Loading...
HomeMy WebLinkAbout20191233 Ver 2_SAW-2017-00269 NWP 13 and 14 Verification Ltr_20210305U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action Id. SAW-2017-00269 County: Wake U.S.G.S. Quad: NC-Raleigh West GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION Permittee: City of Raleigh Lisa Schiffbauer Address: 222 West Hargett Street, Suite 601 Raleigh, NC 27601 Telephone Number: 919-996-4785 E-mail: parkplan@raleighnc.gov Size (acres) ~56 acres Nearest Town Raleigh Nearest Waterway Crabtree Creek River Basin Neuse USGS HUC 03020201 Coordinates Latitude: 35.842792 Longitude: -78.714409 Location description: The project area consists of an approximately 1.8 miles greenway corridor along Crabtree Creek from Ebenezer Church Road at Umstead State Park to the terminus of the existing Crabtree Creek greenway on Lindsay Drive in the City of Raleigh, Wake County, North Carolina. Description of projects area and activity: This verification authorizes the permanent discharge of fill material into 0.012 acre of wetlands and the permanent discharge (riprap bank stabilization – no permanent loss of waters) of fill material into 141 linear feet of stream for the construction of a multi-use bicycling and pedestrian trail (greenway). The permanent wetland impacts associated with this project are authorized under the Nationwide Permit (NWP) 14 for Linear Transportation Projects; whereas, the stream impacts for riprap bank stabilization are authorized under the NWP 13 for Bank Stabilization. Applicable Law(s): Section 404 (Clean Water Act, 33 USC 1344) Section 10 (Rivers and Harbors Act, 33 USC 403) Authorization: NWP 13. Bank Stabilization and NWP 14. Linear Transportation Projects SEE ATTACHED NWP GENERAL, REGIONAL, AND/OR SPECIAL CONDITIONS Your work is authorized by the above referenced permit provided it is accomplished in strict accordance with the enclosed Conditions, your application signed and dated 9/13/2019, and the enclosed plans (Crabtree Creek West Greenway: Wetland and Surface Water Impacts Permit drawings sheets 1, 4-7, 11-12, 14-15, 17). Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order, a restoration order, a Class I administrative penalty, and/or appropriate legal action. This verification will remain valid until the expiration date identified below unless the nationwide authorization is modified, suspended or revoked. If, prior to the expiration date identified below, the nationwide permit authorization is reissued and/or modified, this verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified nationwide permit. If the nationwide permit authorization expires or is suspended, revoked, or is modified, such that the activity would no longer comply with the terms and conditions of the nationwide permit, activities which have commenced (i.e., are under construction) or are under contract to commence in reliance upon the nationwide permit, will remain authorized provided the activity is completed within twelve months of the date of the nationwide permit’s expiration, modification or revocation, unless discretionary authority has been exercised on a case-by-case basis to modify, suspend or revoke the authorization. Activities subject to Section 404 (as indicated above) may also require an individual Section 401 Water Quality Certification. You should contact the NC Division of Water Resources (telephone 919-807-6300) to determine Section 401 requirements. For activities occurring within the twenty coastal counties subject to regulation under the Coastal Area Management Act (CAMA), prior to beginning work you must contact the N.C. Division of Coastal Management Morehead City, NC, at (252) 808-2808. This Department of the Army verification does not relieve the permittee of the responsibility to obtain any other required Federal, State or local approvals/permits. If there are any questions regarding this verification, any of the conditions of the Permit, or the Corps of Engineers regulatory program, please contact Roscoe L. Sullivan, III at 919-554-4884 Ext. 25or roscoe.l.sullivan@usace.army.mil. Corps Regulatory Official: _____________________________________________________Date: 10/28/2019 Expiration Date of Verification: 03/18/2022 The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we continue to do so, please complete the Customer Satisfaction Survey located at http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0 Copy furnished: Agent: VHB David Cooper Address: 940 Main Campus Drive, Suite 500 Raleigh, NC 27606 Telephone Number: 919-741-5784 E-mail: dcooper@vhb.com Action ID Number: SAW-2017-00269 County: Wake Permittee: City of Raleigh, Lisa Schiffbauer Project Name: Crabtree Creek Greenway - Lindsay Drive to Ebenezer Church Road Date Verification Issued: 10/28/2019 Project Manager: Roscoe L. Sullivan, III Upon completion of the activity authorized by this permit and any mitigation required by the permit, sign this certification and return it to the following address: US ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Attn: Roscoe L. Sullivan, III Raleigh Regulatory Office U.S Army Corps of Engineers 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 or roscoe.l.sullivan@usace.army.mil Please note that your permitted activity is subject to a compliance inspection by a U. S. Army Corps of Engineers representative. Failure to comply with any terms or conditions of this authorization may result in the Corps suspending, modifying or revoking the authorization and/or issuing a Class I administrative penalty, or initiating other appropriate legal action. I hereby certify that the work authorized by the above referenced permit has been completed in accordance with the terms and condition of the said permit, and required mitigation was completed in accordance with the permit conditions. _______________________________________ ______________________ Signature of Permittee Date W/E 259.5 W/E 240.4 W/E 240.4 W/E 232.1 W/E 247.3 W/E 274.9 W/E 273.1 W/E 272.8 W/E 262.1 W/E 285.7 W/E 252.4 -L1- -HSW- -Y5-TYPE-IIITYPE-IIITYPE-III-EBCR--EBCR-Ri chl and Cr e ekCrabtree Creek H14014.00 GREENWAY ENGINEER HYDRAULICS ENGINEER PROJECT NO.: REVISIONS: NO.DATE DATE: 919-996-4785 RALEIGH, NC 27601 SUITE 600 222 W. HARGETT ST, RALEIGH MUNICIPAL BUILDING CULTURAL RESOURCES RECREATION and PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com T 919.380.8750 Raleigh, NC 27603 Suite 1100 223 West Street, Firm License No. C-1051 LISA SCHIFFBAUER, PROJECT MANAGER CONTACT: Raleigh, NC 27606 VHB Engineering NC, P.C. (C-3705) 940 Main Campus Drive, Suite 500 FUNC. CLASSIFICATION LEAN ANGLE DESIGN SPEED = = = DESIGN DATA PROJECT LENGTHGRAPHIC SCALES 0 PROFILE (HORIZONTAL)PLANS PROFILE (VERTICAL) 0 GREENWAY 20 DEGREES 20 MPH NORTH CAROLINA CITY OF RALEIGH CRABTREE CREEK WEST GREENWAY FROM EBENEZER CHURCH ROAD TO LINDSAY DRIVE LOCATION: 1 VICINITY MAPEBENEZER CHURCH RD.DURALEI GH RD.LI NDSAY DR.PICARDY DR.POYNER RD.BOXWOOD RD. WEAVER DR. -L1--L2--Y2- -Y1- -L1- -L2- STA. 46+30.36 END CONSTRUCTION -L1- STA. 4+12.68 BEGIN CONSTRUCTION BEGIN PROJECT -L1- STA. 63+10.02 END CONSTRUCTION -L2- STA. 10+80.60 BEGIN CONSTRUCTION 30 15 0 30 60 30 15 30 60 LENGTH OF PROJECT LENGTH OF BRIDGE LENGTH OF BOARDWALK LENGTH OF ASPHALT TRAIL = = = = 1.80 MI 0.06 MI 0.01 MI 1.73 MI1"=30'1"=30'1"=6' PARK STATE UMSTEAD 4 5 6 7 8 9 10 11 12 13 14 15 6 1236 CRABTREE CREEK RICHLAND CREEKCOR: 636-99220450-01-17 FA# CMAQ.0520(57) WBS: 43714.3.8 16 17 NCDOT TIP# C-5604-OD & EROSION CONTROL BOARDWALKS, BRIDGES, DRAINAGE, GRADING, PAVING, RETAINING WALLS, TYPE OF WORK: ACCESS CONSTRUCTION ACCESS CONSTRUCTION ACCESS CONSTRUCTION ACCESS CONSTRUCTION END PROJECT ACCESS CONSTRUCTION WETLAND AND SURFACE WATER IMPACTS PERMIT SHEET 1 OF 22 PERMIT DRAWING PARK STATE UMSTEAD LI NDSAY DR.DURALEI GH RD.EBENEZER CHURCH RD.PICARDY DR.SA-13 SA-12 START WI-24 TT 01 WI-02 WI-08 WI-01WI-10 WI-09 WI-07 WI-22 WI-06 WI-13 WI-03 90090215.90TW WI-11 WK-01 WI-20 90088216.61TOE WI-23 90081217.11TW 90089217.13CLC20059217.18TW WI-04 WI-15 90075217.60CLC 90082217.60CLC WI-21 90076217.60TW WI-05 WI-12 WI-14 20060217.67CLC 90077217.91TOE WI-18 90091218.14TOE WI-19 WI-16 20061218.49TOE WK-02 20058218.54TOE 20024218.59TW 90083218.68TOE 90079218.76TOE 20025218.97TOE 20023219.05CLC 90080219.09TOE 20028219.25CLC 20027219.33TW WI-17 20014219.64TOE 90074219.64TOE 20021219.80TW WH-10 20026220.01TOE 20020220.03TOE 20022220.03CLC 20013220.08TOE 20017220.08TW 20015220.15TOE 20016220.26TOE 20018220.36CLC 20019220.36TOE SJ-02 20007224.69GRD 90086225.57TOP 6011225.89CLC5074225.91TOE 20040225.93TOP 20062226.62GRD 5082226.63TOE 6012226.64CLC WL-07 TT 01 5072226.71TOE 6010226.73STK5010 CLC 5090226.79TOE 6009226.90STK5009 CLC 5107226.94TOE 5094227.00TOE 5097227.10TOE 5080227.17TOE 90084227.18TOP 5098227.19TOE 20009227.27GRD 5106227.44TOE 6008227.65CLC WL-06 90087228.07GRD 20039228.16TOP WL-05 20006228.19TOP 5058228.46TOE 5108228.96TOP 5057229.13TOE 20051229.20TOP 5071229.31TOP 20010229.36TOP WL-04 5083229.45TOP 20036229.48TOP 5052229.74TOE 5099229.76TOP 20057229.77GRD 6007229.87STK5007 CLC 6006229.88STK5006 CLC 90073229.89TOP 5068229.90TOE 20008229.93TOP 20005230.07GRD 5048230.14TOE 20038230.23GRD 20053230.23GRD 20011230.30TOP 20029230.31TOP 6005230.32STK5005 CLC 20052230.33TOP 6004230.40STK5004 CLC 5039230.47TOE 5067230.48TOE 5070230.51GRD 20032230.58TOP 20054230.73EP 5079230.76TOP 20056230.78EP 5073230.79TOP 20055230.81SE 5040230.82TOE 20063230.94TOP 20004230.94GRD 20041231.09GRD 5078231.10GRD 20050231.12GRD 20046231.18GRD 90078231.19WP-90078-NL 20003231.38GRD 20049231.48EP 20042231.52EP 20012231.56GRD 20033231.58TOP 20048231.61SE 20047231.63EP 5056231.73BRK 20043231.75SE 20044231.88EP 5075231.90GRD 20045232.09GRD 5105232.22GRD 5084232.32BRK 5093232.45GRD 90072232.74GRD 5109232.79GRD 5111232.90GRD 20030232.98GRD 5038233.42TOP 5100233.45GRD 5112233.57GRD 20034233.63GRD 5037233.97GRD 20035234.03GRD 5041234.08TOP 90085234.11GRD 20031234.26GRD 5066234.30GRD 20064234.48GRD 5091234.71GRD WD-31 5096234.89TOP 5092234.93TOP S 15" DIP RIPRAP INV=219.59'RIM=223.55'TOP OF CONCRETE=224.75'OTCB INV=219.81' WH-01 WH-02 WH-03 WH-04 WH-05 WH-06 WH-07WH-08 WH-09 WH-11 WH-12 WK-10 TT 01 WK-03 WK-04 WK-05 WK-06 WK-07 WK-08 WK-09 WL-03 WL-02 WL-01 SJ-01 WD-32 WD-30 WD-23 WD-21 WD-20 WD-19 WD-18 WD-17 WD-16 WD-15 WD-01 WD-02 WD-03 WD-04 WD-05 WD-06 WD-07 WD-08WD-09 WD-10 WD-11 WD-12 WD-13 WD-14 WE-01 WE-02 WE-03 WE-06 WE-07 WC-15 WC-16 WC-17 WC-13 WC-18 WC-19 WC-12 WC-11 WC-04WC-03 WC-02 WC-01 WC-20 WB-09 WB-08 WB-07 WB-06 WB-05 WB-04 WB-17 WB-16 WB-15 WB-14WB-13 WB-12 WB-11 WB-10 WG-09 WG-08 WG-07 WG-06 WG-05 WG-04 WG-03 WA-04 WA-03 WA-02 WA-01 WA-06 STREAM F STREAM G WETLAND H WETLAND I WETLAND K WETLAND L STREAM ECRABTREE CREEKCRABTREE CREEK C R ABT REE C REE K CRABTREE CREEK STREAM J RICHLAND CREE KRIC HL AND CREEK WETLAND E WETLAND C WETLAND B WETLAND A WETLAND G WETLAND D STREAM B STREAM B STREAM C SJ-03 SA-14 END STREAM A 5089235.01TOP 5110235.03TOP WD-29 5095235.26GRD 5086235.27GRD 5087235.29GRD 5055235.37TOP 5076235.54GRD 5036235.56BRK 5085235.72TOP 5077235.73GRD 5088235.84GRD 5069235.96GRD 5104236.05TOP 5042236.10GRD 5081236.12WP-5081-NL 5103236.17GRD 5101236.25GRD 5051236.29TOP WD-28 5113236.46GRD 5102236.48GRD 5023236.58TOE 5054236.60GRD 5022236.74TOE 5047236.82TOP 5050237.01GRD 6001237.13CLC 5060237.18GRD WD-27 5005237.26TOE 6000237.29CLC 5033237.35TOE 5028237.39TOE6002237.42CLC 5035237.60TOP WC-14 5004237.71TOE 5046237.72GRD 5059237.79TOP 5017237.82TOE 5013237.82TOE 5021237.86TOP 5061237.91GRD 6003237.91CLC WD-26 5034238.14GRD 5020238.19BRK 5063238.22TOP 5064238.31GRD 5065238.44TOP 5032238.55TOP WE-04 5003238.61TOP 5062238.74GRD 5053238.85GRD WE-05 5024239.20TOP WD-25 5006239.35TOP 5002239.40BRK 5043239.50GRD 5031239.54BRK 5044239.67GRD WD-24 5049239.77GRD 5016240.03GRD 5045240.04GRD 5027240.54TOP WP-100055-NL 5012240.95GRD 5025241.34GRD 5007241.77GRD 5026241.78GRD WC-07 5019241.95TOP 5001242.10TOP 5030242.18TOP WC-05 5029242.30GRD WC-08 5008242.76TOP 5018242.79GRD 5015242.90TOP 5000242.93GRD WC-09 5011243.31TOP 5010243.40GRD 5014243.74GRD WG-01 WD-22 5009244.01GRD WC-10 WC-06 WA-08 WG-02 WA-09 WA-07 WB-03 WB-01 WB-02 S RIPRAP STREAM F STREAM G WETLAND H WETLAND I WETLAND K WETLAND L STREAM ECRABTREE CREEKCRABTREE CREEK C R ABT REE C REE K CRABTREE CREEK STREAM J RICHLAND CREE KRIC HL AND CREEK WETLAND E WETLAND C WETLAND B WETLAND A WETLAND G WETLAND D STREAM B STREAM B STREAM C STREAM A FUNC. CLASSIFICATION LEAN ANGLE DESIGN SPEED = = = DESIGN DATA PROJECT LENGTHGRAPHIC SCALES 0 PROFILE (HORIZONTAL)PLANS PROFILE (VERTICAL) 0 GREENWAY 20 DEGREES 20 MPH NORTH CAROLINA CITY OF RALEIGH CRABTREE CREEK WEST GREENWAY FROM EBENEZER CHURCH ROAD TO LINDSAY DRIVE LOCATION: 1 VICINITY MAPEBENEZER CHURCH RD.DURALEI GH RD.LI NDSAY DR.PICARDY DR.POYNER RD.BOXWOOD RD. WEAVER DR. -L1--L2--Y2- -Y1- -L1- -L2- STA. 46+30.36 END CONSTRUCTION -L1- STA. 4+12.68 BEGIN CONSTRUCTION BEGIN PROJECT -L1- STA. 63+10.02 END CONSTRUCTION -L2- STA. 10+80.60 BEGIN CONSTRUCTION 30 15 0 30 60 30 15 30 60 LENGTH OF PROJECT LENGTH OF BRIDGE LENGTH OF BOARDWALK LENGTH OF ASPHALT TRAIL = = = = 1.80 MI 0.06 MI 0.01 MI 1.73 MI1"=30'1"=30'1"=6' PARK STATE UMSTEAD 4 5 6 7 8 9 10 11 12 13 14 15 6 1236 CRABTREE CREEK RICHLAND CREEKCOR: 636-99220450-01-17 FA# CMAQ.0520(57) WBS: 43714.3.8 16 17 NCDOT TIP# C-5604-OD & EROSION CONTROL BOARDWALKS, BRIDGES, DRAINAGE, GRADING, PAVING, RETAINING WALLS, TYPE OF WORK: ACCESS CONSTRUCTION ACCESS CONSTRUCTION ACCESS CONSTRUCTION ACCESS CONSTRUCTION END PROJECT ACCESS CONSTRUCTION WETLAND AND SURFACE WATER IMPACTS PERMIT SHEET 1 OF 22 PERMIT DRAWING PARK STATE UMSTEAD LI NDSAY DR.DURALEI GH RD.EBENEZER CHURCH RD.PICARDY DR.SITE 1 SITE 15 SITE 2 SITE 3 SITES 4 & 5 SITES 6 & 7 SITE 14 12 & 13 SITES SITE 11 SITE 10 SITE 9 SITE 8 Sign242 .7 238 .3 239 .4 235 .4 239 .3 N/F DB 16344, PG 1019 BM 2007, PG 2444-2446 PIN 0786-21-7624 LOT 112 LOT 213 PIN 0786-12-9457 BM 2007, PG 2444-2446 DB 16344, PG 1019 ASSOCIATION INC UMSTEAD HOMEOWNERS THE HAMPTONS AT N/F ASSOCIATION INC UMSTEAD HOMEOWNERS THE HAMPTONS AT H14014.00 SCALE: 1"=30' GREENWAY ENGINEER HYDRAULICS ENGINEER PROJECT NO.: REVISIONS: NO.DATE DATE: 919-996-4785 RALEIGH, NC 27601 SUITE 600 222 W. HARGETT ST, RALEIGH MUNICIPAL BUILDING CULTURAL RESOURCES RECREATION and PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com T 919.380.8750 Raleigh, NC 27603 Suite 1100 223 West Street, Firm License No. C-1051 LISA SCHIFFBAUER, PROJECT MANAGER CONTACT: Raleigh, NC 27606 VHB Engineering NC, P.C. (C-3705) 940 Main Campus Drive, Suite 500 RIP RAP WOODED AREA WOODED AREA STREAM B EL. = 245.11 -L1- STA. 4+12.68 MATCH EXISTING PATH BEGIN GRADE 8.9' CLEAR CHURCH RD EBENEZER PI = 5+58.33 EL = 237.83'(-)5 .00 0 0% VC = 90' PI = 8+83.33 EL = 239.61' (+)0.5500%(-)0.9000% VC = 20' -L1- STA. 10+88.33 BEGIN BOARDWALK 1 -L1- STA. 11+18.33 END BOARDWALK 1 CL OF GREENWAY EXISTING GRADE AT CL OF GREENWAY PROPOSED GRADE AT (+) 2.1000% EL. = 233.60 STA. 11+25.00 BEGIN DITCH RT. 18" HDPE 18" HDPE SEE DETAIL 6 EMBANKMENT RIP RAP AT SEE DETAIL 6 EMBANKMENT RIP RAP AT REMOVEJB w/Slab Lid 15" RCP-III GEOTEXTILE EST 10 SY EST 3 TONS CLASS B RIP RAP GEOTEXTILE EST 5 SY EST 1 TON CLASS B RIP RAP SEE DETAIL 3 EST 165 SY GEOTEXTILE EST 55 TONS CLASS B RIP RAP TOE PROTECTION SEE DETAIL 3 EST 45 SY GEOTEXTILE EST 15 TONS CLASS B RIP RAP TOE PROTECTION F C F F FFF F F F F F F C F F FFFFF F F F F F C C F F F F F F F C F F F FF C C F C F F F F F C C C C C C C C C F F C C F C F C C C C C CCFCF F F F F F FCGREU TL-34+00 5+00 6+00 7+00 8+00 10+0011+00 -L1- 11+00 9+0015+00 -Y5-TYPE-IIITYPE-IIITYPE-III15+0013+0014+0017+00+40.00C A T-1WETLAND D STREAM B 18" HDPE SEE DETAIL 6 EMBANKMENT RIP RAP AT F F F F F C F F F F5+00 11+00 .02.02STREAM B SEE DETAIL 6 EMBANKMENT RIP RAP ATSEE SHEET 5MATCHLINE -L1- STA 11+50.0044567891011 230 240 250 260 230 240 250 260-L1-MATCHLINE -L1- STA. 11+50.00 SEE SHEET 5SEE SHEETS 16 & 16A FOR -Y3- AND -HSW- PLAN & PROFILES S S SURFACE WATER DENOTES IMPACTS IN SHEET 2 OF 22 PERMIT DRAWING SITE 1 SITE 2 SITE 2 SITE 1 Sign242 .7 238 .3 239 .4 235 .4 239 .3 N/F DB 16344, PG 1019 BM 2007, PG 2444-2446 PIN 0786-21-7624 LOT 112 LOT 213 PIN 0786-12-9457 BM 2007, PG 2444-2446 DB 16344, PG 1019 ASSOCIATION INC UMSTEAD HOMEOWNERS THE HAMPTONS AT N/F ASSOCIATION INC UMSTEAD HOMEOWNERS THE HAMPTONS AT 235235235235235235 235235235235235235235235235235 235 235 235 235 235 240240240240240240240 240240240240 240 240 240240240240240240240 240245245245245245 245245 245 245 245 250250250250250250250 255255255255255255255 255 260260260260260260 265H14014.00 SCALE: 1"=30' GREENWAY ENGINEER HYDRAULICS ENGINEER PROJECT NO.: REVISIONS: NO.DATE DATE: 919-996-4785 RALEIGH, NC 27601 SUITE 600 222 W. HARGETT ST, RALEIGH MUNICIPAL BUILDING CULTURAL RESOURCES RECREATION and PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com T 919.380.8750 Raleigh, NC 27603 Suite 1100 223 West Street, Firm License No. C-1051 LISA SCHIFFBAUER, PROJECT MANAGER CONTACT: Raleigh, NC 27606 VHB Engineering NC, P.C. (C-3705) 940 Main Campus Drive, Suite 500 RIP RAP WOODED AREA WOODED AREA STREAM B EL. = 245.11 -L1- STA. 4+12.68 MATCH EXISTING PATH BEGIN GRADE 8.9' CLEAR CHURCH RD EBENEZER PI = 5+58.33 EL = 237.83'(-)5 .00 0 0% VC = 90' PI = 8+83.33 EL = 239.61' (+)0.5500%(-)0.9000% VC = 20' -L1- STA. 10+88.33 BEGIN BOARDWALK 1 -L1- STA. 11+18.33 END BOARDWALK 1 CL OF GREENWAY EXISTING GRADE AT CL OF GREENWAY PROPOSED GRADE AT (+) 2.1000% EL. = 233.60 STA. 11+25.00 BEGIN DITCH RT. 18" HDPE 18" HDPE SEE DETAIL 6 EMBANKMENT RIP RAP AT SEE DETAIL 6 EMBANKMENT RIP RAP AT REMOVEJB w/Slab Lid 15" RCP-III GEOTEXTILE EST 10 SY EST 3 TONS CLASS B RIP RAP GEOTEXTILE EST 5 SY EST 1 TON CLASS B RIP RAP SEE DETAIL 3 EST 165 SY GEOTEXTILE EST 55 TONS CLASS B RIP RAP TOE PROTECTION SEE DETAIL 3 EST 45 SY GEOTEXTILE EST 15 TONS CLASS B RIP RAP TOE PROTECTION F C F F FFF F F F F F F C F F FFFFF F F F F F C C F F F F F F F C F F F FF C C F C F F F F F C C C C C C C C C F F C C F C F C C C C C CCFCF F F F F F FCGREU TL-34+00 5+00 6+00 7+00 8+00 10+0011+00 -L1- 11+00 9+0015+00 -Y5-TYPE-IIITYPE-IIITYPE-III15+0013+0014+0017+00+40.00C A T-1WETLAND D STREAM B 18" HDPE SEE DETAIL 6 EMBANKMENT RIP RAP AT 235235 240 235235235235 F F F F F C F F F F5+00 11+00 .02.02STREAM B SEE DETAIL 6 EMBANKMENT RIP RAP ATSEE SHEET 5MATCHLINE -L1- STA 11+50.0044567891011 230 240 250 260 230 240 250 260-L1-MATCHLINE -L1- STA. 11+50.00 SEE SHEET 5SEE SHEETS 16 & 16A FOR -Y3- AND -HSW- PLAN & PROFILES S S SURFACE WATER DENOTES IMPACTS IN SHEET 3 OF 22 PERMIT DRAWING SITE 1 SITE 2 SITE 2 SITE 1 235.4 LOT 112 PIN 0786-21-7624 BM 2007, PG 2444-2446 DB 16344, PG 1019 ASSOCIATION INC UMSTEAD HOMEOWNERS THE HAMPTONS AT N/F PIN 0786320346 DB 015580, PG 00928 CITY OF RALEIGH N/F CRABTREE CREEK WETLAND D STREAM B PI = 11+83.33 EL = 236.91' (-)0.9000%(+)0.5000% VC = 30' PI = 12+78.33 EL = 237.39' (+)0.5000%(-)1.1050% VC = 40' PI = 14+13.33 EL = 235.90' (-)1.1050%(+)2.7000% VC = 70' PI = 15+48.33 EL = 239.54' (+)2.7000%(-)3 .8000% VC = 30' PI = 16+08.33 EL = 237.26'(-)3 .8000%(+)0.3515% VC = 70' -L1- STA. 14+81.33 BEGIN BRIDGE 1 -L1- STA. 15+31.33 END BRIDGE 1 CL OF GREENWAY EXISTING GRADE AT CL OF GREENWAY PROPOSED GRADE AT El = 234.125 (+) 0.5000%El = 235.00(+) 0.5000% (+) 1.0000% (+) 0.5000% PI =11+50.00 EL. = 235.50STA. 14+25.00END DITCH RT.EL. = 236.50STA. 18+00.00END DITCH RT.PI =16+50.00EL. = 234.41 STA. 15+32.00 BEGIN DITCH RT.EL. = 234.50STA. 16+00.00BEGIN DITCH LT.H14014.00 SCALE: 1"=30' GREENWAY ENGINEER HYDRAULICS ENGINEER PROJECT NO.: REVISIONS: NO.DATE DATE: 919-996-4785 RALEIGH, NC 27601 SUITE 600 222 W. HARGETT ST, RALEIGH MUNICIPAL BUILDING CULTURAL RESOURCES RECREATION and PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com T 919.380.8750 Raleigh, NC 27603 Suite 1100 223 West Street, Firm License No. C-1051 LISA SCHIFFBAUER, PROJECT MANAGER CONTACT: Raleigh, NC 27606 VHB Engineering NC, P.C. (C-3705) 940 Main Campus Drive, Suite 500 SEE DETAIL 1 SPECIAL CUT DITCH 10 SY GEOTEXTILE 3 TONS CLASS B RIP RAP SEE DETAIL 6 EMBANKMENT RIP RAP AT SEE DETAIL 1 SPECIAL CUT DITCH SEE DETAIL 1 SPECIAL CUT DITCH SEE DETAIL 3 EST 45 SY GEOTEXTILE EST 15 TONS CLASS B RIP RAP TOE PROTECTION SEE DETAIL 6 EMBANKMENT RIP RAP AT F C F C F C F C F C F C C C F C F C FCF C F F F C F C F C CCC C C C C C C C C C C C C C CF C FC F C F PT Sta. 11+62.92 PC Sta. 13+62.35 PRC Sta. 14+10.98 PC Sta. 15+49.45 PC Sta. 18+01.16 PRC Sta. 18+95.08 12+00 13+00 14+00 15+00 16+00 17+00 18+00 PT Sta. 16+57.63 PT Sta. 14+78.29.02.02.02MATCHLINE -L1- STA 11+50.00 SEE SHEET 4MATCHLI NE -L1- STA 19+00.00 SEE SHEET 651213141516171819 220 230 240 250 260 220 230 240 250 260-L1-MATCHLINE -L1- STA. 19+00.00 SEE SHEET 6MATCHLINE -L1- STA. 11+50.00 SEE SHEET 4SITE 3 SITE 3 S S SURFACE WATER DENOTES IMPACTS IN SHEET 4 OF 22 PERMIT DRAWING F C C C CPC Sta. 15+49.45 15+00 16+00 235.4 LOT 112 PIN 0786-21-7624 BM 2007, PG 2444-2446 DB 16344, PG 1019 ASSOCIATION INC UMSTEAD HOMEOWNERS THE HAMPTONS AT N/F PIN 0786320346 DB 015580, PG 00928 CITY OF RALEIGH N/F235235235 235 235235235235235235235235235 235 235 235 235235 235235235235235235 235 2 3 5 235 240240240240240240240240245245245245245245245250250250250250250255255255255255255260260260260260265265265265270270270270270275275275275280280280285285290CRABTREE CREEK WETLAND D STREAM B PI = 11+83.33 EL = 236.91' (-)0.9000%(+)0.5000% VC = 30' PI = 12+78.33 EL = 237.39' (+)0.5000%(-)1.1050% VC = 40' PI = 14+13.33 EL = 235.90' (-)1.1050%(+)2.7000% VC = 70' PI = 15+48.33 EL = 239.54' (+)2.7000%(-)3 .8000% VC = 30' PI = 16+08.33 EL = 237.26'(-)3 .8000%(+)0.3515% VC = 70' -L1- STA. 14+81.33 BEGIN BRIDGE 1 -L1- STA. 15+31.33 END BRIDGE 1 CL OF GREENWAY EXISTING GRADE AT CL OF GREENWAY PROPOSED GRADE AT El = 234.125 (+) 0.5000%El = 235.00(+) 0.5000% (+) 1.0000% (+) 0.5000% PI =11+50.00 EL. = 235.50STA. 14+25.00END DITCH RT.EL. = 236.50STA. 18+00.00END DITCH RT.PI =16+50.00EL. = 234.41 STA. 15+32.00 BEGIN DITCH RT.EL. = 234.50STA. 16+00.00BEGIN DITCH LT.H14014.00 SCALE: 1"=30' GREENWAY ENGINEER HYDRAULICS ENGINEER PROJECT NO.: REVISIONS: NO.DATE DATE: 919-996-4785 RALEIGH, NC 27601 SUITE 600 222 W. HARGETT ST, RALEIGH MUNICIPAL BUILDING CULTURAL RESOURCES RECREATION and PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com T 919.380.8750 Raleigh, NC 27603 Suite 1100 223 West Street, Firm License No. C-1051 LISA SCHIFFBAUER, PROJECT MANAGER CONTACT: Raleigh, NC 27606 VHB Engineering NC, P.C. (C-3705) 940 Main Campus Drive, Suite 500 SEE DETAIL 1 SPECIAL CUT DITCH 10 SY GEOTEXTILE 3 TONS CLASS B RIP RAP SEE DETAIL 6 EMBANKMENT RIP RAP AT SEE DETAIL 1 SPECIAL CUT DITCH SEE DETAIL 1 SPECIAL CUT DITCH SEE DETAIL 3 EST 45 SY GEOTEXTILE EST 15 TONS CLASS B RIP RAP TOE PROTECTION SEE DETAIL 6 EMBANKMENT RIP RAP AT 235235 F C F C F C F C F C F C C C F C F C FCF C F F F C F C F C CCC C C C C C C C C C C C C C CF C FC F C F PT Sta. 11+62.92 PC Sta. 13+62.35 PRC Sta. 14+10.98 PC Sta. 15+49.45 PC Sta. 18+01.16 PRC Sta. 18+95.08 12+00 13+00 14+00 15+00 16+00 17+00 18+00 PT Sta. 16+57.63 PT Sta. 14+78.29.02.02.02MATCHLINE -L1- STA 11+50.00 SEE SHEET 4MATCHLI NE -L1- STA 19+00.00 SEE SHEET 651213141516171819 220 230 240 250 260 220 230 240 250 260-L1-MATCHLINE -L1- STA. 19+00.00 SEE SHEET 6MATCHLINE -L1- STA. 11+50.00 SEE SHEET 4SITE 3 SITE 3 S S SURFACE WATER DENOTES IMPACTS IN SHEET 5 OF 22 PERMIT DRAWING F C C C CPC Sta. 15+49.45 15+00 16+00 MH PPPIN 0786320346 DB 015580, PG 00928 CITY OF RALEIGH N/F RICHLAND CREEK 239.3PI = 23+55.00 EL = 241.66' VC = 30' PI = 24+05.00 EL = 239.66' VC = 70' (+)1.2000%(-)4 .0000%(+)0.5000% -L1- STA. 22+84.00 BEGIN BRIDGE 2 -L1- STA. 23+34.00 END BRIDGE 2PI = 20+65.00 EL = 238.87' (+)0.3515% VC = 50' PI = 21+35.00 EL = 241.18' (+)3.3000%(-)1.5000% VC = 80' PI = 22+15.00 EL = 239.98' (+)1.2000% VC = 50' CL OF GREENWAY EXISTING GRADE AT CL OF GREENWAY PROPOSED GRADE AT El = 238.80(+) 0.5000% (+) 0.8000%El = 240.00(+) 0.5000% (+) 0.5000%PI =26+50.00PI =25+00.00EL. = 237.98 STA. 23+37.00 BEGIN DITCH RT.EL. = 238.50STA. 22+00.00END DITCH LT.EL. = 238.16STA. 23+32.00BEGIN DITCH LT.EL. = 239.00STA. 25+00.00END DITCH LT.EL. = 236.50PI =20+00.00(+) 1.0000% H14014.00 SCALE: 1"=30' GREENWAY ENGINEER HYDRAULICS ENGINEER PROJECT NO.: REVISIONS: NO.DATE DATE: 919-996-4785 RALEIGH, NC 27601 SUITE 600 222 W. HARGETT ST, RALEIGH MUNICIPAL BUILDING CULTURAL RESOURCES RECREATION and PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com T 919.380.8750 Raleigh, NC 27603 Suite 1100 223 West Street, Firm License No. C-1051 LISA SCHIFFBAUER, PROJECT MANAGER CONTACT: Raleigh, NC 27606 VHB Engineering NC, P.C. (C-3705) 940 Main Campus Drive, Suite 500 SEE DETAIL 1 SPECIAL CUT DITCH SEE DETAIL 6 EMBANKMENT RIP RAP AT SEE DETAIL 6 EMBANKMENT RIP RAP AT SEE DETAIL 1 SPECIAL CUT DITCH SEE DETAIL 6 EMBANKMENT RIP RAP AT SEE DETAIL 6 EMBANKMENT RIP RAP ATC C CC CPC Sta. 23+36.13 24+00CFCFC F C F C FCFC FC F C F C F C F C F C F F F F F F F C C CCC C C C C C C C C C F C F C F C F C F C F C CCCCPRC Sta. 19+78.45 PRC Sta. 20+32.01 PT Sta. 20+68.40 PT Sta. 22+79.44 PC Sta. 21+79.15 20+00 21+00 22+00 2 3 +0 0 PC Sta. 23+36.13 24+00 PRC Sta. 24+26.46 25+00 26+00 PCC Sta. 26+52.14 PCC Sta. 26+84.91 STA 27+00.00 SEE SHEET 7MATCHLINE -L1-6 220 230 240 250 260 220 230 240 250 260 19 20 21 22 23 24 25 26 -L1-MAT C HLI NE -L1- ST A 19+00.00 SEE S HEET 5 27MATCHLINE -L1- STA. 27+00.00 SEE SHEET 7MATCHLINE -L1- STA. 19+00.00 SEE SHEET 5S S SURFACE WATER DENOTES IMPACTS IN SHEET 6 OF 22 PERMIT DRAWING SITE 4 SITE 5 SITES 4 & 5 SITE 4 SITE 5 MH PPPIN 0786320346 DB 015580, PG 00928 CITY OF RALEIGH N/F 235235235235235235235235 235235 235 235 235235235 240 240 240 240240240240240240 240 240240245245 245 250250 255255 260265265270275280RICHLAND CREEK 239.3PI = 23+55.00 EL = 241.66' VC = 30' PI = 24+05.00 EL = 239.66' VC = 70' (+)1.2000%(-)4 .0000%(+)0.5000% -L1- STA. 22+84.00 BEGIN BRIDGE 2 -L1- STA. 23+34.00 END BRIDGE 2PI = 20+65.00 EL = 238.87' (+)0.3515% VC = 50' PI = 21+35.00 EL = 241.18' (+)3.3000%(-)1.5000% VC = 80' PI = 22+15.00 EL = 239.98' (+)1.2000% VC = 50' CL OF GREENWAY EXISTING GRADE AT CL OF GREENWAY PROPOSED GRADE AT El = 238.80(+) 0.5000% (+) 0.8000%El = 240.00(+) 0.5000% (+) 0.5000%PI =26+50.00PI =25+00.00EL. = 237.98 STA. 23+37.00 BEGIN DITCH RT.EL. = 238.50STA. 22+00.00END DITCH LT.EL. = 238.16STA. 23+32.00BEGIN DITCH LT.EL. = 239.00STA. 25+00.00END DITCH LT.EL. = 236.50PI =20+00.00(+) 1.0000% H14014.00 SCALE: 1"=30' GREENWAY ENGINEER HYDRAULICS ENGINEER PROJECT NO.: REVISIONS: NO.DATE DATE: 919-996-4785 RALEIGH, NC 27601 SUITE 600 222 W. HARGETT ST, RALEIGH MUNICIPAL BUILDING CULTURAL RESOURCES RECREATION and PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com T 919.380.8750 Raleigh, NC 27603 Suite 1100 223 West Street, Firm License No. C-1051 LISA SCHIFFBAUER, PROJECT MANAGER CONTACT: Raleigh, NC 27606 VHB Engineering NC, P.C. (C-3705) 940 Main Campus Drive, Suite 500 SEE DETAIL 1 SPECIAL CUT DITCH SEE DETAIL 6 EMBANKMENT RIP RAP AT SEE DETAIL 6 EMBANKMENT RIP RAP AT SEE DETAIL 1 SPECIAL CUT DITCH SEE DETAIL 6 EMBANKMENT RIP RAP AT SEE DETAIL 6 EMBANKMENT RIP RAP AT 235235235 240240 C C CC CPC Sta. 23+36.13 24+00CFCFC F C F C FCFC FC F C F C F C F C F C F F F F F F F C C CCC C C C C C C C C C F C F C F C F C F C F C CCCCPRC Sta. 19+78.45 PRC Sta. 20+32.01 PT Sta. 20+68.40 PT Sta. 22+79.44 PC Sta. 21+79.15 20+00 21+00 22+00 2 3 +0 0 PC Sta. 23+36.13 24+00 PRC Sta. 24+26.46 25+00 26+00 PCC Sta. 26+52.14 PCC Sta. 26+84.91 STA 27+00.00 SEE SHEET 7MATCHLINE -L1-6 220 230 240 250 260 220 230 240 250 260 19 20 21 22 23 24 25 26 -L1-MAT C HLI NE -L1- ST A 19+00.00 SEE S HEET 5 27MATCHLINE -L1- STA. 27+00.00 SEE SHEET 7MATCHLINE -L1- STA. 19+00.00 SEE SHEET 5S S SURFACE WATER DENOTES IMPACTS IN SHEET 7 OF 22 PERMIT DRAWING SITE 4 SITE 5 SITES 4 & 5 SITE 4 SITE 5 MH243.3242.8PIN 0786-21-7624 BM 2007, PG 2444-2446 DB 11903, PG 91 DEVELOPMENT COMPANY, LLC THE HAMPTONS N/F (168.9 ACRES PER RECORDS) PIN 0786-34-9208 DB 1592, PG 361 AGGREGATES, INC BENCHMARK CAROLINA N/F C C C C C C C C F C F C F C FC FC FC FCFCFCFCFCF C F C C F C F C F C F C C C C C C 2 8+ 00 2 9 + 0 0 30+00PRC Sta. 30+48.05 31+00 PT Sta. 31+14.39 32+00 PRC Sta. 35+64.61PCC Sta. 37+16.57.02.02STREAM C243.3242.8PI = 28+25.00 EL = 241.76' VC = 20' PI = 29+30.00 EL = 243.23' VC = 20' PI = 31+55.00 EL = 242.67' VC = 30' (+)0.5000%(+)1.4000% (+)1.4000%(-)0.2500%(-)0.2500% (+)1.3000% -L1- STA. 31+13.00 BEGIN BOARDWALK 2 -L1- STA. 31+33.00 END BOARDWALK 2 CL OF GREENWAY EXISTING GRADE AT CL OF GREENWAY PROPOSED GRADE AT El = 241.20(+) 0.6000% (+) 1.0000%El = 242.20(-) 0.5000% (+) 1.2000%EL. = 241.35STA. 31+20.00END DITCH RT.EL. = 241.30 STA. 31+25.00 BEGIN DITCH LT.PI =29+50.00PI =28+50.00H14014.00 SCALE: 1"=30' GREENWAY ENGINEER HYDRAULICS ENGINEER PROJECT NO.: REVISIONS: NO.DATE DATE: 919-996-4785 RALEIGH, NC 27601 SUITE 600 222 W. HARGETT ST, RALEIGH MUNICIPAL BUILDING CULTURAL RESOURCES RECREATION and PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com T 919.380.8750 Raleigh, NC 27603 Suite 1100 223 West Street, Firm License No. C-1051 LISA SCHIFFBAUER, PROJECT MANAGER CONTACT: Raleigh, NC 27606 VHB Engineering NC, P.C. (C-3705) 940 Main Campus Drive, Suite 500 SEE DETAIL 6 EMBANKMENT RIP RAP AT SEE DETAIL 6 EMBANKMENT RIP RAP AT SEE DETAIL 1 SPECIAL CUT DITCH SEE DETAIL 1 SPECIAL CUT DITCH SEE DETAIL 6 EMBANKMENT RIP RAP AT SEE DETAIL 6 EMBANKMENT RIP RAP AT240SEE SHEET 6MATCHLINE -L1- STA 27+00.00230 240 250 27 28 29 30 31 32 33 230 240 250 7 220 260 220 260-L1-MATCHLINE -L1- STA 33+00.00 SEE SHEET 8SEE SHEET 8MATCHLINE -L1- STA 33+00.00MATCHLINE -L1- STA 27+00.00 SEE SHEET 6S S SURFACE WATER DENOTES IMPACTS IN SHEET 8 OF 22 PERMIT DRAWING SITE 6 SITES 6 & 7SITE 7 SITE 6 SITE 7FF C F C F C F 31+00 32+00 MH243.3242.8PIN 0786-21-7624 BM 2007, PG 2444-2446 DB 11903, PG 91 DEVELOPMENT COMPANY, LLC THE HAMPTONS N/F (168.9 ACRES PER RECORDS) PIN 0786-34-9208 DB 1592, PG 361 AGGREGATES, INC BENCHMARK CAROLINA N/F 235235235 235 2 3 5 240 240240240240240 2 4 0 240 2402402402402402402452452452452452452452452452452502502502502502 5 0 250 2552552552552 5 5 260260260260260260265265265265270270275C C C C C C C C F C F C F C FC FC FC FCFCFCFCFCF C F C C F C F C F C F C C C C C C 2 8+ 00 2 9 + 0 0 30+00PRC Sta. 30+48.05 31+00 PT Sta. 31+14.39 32+00 PRC Sta. 35+64.61PCC Sta. 37+16.57.02.02STREAM C243.3242.8PI = 28+25.00 EL = 241.76' VC = 20' PI = 29+30.00 EL = 243.23' VC = 20' PI = 31+55.00 EL = 242.67' VC = 30' (+)0.5000%(+)1.4000% (+)1.4000%(-)0.2500%(-)0.2500% (+)1.3000% -L1- STA. 31+13.00 BEGIN BOARDWALK 2 -L1- STA. 31+33.00 END BOARDWALK 2 CL OF GREENWAY EXISTING GRADE AT CL OF GREENWAY PROPOSED GRADE AT El = 241.20(+) 0.6000% (+) 1.0000%El = 242.20(-) 0.5000% (+) 1.2000%EL. = 241.35STA. 31+20.00END DITCH RT.EL. = 241.30 STA. 31+25.00 BEGIN DITCH LT.PI =29+50.00PI =28+50.00H14014.00 SCALE: 1"=30' GREENWAY ENGINEER HYDRAULICS ENGINEER PROJECT NO.: REVISIONS: NO.DATE DATE: 919-996-4785 RALEIGH, NC 27601 SUITE 600 222 W. HARGETT ST, RALEIGH MUNICIPAL BUILDING CULTURAL RESOURCES RECREATION and PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com T 919.380.8750 Raleigh, NC 27603 Suite 1100 223 West Street, Firm License No. C-1051 LISA SCHIFFBAUER, PROJECT MANAGER CONTACT: Raleigh, NC 27606 VHB Engineering NC, P.C. (C-3705) 940 Main Campus Drive, Suite 500 SEE DETAIL 6 EMBANKMENT RIP RAP AT SEE DETAIL 6 EMBANKMENT RIP RAP AT SEE DETAIL 1 SPECIAL CUT DITCH SEE DETAIL 1 SPECIAL CUT DITCH SEE DETAIL 6 EMBANKMENT RIP RAP AT SEE DETAIL 6 EMBANKMENT RIP RAP AT240SEE SHEET 6MATCHLINE -L1- STA 27+00.00230 240 250 27 28 29 30 31 32 33 230 240 250 7 220 260 220 260-L1-MATCHLINE -L1- STA 33+00.00 SEE SHEET 8SEE SHEET 8MATCHLINE -L1- STA 33+00.00MATCHLINE -L1- STA 27+00.00 SEE SHEET 6S S SURFACE WATER DENOTES IMPACTS IN SHEET 9 OF 22 PERMIT DRAWING SITE 6 SITES 6 & 7SITE 7 SITE 6 SITE 7FF C F C F C F 31+00 32+00 MH MH MH MH EV276.5 276.2 W/E 259.5 W/E 240.4 W/E 240.4 W/E 247.3 (28.49 ACRES PER RECORDS)PIN 0786-51-2559DB 1592, PG 361AGGREGATES, INCBENCHMARK CAROLINA N/F BLDGRD W/E 259.5 W/E 240.4 W/E 240.4 W/E 247.3 SJ-02 RIPRAP SJ-01CRABTREE CREEKSJ-03 H14014.00 SCALE: 1"=30' GREENWAY ENGINEER HYDRAULICS ENGINEER PROJECT NO.: REVISIONS: NO.DATE DATE: 919-996-4785 RALEIGH, NC 27601 SUITE 600 222 W. HARGETT ST, RALEIGH MUNICIPAL BUILDING CULTURAL RESOURCES RECREATION and PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com T 919.380.8750 Raleigh, NC 27603 Suite 1100 223 West Street, Firm License No. C-1051 LISA SCHIFFBAUER, PROJECT MANAGER CONTACT: Raleigh, NC 27606 VHB Engineering NC, P.C. (C-3705) 940 Main Campus Drive, Suite 500MATCHLINE -L2- STA 21+50.00 SEE SHEET 1211 SITE 8 SITE 8 S S SURFACE WATER DENOTES IMPACTS IN SHEET 10 OF 22 PERMIT DRAWING MATCHLINE -L2- STA 21+50.00 SEE SHEET 1211 SITE 8 SITE 8 S S SURFACE WATER DENOTES IMPACTS IN SHEET 10 OF 22 PERMIT DRAWING 2GI SEE DETAIL 7 CONCRETE DITCH SEE DETAIL 6 EMBANKMENT RIP RAP AT 18" HDPE 10 SY GEOTEXTILE 3 TONS CLASS B RIP RAP SEE DETAIL 5 DDE =7 CY 20' @ 1.0% 2' BASE TAIL DITCH EST 92 SY GEOTEXTILE EST 32 TONS CLASS B RIP RAP SEE DETAIL 3 TOE PROTECTIONEST 243 SY GEOTEXTILE EST 85 TONS CLASS B RIP RAP SEE DETAIL 3 TOE PROTECTION EST 185 S Y GE OTE XTILE EST 65 T O NS CL ASS B RIP R AP SEE DET AIL 10 BE R M DIT C HEST 185 SY GEOTEXTILE EST 65 TONS CLASS B RIP RAP SEE DETAIL 10 BERM DITCH SEE DET AIL 11DDE =8 C Y14' @ 0.71 %4' B ASE T AIL DIT C H2GI SEE DETAIL 7 CONCRETE DITCH SEE DETAIL 6 EMBANKMENT RIP RAP AT 18" HDPE 10 SY GEOTEXTILE 3 TONS CLASS B RIP RAP SEE DETAIL 5 DDE =7 CY 20' @ 1.0% 2' BASE TAIL DITCH FC FF F F FFFFFFFF FFFCFF F F C C C C C CCCCCCCCCCCCCCCCCCCCCCFFFF F F F F CCC F F10+0011+0012 +0 0 13+00 1 4 + 0 0 15+0016+00 17+0018+00 19+0020 +00 21 +00 F FFF C C C C C F F F C F 1 4 + 0 0 15+0018+00 MH MH MH MH EV276.5 276.2 W/E 259.5 W/E 240.4 W/E 240.4 W/E 247.3 (28.49 ACRES PER RECORDS)PIN 0786-51-2559DB 1592, PG 361AGGREGATES, INCBENCHMARK CAROLINA N/F 2 2 5 2 2 5 225 225225225225225225225 225225225225225230230230230 2 3 0230230230230230230 230230230230230230235235235235235235235235235235 2 3 5 235 23523523 52352 3 5 2 3 5 240240240240240240240240240240 240240 2402402 4 0 240 240 240245245245245245245245245245 245 245245245245245 245245 245 245 245245250250250250250250250250250250 250 250250 250 2 5 0 2502502552552552552552552552552552552552 5 5 255255 255 255 255 255 255260 260 260260260260260 260260260260260260260260260260 260260 260 260 260 2652652652652652652 6 5 265265 265265 2 6 5 265265265265 2702702702702702 7 0 270 270 270 275275275275275275275 275275 275 2802802802 80 280 280 280 280 285285285285290290 295BLDGRD W/E 259.5 W/E 240.4 W/E 240.4 W/E 247.3 SJ-02 RIPRAP SJ-01CRABTREE CREEKSJ-03 H14014.00 SCALE: 1"=30' GREENWAY ENGINEER HYDRAULICS ENGINEER PROJECT NO.: REVISIONS: NO.DATE DATE: 919-996-4785 RALEIGH, NC 27601 SUITE 600 222 W. HARGETT ST, RALEIGH MUNICIPAL BUILDING CULTURAL RESOURCES RECREATION and PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com T 919.380.8750 Raleigh, NC 27603 Suite 1100 223 West Street, Firm License No. C-1051 LISA SCHIFFBAUER, PROJECT MANAGER CONTACT: Raleigh, NC 27606 VHB Engineering NC, P.C. (C-3705) 940 Main Campus Drive, Suite 500MATCHLINE -L2- STA 21+50.00 SEE SHEET 1211 SITE 8 SITE 8 S S SURFACE WATER DENOTES IMPACTS IN SHEET 11 OF 22 PERMIT DRAWING MATCHLINE -L2- STA 21+50.00 SEE SHEET 1211 SITE 8 SITE 8 S S SURFACE WATER DENOTES IMPACTS IN SHEET 11 OF 22 PERMIT DRAWING 2GI SEE DETAIL 7 CONCRETE DITCH SEE DETAIL 6 EMBANKMENT RIP RAP AT 18" HDPE 10 SY GEOTEXTILE 3 TONS CLASS B RIP RAP SEE DETAIL 5 DDE =7 CY 20' @ 1.0% 2' BASE TAIL DITCH EST 92 SY GEOTEXTILE EST 32 TONS CLASS B RIP RAP SEE DETAIL 3 TOE PROTECTIONEST 243 SY GEOTEXTILE EST 85 TONS CLASS B RIP RAP SEE DETAIL 3 TOE PROTECTION EST 185 S Y GE OTE XTILE EST 65 T O NS CL ASS B RIP R AP SEE DET AIL 10 BE R M DIT C HEST 185 SY GEOTEXTILE EST 65 TONS CLASS B RIP RAP SEE DETAIL 10 BERM DITCH SEE DET AIL 11DDE =8 C Y14' @ 0.71 %4' B ASE T AIL DIT C H2GI SEE DETAIL 7 CONCRETE DITCH SEE DETAIL 6 EMBANKMENT RIP RAP AT 18" HDPE 10 SY GEOTEXTILE 3 TONS CLASS B RIP RAP SEE DETAIL 5 DDE =7 CY 20' @ 1.0% 2' BASE TAIL DITCH 225230235235240245245250255FC FF F F FFFFFFFF FFFCFF F F C C C C C CCCCCCCCCCCCCCCCCCCCCCFFFF F F F F CCC F F10+0011+0012 +0 0 13+00 1 4 + 0 0 15+0016+00 17+0018+00 19+0020 +00 21 +00 F FFF C C C C C F F F C F 1 4 + 0 0 15+0018+00 MH 233.7233.2 232.7 PIN 0786-51-7568BM 2016, PG 1713 DB 2204, PG 48JUNE T. F. TUNGDAVID C. C. & N/F 122223242526272829 210 220 230 240 250 210 220 230 240 250 MATCHLINE -L2- STA. 21+50.00 SEE SHEET 11AMATCHLINE -L2- STA. 29+50.00 SEE SHEET 13MATCHLINE -L2- STA 29+50.00 SEE SHEET 13MATCHLINE -L2- STA 21+50.00 SEE SHEET 11SITE 9 SITE 9 SITE 10 SITE 10 SHEET 12 OF 22 PERMIT DRAWING S S SURFACE WATER DENOTES IMPACTS IN CL OF GREENWAY EXISTING GRADE AT CL OF GREENWAY PROPOSED GRADE AT PI = 24+51.49 EL = 241.00' (+)0.0000% VC = 50' PI = 27+57.03 EL = 241.00' (-)3 .0000% VC = 40' (-)3 .0000% -L2_REV- STA. 25+00.37 BEGIN BRIDGE 4 -L2_REV- STA. 27+15.37 END BRIDGE 4 PI = 22+17.63 EL = 232.35' (-)0.4000%(+)3.7000% VC = 250' EL. = 236.32 -L2_REV- STA. 23+24.33 -L2- STA. 23+24.33=EL. = 241.30STA. 24+15END DITCH RT.36" HDPE El = 229.00(-) 8.8000%(+) 1.6000%El = 231.00(+) 8.0000%El = 237.00(+) 28.6667%PI =28+75.000El = 236.00(-) 14.0000 %(-) 3 .6000%PI =29+25.000El = 234.20EL. = 239.50STA. 28+50.00BEGIN DITCH LT.PI =24+00.00PI =23+25.00PI =22+00.00El = 231.00(+) 6.2500%(+) 36.0000%EL. = 230.00STA. 26+84.00BEGIN DITCH LT.El = 240.00PI =27+25.00PI =27+00.00EL. = 241.00 STA. 27+30.00 END DITCH LT.(+) 20.0000% #5 WALL RT #6 WALL LT PI =21+50.00El = 233.40H14014.00 SCALE: 1"=30' GREENWAY ENGINEER HYDRAULICS ENGINEER PROJECT NO.: REVISIONS: NO.DATE DATE: 919-996-4785 RALEIGH, NC 27601 SUITE 600 222 W. HARGETT ST, RALEIGH MUNICIPAL BUILDING CULTURAL RESOURCES RECREATION and PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com T 919.380.8750 Raleigh, NC 27603 Suite 1100 223 West Street, Firm License No. C-1051 LISA SCHIFFBAUER, PROJECT MANAGER CONTACT: Raleigh, NC 27606 VHB Engineering NC, P.C. (C-3705) 940 Main Campus Drive, Suite 500 STREAM J 36" HDPE 28 SY GEOTEXTILE 11 TONS CLASS B RIP RAP SEE DETAIL 6 EMBANKMENT RIP RAP AT SEE DETAIL 6 EMBANKMENT RIP RAP AT EST 262 SY GEOTEXTILE EST 87 TONS CLASS B RIP RAP SEE DETAIL 4 SPECIAL CUT DITCH EST 25 SY GEOTEXTILE EST 10 TONS CLASS B RIP RAP SEE DETAIL 3 TOE PROTECTION EST 43 SY GEOTEXTILE EST 15 TONS CLASS B RIP RAP SEE DETAIL 4 SPECIAL CUT DITCH EST 262 SY GEOTEXTILE EST 85 TONS CLASS B RIP RAP SEE DETAIL 4 SPECIAL CUT DITCH EST 185 SY GEOTEXTILE EST 65 TONS CLASS B RIP RAP SEE DETAIL 10 BERM DITCH SEE DETAIL 11 DDE =8 CY 14' @ 0.71% 4' BASE TAIL DITCH EST 157 SY GEOTEXTILE EST 53 TONS CLASS B RIP RAP SEE DETAIL 12 BERM DITCH 28 SY GEOTEXTILE 11 TONS CLASS B RIP RAP SEE DETAIL 6 EMBANKMENT RIP RAP AT SEE DETAIL 11 DDE =8 CY 14' @ 0.71% 4' BASE TAIL DITCH C C F C F C F C F C F C F C F C FCF C F C F C C C F C FF C F C C CCCCCFCFCFCFCFC F22+00 25+0023+00 24 +00 26+00 28+0029+0027+00 F F F F C F C C C22+00 PC Sta. 22+35.39 -L2- PCC Sta. 23+24.33 27+00 SEE DETAIL 6 EMBANKMENT RIP RAP AT FROM STA. 27+50 TO STA. 29+00 LT. -L2- MH 233.7233.2 232.7 PIN 0786-51-7568BM 2016, PG 1713 DB 2204, PG 48JUNE T. F. TUNGDAVID C. C. & N/F225225225225225225225 2252 30230230230 230230230230235235235235235235 235235240240240240240 2 40 2 40 240 240 245245245245245 245 245245 245 250250250250250250250 250250 25 0 255255255255 255 255255 2 5 5 260260260260 260 260 260 265265265 2 6 5 270270270270 270 2 7 0 275275 2 7 5280280122223242526272829 210 220 230 240 250 210 220 230 240 250 MATCHLINE -L2- STA. 21+50.00 SEE SHEET 11AMATCHLINE -L2- STA. 29+50.00 SEE SHEET 13MATCHLINE -L2- STA 29+50.00 SEE SHEET 13MATCHLINE -L2- STA 21+50.00 SEE SHEET 11SITE 9 SITE 9 SITE 10 SITE 10 SHEET 13 OF 22 PERMIT DRAWING S S SURFACE WATER DENOTES IMPACTS IN CL OF GREENWAY EXISTING GRADE AT CL OF GREENWAY PROPOSED GRADE AT PI = 24+51.49 EL = 241.00' (+)0.0000% VC = 50' PI = 27+57.03 EL = 241.00' (-)3 .0000% VC = 40' (-)3 .0000% -L2_REV- STA. 25+00.37 BEGIN BRIDGE 4 -L2_REV- STA. 27+15.37 END BRIDGE 4 PI = 22+17.63 EL = 232.35' (-)0.4000%(+)3.7000% VC = 250' EL. = 236.32 -L2_REV- STA. 23+24.33 -L2- STA. 23+24.33=EL. = 241.30STA. 24+15END DITCH RT.36" HDPE El = 229.00(-) 8.8000%(+) 1.6000%El = 231.00(+) 8.0000%El = 237.00(+) 28.6667%PI =28+75.000El = 236.00(-) 14.0000 %(-) 3 .6000%PI =29+25.000El = 234.20EL. = 239.50STA. 28+50.00BEGIN DITCH LT.PI =24+00.00PI =23+25.00PI =22+00.00El = 231.00(+) 6.2500%(+) 36.0000%EL. = 230.00STA. 26+84.00BEGIN DITCH LT.El = 240.00PI =27+25.00PI =27+00.00EL. = 241.00 STA. 27+30.00 END DITCH LT.(+) 20.0000% #5 WALL RT #6 WALL LT PI =21+50.00El = 233.40H14014.00 SCALE: 1"=30' GREENWAY ENGINEER HYDRAULICS ENGINEER PROJECT NO.: REVISIONS: NO.DATE DATE: 919-996-4785 RALEIGH, NC 27601 SUITE 600 222 W. HARGETT ST, RALEIGH MUNICIPAL BUILDING CULTURAL RESOURCES RECREATION and PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com T 919.380.8750 Raleigh, NC 27603 Suite 1100 223 West Street, Firm License No. C-1051 LISA SCHIFFBAUER, PROJECT MANAGER CONTACT: Raleigh, NC 27606 VHB Engineering NC, P.C. (C-3705) 940 Main Campus Drive, Suite 500 STREAM J 36" HDPE 28 SY GEOTEXTILE 11 TONS CLASS B RIP RAP SEE DETAIL 6 EMBANKMENT RIP RAP AT SEE DETAIL 6 EMBANKMENT RIP RAP AT EST 262 SY GEOTEXTILE EST 87 TONS CLASS B RIP RAP SEE DETAIL 4 SPECIAL CUT DITCH EST 25 SY GEOTEXTILE EST 10 TONS CLASS B RIP RAP SEE DETAIL 3 TOE PROTECTION EST 43 SY GEOTEXTILE EST 15 TONS CLASS B RIP RAP SEE DETAIL 4 SPECIAL CUT DITCH EST 262 SY GEOTEXTILE EST 85 TONS CLASS B RIP RAP SEE DETAIL 4 SPECIAL CUT DITCH EST 185 SY GEOTEXTILE EST 65 TONS CLASS B RIP RAP SEE DETAIL 10 BERM DITCH SEE DETAIL 11 DDE =8 CY 14' @ 0.71% 4' BASE TAIL DITCH EST 157 SY GEOTEXTILE EST 53 TONS CLASS B RIP RAP SEE DETAIL 12 BERM DITCH 28 SY GEOTEXTILE 11 TONS CLASS B RIP RAP SEE DETAIL 6 EMBANKMENT RIP RAP AT SEE DETAIL 11 DDE =8 CY 14' @ 0.71% 4' BASE TAIL DITCH 225230230C C F C F C F C F C F C F C F C FCF C F C F C C C F C FF C F C C CCCCCFCFCFCFCFC F22+00 25+0023+00 24 +00 26+00 28+0029+0027+00 225230235240245250 260 F F F F C F C C C22+00 PC Sta. 22+35.39 -L2- PCC Sta. 23+24.33 27+00 SEE DETAIL 6 EMBANKMENT RIP RAP AT FROM STA. 27+50 TO STA. 29+00 LT. -L2- MH 230.6 232.3 S PIN 1786-61-9227LOT 288DB 10019, PG 313 KHALED A. HARFOUSHN/F PIN 0786-71-0351LOT 287DB 15666, PG 797 ELIZABETH ANN CRAIG JOSHUA RAY CRAIG ANDN/F FFFFCCFCFCFFFFFFFFFCF C F C F C F C C C F F F F F F F F F F F F F F F F F F F F F C C C F C F C F F F F PC Sta. 39+53.11 4 0 + 0 0 PT Sta. 42+77.69 PC Sta. 43+16.7538+0039+0041+00 42+00 43+00 44+00 -L2- PT Sta. 44+27.68 CRABTREE CREEK C/L.02.0 2 STREAM F WETLAND H WETLAND IWETLAND K CRABTREE CREEKCL OF GREENWAY EXISTING GRADE AT CL OF GREENWAY PROPOSED GRADE AT (-)0.5500%(+)1.2000% (+)1.2000%(-)0.5000% (-)0.5000% 18" HDPE 18" HDPE H14014.00 SCALE: 1"=30' GREENWAY ENGINEER HYDRAULICS ENGINEER PROJECT NO.: REVISIONS: NO.DATE DATE: 919-996-4785 RALEIGH, NC 27601 SUITE 600 222 W. HARGETT ST, RALEIGH MUNICIPAL BUILDING CULTURAL RESOURCES RECREATION and PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com T 919.380.8750 Raleigh, NC 27603 Suite 1100 223 West Street, Firm License No. C-1051 LISA SCHIFFBAUER, PROJECT MANAGER CONTACT: Raleigh, NC 27606 VHB Engineering NC, P.C. (C-3705) 940 Main Campus Drive, Suite 500 18" HDPE 18" HDPE SEE DETAIL 6 EMBANKMENT RIP RAP AT SEE DETAIL 6 EMBANKMENT RIP RAP AT 18" HDPE PI = 37+90.40 EL = 231.43' VC = 100' PI = 39+20.40 EL = 232.99' VC = 150' PI = 44+85.00 EL = 230.16' VC = 80' ( Not to Scale) RIP RAP AT EMBANKMENT FROM STA. 42+84 TO STA. 42+97 RT -L2- FROM STA. 39+11 TO STA. 39+26 RT -L2- DETAIL 6 Grade Ditch 1.5' GEOTEXTILE Geotextile= 10 sy Type of Liner= 4 TONS,CL I Rip-Rap 10'min. 1.0'min. WETLAND I F F F F F F F F PT Sta. 42+77.69 43+00 S 15 " DIP INV=219.59'RIM=223.55'TOP OF CONCRETE=224.75' OTCB INV=219.81' STREAM F WETLAND H WETLAND IWETLAND K CRABTREE CREEKWETLAND I 18" HDPE SEE DETAIL 6 EMBANKMENT RIP RAP AT MATCHLINE -L2- STA 37+50.00 SEE SHEET 1314 220 230 240 250 210 220 230 240 250 210 37 38 39 40 41 42 43 44 MATCHLINE -L2- STA 45+00.00 SEE SHEET 15MATCHLINE -L2- STA 37+50.00 SEE SHEET 13MAT CHLI NE - L 2- S T A 4 5 + 0 0. 0 0 S E E S HE E T 1 5 WETLAND DENOTES FILL INFF CLEARING DENOTES MECHANIZED* * * * ** * ** * * S S SURFACE WATER DENOTES IMPACTS IN SITE 12 SITE 12 SITE 11 SITE 11 SHEET 14 OF 22 PERMIT DRAWING -L2-FFFFFFF39+00 MH 230.6 232.3 S PIN 1786-61-9227LOT 288DB 10019, PG 313 KHALED A. HARFOUSHN/F PIN 0786-71-0351LOT 287DB 15666, PG 797 ELIZABETH ANN CRAIG JOSHUA RAY CRAIG ANDN/F 225 225 225 225225 225225 225225225225225225225 225230230230 230 230 230230230 230 2302302 3 0230 230230 2302302302302302302352352352352352 35 235 2352402402402 40240 240 245245245245 245 245 245 250250250255 FFFFCCFCFCFFFFFFFFFCF C F C F C F C C C F F F F F F F F F F F F F F F F F F F F F C C C F C F C F F F F PC Sta. 39+53.11 4 0 + 0 0 PT Sta. 42+77.69 PC Sta. 43+16.7538+0039+0041+00 42+00 43+00 44+00 -L2- PT Sta. 44+27.68 CRABTREE CREEK C/L.02.0 2 STREAM F WETLAND H WETLAND IWETLAND K CRABTREE CREEKCL OF GREENWAY EXISTING GRADE AT CL OF GREENWAY PROPOSED GRADE AT (-)0.5500%(+)1.2000% (+)1.2000%(-)0.5000% (-)0.5000% 18" HDPE 18" HDPE H14014.00 SCALE: 1"=30' GREENWAY ENGINEER HYDRAULICS ENGINEER PROJECT NO.: REVISIONS: NO.DATE DATE: 919-996-4785 RALEIGH, NC 27601 SUITE 600 222 W. HARGETT ST, RALEIGH MUNICIPAL BUILDING CULTURAL RESOURCES RECREATION and PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com T 919.380.8750 Raleigh, NC 27603 Suite 1100 223 West Street, Firm License No. C-1051 LISA SCHIFFBAUER, PROJECT MANAGER CONTACT: Raleigh, NC 27606 VHB Engineering NC, P.C. (C-3705) 940 Main Campus Drive, Suite 500 18" HDPE 18" HDPE SEE DETAIL 6 EMBANKMENT RIP RAP AT SEE DETAIL 6 EMBANKMENT RIP RAP AT 18" HDPE 225 225 230 PI = 37+90.40 EL = 231.43' VC = 100' PI = 39+20.40 EL = 232.99' VC = 150' PI = 44+85.00 EL = 230.16' VC = 80' ( Not to Scale) RIP RAP AT EMBANKMENT FROM STA. 42+84 TO STA. 42+97 RT -L2- FROM STA. 39+11 TO STA. 39+26 RT -L2- DETAIL 6 Grade Ditch 1.5' GEOTEXTILE Geotextile= 10 sy Type of Liner= 4 TONS,CL I Rip-Rap 10'min. 1.0'min. WETLAND I F F F F F F F F PT Sta. 42+77.69 43+00 S 15 " DIP INV=219.59'RIM=223.55'TOP OF CONCRETE=224.75' OTCB INV=219.81' STREAM F WETLAND H WETLAND IWETLAND K CRABTREE CREEKWETLAND I 225 230230 18" HDPE SEE DETAIL 6 EMBANKMENT RIP RAP AT MATCHLINE -L2- STA 37+50.00 SEE SHEET 1314 220 230 240 250 210 220 230 240 250 210 37 38 39 40 41 42 43 44 MATCHLINE -L2- STA 45+00.00 SEE SHEET 15MATCHLINE -L2- STA 37+50.00 SEE SHEET 13MAT CHLI NE - L 2- S T A 4 5 + 0 0. 0 0 S E E S HE E T 1 5 WETLAND DENOTES FILL INFF CLEARING DENOTES MECHANIZED* * * * ** * ** * * S S SURFACE WATER DENOTES IMPACTS IN SITE 12 SITE 12 SITE 11 SITE 11 SHEET 15 OF 22 PERMIT DRAWING -L2-FFFFFFF39+00 MH MH MH Si gnSPIN 0786-71-0351LOT 287DB 15666, PG 797ELIZABETH ANN CRAIGJOSHUA RAY CRAIG ANDN/FPIN 0786-71-1358LOT 286DB 15033, PG 273CHARLES S. NICHOLSJULIA G. HAFER AND N/FS 15" DIPINV=219.59'RIM=223.55'TOP OF CONCRETE=224.75'OTCBINV=219.81'STREAM GEL. = 249.68 -PLCON- STA. 14+60.00 END GRADE EL. = 244.38 -PLCON- STA. 13+10.00 END BRIDGE PI = 10+40.00 EL = 240.48' PI = 10+50.00 EL = 240.18' PI = 10+60.00 EL = 239.98' PI = 10+70.00 EL = 239.88' PI = 10+80.00 EL = 239.88' PI = 10+90.00 EL = 239.98' (+)2.00% (+)2.00%(+)1.00%(+)0.00%(-)1.00%(-)2.00%(-)3.00%(-)4.00%PI = 13+20.00 EL = 244.58' PI = 13+70.00 EL = 246.08' (+)4.00% (+)3.00% EL. = 240.68 -PLCON- STA. 10+35.00 BEGIN GRADE EL. = 242.38 -PLCON- STA. 12+10.00 BEGIN BRIDGE H14014.00 SCALE: 1"=30' GREENWAY ENGINEER HYDRAULICS ENGINEER PROJECT NO.: REVISIONS: NO.DATE DATE: 919-996-4785 RALEIGH, NC 27601 SUITE 600 222 W. HARGETT ST, RALEIGH MUNICIPAL BUILDING CULTURAL RESOURCES RECREATION and PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com T 919.380.8750 Raleigh, NC 27603 Suite 1100 223 West Street, Firm License No. C-1051 LISA SCHIFFBAUER, PROJECT MANAGER CONTACT: Raleigh, NC 27606 VHB Engineering NC, P.C. (C-3705) 940 Main Campus Drive, Suite 500 CL OF GREENWAY EXISTING GRADE AT CL OF GREENWAY PROPOSED GRADE AT EL. = 231.67 -L2_REV- STA. 47+18.22 TIE TO EXISTING GREENWAY END GRADE PI = 46+12.21 EL = 231.82' (+)1.3000% VC = 25' PI = 47+07.04 EL = 231.82' (+)0.0000%(-)1.3000% VC = 20' RETAIN RETAIN FCFFFFFFFFFFCCCFFFFFFPC Sta. 45+90.21 PT Sta. 46+28.53 PC Sta. 46+66.36 PRC Sta. 46+88.81 PT Sta. 47+18.22 POT Sta. 47+83.07 46+0047+00POT Sta. 10+00.00 PI Sta. 10+35.00 PI Sta. 11+90.00 PI Sta. 13+45.00 .02 .02 POT Sta. 14+95.00 S 15" DIP INV=219.81'STREAM GWETLAND HFCFFFFS 15" DIPINV=219.59'RIM=223.55'TOP OF CONCRETE=224.75'OTCBRETAIN S 1546471045 220 230 240 250 260 220 230 240 250 260-PLCON- MATCHLINE -L2- STA 45+00.00 SEE SHEET 14 -L2- 220 230 240 250 260 11 12 13 14 15 WETLAND DENOTES FILL INFF CLEARING DENOTES MECHANIZED* * * * ** * ** * *SHEET 16 OF 22 PERMIT DRAWING SITE 14 SITE 14 MH MH MH Si gnSPIN 0786-71-0351LOT 287DB 15666, PG 797ELIZABETH ANN CRAIGJOSHUA RAY CRAIG ANDN/FPIN 0786-71-1358LOT 286DB 15033, PG 273CHARLES S. NICHOLSJULIA G. HAFER AND N/F225225225225225225225225230230230230 2 3 0 230230230230230 2352 3 5 235235235235 2352 3 5235 240240240240240240 240240 245 245 245245245245245245245 245 250250250250 250250 2502502502552 5 5 255255255255255 255 255255260260260260260 260 265265265 270270275275280245 250 240235245 250255 240245235260265260 290S 15" DIPINV=219.59'RIM=223.55'TOP OF CONCRETE=224.75'OTCBINV=219.81'STREAM GEL. = 249.68 -PLCON- STA. 14+60.00 END GRADE EL. = 244.38 -PLCON- STA. 13+10.00 END BRIDGE PI = 10+40.00 EL = 240.48' PI = 10+50.00 EL = 240.18' PI = 10+60.00 EL = 239.98' PI = 10+70.00 EL = 239.88' PI = 10+80.00 EL = 239.88' PI = 10+90.00 EL = 239.98' (+)2.00% (+)2.00%(+)1.00%(+)0.00%(-)1.00%(-)2.00%(-)3.00%(-)4.00%PI = 13+20.00 EL = 244.58' PI = 13+70.00 EL = 246.08' (+)4.00% (+)3.00% EL. = 240.68 -PLCON- STA. 10+35.00 BEGIN GRADE EL. = 242.38 -PLCON- STA. 12+10.00 BEGIN BRIDGE H14014.00 SCALE: 1"=30' GREENWAY ENGINEER HYDRAULICS ENGINEER PROJECT NO.: REVISIONS: NO.DATE DATE: 919-996-4785 RALEIGH, NC 27601 SUITE 600 222 W. HARGETT ST, RALEIGH MUNICIPAL BUILDING CULTURAL RESOURCES RECREATION and PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com T 919.380.8750 Raleigh, NC 27603 Suite 1100 223 West Street, Firm License No. C-1051 LISA SCHIFFBAUER, PROJECT MANAGER CONTACT: Raleigh, NC 27606 VHB Engineering NC, P.C. (C-3705) 940 Main Campus Drive, Suite 500 CL OF GREENWAY EXISTING GRADE AT CL OF GREENWAY PROPOSED GRADE AT EL. = 231.67 -L2_REV- STA. 47+18.22 TIE TO EXISTING GREENWAY END GRADE PI = 46+12.21 EL = 231.82' (+)1.3000% VC = 25' PI = 47+07.04 EL = 231.82' (+)0.0000%(-)1.3000% VC = 20' RETAIN RETAIN FCFFFFFFFFFFCCCFFFFFFPC Sta. 45+90.21 PT Sta. 46+28.53 PC Sta. 46+66.36 PRC Sta. 46+88.81 PT Sta. 47+18.22 POT Sta. 47+83.07 46+0047+00POT Sta. 10+00.00 PI Sta. 10+35.00 PI Sta. 11+90.00 PI Sta. 13+45.00 .02 .02 POT Sta. 14+95.00 S 15" DIP INV=219.81'STREAM GWETLAND H225225230FCFFFFS 15" DIPINV=219.59'RIM=223.55'TOP OF CONCRETE=224.75'OTCBRETAIN S 1546471045 220 230 240 250 260 220 230 240 250 260-PLCON- MATCHLINE -L2- STA 45+00.00 SEE SHEET 14 -L2- 220 230 240 250 260 11 12 13 14 15 WETLAND DENOTES FILL INFF CLEARING DENOTES MECHANIZED* * * * ** * ** * *SHEET 17 OF 22 PERMIT DRAWING SITE 14 SITE 14 MH MH MH MH MH MH MH EVEVEVSign255 .5 255 .9 WP -10002{L LOT 111 PIN 0786-22-7860 BM 2008, PG 1009 DB 11903, PG 91 ASSOCIATION INC HOMEOWNERS AT UMSTEAD THE HAMPTONS N/F BM 2008, PG 1008 (60' PUBLIC R/W) POYNER RD LOT 111 PIN 0786-22-7860 BM 2008, PG 1009 DB 11903, PG 91 ASSOCIATION INC HOMEOWNERS AT UMSTEAD THE HAMPTONS N/F 17 S S SURFACE WATER DENOTES IMPACTS IN SHEET 18 OF 22 PERMIT DRAWING H14014.00 SCALE: 1"=30' GREENWAY ENGINEER HYDRAULICS ENGINEER PROJECT NO.: REVISIONS: NO.DATE DATE: 919-996-4785 RALEIGH, NC 27601 SUITE 600 222 W. HARGETT ST, RALEIGH MUNICIPAL BUILDING CULTURAL RESOURCES RECREATION and PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com T 919.380.8750 Raleigh, NC 27603 Suite 1100 223 West Street, Firm License No. C-1051 LISA SCHIFFBAUER, PROJECT MANAGER CONTACT: Raleigh, NC 27606 VHB Engineering NC, P.C. (C-3705) 940 Main Campus Drive, Suite 500 SITE 15 SITE 15 F C CFC F C F C FC FCFC F C F C F C F C F F F F FF FCCCCFFFFCCC C C C C C C F F F F FC CC C F F F F F C C C C F C F C F C C C C CCFCF F F F PT Sta. 4+46.75 PC Sta. 3+78.33 PC Sta. 6+93.22 4+00 5+00 6+00 7+00 8+00 10+0011+00 -L1- 11+00 12+00 13+00 14+00 15+00 16+00 10+00 9+00PC Sta. 12+70.78 POT Sta. 16+02.43 -Y5- APPROACH RAILS CRABTREE CREEK C/LTYPE-IIIGREU TL-315+00POT S ta . 19+00 .00 16+0017+0018+0019+00-EBCR-STREAM B 17 S S SURFACE WATER DENOTES IMPACTS IN SHEET 18 OF 22 PERMIT DRAWING DI 15" HDPE 5 SY GEOTEXTILE 1 TON CLASS B RIP RAP SEE DETAIL 6 EMBANKMENT RIP RAP AT JB w/Slab Lid 7 SY GEOTEXTILE 2 TONS CLASS B RIP RAP 15" HDPE AND TIE TO JB SECTION OF 15" CSP REPLACE DAMAGED SEE DETAIL 5 DDE =4 CY 20' @ 1.50% 2' BASE TAIL DITCH B 2:12:1D ( Not to Scale) 2' BASE TAIL DITCH -Y5- STA. 11+31 TO STA. 11+50 RT. DETAIL 5 B=2 Ft. Min. D=1 Ft. Ground Natural Ground Natural ( Not to Scale) RIP RAP AT EMBANKMENT FROM -Y5- STA. 12+91 TO STA. 12+99 RT DETAIL 6 Grade Ditch 1.5' GEOTEXTILE Geotextile= 10 sy Type of Liner= 4 TONS,CL I Rip-Rap 10'min. 1.0'min. SITE 15 SITE 15 DI 15" HDPE 5 SY GEOTEXTILE 1 TON CLASS B RIP RAP SEE DETAIL 6 EMBANKMENT RIP RAP AT F F F F F13+00 PC Sta.14+40.41 MH MH MH MH MH MH MH EVEVEVSign255 .5 255 .9 WP -10002{L LOT 111 PIN 0786-22-7860 BM 2008, PG 1009 DB 11903, PG 91 ASSOCIATION INC HOMEOWNERS AT UMSTEAD THE HAMPTONS N/F BM 2008, PG 1008 (60' PUBLIC R/W) POYNER RD LOT 111 PIN 0786-22-7860 BM 2008, PG 1009 DB 11903, PG 91 ASSOCIATION INC HOMEOWNERS AT UMSTEAD THE HAMPTONS N/F 235235235235235235 235235235235235235 235235235235 235 235 235 235235235 235 240240240240240240240 240 240240 240 240 2402 4 0 240240 245245245245245245245245245 245 245 245 245 245245 245 245 250250250250250 250 250 250 250 250 250255255255255255 255255 255 255 255255255260260260 260 260260 260 260265 265265265 265 265 2 6 5265270 2 7 0 270270 270 2702 7 5 275 275 2 7 5 2 7 5 280 2 8 0 280 2 8 0 285 300 17 S S SURFACE WATER DENOTES IMPACTS IN SHEET 19 OF 22 PERMIT DRAWING H14014.00 SCALE: 1"=30' GREENWAY ENGINEER HYDRAULICS ENGINEER PROJECT NO.: REVISIONS: NO.DATE DATE: 919-996-4785 RALEIGH, NC 27601 SUITE 600 222 W. HARGETT ST, RALEIGH MUNICIPAL BUILDING CULTURAL RESOURCES RECREATION and PARKS,GREENWAYCRABTREE CREEK WEST EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com T 919.380.8750 Raleigh, NC 27603 Suite 1100 223 West Street, Firm License No. C-1051 LISA SCHIFFBAUER, PROJECT MANAGER CONTACT: Raleigh, NC 27606 VHB Engineering NC, P.C. (C-3705) 940 Main Campus Drive, Suite 500 SITE 15 SITE 15 F C CFC F C F C FC FCFC F C F C F C F C F F F F FF FCCCCFFFFCCC C C C C C C F F F F FC CC C F F F F F C C C C F C F C F C C C C CCFCF F F F PT Sta. 4+46.75 PC Sta. 3+78.33 PC Sta. 6+93.22 4+00 5+00 6+00 7+00 8+00 10+0011+00 -L1- 11+00 12+00 13+00 14+00 15+00 16+00 10+00 9+00PC Sta. 12+70.78 POT Sta. 16+02.43 -Y5- APPROACH RAILS CRABTREE CREEK C/LTYPE-IIIGREU TL-315+00POT S ta . 19+00 .00 16+0017+0018+0019+00-EBCR-STREAM B 17 S S SURFACE WATER DENOTES IMPACTS IN SHEET 19 OF 22 PERMIT DRAWING DI 15" HDPE 5 SY GEOTEXTILE 1 TON CLASS B RIP RAP SEE DETAIL 6 EMBANKMENT RIP RAP AT JB w/Slab Lid 7 SY GEOTEXTILE 2 TONS CLASS B RIP RAP 15" HDPE AND TIE TO JB SECTION OF 15" CSP REPLACE DAMAGED SEE DETAIL 5 DDE =4 CY 20' @ 1.50% 2' BASE TAIL DITCH B 2:12:1D ( Not to Scale) 2' BASE TAIL DITCH -Y5- STA. 11+31 TO STA. 11+50 RT. DETAIL 5 B=2 Ft. Min. D=1 Ft. Ground Natural Ground Natural ( Not to Scale) RIP RAP AT EMBANKMENT FROM -Y5- STA. 12+91 TO STA. 12+99 RT DETAIL 6 Grade Ditch 1.5' GEOTEXTILE Geotextile= 10 sy Type of Liner= 4 TONS,CL I Rip-Rap 10'min. 1.0'min. 235 240 SITE 15 SITE 15 DI 15" HDPE 5 SY GEOTEXTILE 1 TON CLASS B RIP RAP SEE DETAIL 6 EMBANKMENT RIP RAP AT F F F F F13+00 PC Sta.14+40.41 220 230 240 210 220 230 240 210 -L2- 42+75 WETWET CLEARINGMECHANIZEDFILLPERMANENT SHEET 20 OF 22 PERMIT DRAWING 229.37 0.02 3:1S.S.228.77 2:1 S.S.225.55 H14014.00 SCALE: 1"=30' GREENWAY ENGINEER HYDRAULICS ENGINEER (919) 557-0929 Cary, NC 27518 Suite 101 1151 SE Cary Parkway NC FIRM LICENSE No: F-1148 DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS PROJECT NO.: REVISIONS: NO.DATE DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS DATE: LISA POTTS, PROJECT MANAGER CONTACT:GREENWAYCRABTREE CREEK WEST 919-996-4785 RALEIGH, NC 27601 SUITE 600 222 W. HARGETT ST, RALEIGH MUNICIPAL BUILDING CULTURAL RESOURCES RECREATION and PARKS, NOVEMBER, 2018EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com T 919.380.8750 Raleigh, NC 27603 Suite 1100 223 West Street, Firm License No. C-1051 220 230 240 210 220 230 240 210 -L2- 45+32 WETWET CLEARINGMECHANIZEDPERMANENT FILLSHEET 21 OF 22 PERMIT DRAWING 228.90 S.S.228.59S.S.228.57 3:1 3:10.02 H14014.00 SCALE: 1"=30' GREENWAY ENGINEER HYDRAULICS ENGINEER (919) 557-0929 Cary, NC 27518 Suite 101 1151 SE Cary Parkway NC FIRM LICENSE No: F-1148 DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS PROJECT NO.: REVISIONS: NO.DATE DO NOT USE FOR CONSTRUCTION PRELIMINARY PLANS DATE: LISA POTTS, PROJECT MANAGER CONTACT:GREENWAYCRABTREE CREEK WEST 919-996-4785 RALEIGH, NC 27601 SUITE 600 222 W. HARGETT ST, RALEIGH MUNICIPAL BUILDING CULTURAL RESOURCES RECREATION and PARKS, NOVEMBER, 2018EBENEZER CHURCH RD. TO PICARDY DR.www.stewartinc.com T 919.380.8750 Raleigh, NC 27603 Suite 1100 223 West Street, Firm License No. C-1051 Hand Existing Existing Permanent Temp. Excavation Mechanized Clearing Permanent Temp. Channel Channel Natural Site Station Structure Fill In Fill In in Clearing in SW SW Impacts Impacts StreamNo. (From/To) Size / Type Wetlands Wetlands Wetlands in Wetlands Wetlands impacts impacts Permanent Temp. Design (ac) (ac) (ac) (ac) (ac) (ac) (ac) (ft) (ft) (ft) 1 5+41/5+52 -L1- LT. STABILIZATION < 0.01 8 2 11+14/11+27 -L1- RT. STABILIZATION < 0.01 11 3 15+24/15+35 -L1- RT. STABILIZATION < 0.01 6 4 23+24/23+37 -L1- RT. STABILIZATION < 0.01 8 5 23+17/23+32 -L1- LT. STABILIZATION < 0.01 8 6 31+16/31+25 -L1- RT. STABILIZATION < 0.01 9 7 31+19/31+30 -L1- LT. STABILIZATION < 0.01 12 8 18+16/18+31 -L2- LT. STABILIZATION < 0.01 11 9 21+93/22+16 -L2- LT. STABILIZATION < 0.01 22 10 26+77/26+89 -L2- LT. STABILIZATION < 0.01 8 11 39+11/39+26 -L2- RT. STABILIZATION < 0.01 13 12 42+55/43+01 -L2- LT. 18" HDPE < 0.01 < 0.01 13 42+84/42+97 -L2- RT. STABILIZATION < 0.01 13 14 45+25/45+43 -L2- LT. EXIST.15" DIP < 0.01 15 12+88/13+00 -Y5- RT. STABILIZATION < 0.01 12 TOTALS*: 0.008 0.004 0.040 141 0 0*Rounded totals are sum of actual impactsNOTES:Revised 2018 Feb SHEET 22 OF 22 WETLAND AND SURACE WATER IMPACTS SUMMARYWETLAND IMPACTS SURFACE WATER IMPACTSWAKE COUNTYCRABTREE CREEK WEST GREENWAY NC DEPARTMENT OF TRANSPORTATIONDIVISION OF HIGHWAYS09/13/2019