Laurie,
Have they gotten a permit from use
- Original Message
From Guthrie, Barry
Sent Thursday, June 28, 2012 8 55 AM
To Michael Rlkard @nps gov, David L Timpy @usace army mil
Cc Pat Kenney @nps gov, Wouter Ketel @nps gov, Steenhuls, Joanne,
Subject RE Cape Lookout National Seashore - permit request
Michael,
ron sechler @noaa gov
That is correct, both Long Point and Great Island fall under active consistencies and therefore
are authorized to go under DCM standards and conditions
Barry
-- Original Message
From Michael Rikard @nps gov [mailto Michael Rikard @nps gov]
Sent Thursday, June 28, 2012 8 35 AM
To David L Timpy @usace army mil
Cc Pat Kenney @nps gov, Wouter Ketel @nps gov, Steenhuls, Joanne, Guthrie, Barry,
ron sechler @noaa gov
Subject Fw Cape Lookout National Seashore - permit request
Dave
As requested below, attached are the permit drawings for the proposed dredging of the Harkers
Island boat basin at Cape Lookout National Seashore
Also attached are the PCN s for the maintenance dredging of the Great Island boat basin on
South Core Banks and the Long Point boat basin on North Core Banks As a result of the
meeting that was held at Cape Lookout on Monday, June 11, it is our understanding that we are
good to go with the dredging of the Long Point and Great Island basin s since the consistency
determination has been met with the NC Division of Coastal Management We do understand
that It Is our responsibility to ensure that SAV s are not impacted by NPS maintenance dredging
activities
Please contact us If any additional information is needed
Michael Rlkard, Ph D
Resource Management Specialist
Cape Lookout National Seashore
131 Charles Street
Harkers Island, NC 28531
252 728 2250 x3012
(See attached We PCN Long Point Boat Basin docx)(See attached file
Harkers Island Cross Section pdf)(See attached We Harkers Island Maint Dredging
Plan pdf)(See attached file PCN Great Island Boat Basin docx)
- - -- Original Message - - --
From Timpy, David L SAW (David L Timpy@)usace army mil]
Sent 0611912012 11 20 AM GMT
To Pat Kenney
Cc Joanne Steenhuls (Joanne Steenhuls @ncdenr gov)
< Joanne Steenhuls @ncdenr gov >, Guthrie, Barry < barry guthne @ncdenr gov >, smtp-
Sechler, Ron <ron sechler @noaa gov >, Beter, Dale E SAW
<Dale E Beter @usace army mil>
Subject RE Cape Lookout National Seashore - permit request
Pa t,
Thanks for the PCN for the maintenance dredging of the Park s existing basin at Harkers
Island
We also need some permit drawings (8 112 x 10 or 11 x 17) of the basin showing area to
be dredged, existing depths, previously authorized and /or depths of dredging, cross - sections of
proposed dredge area, vicinity map, and general layout of basin including the existing boat
ramp Also, the PCN should address the presence of SAV s Based on our meeting last week,
its my understanding the area within the basin does not contain SAV s
I have attached a copy of NWP35 and NWP16 Please review the NWP35 'Regional
conditions (on pages 19 -26) to ensure these conditions are met, particularly with respect to SAV
and shellfish
Regarding the proposed maintenance dredging of the ferry boat basins at Great Island, on
South Core Banks, and Long Point, on North Core Banks, the regional conditions of NWP35
require submittal of a PCN for these activities, please provide separate PCN for each area with a
copy to the NCDWQ A survey of SAV of the channel In these areas Is recommended for each
area, prior to dredging and the mobilization of dredge equipment since SAV is prevalent in the
project areas This is consistent to what we did with Long Point Basin following Hurricane Irene
last year
Please note that It is the responsibility of the NPS that SAV's are not Impacted by NPS
maintenance dredging activities The NPS may wish to consider conducting repeated SAV
surveys (say annually) of Its channels to document the presence (or lack of presence) of SAV
This is Just a suggestion given the longterm dredging needs of the NPS We d be glad to review
and coordinate any SAV data that you collect, if provided
Hope this helps I have copied Joanne Steenhuis, DWQ since you will also need a Water
Quality 401 and Barry Guthrie for any DCM requirements Ron Sechler, NMFS Is copied for his
Information (Ron we discuss at a later date)
Dave Tlmpy
Project Manager
Regulatory Division
US Army Corps of Engineers, Wilmington District
69 Darlington, Avenue
Wilmington, North Carolina 28402 1890
Office 910 251 -4634
Cell 910 617 3254
Fax 910 251 -4025
Email david L Timpy @usace army mil
Website http //www saw usace army mil
The Wilmington District is committed to providing the highest level of support to the public To
help us ensure we continue to do so, please complete the Customer Satisfaction Survey located
at our website at http 1/per2 nwp usace army mil /survey html to complete the survey online
-- Original Message - -- -
From Pat Kenney @nps gov fmailto Pat Kenney @nps govt
Sent Monday, June 18, 2012 8 15 PM
To Timpy, David L SAW
Cc smtp Rikard, Michael
Subject Cape Lookout National Seashore - permit request
Mr Tlmpy
Cape Lookout National Seashore is proposing to dredge less than 1000 cubic yards of material
from the boat basin at the park headquarters building at Harkers Island If this project is
approved, the dredged material will be placed in an upland site (previously disturb lands) within
the 90+ acre NPS administrative site on Harkers Island I have attached a pre construction
notification form and requesting that this project be reviewed for approval of a general permit to
conduct the dredging Should there be other agencies that need to be contacted please let me
know
Also as a follow up to our meeting on Monday, June 11, I would also like to officially notify you
that Cape Lookout National Seashore plans to conduct maintenance dredging of the ferry boat
basins at Great Island, on South Core Banks, and Long Point, on North Core Banks The Division
of Coastal Management has determined that maintenance dredging of these two boat basins is
consistent with the Coastal Management Act based on previous consistency determinations
Thank you for your assistance and please do not hesitate to contact Michael Rikard or me if you
need any additional information
Pat
(See attached file Harkers Island Dredging PCN doc)
*************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
Patrick M Kenney
Superintendent
Cape Lookout National Seashore
131 Charles Street
Harkers Island, NC 28531
office 252 728 -2250 x3014
*************************** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
(See attached file Harkers Island Dredging PCN doc)(See attached file