. 42+76
END DITCH LT.
CL OF GREENWAY
EXISTING GRADE AT
CL OF GREENWAY
PROPOSED GRADE AT
(+)2.0000%
(+)8.0000%
(+)2.0000%
(+)7.0000%
(+)2.0000%
PI = 54+35.35
EL = 335.92'
VC = 40'
PI = 53+95.35
EL = 335.12'
VC = 20'
PI = 52+02.09
EL = 321.59'
VC = 210'
VC = 200'
(+)2.0000%
PI = 47+16.88
EL = 311.89'
H14014.00
SCALE: 1"=30'
GREENWAY ENGINEER
HYDRAULICS ENGINEER
PROJECT NO.:
REVISIONS:
NO.DATE
LISA POTTS, PROJECT MANAGER
CONTACT:GREENWAYCRABTREE CREEK WEST 919-996-4785
RALEIGH, NC 27601
SUITE 600
222 W. HARGETT ST,
RALEIGH MUNICIPAL BUILDING
CULTURAL RESOURCES
RECREATION and
PARKS,EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com
T 919.380.8750
Raleigh, NC 27603
Suite 1100
223 West Street,
Firm License No. C-1051
Raleigh, NC 27606
VHB Engineering NC, P.C. (C-3705)
940 Main Campus Drive, Suite 500
ANILO
RAC HTRO
NLA
NOISSEFO
RPREENIGNEAND
REW
. O UNGYP
034407
SEAL
DATE: JUNE 22, 2020
41 42 43 44 45
330
340
310
320
330
340 MATCHLINE -L1- STA. 47+50.00 SEE BELOWMATCHLINE -L1- STA. 47+50.00 SEE ABOVESEE SHEET 8 FOR HORIZONTAL ALIGNMENT OF -L1- STA. 33+00.00 TO 55+00.00
48 50
250
300
310
260
270
280
290
5453525149
46 47
250
300
310
260
270
280
290
-L1-
-L1-PROFESSIONA
LE
NG INEERNORTH CARO
LINA
SEAL
14101
J
HN M
. KAM P ATORH
21SEE SHEET 22MATCHLINE -L1- STA 55+00.00MATCHLINE -L1- STA. 41+00.00 SEE SHEET 20VC = 20'
VC = 20'
VC = 30'
PI = 41+21.84
EL = 272.95'
PI = 41+41.84
EL = 273.95'
PI = 41+61.84
EL = 274.75'
EL = 275.35'
PI = 41+81.84
PI = 45+25.34
EL = 295.93'PI = 44+95.24
EL = 295.33'
PI = 42+96.83
EL = 278.80'
6/22/2020
6/22/2020
H14014.00
SCALE: 1"=30'
GREENWAY ENGINEER
HYDRAULICS ENGINEER
PROJECT NO.:
REVISIONS:
NO.DATE
LISA POTTS, PROJECT MANAGER
CONTACT:GREENWAYCRABTREE CREEK WEST 919-996-4785
RALEIGH, NC 27601
SUITE 600
222 W. HARGETT ST,
RALEIGH MUNICIPAL BUILDING
CULTURAL RESOURCES
RECREATION and
PARKS,EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com
T 919.380.8750
Raleigh, NC 27603
Suite 1100
223 West Street,
Firm License No. C-1051
Raleigh, NC 27606
VHB Engineering NC, P.C. (C-3705)
940 Main Campus Drive, Suite 500
ANILO
RAC HTRO
NLA
NOISSEFO
RPREENIGNEAND
REW
. O UNGYP
034407
SEAL
DATE: JUNE 22, 2020
CL OF GREENWAY
PROPOSED GRADE AT
CL OF GREENWAY
EXISTING GRADE AT
PI = 55+70.35
EL = 346.72'
VC = 80'
(-)2.2000%
(+)0.9500%(-)5.0000%
PI = 59+77.11
EL = 339.93'
VC = 120'
VC = 44'
PI = 58+72.16
EL = 345.18'
PI = 57+10.35
EL = 343.64'
VC = 60'
24" HDPE
24" HDPE
(+)7.0001%
(+)8.0000%
320
330
340
350
360
320
330
340
350
360
MATCHLINE -L1- STA 55+00.00 SEE SHEET 21SEE SHEETS SD-1 THRU SD-16 FOR SIGNING, DELINEATION, AND AMENITIES
-L1- SUPERELEVATION INCREMENT SPACING IS 7.5' UNLESS OTHERWISE NOTED.
55 56 57 58 59 60 MATCHLINE -L1- STA 60+50.00 SEE BELOWCL OF GREENWAY
EXISTING GRADE AT
CL OF GREENWAY
PROPOSED GRADE AT
EL. = 365.15
-L1- STA. 63+70.29
MATCH EXISTING PATH
END GRADE
(+)8.0000%
(+)2.0000%
(+)7.0001%
PI = 62+00.35
EL = 351.56'
VC = 100'
PI = 61+20.34
EL = 349.96'
VC = 50'
330
340
350
360
370
330
340
350
360
370
60 61 62 63MATCHLINE -L1- STA 60+50.00 SEE SHEET 9PROFESSIONA
LE
NG INEERNORTH CARO
LINA
SEAL
14101
J
HN M
. KAM P ATORH
22
SEE SHEET 9 FOR HORIZONTAL ALIGNMENT OF -L1- STA. 55+00.00 TO 60+50.00
SEE SHEET 10 FOR HORIZONTAL ALIGNMENT OF -L1- STA. 60+50.00 TO 63+70.29
-L1-
-L1-
6/22/2020
6/22/2020
BRIDGES
DURALEIGH RD.
36.6' CLEAR TO
CL OF GREENWAY
EXISTING GRADE AT
CL OF GREENWAY
PROPOSED GRADE AT
PI = 18+11.00
EL = 233.97'
(-)0.4000%
VC = 200'EL. = 239.60STA. 20+00.00BEGIN DITCH RT.(-) 10.0000%(-) 0.4000%PI =20+25.00El = 237.10PI =20+50.00El = 237.00(-)
4
.
8
0
0
0%PI =21+00.00El = 234.60(-) 2.4000%El = 233.40PI =21+50.00PI = 12+80.00
EL = 261.96'
(-
)8.0000%(-)2.0000%
VC = 40'
PI = 13+20.00
EL = 261.16'
(-
)8.0000%VC = 20'
PI = 14+60.00
EL = 249.96'
(-
)8.0000%(-)2.0000%
VC = 100'
PI = 16+61.52
EL = 245.93'
VC = 50'
CL OF GREENWAY
EXISTING GRADE AT
CL OF GREENWAY
PROPOSED GRADE AT
(-
)8.0000%EL. = 277.91
-L2- STA. 10+80.60
MATCH EXISTING PATH
BEGIN GRADE
H14014.00
SCALE: 1"=30'
GREENWAY ENGINEER
HYDRAULICS ENGINEER
PROJECT NO.:
REVISIONS:
NO.DATE
LISA POTTS, PROJECT MANAGER
CONTACT:GREENWAYCRABTREE CREEK WEST 919-996-4785
RALEIGH, NC 27601
SUITE 600
222 W. HARGETT ST,
RALEIGH MUNICIPAL BUILDING
CULTURAL RESOURCES
RECREATION and
PARKS,EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com
T 919.380.8750
Raleigh, NC 27603
Suite 1100
223 West Street,
Firm License No. C-1051
Raleigh, NC 27606
VHB Engineering NC, P.C. (C-3705)
940 Main Campus Drive, Suite 500
ANILO
RAC HTRO
NLA
NOISSEFO
RPREENIGNEAND
REW
. O UNGYP
034407
SEAL
DATE: JUNE 22, 2020
230
240
250
260
270
280
290
230
240
250
260
270
280
290
220
230
240
250
260
240
250
260
18 19 20 21
10 11 12 13 14 15 16 17 18
-L2-
-L2-MATCHLINE -L2- STA 18+00.00 SEE ABOVEMATCHLINE -L2- STA 18+00.00 SEE BELOWSEE SHEET 11 FOR HORIZONTAL ALIGNMENT -L2- STA. 10+80.60 TO 21+50.00 PROFESSIONA
LE
NG INEERNORTH CARO
LINA
SEAL
14101
J
HN M
. KAM P ATORH
23MATCHLINE -L2- STA 21+50.00 SEE SHEET 246/22/2020
6/22/2020
H14014.00
SCALE: 1"=30'
GREENWAY ENGINEER
HYDRAULICS ENGINEER
PROJECT NO.:
REVISIONS:
NO.DATE
LISA POTTS, PROJECT MANAGER
CONTACT:GREENWAYCRABTREE CREEK WEST 919-996-4785
RALEIGH, NC 27601
SUITE 600
222 W. HARGETT ST,
RALEIGH MUNICIPAL BUILDING
CULTURAL RESOURCES
RECREATION and
PARKS,EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com
T 919.380.8750
Raleigh, NC 27603
Suite 1100
223 West Street,
Firm License No. C-1051
Raleigh, NC 27606
VHB Engineering NC, P.C. (C-3705)
940 Main Campus Drive, Suite 500
ANILO
RAC HTRO
NLA
NOISSEFO
RPREENIGNEAND
REW
. O UNGYP
034407
SEAL
DATE: JUNE 22, 2020
22 23 24 25 26 27 28 29
220
230
240
250
260
MATCHLINE -L2- STA. 21+50.00 SEE SHEET 23SEE SHEETS SD-1 THRU SD-16 FOR SIGNING, DELINEATION, AND AMENITIES
220
230
240
250
260
SEE SHEET 1I FOR RIGHT-OF-ENTRY AGREEMENT
MATCHLINE -L2- STA. 29+50.00 SEE BELOWCL OF GREENWAY
EXISTING GRADE AT
CL OF GREENWAY
PROPOSED GRADE AT
PI = 24+51.49
EL = 241.00'
(+)0.0000%
VC = 50'
PI = 27+57.03
EL = 241.00'
(-
)3
.0000%
VC = 40'
(-
)3
.0000%
PI = 22+17.63
EL = 232.35'
(-)0.4000%(+)3.7000%
VC = 250'
36" HDPEEl = 233.40El = 233.40PI =21+50.00(-) 8.8000%PI =22+00.00
El = 229.00
(+) 1.6000%PI =23+25.00El = 231.00(+) 8.0000%PI =24+00.00El = 237.00(+) 8.4000%EL. = 239.10STA. 24+25END DITCH RT.(+) 6.2500%El = 231.00PI =27+00.00EL. = 230.00
STA. 26+84.00
BEGIN DITCH LT.(+) 36.0000%(+) 20.0000%
EL. = 255.99
STA. 27+50.00
BEGIN DITCH LT.(-) 6.2300%(-) 15.3200
%El = 254.43PI =27+75.000(-)
1
0.
9
2
0
0
%(-) 19.5400%PI =28+00.000El = 250.60PI =28+25.000El = 247.88PI =28+50.000El = 242.99PI =28+75.000El = 238.81(-) 14.8400
%(-) 16.7200
%(-) 3
.6000%PI =29+00.000El = 235.10PI =29+25.000El = 234.20CLEARANCE
VERTICAL
6'
EL. = 236.32
-L2- STA. 23+24.33
-L2- STA. 23+24.33=
-L2- STA. 25+00.37
BEGIN BRIDGE 4
-L2- STA. 27+15.37
END BRIDGE 4
48" SANITARY SEWER PIPE
EL. = 240.00
STA. 27+25.00
END DITCH LT.
CL OF GREENWAY
EXISTING GRADE AT
CL OF GREENWAY
PROPOSED GRADE AT
PI = 29+40.12
EL = 235.51'
(-)1.7000%
VC = 50'
PI = 32+10.40
EL = 230.91'
(-)1.7000%(+)0.7500%
VC = 100'
PI = 34+95.40
EL = 233.05'
(+)0.7500%(-)0.5500%
VC = 50'
(-) 1.6000%PI =31+25.000El = 231.00-L2- STA. 35+80.40
END BOARDWALK 4
-L2- STA. 35+50.40
BEGIN BOARDWALK 4
EL = 230.20STA. 31+43.00END DITCH LT.(-) 4.4444%
220
230
240
250
210
250
240
230
220
210
30 31 32 33 34 35 36 37 MATCHLINE -L2- STA 37+50.00 SEE SHEET 25SEE SHEETS SD-1 THRU SD-16 FOR SIGNING, DELINEATION, AND AMENITIES
MATCHLINE -L2- STA 29+50.00 SEE SHEET ABOVEPROFESSIONA
LE
NG INEERNORTH CARO
LINA
SEAL
14101
J
HN M
. KAM P ATORH
24
SEE SHEET 12 FOR HORIZONTAL ALIGNMENT OF -L1- STA. 21+50.00 TO 29+50.00
SEE SHEET 13 FOR HORIZONTAL ALIGNMENT OF -L1- STA. 29+50.00 TO 37+50.00
-L2-
-L2-
6/22/2020
6/22/2020
H14014.00
SCALE: 1"=30'
GREENWAY ENGINEER
HYDRAULICS ENGINEER
PROJECT NO.:
REVISIONS:
NO.DATE
LISA POTTS, PROJECT MANAGER
CONTACT:GREENWAYCRABTREE CREEK WEST 919-996-4785
RALEIGH, NC 27601
SUITE 600
222 W. HARGETT ST,
RALEIGH MUNICIPAL BUILDING
CULTURAL RESOURCES
RECREATION and
PARKS,EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com
T 919.380.8750
Raleigh, NC 27603
Suite 1100
223 West Street,
Firm License No. C-1051
Raleigh, NC 27606
VHB Engineering NC, P.C. (C-3705)
940 Main Campus Drive, Suite 500
ANILO
RAC HTRO
NLA
NOISSEFO
RPREENIGNEAND
REW
. O UNGYP
034407
SEAL
DATE: JUNE 22, 2020
CL OF GREENWAY
EXISTING GRADE AT
CL OF GREENWAY
PROPOSED GRADE AT
(-)0.5500%(+)1.2000%
(+)1.2000%(-)0.5000%
18" HDPE
PI = 44+85.00
EL = 230.16'
(-)0.5000%
VC = 80'
PI = 10+85.00
EL = 231.66'
(-)0.5000%
(-)1.2756%
PI = 11+35.00
EL = 231.03'
(-)1.2756%(+)0.3000%
PI = 11+85.00
EL = 231.18'
(+)0.3000%(-)0.5000%
18" HDPE
CL OF GREENWAY
EXISTING GRADE AT
220
230
240
250
210
220
230
240
250
210
38 39 40 44MATCHLINE -L2- STA 37+50.00 SEE SHEET 24SEE SHEETS SD-1 THRU SD-16 FOR SIGNING, DELINEATION, AND AMENITIES
451112
EL. =230.84
-L2- = 43+50.00
-L2_REV- = 12+52.44
EL. = 232.09
-L2_REV- = 10+00.00
-L2- = 41+00.00
MATCHLINE -L2- STA 45+00.00 SEE BELOWPI = 37+90.40
EL = 231.43'
VC = 100'
PI = 39+20.40
EL = 232.99'
VC = 150'
VC = 40'
VC = 60'
VC = 40'
-L2--L2--L2_REV-
EL. = 250.36
-PLCON- STA. 14+85.00
END GRADE
EL. = 240.71
-PLCON- STA. 10+20.00
BEGIN GRADE
-PLCON- STA. 10+39.92
BEGIN BOARDWALK 5
-PLCON- STA. 14+65.08
END BOARDWALK 6
CLEARANCE
VERTICAL
9' SEWERSANITARYSEWERSANITARYCLEARANCE
VERTICAL
8'
-L2-
PI = 13+48.00
EL = 245.67'
PI = 14+00.00
EL = 247.38'(+)4.00%
(+)3.00%
(+)1.50%
(+)1.50%
PI = 10+30.00
EL = 240.90'
(+)1.98%
PI = 14+65.00
EL = 249.83'(+)2.64%EL. = 243.60
-PLCON- STA. 12+08.92
BEGIN BRIDGE 5 *
EL. = 243.60
-PLCON- STA. 12+09.92
END BOARDWALK 5 *
EL. = 245.10
-PLCON- STA. 13+10.08
BEGIN BOARDWALK 6 *
EL. = 245.10
-PLCON- STA. 13+11.08
END BRIDGE 5 *
* BOARDWALK & BRIDGE OVERLAP ONE FOOT.
CL OF GREENWAY
EXISTING GRADE AT
CL OF GREENWAY
PROPOSED GRADE AT
EL. = 231.79
-L2- STA. 46+90.95
TIE TO EXISTING GREENWAY
END GRADE-PLC0N-(+)1.4095%
PI = 46+00.00
EL = 231.79'
(+)1.4095%(+)0.0000%
VC = 150'
46 47 1045
220
230
240
250
220
230
240
250
MATCHLINE -L2- STA 45+00.00 SEE SHEET 14
220
230
240
250
11 12 13 14 15
SEE SHEETS SD-1 THRU SD-16 FOR SIGNING, DELINEATION, AND AMENITIES
-L2- SUPERELEVATION INCREMENT SPACING IS 7.5' UNLESS OTHERWISE NOTED.MATCHLINE -L2- STA 45+00.00 SEE ABOVEPROFESSIONA
LE
NG INEERNORTH CARO
LINA
SEAL
14101
J
HN M
. KAM P ATORH
25
SEE SHEET 14 FOR HORIZONTAL ALIGNMENT OF -L2- STA. 37+50.00 TO 45+00.00
SEE SHEET 15 FOR HORIZONTAL ALIGNMENT OF -L2- STA. 45+00.00 TO 46+90.95 AND -PLCON-
-PLCON--L2-
6/22/2020
6/22/2020
EL. = 263.53
-HSW- STA. 11+94.00
END GRADEPI = 10+15.50
EL = 271.67'
(-)0.5000%
VC = 10'
PI = 11+68.72
EL = 265.85'(-)3
.8000%
(-)9.1801%VC = 40'
EL. = 271.71
-HSW- STA. 10+08.77
BEGIN GRADE
18" HDPE
CL OF GREENWAY
PROPOSED GRADE AT
CL OF GREENWAY
EXISTING GRADE AT
EL. = 265.41
-Y3- STA. 10+00.00
BEGIN GRADE
PI = 10+35.00
EL = 264.51'
(-)2
.5584%
(-)
1
1.
0
0
0
0
%VC = 40'
PI = 11+65.00
EL = 250.21'
(-
)8.5000%VC = 50'
PI = 12+79.39
EL = 240.49'
(-)0.0750%
VC = 100'
PI = 15+45.39
EL = 240.29'
(-)0.0750%
(-)2.0000%
VC = 100'
CL OF GREENWAY
EXISTING GRADE AT
CL OF GREENWAY
PROPOSED GRADE AT
EL. = 239.27
-Y3- STA. 15+96.43
END GRADE
H14014.00
SCALE: 1"=30'
GREENWAY ENGINEER
HYDRAULICS ENGINEER
PROJECT NO.:
REVISIONS:
NO.DATE
LISA POTTS, PROJECT MANAGER
CONTACT:GREENWAYCRABTREE CREEK WEST 919-996-4785
RALEIGH, NC 27601
SUITE 600
222 W. HARGETT ST,
RALEIGH MUNICIPAL BUILDING
CULTURAL RESOURCES
RECREATION and
PARKS,EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com
T 919.380.8750
Raleigh, NC 27603
Suite 1100
223 West Street,
Firm License No. C-1051
Raleigh, NC 27606
VHB Engineering NC, P.C. (C-3705)
940 Main Campus Drive, Suite 500
ANILO
RAC HTRO
NLA
NOISSEFO
RPREENIGNEAND
REW
. O UNGYP
034407
SEAL
DATE: JUNE 22, 2020
-Y3-
-HSW-
10 11 12 13 14 15 16 17 18
230
240
250
260
270
230
240
250
260
270
230
240
250
260
270
230
240
250
260
270
10 11 12
SEE SHEET 16 FOR HORIZONTAL ALIGNMENT OF -Y3- AND -HSW-
280280
PROFESSIONA
LE
NG INEERNORTH CARO
LINA
SEAL
14101
J
HN M
. KAM P ATORH
26
6/22/2020
6/22/2020
H14014.00
SCALE: 1"=30'
GREENWAY ENGINEER
HYDRAULICS ENGINEER
PROJECT NO.:
REVISIONS:
NO.DATE
LISA POTTS, PROJECT MANAGER
CONTACT:GREENWAYCRABTREE CREEK WEST 919-996-4785
RALEIGH, NC 27601
SUITE 600
222 W. HARGETT ST,
RALEIGH MUNICIPAL BUILDING
CULTURAL RESOURCES
RECREATION and
PARKS,EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com
T 919.380.8750
Raleigh, NC 27603
Suite 1100
223 West Street,
Firm License No. C-1051
Raleigh, NC 27606
VHB Engineering NC, P.C. (C-3705)
940 Main Campus Drive, Suite 500
ANILO
RAC HTRO
NLA
NOISSEFO
RPREENIGNEAND
REW
. O UNGYP
034407
SEAL
DATE: JUNE 22, 2020
10 11 12 13 14 15 16 17
230
240
250
260
230
240
250
260
SEE SHEET 17 FOR HORIZONTAL ALIGNMENT OF -Y5-
EL = 239.19'
PI = 12+49.76
(-)1.5984%
(+)7.3740%
VC = 75'
EL = 240.16'
PI = 10+79.87
(-)4
.2
13
9%(+)4.4532%
VC = 30'
VC = 40'
EL = 241.82'
PI = 10+40.42
(-
)8.0000%(-)4
.2
13
9%
PI = 10+04.05
EL = 244.73'
(-
)8.0000%VC = 5'
EL = 241.44'
PI = 11+08.67
(+)4.4532%(-)1.5984%
VC = 25'
EL = 254.27'
PI = 14+54.39
(+)7.3740%
(+)2.0000%
VC = 45'
EL = 255.27'
PI = 15+04.39
(+)2.0000%
(+)7.3787%
VC = 45'
EL = 265.59'
PI = 16+44.14
(+)7.3787%(-)1.4177%
VC = 15'
EL. = 244.71
-Y5- STA. 10+00.00
BEGIN GRADE
EL. = 265.43
-Y5- STA. 16+55.44
END GRADE
15" HDPE15" RCP-III
CL OF GREENWAY
EXISTING GRADE AT
CL OF GREENWAY
PROPOSED GRADE AT
PROFESSIONA
LE
NG INEERNORTH CARO
LINA
SEAL
14101
J
HN M
. KAM P ATORH
27
-Y5-
6/22/2020
6/22/2020