Loading...
HomeMy WebLinkAbout20210214 Ver 1_Shoreline Stabilization_20210309Submission Form Pre -Filing Meeting Information Before submitting this form please ensure you have submitted the Pre -Filing Meeting Request Form as we will not be able to accept your application without this important first step. The Pre -Filing Meeting Request Form is used in accordance with 40 C.F.R. Section 121.4(a) "At least 30 days prior to submitting a certification request, the project proponent shall request a pre -filing meeting with the certifying agency" and in accordance with 40 C.F.R. Section 121.5(b)(7), and (c)(5) all certification requests shall include documentation that a pre -filing meeting request was submitted to the certifying authority at least 30 days prior to submitting the certification request. Click here to read more information on when this form is needed prior to application submission or here to viewthe form. Attach documentation of Pre -Filing Meeting Request here: ARIK PRE FILE.pdf 51.52KB Pre -fling Meeting or Request Date 1/29/2021 ID# 20210214 Version 1 I. Applicant Information [15A NCAC 02H .0502(a)] Please note: fields marked with a red asterisk below are required. You will not be able to submit the form until all mandatory questions are answered. Primary Contact Email * HAGER@LAKEPERMIT.COM Rease provide an email address for payment and requests for more information here. Owner Information: Name: * EQUIPMENT & SUPPLY INC Email: * ARIK.ADAMS@EQUIPSY.COM Phone Number:* (704)989-3503 (xxx)xxx-xxxx Mailing Address:* Street Address 3625 ANTIOCH CHURCH RD Address Line 2 City State / Frovince / Region MATTHEWS NC Fbstal / Zip Code Country 28104 United States Is there an agent working on the project? * Agent/Consultant Information ................................................................................................................. Name: Company Affiliation:* Email: Phone Number:* Mailing Address:* F Yes r No TAMARA HAGER LKN DREDGE & MARINE CONST HAGER@LAKEPERMIT. COM (704)575-2227 (XXX)XXX-XXXX Address PO BOX 5335 Address Line 2 City MOORESVILLE Fbstal / Zip Code 28117 Asigned and dated copyof the Agent Authorization letter:* ARIK AUTH.pdf 969.05KB Link to: Sample Agent Authorization Form Project Information [15A NCAC 02H .0502(a) & (b)] Project Name:* EQUIPMENT & SUPPLY INC State / Province / Region North Carolina Country United States If your project has a formal name please use this. If your project does not hake a formal name, please identify your project by the owner name and proposed activity (Jones Property Access Road, Smith Guest House, etc.) List in parentheses any other names that have been used to identify the project in the past. 1. Provide a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads.* r Upload File r Lookup address Upload Map: ARIKSURVEY.pdf Latitude:* 35.495589 958.74KB Longitude:*-80.911087 2. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, structures (buildings, retaining walls, docks, impervious surfaces, etc.), rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram under section 12.normal pool lake level/normal water level* ARIK SKETCH.pdf 898.27KB Please use the diagram at the link below: https://edocs.deq.nc.gov/WaterResources/0/edoc/616616/Shoreline%20Layout.docx 3. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.)* ARIK PICS.pdf 1.39MB 4. Location of the property (where work is to be conducted) Nearest Town:* CORNELIUS County:* Mecklenburg Lake/ river/ ocean adjacent to NORMAN/CATAWBA property: Subdivisions name or site address:* RAINTREE GREENS LOT # 22 hclude phasellot nunber Directions to site:* FROM COWANS FORD DAM TURN LEFT ONTO HWY 73 5.2 MILES, TURN LEFT ONTO WEST CATAWBA AVE 2.7 MILES, TURN LEFT ONTO BETHEL CHURCH RD 1.4 MILES, TURN RIGHT ONTO PINEHURST DR .10 MILES, TURN RIGHT ONTO ISLAND FOREST DR .30 MILES, TURN RIGHT ONTO EASTPOINT DR .10 PROPERTY ON RIGHT. Rease include road naves and nunbers, landrrarks etc. 5. Describe the existing land use or condition of the site at the time of this application:* RESIDENTIAL Fbsidential, undeveloped, etc. 6. Property Size .67 Acres 7. Describe proposed work (include discussion as to how hardening of shoreline has been avoided, or why it is necessary): RIP RAP BARE ERODED AREAS FOR SHORELINE STABLIZATION 8. How will the work be done?* r- From Land IW From Water 9. Total amount of disturbance below the normal pool lake level/ normal water level:* 0 (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) square feet 10. Total amount of disturbance above the normal pool lake level/ normal water level and 50 feet land -ward:* (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) 0 square feet 11. Please describe the vegetation above the normal pool lake level/ normal water level and 50 feet landward to be impacted:* (nunber of trees, for instance) NONE Sketch: ARIKSKETCH.pdf 898.27KB Application Fee: Once the application has been accepted. You will need to send a corresponding fee in with the appropriate DWR#. The application fee is as follows (pursuant to G.S. 143-215.3D): o $240.00 for impacts to lake (below normal water level) of less than 1 acre o $570.00 for impacts to lake (below normal water level) of greater or equal to 1 acre By digitally signing below, I certify that: o I, the project proponent, hereby certifies that all information contained herein is true, accurate, and complete to the best of my knowledge and belief o I, the project proponent, hereby requests that the certifying authority review and take action on this CWA 401 certification request within the applicable reasonable period of time. o I agree that submission of this Shoreline Stabilization online form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); o I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); 0 1 understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND o I intend to electronically sign and submit the Shoreline Stabilization online form. Full Name:* EQUIPMENT & SUPPLY INC Signature: IQujWT& My" 1f'e- Initial Review Is this accepted into the review process?* Project Number:* 20210214 Select Reviewer:* Select Reviewing Office Has payment been received?* What amount is owed?* rYes allo Version:* 1 Alan Johnsomeads\adjohnsonl Mooresville Regional Office - (704) 663-1699 r No Payment Needed r Fee Received r Need Fee - send electronic notification r $240.00 f $570.00 og a_ �"� t pa,►� ate ::_ 1 1�J " he apnrovzI is tm the purpose 2EiG a-esicn CccCribad in MOLE zppiication. tiip,-Cc, na^ frlG[C2T8u !il c - ^r. t•i 2ppifCadori IS a imal;ton Gi tha Buffer. 'LIs. = scr,!t Work ShmflG be ^=cvie-ed ?ri'i;1c 2'30c Or' 02L _451,05and 15AIMIC=CO25.Q 4'3(8): c5° avc tie,21iGblr?[7 i0 b2 rc'I'.S{3VeC Suffer :lAil$iif?�fl _ Qi vcii-�{i 3D r' oic ion!, J7i' 55 a3{?('QLfBC�- t.YC=Gi?n, iitOSEt�'s ii'1 cs. cr= �3`-�-.ri V EIIkBrliliik3L 2i QflS ::i?= iiTtf`18Lri cu So`30r81Sri� Cui ==s 'ciiinr_Q. !2Niknunsi Shaping -a� �[imedaba�_f0wee. VBLS �ri_�f� w s==- :c I- =: cis�e ui�s=�7_i 10 0E grou IC cviar- (�,SA MC ,CO25 CiZ4_3 (e)l __1t_ 3Lnc= r:OtaVz_,Ma .EIIC__ P� n zv ;13:a`=5 CiilGz t-_-t i OW =rdcll•;L j;?vc, =`C_ ere i lO c{ war-i ii'% v i i1 p=- il!; 2ay<t: �C _ _� �.. rCr Ci5.3 �cr cC nvf:: 2 Ofvi_3G1. nei—e 2-_ `11- ii su-os Gil Size TQ -. 1'` C��_ VirCily ."3-. be CQCir : ='cl `Oi:1 1ci7G .i1 i15_ i<1[SIC2=-e an 2CCa5_ =in . �G. ha -rc5 C_'C; ,�•G :r=!i :J ^C: �.']7= �' __G:S. �;1i;'= ._.. rc C�tr.dor shoj:i� ae ^_`-Ciri ....- -is_ rnLr na C.Lf'•'si'=e Jvi �i:: _:_ `?.ter. _'$a:T:i4>laC2i rsf1:S6`_ rJ3 s-7?CufS for �'121=m rjeC ?Gr Gl: as �ieC�Bf�=_ :Qlci:T_ =.i; .:Q"5=? ==-G �151.i7G 3 iil lf5i 2 Z plc i=iil:'=!=t'?ur;JGi. :1i. Gi_ch'cr=e C-iar to p;1==riivg The DQ '2f CI =Cc.^ c= Gii:'�5=_ .'s. h=ssiok� on- osiv� iett �f21t�_f �FN:CAC033.024313j:lF1': C{A3 viSG cr.Fse Ll PiOst_!cmil3:; Vl'_`�����. �`��,�" :'a`'!i2ia t:r= i E �'E_...,cC vi ic'-cc ✓„`',UI �.. .6- i_.. L i » Lfc. i.� 1,'?O r.'.cmdu .cam'' ili C IE. �11i= ; �G� =_ �Cf Gwt(}r=_-_` - _. Ci7 t.IQiEfC'i... EiiC z..___c:iL2_i UU is 1 J i! a r:L�'� 21-1C� l L= '-�'ax w{'1 t•Y �:�: Sti!}-jity it�4CLloii 2rir 25111 :.r ?i�}aC, tn, = ap 3 vS6 pi^n,,E) anuc".�'.^3i =�i=Vr'-`*; zi_rictn. wQ� Icn y o N N. � O z a z a O w w T r z z O V O m u n Lu 3 � LU r g Cy a 0. O Z �.4 cqi� P $ P Nyy l Z �L Sb S 7 A 4 d � o c: S d m C j yJ ro w � ooc 1 j ; t 1 � � I Lake (At Full Pond/Normal Water Levei) lUN Pond/ INorma Water Ve Shoreline ' Ni, 1Ni• j )u'A L D isi Lt1�j Q Please approximately sketch the fallowing information on this Plan (provide dimensions for�c�ch ir�rrr, such as ?o jtx goo-fL 1 • All proposed vegetation clearing 2. Location of rip rap or fill to be placed above the Full Pon d/'€Normal Water Level elevation 3• Location of rip rap orfill to be placed belovv the Full Pond/ Normal Water Level elevation 4- Location of any proposed structures such as buildings, retaining walls, docks, etc. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation �- Location of construction access corridors FORM. SSGP 10-2-013 Page 3 of 3 From: TAMARA HAGER hager@lakepermit,com Subject: Equipment & supply shoreline pics Date: Feb 2, 2021 at 4:15:13 PM To: TAMARA HAGER hager@lakepermit.com 1\3 U _Pt (>S Lqu.i PM-C,4 pIi SYic zo 9I 2. L W PWW' J9P- Go,r� N�O3 I Tamara Hager 704-575-2227 Lake Permit LLC Lake (At Full Pond/Normal Water Levei) lUN Pond/ INorma Water Ve Shoreline ' Ni, 1Ni• j )u'A L D isi Lt1�j Q Please approximately sketch the fallowing information on this Plan (provide dimensions for�c�ch ir�rrr, such as ?o jtx goo-fL 1 • All proposed vegetation clearing 2. Location of rip rap or fill to be placed above the Full Pon d/'€Normal Water Level elevation 3• Location of rip rap orfill to be placed belovv the Full Pond/ Normal Water Level elevation 4- Location of any proposed structures such as buildings, retaining walls, docks, etc. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation �- Location of construction access corridors FORM. SSGP 10-2-013 Page 3 of 3 DWR Pre-Fil ing Meeting Req u est Form ID#*Ve rsion * Re gional Office * Re v ie we r List * Contact Name * Contact Email Addre ss * Proje ct Name * Proje ct Owne r * Proje ct County * Owne r Addre ss: Is this a transportation proje ct?* Type (s) of approv al sought from the DWR: Doe s this proje ct hav e an e xisting proje ct ID#?* Do you know the name of the staff me mbe r you would like to re que st a me e ting with? Ple ase giv e a brie f proje ct de scription be low.* Please give a couple of dates you are available for a meeting. 20210214 1 Mooresville Regional Office - (704) 663-1699 Alan Johnson Pre-Filing Me eting Reque st submitte d 1/29/2021 TAMARA HAGER HAGER@LAKEPERMIT.COM ADAMS EQUIPMENT & SUPPLY INC Mecklenburg City CORNELIUS State / Province / Region NC Postal / Zip Code 28031 Country United States Street Address 20812 EASTPOINT DR Address Line 2 Yes No 401 Water Quality Certification - Regular 401 Water Quality Certification - Express Individual Permit Modification Shoreline Stabilization Yes No NONE NEEDED RIP RAP BARE ERODED AREAS FOR SHORELINE STABIZATON Ple ase attach the docume ntation you would like to hav e the me e ting about. Signature Submittal Date pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: · This form completes the requirement of the Pre-Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. · I understand by signing this form that I cannot submit my application until 30 calendar days after this pre-filing meeting request. · I also understand that DWR is not required to respond or grant the meeting request. Your project’s thirty-day clock started upon receipt of this application.  You will receive notification regarding meeting location and time if a meeting is necessary.  You will receive notification when the thirty-day clock has expired, and you can submit an application. 1/29/2021