Loading...
HomeMy WebLinkAbout20011551 Ver 4_More Info Received_20120725The Catena Group Ms Amy Euliss N C Department of Environment and Natural Resources Winston Salem Regional Office Division of Water Quality Surface Water Protection 585 Waughtown Street Winston Salem NC 27107 410 B Millstone Drive Hillsborough NC 27278 (919) 732 1300 July 25 2012 Re North Carolina Granite Corporation Surry County, North Carolina (Action ID SAW 2011 01765) Dear Ms Euliss I am writing in reference to your email to Michael Wood dated July 16 2012 in which you requested clarification and additional information relating to the proposed impacts associated with the modifications to the Ararat River at the North Carolina Granite Corporation (NCGC) in Mount Airy Surry County North Carolina The original permit application for the proposed structures requested that all past activities be authorized This was unclear we want to confirm that there will be no permanent dam in the river as part of this project Additionally clarification was requested for the amount fill (linear feet and cubic yards) associated with each proposed structure Below is a table that includes this information The weir that was previously permitted is approximately 185 linear feet long and approximately 600 cubic feet of fill Installation of the proposed structures will require working in the river The Ararat River is too large to dewater during construction of the proposed structures Baker Engineering in the design plans for the proposed structures detailed the sequence of constructions activities which is enclosed As feasible construction will be conducted from the banks but work within the river will need to be permitted Linear Feet of Arms Linear Feet of River Station Cubic Yards of Material Single wing 100 95 26667 W weir 300 85 80000 DD Crossvane 230 85 61333 Total 630 265 168000 The weir that was previously permitted is approximately 185 linear feet long and approximately 600 cubic feet of fill Installation of the proposed structures will require working in the river The Ararat River is too large to dewater during construction of the proposed structures Baker Engineering in the design plans for the proposed structures detailed the sequence of constructions activities which is enclosed As feasible construction will be conducted from the banks but work within the river will need to be permitted The Catena Group 410 B Millstone Drive Hillsborough NC 27278 (919) 732 1300 NCGC received a permit April 26 2011 to place temporary fill in the river as needed while waiting for the current permit application to be processed This permit has not been utilized to date It is not anticipated that NCGC will need to utilize these temporary actions However in the event that water levels in the Ararat River fall during this current permit application nrocess and onerations at the quarry are impacted the structures may still need to be installed We request that you do not rescind the temporary permit until the proposed structures are permitted and construction begins We are very appreciative of your time and assistance with this matter If we can provide additional information to facilitate this application please contact me at 919 732 1300 (office) or 919 417 8027 (mobile) Sincerely The Catena Group, Inc )nt�w 6 Lq�c—) Michael Wood Enclosures Baker Engineering Construction Schedule CC Mr Monte Matthews Raleigh Regulatory Field Office US Army Corps of Engineers 3331 Heritage Trade Drive Suite 105 Wake Forest North Carolina 27587 Mr Carlos Goad North Carolina Granite Corporation P O Box 151 Mount Airy NC 27030 Mr Ian McMillian N C Department of Environment and Natural Resources Division of Water Quality Wetlands /401 Unit 1650 Mail Service Center Raleigh NC 27699