Loading...
HomeMy WebLinkAbout20061617 Ver 5_Stormwater Approval_20120801NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Governor Mr Bill Honaker Charles Wakild P E Director August 1 2012 Redus Raleigh Housing LLC 8540 Colonade Center Drive Suite 111 Raleigh North Carolina 27615 Subject Property Wendell Falls APPROVAL OF MODIFIED STORMWATER MANAGEMENT PLAN Dear Mr Honaker Dee Freeman Secretary DWQ Project # 06- 1617v5 Wake County On September 17 2010 the Division of Water Quality (DWQ) issued a revised 401 Water Quality Certification for the following actions to construct the Wendell Falls mixed use development in Wake County • Permanently impact 3 39 acres of 404 wetland • Temporarily impact 0 232 acres of 404 wetland • Permanently impact 2 442 linear feet of perennial stream • Temporarily impact 625 linear feet of perennial stream • Permanently impact 596 linear feet of intermittent stream • Permanently impact 0 16 acres of open water • Permanently impact 224 770 square feet of Zone 1 Neuse River basin riparian buffers • Temporarily impact 42 689 square feet of Zone 1 Neuse River basin riparian buffers • Permanently impact 140 670 square feet of Zone 2 Neuse River basin riparian buffers and • Temporarily impact 25 700 square feet of Zone 2 Neuse River basin riparian buffers 1617 Mad Service Center Raleigh North Carolina 276991617 Location 512 N Salisbury St Raleigh North Carolina 27604 Phone 919 -807 63001 FAX 919 - 807 -64921 Customer Service 1- 877 -623 6748 Internet www ncwaterauality oro An Equal Opportunity 1 Affirmative Action Employer NorthCarolina Naturallff Mr Bill Honaker August] 2012 Page 2 of 3 In order to meet Condition 25 (Stormwater Management) and Condition 26 (Diffuse Flow) of the 401 Certification for this project a stormwater management and diffuse flow plan was approved on September 17 2010 for the current phases of the project simultaneously with the issuance of the 401 Certification On July 17 2012 the DWQ received a request (dated July 16 2012) from your consultant Mr Ken Jesneck PE of Withers & Ravenel requesting a modification to the stormwater and diffuse flow plan The modification involves relocating a stormwater wetland approximately 14 feet to the south in order to avoid a Progress Energy easement The DWQ approves the modified stormwater and diffuse flow plan as satisfying Conditions 25 and 26 of the 401 Water Quality Certification This approval is for the purpose and design that you described in your application If you change your project you must notify us and you may be required to send us a new SMP This approval requires you to follow the conditions listed in the General Water Quality Certification for the project and the following additional conditions listed below The SMP approved by the DWQ consists of the approved Best Management Practices and all associated stormwater conveyances inlet and outlet structures and the grading and drainage patterns The plans and specifications for Wendell Falls approved by DWQ are incorporated by reference into this approval and are enforceable by DWQ provided however any modification to the design of the stormwater management system that is accepted by DWQ shall take precedence over the original plans and specifications 2 The footprint of all stormwater management devices as well as an additional 10 foot wide area on all sides of the devices shall be located in either public rights - of -way dedicated common areas or recorded easement areas The final plats for the project showing all such rights of -way common areas and easement areas shall be in accordance with the approved plans 3 Maintenance activities for the wet detention pond shall be performed in accordance with the notarized O &M agreements The O & M agreement must transfer with the sale of the land or transfer of ownership /responsibility for the BMP facility DWQ must be notified promptly of every transfer 4 The applicant and /or authorized agent shall provide a completed Certificate of Completion form to the DWQ within thirty (30) days of project completion (available at http / /portal ncdenr orq /web /wq /swp /ws /401 /certsandpermits /apply /forms) Thank you for your attention to this matter If you have any questions or wish to discuss these matters further please do not hesitate to contact me at 919 807 6381 Mr BIII Honaker August 1 2012 Page 3 of 3 Sincerely Os � 0_0t:I-9-- Annette Lucas PE Wetlands Buffers and Stormwater Compliance and Permitting (Webscape) Unit AML /aml cc Becky Fox EPA USACE Raleigh Lauren Witherspoon DWQ Raleigh Regional Office Pinellas Corporation 7008 Harps MITI Road Suite 103 Raleigh 27615 Ken Jesnick PE Withers & Ravenel 111 MacKenan Drive Cary 27511 File Copy Filename 061617v5WendellFalls (Wake)_SW_Mod_Approve docx