HomeMy WebLinkAbout090165_Annual Report_20210309VNILNIAL FACILIT\ %AM. AL CERTIFICATION FORM
LC or l'errnit umber t A T.'nq 16 5-
County
Shawn on Certificate of 1..-0 erage or Pern Ain Peaks 4;1
Operator in Chare.e. for Kcn Irtsertific,ation
1020
artiroai allowed k. the abo‘e permit occurred during the past calendar year
NO If skip Part 1 ;1.nd Part 1.1 and proceed to the certification Also, ifanimal
, Mil not land applied. please- armh e \planation on how the animal ‘kaste was handled
Puri 1 1 In rorrnation:
total number of applicatwr 1 elds @or Pul k please check the appropriate bo\) in the Certified
Nlanagenient Plan \AV\IPi 1rw1 I.. seable Acres approNed in the 4,2,1,.Vi
51
• 1 Total number of fields 6 r.r : iplez.tse chci..k the appropriate 1r on IA inch land at-The:It:on
n=d during the ve3r- 't mat Acres on Which WaSte. was applied jJ
Plant \ applied thiririg the ,citr for all application sites
9,5 i 4
. _
Avoilabic to be land applied annually by Elie CAW \II) and
.inored amount rnanure, litter and process wastewater sold or given to other persons and taken
oti stw du.ring the yeztr 0 torts or gallons iplease cheek the 'appropriate box
t) Annual a%-t:rage number olarninaLs ty'pe at. this faeilit3: during thzi previous
s" 149
l_argesf and smallest number of igiirrials by type ilt this d di-4:‘, 0fl flL during the preA j01.1:.; veui
L
!t-.4rtallesi •1
rhese numbers at for informAional ptirpose$ ..,inee the oTils, pynr:f?
11W taCility
Initpotior )1 applicable: Sm.t1d
Pail IL flcilth- Ntatits:
tho number o:
14 rvi \1 Fill Iv,: Ill HI N
f(t \kin !Hi I At \'•••, ('-(.)1p1 \\N I) k.)1 \O\
\I) } xvi, AIN ci iv •kt• ilt..)\ AkI \-..()11111.( H.q.)*1 I)1k11i 1 .1.1,1
Vi'st 1
itpri!ckl
Vti_74
AFACF 3-14,03
The. faCititv was- operated in such a way that thew '0.•.aS no direct runoff of waste from a Yes No.
the facility (including. the houSeS, laborisstorage ponds and the application sites) during
the past calendar year.
3: Them WaS no disc:name of waste to surface water from this facility during the past V Yes No
caltrular year
4„ '{here was rio freeboard Violation in a y lagOons or 5k-ita: ponds at if& facility during a Yes
111 past calendar year
There was, 00 PAN application to an fields or crops at this facility igeater than the
leve15. spek-J fled in this facilit:,4''s WMP during the past calendar year.
All land application equipment •IA;as calibrated. at least once during the past calendar year Yes ' No
Site.&.,elacCumulation in all lagoons did not.exceed the volUme for which the lagoon ilk Yes
w-&i..de,5igued or reduce the lagoon'.s. minimum treatment volume to less than the volume
r hiCb the lagoon was designed,
8. A copy of the, Annual Sludge Survey Form for this facility is attached to this Certification. * Yes No
analysis 'Acre performed On each field.reeeiving animal waste during the
ealendar year. '"*I-Z.EQ1:..'181-..D EV.F.RY .3 YEA R.S.NOW DONE N 2018****
Soil pH ska? maintaine,iias speci fied. in the permit during the past calendar Year? Yes No
1 I., All required monitoring.and reporting was: performed in accordance with the facility's
permit diinn the pasi calendar year.
2. All operationa and 1.1)4iilig.T.NOICTC,g4t!iTV..9.1c.:ia.5w di permit NU=„re, complied with during N
past calendar ar or, Hi the ease 1 j deviant -al. prior authoriAition was rccer,
Tom. the Di,O:s..i.on W'citer Quali
as ..3"led irt Oic C.AWMP were ittillintiliTIO during the past calendar year 3nall
mceiVing animal waste and ilie cropsv.,rown Were removed in .accordance ith
!.,ieility's permit,
butler requ'imments a.7•.; specified on the p(1-init arid the CA WNW For this facility were Ve,= . No
maintained durirw. och .applicatik of animal waste during the.past calendar t,tvar.
under penally
in ac anr iL
irdOrrnatiori tiubflutied,1
respi.viible
in% kriowledge and belief: nitee
it.,171,Initttiw, false. infi)rmation, tneludit,,
Yes a No
*Yc
ieurnent and aitachttient, ‘A.ere prepared under my direction or
ipried to assure thin u u -fed r)ersonnel properly gather tuid
, . • • .it f Of the 5,1 :Ain per,A in ,; \\ho manage the system, or
,rmatiOn. tiv.: information nitted 15, to the beS1
ai,,:tre that there arc 'Arntfic.unt perialtiesfor
,iT0,1 imp! konment loi
Wid li10. (type or print)
P:41- 744
141,,Piitc,i,rc Purmitlec
. . „
'.71.4f..10.114ot l(ipk131Cit in (...,..111tIVO
d'ilicteraliOniPeniiitteei
AFACF 3-14-03
BARWICK AG SERVICES, LLC CLINTON, NC 910-385-1000
Appendix 1. Lagoon Sludge Survey Form
A. Farm Permit or DWQ Identification Number Twin Peaks #2
B. Lagoon Identification 9-165
C. Person(s) Taking Measurements Curtis Barwick
D. Date of Measurement 9/25/2020
E. Methods/Devices Used for Measurement of:
a. Distance from the lagoon liquid surface to the top of the sludge layer.
DISC
b. Distance from the lagoon liquid surface to the bottom (soil) of the lagoon.
pvc pipe
c. Thickness of the sludge layer if making a direct measurement with "core sampler".
F. Lagoon Surface Area (using dimensions at inside top of bank). 3.47 (acres)
(Draw a sketch of the lagoon on a separate sheet, list dimensions, and calculate surface area. The lagoon
may have been built different than designed, so measurements should be made.)
G. Estimate number of sampling points:
a. Less than 1.33 acres: Use 8 points
b. If more than 1.33 ac. 4.71 acres x 6 =
20 , with maximum of 24.
(Using sketch and dimensions, develop a uniform grid that has the same number of intersections as the
estimated number of sampling points needed. Number the intersection points on the lagoon grid so that data
recorded at each can be easily matched.)
H. Conduct sludge survey and record data on "Sludge Survey Data Sheet" (Appendix 2). Also, at the
location of the pump intake, take measurements of distance from liquid surface to top of sludge
layer and record it on the Data Sheet (last row); this must be at least 2.5 ft. when irrigating.
I. At the time of the survey, also measure the distance from the Maximum Liquid Level to the Present Liquid
Level (measure at the lagoon gauge pole): 2.0
J Determine the distance from the top of bank to the Maximum Liquid Level 1.6
(use lagoon management plan or other lagoon records)
K. Determine the distance from the Maximum Liquid to the Minimum Liquid level: 2.1
(use lagoon management plan or other lagoon records)
L. Calculate the distance from the present liquid surface level to the Minimum Liquid Level 0.1
(Item K Minus Item I, assuming the present liquid level is below the Maximum Liquid Level)
M. Record from the Sludge Survey Data Sheet the distance from the present liquid surface level to the
lagoon bottom (average for all the measurement points) 8.3
N. Record from the Sludge Survey Data Sheet the distance from the present liquid surface level to the top
of the sludge layer (average for all the measurement points): 4.3
Q. Record from the Sludge Survey Data Sheet the average thickness of the sludge layer: 4.0
P. Calculate the thickness of the existing Liquid Treatment Zone (Item N minus Item L): 4.2
Q. If Item 0 is greater than Item P, proceed to the Worksheet for Sludge Volume and Treatment Volume.
If Item 0 is equal to or less than Item P, you do not have to determine vplofnes.
Completed by:
Curtis Barwick
Print Name /Signature
6.7 at pump intake
Date: 9/25/2020
Appendix 2. Sludge Survey Data Sheet* Revised August 2008
Lagoon Identification
Completed by:
Print Name
Signature
Date:
(A)
Grid Point
No.
(B)
Distance from liquid surface
to top of sludge
(C)
Distance from liquid surface
to lagoon bottom (soil)
(C)-(B)
Thickness of sludge layer
Ft. & in.
Ft. (tenths)
Ft.
& in.
Ft. (tenths)
Ft.
& in.
Ft. (tenths)
1
1
4
1.3
7
11
7.9
6.6
2
3
5
3.4
8
1
8.1
4.7
3
4
3
4.3
8
4
8.3
4.1
4
3
6
3.5
8
5
8.4
4.9
5
3
2
3.2
8
3
8.3
5.1
6
3
5
3.4
8
4
8.3
4.9
7
5
0
5.0
8
4
8.3
3.3
8
5
1
5.1
8
8
8.7
3.6
9
4
9
4.8
8
8
8.7
3.9
10
6
7
6.6
8
7
8.6
2.0
11
6
9
6.8
8
6
8.5
1.8
12
4
11
4.9
8
5
8.4
3.5
13
5
10
5.8
8
5
8.4
2.6
14
6
5
6.4
8
2
8.2
1.8
15
6
2
6.2
8
1
8.1
1.9
15
2
0
2.0
8
4
8.3
6.3
17
4
10
4.8
8
4
8.3
3.5
18
2
2
2.2
8
2
8.2
6.0
19
4
11
4.9
8
1
8.1
3.2
20
1
6
1.5
8
3
8.3
6.8
21
0.0
0.0
0.0
22
0.0
0.0
0.0
23
0.0
0.0
0.0
24
0.0
0.0
0.0
25
0.0
0.0
0.0
Number of points with readings
20.0
20.0
X
X
20.0
Average of
points
X X
4.3
X
X
8.3166667
X
X
4.016666667
At pump
intake
0.0
X
X
X X
X X
*AII Grid Points and corresponding sludge layer thicknesses must be shown on a sketch attached to this
Sludge Survey Data Sheet.
Appendix 3. Worksheet for sludge volume and treatment volume Revised August 2008
The average thickness of the sludge layer and the thickness of the existing liquid (sludge -free) treatment zone are determined
from the Information on the Lagoon Sludge Survey Form ( Items 0 and P, respectively). In this example, the average sludge
layer thickness is 2.5 feet and the existing liquid treatment zone is 3.5 feet. If the lagoon has a designed sludge storage volume,
see notes at end of the worksheet. The dimensions of the lagoon as measured and the side slope are needed
for calculations of sludge volume and of total treatment volume. If the lagoon is a standard geometric shape, the sludge
volume and the treatment volume in the lagoon can be estimated by using standard equations. For approximate volumes
of rectangular lagoons with constant side slope, calculate length and width at the midpoint of the layer, and multiply by layer
thickness to calculate layer volume, as shown in the example. For irregular shapes, convert the total surface area to a square
or rectangular shape. For exact volumes for lagoons with constant side slope, the "Prismoidal Equations" may be used.
Example Your Lagoon
1. Average sludge Layer Thickness (T) 2.5 ft. 4.0 ft.
2. Depth of the lagoon from top of bank to bottom soil surface (D) 11 ft. 11.9 ft.
3. Slope = Horizontal/ vertical side slope (5) 3 3.0
4. Length at the top of inside bank (L) 457 ft. 755.0 ft.
5. Width at top inside slope (W) 229 ft. 200.0 ft.
6. Length at midpoint of sludge layer Lm= L-25(D-(T/2)) 398.5 ft. 695.7 ft.
7. Width at midpoint of sludge layer Wm= W-2S(D-(T12)) 170.5 ft. 140.7 ft.
8. Volume of sludge (Vs) Vs=Lm Wm T 169,860 ft3 391,607 ft3
9. Volume in gallons: Vs9=V*7.5 gal.lft3. 1,273,950 gal. 2,937,052 gal.
10. Thickness of existing liquid tmt. zone (Y) 3.5 ft 4.2 ft
11. Thickness of total treatment zone (Z) Z= T+Y 6 ft 8.2 ft
12. Length at midpoint of total tmt. zone Lz= L-2(S)(D-(Z12) 409 ft. 708.3 ft.
13. Width at midpoint of total tmt. Zone WZ = W-2(S)(D-(Z/2) 181 ft. 153.3 ft.
14. Volume of total treatment zone (Vz) Vz = LZWZZ 444,174 ft3 890,517 ft3
15. Ratio ( R) of sludge layer volume to total Treatment Volume
R = VsNz 0.38 0.44
If the ratio R exceeds 0.50, than a sludge Plan of Action may be required. Check with DWQ for information
on filing the Plan of Action.
Note: If the lagoon has a designed sludge storage volume (DSSV), subtract that volume from both the volume
of sludge (Vs) (Item 8) and from the volume of total treatment zone (Vz) (Item 14), and take the ratio.
Then, R = (Vs-DSSV) / (Vz - DSSV)
Example: If DSSV = 85,000 ft3, then R = (169,860 - 85,000)1(447,174 - 85,000) = 84,860 / 362,174 = 0.24.
16. Design sludge storage volume (DSSV) 85,000
17. Ratio (R) of sludge layer volume to treatment volume adjusted
for designed sludge storage volume 0.24 0.44
Computation Sheet
U.S. Department of Agriculture
NRCS—ENG-523A Rev. 6-2002
—/GS
Natural Resources Conservation Service
State
• .
Project' fJ
f �a ;�. G� l� d2 2liC4Pa�.. l.�v
By +�r[. \l
4W
Date
C{ae'eiy
T y,
j /
25"20
Job No.
Subject a �(
•
�q�! �,.� A. Ca • 7
area ,�'{3 P
0i !� ��—�1 we
Sheet of
iJ 1 �r
1
i 1 '.
�
'
� �
1 I
1 • ,
i -!
I!
'' -.1--
,
r __ti _
__ii
.1'._
,
1
1
/Yr -.1. -
1
I �y
—�
j
r
r
, i
.
g i
4,'
k
k
i
___
_______
/
_
I
_ _
i
r 1
1
i
l'
R
J
i
.1
I
I iff
1
'
i I
i q
l
i
E
l
l
i
i i
!
`
I—
11
,
I !
I
-
, 3 l9
1
!
{
1
i
,
a_
, v
r
— 1
ti
-r
[
f/
._
i
1
1 '
1.
jj
1
,
,
i-- ...
1
1
. G
-L
;__....._.
_
-�
-7—
'�
1
, H
Ham.