HomeMy WebLinkAboutNCC201043_NOT Closeout Documents_20210306North Carolina Department of Environmental Quality
Land Resources: 1628 Mail Service Center, Raleigh, NC 27699 (919) 791-4200
County: Wake Project: Cape Fear Plant - Method 115kV Line River basin: Neuse
Person financially responsible: DUKE ENERGY PROGRESS LLC - Thomas C Project N: WAKE-2020-054
Williams, Manager of Transmission Engineering
Address: 410 S. Wilmington Street, Raleigh, NC 27601
1. Project Location: Pierce Olive Road, Apex
Pictures: No
2. Weather and soil conditions: overcast, wet, workable Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCG010000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name): no one on site Title:
Inspection report: Sent Report Date given/sent: February 10, 2021
9. Corrective action needed:
10. Comments: Project is complete and site is substantially in compliance. Close file.
Note: Surrounding disturbance is due to NCDOT 540 construction.
Reported by: Kimberly Summers Others present:
Date of inspection: February 09, 2021 Time arriving on site: 9:55 AM Time leaving site: 10:25 AM
cc: