Loading...
HomeMy WebLinkAboutNCC201043_NOT Closeout Documents_20210306North Carolina Department of Environmental Quality Land Resources: 1628 Mail Service Center, Raleigh, NC 27699 (919) 791-4200 County: Wake Project: Cape Fear Plant - Method 115kV Line River basin: Neuse Person financially responsible: DUKE ENERGY PROGRESS LLC - Thomas C Project N: WAKE-2020-054 Williams, Manager of Transmission Engineering Address: 410 S. Wilmington Street, Raleigh, NC 27601 1. Project Location: Pierce Olive Road, Apex Pictures: No 2. Weather and soil conditions: overcast, wet, workable Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): no one on site Title: Inspection report: Sent Report Date given/sent: February 10, 2021 9. Corrective action needed: 10. Comments: Project is complete and site is substantially in compliance. Close file. Note: Surrounding disturbance is due to NCDOT 540 construction. Reported by: Kimberly Summers Others present: Date of inspection: February 09, 2021 Time arriving on site: 9:55 AM Time leaving site: 10:25 AM cc: