Loading...
HomeMy WebLinkAboutNCC201043_Notice of Termination_20210306Action History (UTC-05:00) Eastern Time (US & Canada) Submit by Anonymous User 3/6/2021 9:51:06 AM (NOT Submittal) Approve by Morman, Alaina 3/9/2021 2:30:38 PM (NOT Request Review- NCC201043) • The task was assigned to Morman, Alaina. The due date is: March 11, 2021 5:00 PM 3/6/2021 9:51 AM 1 � NORTH CAROLINA Enrlronmenral Quallly Certificate of NCC201043 Coverage (COC) Enter the Certificate of Coverage Nmber No.* 2020 Annual Fee Status 2021 Annual Fee Status OPEN K/hy be blank (if not yet billed). Information associated with this permit: Project Name Cape Fear Plant - Method 115kV Line NCDOT Line Relocation Address Pierce Olive Road, Apex, NC County Wake Latitude 35.6750 Longitude -78.7790 Permittee Listed Duke Energy Progress Legally Responsible Thomas Williams Jr. Individual NC Reference No. NCG01-2020-1043 E&SC Plan ID WAKE-2020-054 Original NOI 23096 Tracking No. Date COC Issued 3/17/2020 Prior Rescission Cate populates only if COCwas already rescinded at time of submittal. Date Reason for Rescission/Termination Request: Reason for r Project Closed -Out Termination of r Sale (Another Owner/Operator obtained a new COC) Coverage * r Mistake or Invalid Coverage r Other Addional IVbre information about the basis of this request, if needed. Explanation Supporting upload Supporting Documentation if applicable. Documentation MstbeRYforrrat Project Close-out Information: Final Close-out 2/10/2021 Inspection Approval Project Close-out WAKE-2020-054_20210209_InspRpt.pdf 114.11KB Approval Must be FDFfornat Documentation North Carolina General Statute 143-215.66 (1) provides that: Anyperson who knowinglymakes any false statement, representation, or certification in anyapplication, record, report, plan, or other documentfiled or required to be maintained under this Article or a rule implementing this Article; or who knowingly makes a false statement of a material fact in a rulemaking proceeding or contested case under this Article; or who falsifies, tampers with, or knowingly renders inaccurate any recording or monitoring deice or method required to be operated or maintained under this Article or rules of the Commission implementing this Artcle shall be guiltyofa Class 2 misdemeanor which mayinclude a fine not to exceed ten thousand dollars ($10,000). rJ I, as an authorized representative, hereby request rescission of coverage under the NPDES Stormwater Permit for the subject facility. I am familiar with the information contained in this request and to the best of my knowledge and belief such information is true, complete and accurate. *This form must be signed by a responsible corporate officer that owns or operates the construction activity, such as a president, secretary, treasurer, or vice president, or a manager that is authorized in accordance with Part IV, Section B, Item (6) of the NCG010000 General Permit. For more information on signatory requirements, see Part IV, Section B, Item (6) of that permit. Signature Type Name* Randy Veltri Title * Director of Transmission Permitting Organization* Duke Energy Progress LLC Date * 03/06/2021 Email for Randy.Veltri@duke-energy.com Confirmation * Contact Telephone* 704-577-5807 NOT Certification NCG01-eNOT-Certification-Form-20201215- Form DEMLR-SW.pdf Mist be FDF Fornat Is this COC Already Ensure this CCChas not been rescinded since subrrittal! Rescinded? Additional Email CCd on Notification Errails (Optional) nuwan.wijesuriya@duke-energy.com Original Permittee CCd on Wification Bmils Email thomas.williamsjr@duke-energy.com Original Site Contact CCd on Notificaiton Errails Email philburn@mckimcreed.com 331.92KB