Loading...
HomeMy WebLinkAboutWQCSD0352_Regional Office Historical File Pre 2018Parker, Tony R From: - Sent: To: Subject: Steven Lambert <mslambert@yadtel.net> Tuesday, September 17, 2019-9:28 PM Parker, Tony R RE: [External] Fixing Stuff update CAUTION: A lot of parts were required for the lift station electrical repair. It was also found that telemetry went down and required the IT provider to troubleshoot and reset it. Telemetry is on line and more parts will be installed soon. The basic telemetry requirements are also on line. From: Parker, Tony R [mailto:tony.parker@ncdenr.gov] Sent: Friday, August 2, 2019 7:09 AM To: Steven Lambert <mslambert@yadtel.net> Subject: RE: [External] Fixing Stuff update Thanks Steve. Let me know when complete. Tony Parker 'Environmental Specialist Water Quality Regional Operations Section Division of Water Resources NC.Department of Environmental Quality 704-663-1699 office tony.parker(ncdenr.gov Mooresville Regional Office 610 East Center Avenue, Suite 301 Mooresville, NC 28115 t+< it �Alothing Compares. Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Steven Lambert [mailto:mslambert@yadtel.net] Sent: Thursday, August 1, 2019 9:24 PM To: Parker, Tony R <tony.parker@ncdenr.gov> 1 Cc: harmonync@yadtel.net Subject: [External] Fixing Stuff update 'CAUTION We have secured Ehret Electric to troubleshoot lift stations and to facilitate repairs. His first planned visit is Friday, August 4—weather permting ROY COOPER Governor MICHAEL S. REGAN Secretary LINDA CULPEPPER Director NORTH CAROLINA Environmental Quality August 2, 2019 The Honorable D. Lee Matney, Mayor Town of Harmony PO Box 118 Harmony, NC 28634 Subject: Compliance Evaluation Inspection Town of Harmony Permit No. WQCSD0352 Iredell County Dear Mr. Matney: 1. Mr. Tony Parker of the Mooresville Regional Office of the NC Division of Water Resources (DWR or the Division) conducted a compliance evaluation inspection (CEI) of the subject wastewater collection system (WWCS) on July 30, 2019. The assistance you provided and the assistance of Mr. Steve Lambert during the inspection was greatly appreciated. A copy of the inspection report is attached for your records and inspection findings are summarized below. Site/System Review 2. The following system components were inspected: a. Three influent manholes were inspected. No issues. b. Three pump stations were inspected. Issues noted. Please see attached report. c. One dedicated on -site generator was inspected. No issues. 3. As you are aware, owners of permitted collection systems must comply with their permit and all rules listed under NC Administrative Code 15A NCAC 02T .0400, et seq. The system status is outlined below: a. 15A NCAC 02T .0403(a)(1): Requires that the system be effectively maintained and operated at all times to prevent discharge to land or surface waters and any contravention of ground or surface water standards. Observations: The system has had no reportable spills for this review period. Compliance Status: Compliant. North Carolina Department of Environmental Quality I Division of Water Resources ��Jjj Mooresville Regional Office 1610 East Center Avenue, Suite 301 I Mooresville, North Carolina 28115 FLITIAD.�� 704.663.1699 r b. 15A NCAC 02T .0403(a)(2): Requires that a map of the wastewater collection system be developed and actively maintained. Observations: A detailed map was available. Compliance Status: Compliant. c. 15A NCAC 02T .0403(a)15j Requires that the permittee or its representative inspect high -priority sewers (HPS - as defined in 15A NCAC 02T .0402(2)) at least once every six months and document the inspections. - Observations: The system has one High Priority line or aerial crossing. Compliance Status: Compliant d. 15A NCAC 02T .0403(a)(6): Requires that the permittee or its representative conduct a general observation of the entire wastewater collection system at least once per year. Observations: This is completed by R/W mowing and line maintenance activities. Compliance Status: Compliant. e. 15A NCAC 02T .0403(a)(7): Requires that overflows and bypasses from the system be reported to the Division's Mooresville Regional Office in accordance with 15A NCAC 02B .0506(a), and that public notice must be provided as required by G.S. 143-215.1C. Observations: The system has not had any reportable spills for this review period. The NC regulations and statutes, which cover the reporting requirements for SSOs, are found in NC Administrative Code 15A NCAC 02B .0506(a) and NC General Statute 143-215.1C, respectively. You may access the NC regulations online at the NC Office of Administrative Hearings (OAH) website at: http://www.oah.state.nc.us/rules/ and the NC General Statutes online at the NC General Assembly's website at: http://www.ncga.state.nc.us/gascripts/Statutes/StatutesTOC.pl. You may wish to review them to ensure you are fully familiar with all requirements. When reporting SSOs to DWQ, you must call the Mooresville Regional Office (MRO) at 704-663-1699 during normal business hours. If outside normal business hours, you must report the spill to the NC Division of Emergency Management at 1-800-858-0368. Please note that all reportable SSOs must be reported within 24 hours of the occurrence, or first knowledge, of the SSO. Please also note that voice mail or faxed messages are not considered as the initial verbal report. You must talk to and report the spill to a live person. Compliance Status: Compliant f. 15A NCAC 02T .0403(a)(8): Requires that a grease control program be developed and implemented as follows: g. 1. For publicly owned collection systems, the Grease Control Program shall include at least bi-annual distribution of grease education materials by the owner or representative. Observations: Educational information is posted at Town Hall and info is mailed to all customers. 15A NCAC 02T .0403(a)(10): Requires that documentation be kept for all activities you undertake to comply with the requirements of 15A NCAC 02T .0403, subparagraphs (a)(1) through (a)(9), for a minimum of three years, with the exception of the map, which shall be maintained for the life of the system. Also any new additions, subdivisions or phased development needs to be incorporated as well. Observations: Records and a system map were available. Compliance Status: Compliant The inspection report should be self-explanatory; however, if you have any questions regarding the inspection report or this letter please give me or Tony Parker a call at 704- 663-1699. Attachment: BIMS Inspection Report CC: MRO Central Files/PERCS Unit (e-copy) Sincerely, f--DocuSigned by: A4I Lw H P4444 F161 FB69A2D84A3... for W. Corey Basinger, Regional Supervisor Mooresville Regional Office Water Quality Regional Operations Section Division of Water Resources, NCDEQ Compliance Inspection Report Permit: WQCSD0352 Effective: 11/16/10 Expiration: SOC: Effective: Expiration: County: Iredell Region: Mooresville Contact Person: Joseph Lawerence Steele Directions to Facility: Owner : Town of Harmony Facility: Harmony Collection System Title: Phone: 704-546-2602 Ext.241 System Classifications: Primary ORC: Certification: Phone: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 07/30/2019 Entry Time: 01:OOPM Exit Time: 03:30PM Primary Inspector: Tony Parker Phone: 704-663-1699 Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Collection System Inspect Non Sampling Permit Inspection Type: Deemed permitted collection system management and operation Facility Status: El Compliant . El Not Compliant Question Areas: • Miscellaneous Questions ▪ Spills/Response Plan ▪ Manholes (See attachment summary) • General II Inspections ■ Pump Stations Grease Control 1. Lines Page 1 of 6 Permit: WQCSD0352 Owner - Facility: Town of Harmony Inspection Date: 07/30/2019 Inspection Type : Collection System Inspect Non Sampling Reason for Visit: Routine Inspection Summary: Page 2 of 6 Permit: WQCSD0352 Owner - Facility: Town of Harmony Inspection Date: 07/30/2019 Inspection Type : Collection System Inspect Non Sampling Reason for Visit: Routine General # Is this system a satellite system? # If Yes, what is system name or permit number? Is there a overall sewer system map? Does the map include: pipe sizes Pipe materials (PVC, DIP, etc) Pipe location # Flow direction # Approximate pipe age # Pump station ID, location and capacity # Force main air release valve location & type # Location of satellite connections Are system maintenance records maintained? Comment: Grease Control Is grease/sewer education program documented with req'd customer distribution? # Are other types of education tools used like websites, booths, special meetings, etc? If Yes, what are they? (This can reduce mailing to annual.) Posted at pay booth at Town Hall and mail outs. For public systems, is there a Grease Control Program via an ordinance/agreement? If Yes, does it require grease control devices at applicable locations? Is the Grease Control Program enforced via periodic inspections/records review? Is action taken against violators? Comment: This is a Deemed system with adequate controls. Spills and Response Action Plan # Is system free of known points of bypass? # Have there been any sewer spills in the past 3 years? If Yes, were they reported to the Division if meeting the reportable criteria? If applicable, is there documentation of press releases and public notices issued? Are all spills or sewer related issues/complaints documented? # Are there repeated overflows/problems (2 or more in 12 months) at same location? # If Yes, is there a corrective action plan? Is a Spill Response Action Plan available? Is a Spill Response Action Plan available for all personnel? Yes No NA NE ❑ ❑ • ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ III ❑ ❑ ❑ • ❑ ❑ ❑ 01:111110 ▪ ❑ ❑ ❑ ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ Yes No NA NE ■ ❑❑❑ ▪ ❑ ❑ ❑ ■ ❑❑❑ ❑❑❑■ ❑ ❑ ❑• ❑ ❑ ❑ MI Yes No NA NE 1 ❑ ❑ ❑ ❑ 1 ❑ ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑•❑ ❑ ❑ ❑ ▪ ❑ ❑ ❑ ■ ❑❑❑ Page 3 of 6 Permit: WQCSD0352 Owner - Facility: Town of Harmony Inspection Date: 07/30/2019 Inspection Type : Collection System Inspect Non Sampling Reason for Visit: Routine Does the plan include: # 24-hour contact numbers # Response time # Equipment list and spare parts inventory # Access to cleaning equipment # Access to construction crews, contractors, and/or engineers # Source of emergency funds # Site sanitation'and cleanup materials # Post-overflow/spill assessment Comment: No spills. Inspections Are adequate maintenance records maintained? Are pump stations being inspected at the required frequency? Is at least one complete functionality test conducted weekly per pump station? Is there a system or plan in place to observe the entire system annually? Is the annual inspection documented? # Does the system have any high -priority lines/locations? Are inspections of HPL documented at least every 6 months? Are new lines being added to the HPL list when found or created? Comment: Lines/Right-of-Ways/Aerial Lines Please list the Lines/Right of Ways/Aerial Lines Inspected: One aerial line was attempted to be inspected but due to pending operations this visit was cancelled. Are right-of-ways and easements maintained for the full width for access? If No, give details on temporary access: Documentation was available indicating these lines are mowed and maintained.as needed. Is maintenance documented? Were all areas/lines inspected free of issues? Comment: Due to other operations line visits were not evaluated at this time, however records were available documenting these are maintained as required. Manholes Please list the Manholes Inspected: Influent manholes were checked at 3 pump stations that were visited and no issues were observed. Are manholes accessible? # Are manhole covers/vents above grade? Are manholes free of visible signs of overflow? Are manholes free of sinkholes and depressions? R ❑ ❑ ❑ ▪ ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ ▪ ❑ ❑ ❑ ❑ ❑ II ❑ ▪ ❑ ❑ ❑ II ❑ ❑ ❑ Yes No NA NE ▪ ❑ ❑ ❑ • ❑ ❑ ❑ • ▪ ❑.❑ ❑ ❑ ❑ ❑ ■ ❑❑❑ • ❑ ❑ ❑ ▪ ❑ ❑ ❑ ❑ ❑ II ❑ Yes No NA NE ❑ ❑ ❑• • ❑ ❑ ❑ ❑ ❑ ❑ • Yes No NA NE ▪ ❑ ❑ ❑ Cl• ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ Page 4 of 6 Owner - Facility: Town of Harmony Permit: WQCSD0352 a) 0 Reason for Visit: Inspection Type : Collection System Inspect Non Sampling Inspection Date: 07/30/2019 00000000000 ❑ ❑ ❑ ❑ ❑ ❑ ❑ ❑ DDDDDDDDED •• ❑ ❑ ❑ Are manhole covers present? # Are manholes properly seated? # Are manholes in good condition? # Are inverts in good condition? Is flow unrestricted in manholes? ca en 2 m ai O- .Q O y O C c'• (-•,• y O N 'O j E o m. co6) 7 a) a) a) Cs.. O > > �. o N en to enV) a) C Ou) C p) a) 8 80. x N N d E .O O O O to j O a) a) a) co N a) a) O ay) CO 0)) a) a) E d O o O o 4- O .0 L .0 L 0 .0 C C C C C C al Ca CU CU as E E E E> E a) a) ' a) a) a) a) No issues observed with the manholes checked. C E E 0 < < < < < U Yes No NA NE N co a r Do 0 o # Number of duplex or larger pump stations in system # Number of vacuum stations in system # Number of simplex pump stations in system # Number of simplex pump stations in system serving more than one building How many pump/vacuum stations have: A two-way "auto polling" communication system (SCADA) installed? # A simple one-way telemetry/communication system (auto -dialer) installed? For pump stations inspected: 000000 DDDDE 000000 DDD ❑•❑ Are they secure with restricted access? Were they free of by-pass structures/pipes? Were wet wells free of excessive grease/debris? Do they all have telemetry installed? Is the telemetry system functional? Is a 24-hour notification sign posted ? Does the sign include: Owner Name? Pump station identifier? n• Lou' 0) -o Instructions.for notification? 24-hour emergency contact numbers? Are audio and visual alarms present? CO 0 0) a) rn m n Permit: WQCSD0352 Owner - Facility: Town of Harmony Inspection Date: 07/30/2019 Inspection Type : Collection System Inspect Non Sampling Reason for Visit: Routine Are audio and visual alarms operable? # Is there a backup generator or bypass pump connected? if tested during inspection, did it function properly? Is the back-up system tested at least bi-annually under normal operating conditions? # Does it have a dedicated connection for a portable generator? # Is the owner relying on portable units in the event of a power outage? # If Yes, is there a distribution plan? If Yes, what resources (Units/StaffNehicles/etc) are included in Plan? Four of the 7 P/S's have dedicated generators and the other three sites have a quick connect for a portable unit maintained, tested and stored at the Towns WWfP. The portable unit was not evaluated. The Midway P/S was visited and the on site unit functioned properly when tested. # Does Permittee have the approved percentage of replacement simplex pumps? Is recordkeeping of pump station inspection and maintenance program adequate? Do pump station logs include at a minimum: Inside and outside cleaning and debris removal? Inspecting and exercising all valves? Inspecting and lubricating pumps and other equipment? Inspecting alarms, telemetry and auxiliary equipment? ❑ ❑ ❑ ▪ ❑ ❑ ❑ ▪ ❑ ❑ ❑ ■ ❑❑❑ IN ❑ ❑ ❑ ▪ ❑ ❑ ❑ ❑ ❑ ❑• ❑ ❑ 1 ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ • ❑ ❑ ❑ ▪ ❑ ❑ ❑ ▪ ❑ ❑ ❑ Comment: The 3 alarms tested failed to function properly to some degree at time of inspection. It could not be determined at the time of inspection the exact cause of these failures. The contract operator on site notified the maintenance staff to determine the cause and to repair or replace defective equipment. Page 6 of 6 Parker, Tony R From: Sent: To: Cc: Subject: Steven Lambert <mslambert@yadtel.net> Thursday, August 1, 2019 9:24 PM Parker, Tony R harmonync@yadtel.net [External] Fixing Stuff update CAUTION: We have secured Ehret Electric to troubleshoot lift stations and to facilitate repairs. His first planned visit is Friday, August 4—weather permting 1 1.5A-NCAC 02T .0403 PERMITTING LIT tqc=uum.pis MI" Permittee: `�o�n a ,4-7n'1.r Tracking #: WQCSDO, j- V Date: } l 3 O/ ! i .POC Phone: . POC: - (a) Collection systems having an actual, permitted or Division approved average daily flow less than 200,000 gallons per day are deemed permitted pursuant to Rule .0113 this Subchapter provided the system meets the criteria in Rule .0113 of this Subchapter and all specific criteria required in this Rule: YES NO • REMARKS - (1) The sewer system is effectively maintained and operated at all times to prevent discharge to land or surface waters,v. and to prevent any contravention of groundwater standards or surface water standards.. �, / d S /� 711 �'S / V Q/ p�--a el �('�/i`cr.� . (2) A map of the sewer system has been developed and is maintained actively . - , jT; Y`s . • (3) An operation and maintenance plan including pump station inspection frequency, preventative maintenance •• schedule, spare parts inventory and overflow response has been developed and implemented. / ✓ 'Ai1„ A.., %,�/44, --.4 r� n �,_,�,,,, 1" . . . (4) Pump stations that are not connected to a telemetry-; system (i.e., remote alarm system) are inspected -by the permittee or its representative every day (i.e., 365 days per • year). Pump stations that are connected to•a telemetry are inspected at least once per week system : - . (5) High -priority sewers are inspected by the permittee or its representative at least once every s x-months and inspections are documented. (6) A general observation by the permittee or its representative of the entire sewer system is conducted at least once per year. (7) Overfows and bypasses are reported tothe appropriate Division regional' office in accordance with 15A NCAC 02B .0506(a), and public notice is provided as required by G.S. 143-215.1 C. . S�� �/ f 7 - . . t/ rli j % .6.- k, �/ , £ %Y� A Grease Control Program is in place as follows` (t3) • . , ] I rov,) �/ 0 I hW ' .• - / . . . (A) For publicly owned collection systems, the Grease Control Program shall include at least bi-annual distribution of educational materials for both commercial and residential ' users and the legal means to require grease interceptors for new construction and retrofit, if necessary, of grease interceptors at existing establishments. The plan shall also include legal means for inspections of the grease .. interceptors; enforcement for violators and the legal means to control grease entering the system from other public and private satellite sewer systems. (B) For privately owned collection systems, the Grease Control Program shall include at least bi-annual distribution of grease education materials to users of the collection system by the permittee or its representative. V . . -o - , - .• • . (C) Grease education materials shall be.distributed more • often than required in Parts (A) and (B) of this Subparagraph if necessary to prevent grease -related sanitary sewer overflows. (9) Right-of-ways and easements are maintained in the full easement width for personnel and equipment accessibility. / i/ . (10) Documentation shall be kept for Subparagraphs (a)(1) through (a)(9) of this Rule for a minimum of three years with ✓- . Pump Station Inspection Checklist Name: Address: # Pumps - 1 2 Working : 1 2• ij/141SS er Runrime- Weather.. / YES NO Signage: " " Housekeeping: ^/ Secure: Wet Well Floats: Debris: C I, ffA+- 0 ✓ . Working High Water Float Telemetry: • SCADA: .,{ Audio/Visual: C/‘% 511,4' A.:I ) rl,j' tly:-/7 ✓ k (11t /. • ... Is alarm system tested, How often: l 0lc .i/- Inspection Logs: Emergency Pawer. gi4,r',L, c4517.-4. c-- J• Type: Portable Onsite Fuel - _ ScheduleNender - Duick Connect:. " . • resting Schedule: M. Cj ''i rn?‘-�-k 1y 3ackflow )verflow Piping: - 3ypass Pumping: nspection Schedule: ;omments/ Observations: 04 I Pump Station Inspection Checklist Name: - Address: # pumps - 1 2 72 �15. Working : 1 c /14 1� is hf 1 t L 1- . Run Time - l YES Weather. - - • C r ae..,- NO ' Signage: �� ' Housekeeping: Secure: • e/ Wet Well Floats: . , / Debris: " - k ; c V Working High Water Float ✓ Telemetry: uY 4 GJ o ✓Y �4 .N Ud' - L.rsl,4- r�) 0 C -2f'-c -- l-/- i SCADA: AudioNisual:... l•) ,r n. In) tc✓ �t .k f Ia4- Is alarm system tested, How often: ta)k ), c✓ Inspection Logs: Emergency Power. • •- . s Type: Portable Cnsit Fuel - ScheduleNendet - Duick Connect:. N / /7 . resting Schedule: IA) yc 11 ' 3ackflow: n� -)verflnw Pining: • - 3ypass Pumping: nspection Schedule: ;omments/ Observati n o-y\ 1)014)a7- , i . . . . . . • . . - Pump Station Inspection Checklist • Name: • Address: 17 \- • Working ,- .1 41, • i . . . . . . . Run Tine 7 Weather. . • •' r(eA,../ YES •NO . Signage: . . ,,- • Housekeeping: •17- . . . •Secure: • WetWeil Floats: . - Debris: IV Working High Water Float '.7 edil ',, •• . ''‘... • Telemetry: . SCADA: • t , AudioNisual: .• (\j- 0 ce,„ L, c9\,\.)- • f4v 6 -,,, . • is alarm system tested, How often: . k ( Inspection Logs: /1/0A En.iergency Power: •• ._ r/—.. Type Portable Onsite Fuel - _ ScheduleNender - -,_ Duick Co ct-r- - . Vesting Schedule: en.,' /IA ' yvf)ti . S y • 3ackflow: • 4//29 )verflow Piping: • • 3ypass Pumping: • 1../ nspection Schedule: • . lAjs4 ) 5 TjA / 1:-'1--N, • . ;omments/ Observations: L Beverly Eaves Perdue Governor Alria NCDENR Fii North Carolina Department of Environment and Natural Resources Division of Water Quality Charles Wakild, P.E. Dee Freeman Director Secretary July 17, 2012 The Honorable Joyce Rogers, Mayor Town of Harmony Post Office Box 118 Harmony, North Carolina 28634 Subject: Compliance Evaluation Inspection Town of Harmony Collection System Permit No. WQCSD0352 Iredell County Dear Ms. Rogers: Enclosed is a copy of the Compliance Evaluation Inspection Report for the inspection conducted at the subject facility on June 22, 2012 Mr. Lon Snider of this Office. The report should be self-explanatory; however, should you have any questions concerning this report, please do not hesitate to contact me at (704) 663-1699. erel \.l Lon Snider Environmental Specialist Enclosures Mooresville Regional Office Location: 610 East Center Ave., Suite 301 Mooresville, NC 28115 Phone: (704) 663-16991 Fax: (704) 663-6040 ! Customer Service: 1-877-623-6748 Internet http:llportal.ncdenr.orgiweblwq An Equal Opportunity .t Afrirmative Action Employer — 309%0 Recycled/10% Post Consumer paper NorthCarolina Xaturall ji Permit: WQCSD0352 SOC: County: Iredell Region: Mooresville Contact Person: Compliance Inspection Report Effective: 11/16/10 Expiration: Owner: Town of Harmony Effective: Expiration: Facility: Harmony Collection System uiw CS- 9- ° (A- '�Y 5l »fu,,i.-f as �� 71 z$1 i 6' AIPD E s New Joseph Lawerence Steele Title: Directions to Facility: System Classifications: Primary ORC: Secondary ORC(s): Phone: 704-546-2602 Ext.241 Certification: Phone: On -Site Representative(s): Related Permits: Inspection Date: 06/22/2012 ntry Time: 01:30 PM Exit Time: 03:30 PM Primary Inspector: Lon Snider Phone: 704-663-1699 Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Collection System Inspect Non Sampling Permit Inspection Type: Deemed permitted collection system management and operation Facility Status: • Compliant 0 Not Compliant Question Areas: ■ Miscellaneous Questions ■ Monitoring & Rpting Reqmts Lines "'Performance Standards Inspections (See attachment summary) ▪ Operation & Maint Reqmts • Records ▪ Pump Station • Manhole Page: 1 Permit: WQCSD0352 Owner - Facility: Town of Harmony Inspection Date: 06/22/2012 Inspection,Type: Collection System Inspect Non Sampling Reason for Visit: Routine Inspection Summary: Page: 2 a Permit: WQCSD0352 Owner - Facility: Town of Harmony Inspection Date: 06/22/2012 Inspection Type: Collection System Inspect Non Sampling Reason for Visit: Routine Performance Standards Is Public Education Program for grease established and documented? What educational tools are used? There was no documentation of a Public Education Program for grease. Is Sewer Use Ordinance/Legal Authority available? Does it appear that the Sewer Use Ordinance is enforced? Is Grease Trap Ordinance available? Is Septic Tank Ordinance available (as applicable, i.e. annexation) List enforcement actions by permittee, if any, in the last 12 months I did not see a copy of the Sewer Use Ordinance during my inspection. Has an acceptable Capital Improvement Plan (CIP) been implemented? Does CIP address short term needs and long term \"master plan\" concepts? Does CIP cover three to five year period? Does CIP include Goal Statement? Does CIP include description of project area? Does CIP include description of existing facilities? Does CIP include known deficiencies? Does CIP include forecasted future needs? Is CIP designated only for wastewater collection and treatment? Approximate capital improvement budget for collection system? Total annual revenue for wastewater collection and treatment? CIP Comments System is just over a year old. Is system free of known points of bypass? If no, describe type of bypass and location Is a 24-hour notification sign posted at ALL pump stations? # Does the sign include: Instructions for notification? Pump station identifier? 24-hour contact numbers If no, list deficient pump stations Yes No NA NE Florin FlFlFl■ nnn■ nnn■ n n■n n il ■❑ Fln■n nFl■Fl n n■n n n■n nn■n n n■n ❑ ❑ ■ ❑ n n■n ■ nnn ■ nnn ■ nnn ■ nnn ■ nnn Page: 3 Permit: WQCSD0352 Owner - Facility: Town of Harmony Inspection Date: 06/22/2012 Inspection Type: Collection System Inspect Non Sampling Reason for Visit: Routine # Do ALL pump stations have an "auto polling" feature/SCADA? Number of pump stations Number of pump stations that have SCADA Number of pump stations that have simple telemetry Number of pump stations that have only audible and visual alarms Number of pump stations that do not meet permit requirements # Does the perrrmittee have a root control program? # If yes, date implemented? Describe: Comment: Grease control requirments for Deemed Collection Systems as stated in 15A NCAC 02T .0403 paragraph (8)(A). For publicly owned collection systems, the Grease Control Program shall include at least bi-annual distribution of educational materials for both commercial and residential users and the legal means to require grease interceptors for new construction and retrofit, if necessary, of grease interceptors at existing establishments. The plan shall also include legal means for inspections of the grease interceptors, enforcement for violators and the legal means to control grease entering the system from other public and private satellite sewer systems. Inspections Are maintenance records for sewer lines available? Are records available that document pump station inspections? Are SCADA or telemetry equipped pump stations inspected at least once a week? Are non-SCADA/telemetry equipped pump stations inspected every day? Are records available that document citizen complaints? # Do you have a system to conduct an annual observation of entire system? # Has there been an observation of remote areas in the last year? Are records available that document inspections of high -priority lines? Has there been visual inspections of high -priority lines in last six months? Comment: Operation & Maintenance Requirements Are all log books available? Does supervisor review all log books on a regular basis? Does the supervisor have plans to address documented short-term problem areas? ■nnn 7 7 0 0 0 Yes No NA NE 00•0 ■ nnn ■ nnn nn■n ■ nnn ■ nnn ■ nnn n n■n n n■n Yes No NA NE ■ nnn ■ nnn El nun Page: 4 1 Permit: WQCSD0352 Owner - Facility: Town of Harmony Inspection Date: 06/22/2012 Inspection Type: Collection System Inspect Non Sampling Reason for Visit: Routine What is the schedule for reviewing inspection, maintenance, & operations logs and problem areas? Are maintenance records for equipment available? Is a schedule maintained for testing emergency/standby equipment? What is the schedule for testing emergency/standby equipment? Do pump station logs include: Inside and outside cleaning and debris removal? Inspecting and exercising all valves? Inspecting and lubricating pumps and other equipment? Inspecting alarms, telemetry and auxiliary equipment? Is there at least one spare pump for each pump station w/o pump reliability? Are maintenance records for right-of-ways available? Are right-of-ways currently accessible in the event of an emergency? Are system cleaning records available? Has at least 10% of system been cleaned annually? What areas are scheduled for cleaning in the next 12 months? Is a Spill Response Action Plan available? Does the plan include: 24-hour contact numbers Response time Equipment list and spare parts inventory Access to cleaning equipment Access to construction crews, contractors, and/or engineers Source of emergency funds Site sanitation and cleanup materials Post-overflow/spill assessment Is a Spill Response Action Plan available for all personnel? Is the spare parts inventory adequate? Comment: An operation and maintenance plan including pump station inspection frequency, preventative maintenance schedule, spare parts inventory and overflow response should be developed and implemented. ■ nnn ■ nnn weekly ■ nnn ■ nnn ■ nnn ■ nnn n nn■ n nn■ ■ nnn n n■n n n■n n ■nn n ■n.n n ■nn n orm n ■nn n ■nn n ■nn Florin n ■nn n ■rim ■ nnn Page: 5 Permit: WQCSD0352 Owner - Facility: Town of Harmony Inspection Date: 06/22/2012 Inspection Type: Collection System Inspect Non Sampling Reason for Visit: Routine Records Are adequate records of all SSOs, spills and complaints available? Are records of SSOs that are under the reportable threshold available? Do spill records indicate repeated overflows (2 or more in 12 months) at same location? If yes, is there a corrective action plan? Is a map of the system available? Does the map include: Pipe sizes Pipe materials Pipe location Flow direction Approximate pipe age Number of service taps Pump stations and capacity If no, what percent is complete? List any modifications and extensions that need to be added to the map # Does the permittee have a copy of their permit? Comment: Monitoring and Reporting Requirements Are copies of required press releases and distribution lists available? Are public notices and proof of publication available? # Is an annual report being prepared in accordance with G.S. 143-215.1C? # Is permittee compliant with all compliance schedules in the permits? If no, which one(s)? Comment: A annual report should be prepared and submitted each year. 21 S-Hwy21 S Pump Station Pump station type Are pump station logs available? Is it accessible in all weather conditions? Yes No NA NE n n■n n n■n nn■n n n■n ■ nnn ■ nnn ■ nnn ■ nnn ■ nnn nn■n n n■n ■ nnn 100 nn■n Yes No NA NE n n■n ❑0•0 ■ nnn nn■n Yes No NA NE Duplex ■ nnn ■ nnn Page: 6 Is pump station free of overflow piping? 6pa}Iwll sseooe ollgnd sl iegwnu auoyd /oue6Jew9 cJayl;ueP! uoiTejs dwnd Instructions for notification? :epnloul;l seoa Is a 24-hour notification sign posted? Is the generator inspected according to their schedule'? ,;ueia};ns pue >lue; ut !erg sl # 6 elgeiedo Joiejeuab ay; sl CiT 0 0 n O 'D3 • (D CD 3 CD O' • ,C (D • CO (D C. ccoo CD • 'CT) a o D C. O (D O • 3 C • N •J Is an emergency generator available? 6 algeJado SGAIEA ne aiy �aaeld ul Se NBA;allaJ J!B aw > > u, > m m g (o Cr 0 CD 0 PO CU 0 0 -D n O O (- a (D (D N < < < -- Cn O COD COD D N (n N = — o =cn a)'D 'D N CD -0 n 3 N Cn m(OoJ co o •J D cn m o- C (D •J 8 0. •J Are audio and visual alarms present? Is simple telemetry operational? Lfuesaid ti}awala} eldwls s1 Is "auto polling" feature/SCADA operational? Is "auto polling" feature/SCADA present? Are wet wells free of excessive debris? 6e geJedo sdwnd lie eiv 61uesaJd sdwnd lie aiv # Is general housekeeping acceptable? ID D D D D D D D ID D D D D D ID ID D D D D D D D D D ID ID D D D D ID D D D ID D D■ D D D D D D D 0 D■■ D D D D D D ID ID I] D D ❑ I] D D •D I] D I] I] ■ ■ ■ ■ D I] I] D 0 I] D D D I] I] I] I] m ZI.OZ/ZZ/90 :o;ea uo!;aadsu! 7 N CD n O 17 D n 0 (D 0 0 U) 0) N (o 3 N CD 0 O (A N 3 0 7 augnoi :;!s!n Jo; uoseab ZS£OaSODM :;!wied ,(uouneH Jo uMol :A aped - .IOUMO Permit: WQCSD0352 Inspection Date: 06/22/2012 Owner - Facility: Town of Harmony Inspection Type: Collection System Inspect Non Sampling Reason for Visit: Routine Is the pump station free of signs of overflow? Are run times comparable for multiple pumps? Comment: This is the main pump station that sends all flow to the WWTP. HAYS ST - Manhole Is manhole accessible? # Is manhole cover/vent above grade? Is the manhole free of visible signs of overflow? Is the manhole free of sinkholes and depressions? Is manhole cover present? # Is manhole properly seated? # Is manhole in good condition? # Is invert in good condition? Is line free -flowing and unrestricted in manhole? Is manhole free of excessive amounts of grease? Is manhole free of excessive roots? Is manhole free of excessive sand? Is manhole's extended vent screened? Are vents free of submergence? Are manholes free of bypass structures or pipes? Comment: LINDA DR - Manhole Is manhole accessible? # Is manhole cover/vent above grade? Is the manhole free of visible signs of overflow? Is the manhole free of sinkholes and depressions? Is manhole cover present? # Is manhole properly seated? # Is manhole in good condition? ■ nnn Yes No NA NE ■ nnn ■ nnn ■ nnn ■ nnn ■ nnn ■ nnn ■ nnn ■ nnn ■ nnn ■ nnn ■ nnn ■ nnn nn■n nn■n 'inn n Yes No NA NE ■ nnn ■ nnn ■ nnn ■ nnn ■ nnn ■ nnn ■ nnn Page: 8 e Permit: WQCSD0352 Owner - Facility: Town of Harmony Inspection Date: 06/22/2012 Inspection Type: Collection System Inspect Non Sampling Reason for Visit: Routine # Is invert in good condition? Is line free -flowing and unrestricted in manhole? Is manhole free of excessive amounts of grease? Is manhole free of excessive roots? Is manhole free of excessive sand? Is manhole's extended vent screened? Are vents free of submergence? Are manholes free of bypass structures or pipes? Comment: There was a good amount of grease built up on the walls of the flow channel in the manhole. This area should be cleaned & inpsected due to the apparent grease that is being introduced into the system up stream of this manhole and pump station. LINDA DR - Linda Drive Pump Station Pump station type Are pump station logs available? Is it accessible in all weather conditions? # Is general housekeeping acceptable? Are all pumps present? Are all pumps operable? Are wet wells free of excessive debris? Are upstream manholes free of excessive debris/signs of overflow? Are floats/controls for pumps/alarms operable? Is "auto polling" feature/SCADA present? Is "auto polling" feature/SCADA operational? Is simple telemetry present? Is simple telemetry operational? Are audio and visual alarms present? Are audio and visual alarms operable? Is the Pump station inspected as required? Are backflow devices in place? ■ nnn ■ nnn n ■nn ■ nnn ■ nnn n n■n n n■n ■ nnn Yes No NA NE ■ nnn ■ nnn ■ nnn ■ nnn ■ nnn n orm ■ nnn ■ nnn ■ nnn ■ nnn n n■40 n n■n ■ nnn ■ nnn ■ nnn nnn■ Page: 9 Permit: WQCSD0352 Owner - Facility: Town of Harmony Inspection Date: 06/22/2012 Inspection Type: Collection System Inspect Non Sampling Reason for Visit: Routine Are backflow devices operable? Are aft relief valves in place? Are air relief valves operable? # Is an emergency generator available? Can the emergency generator run the pumps? Is the pump station equipped for quick hook-up? Is the generator operable? # Is fuel in tank and sufficient? Is the generator inspected according to their schedule? Is a 24-hour notification sign posted? Does it include: Instructions for notification? Pump station identifier? Emergency phone number Is public access limited? Is pump station free of overflow piping? Is the pump station free of signs of overflow? Are run times comparable for multiple pumps? Comment: There was a significant amount of grease built up in the wet well & on the floats. LITTLE WILKESBORO RD - Manhole Is manhole accessible? # Is manhole cover/vent above grade? Is the manhole free of visible signs of overflow? Is the manhole free of sinkholes and depressions? Is manhole cover present? # Is manhole properly seated? # Is manhole in good condition? # Is invert in good condition? n nn■ n nn■ n nn■ ■ nnn ■ nnn ■ nnn ■ nnn ■ nnn ■ nnn ■ nnn ■ nnn ■ nnn ■ nnn ■ n n n ■ nnn ■ nnn Yes No NA NE ■ .nnn ■ DOO ■ nnn ■ nnn ■ nnn ■ nnn ■ nnn ■ nnn Page: 10 Permit: WQCSD0352 Owner - Facility: Town of Harmony Inspection Date: 06/22/2012 Inspection Type: Collection System Inspect Non Sampling Reason for Visit: Routine Is line free -flowing and unrestricted in manhole? Is manhole free of excessive amounts of grease? Is manhole free of excessive roots? Is manhole free of excessive sand? Is manhole's extended vent screened? Are vents free of submergence? Are manholes free of bypass structures or pipes? Comment: ■ nnn ■ nnn ■ nnn ■ nnn n n■n n n■n ■ nnn Page: 11 1 Deemed Permitted Collection System Requirement Reference The sewer system is effectively maintained and operated at all times to prevent discharge to land or surface waters, and to prevent any contravention of groundwater standards or surface water standards. 15 A NCAC 02T .0403(a)(1) A map of the sewer system has been developed and is actively maintained. 15 A NCAC 02T .0403(a)(2) An operation and maintenance plan including pump station inspection frequency, preventative maintenance schedule, spare parts inventory and overflow response has been developed and implemented. 15 A NCAC 02T .0403(a)(3) Pump stations that are not connected to a telemetry system (i.e., remote alarm system) are inspected by the permittee or its representative every day (i.e., 365 days per year). Pump stations that are connected to a telemetry system are inspected at least once per week. 15 A NCAC 02T .0403(a)(4) High -priority sewers are inspected by the permittee or its representative at least once every six -months and inspections are documented. 15 A NCAC 02T .0403(a)(5) A general observation by the permittee or its representative of the entire sewer system is conducted at least once per year. 15 A NCAC 02T .0403(a)(6) Overflows and bypasses are reported to the appropriate Division regional office in accordance with 15A NCAC 02B .0506(a), and public notice is provided as required by G.S. 143-215.1 C. 15 A NCAC 02T 0403(a)(7) A Grease Control Program is in place as follows: (A) For publicly owned collection systems, the Grease Control Program shall include at least bi-annual distribution of educational materials for both commercial and residential users and the legal means to require grease interceptors for new construction and retrofit, if necessary, of grease interceptors at existing establishments. The plan shall also include legal means for inspections of the grease interceptors, enforcement for violators and the legal means to control grease entering the system from other public and private satellite sewer systems. (B) For privately owned collection systems, the Grease Control Program shall include at least bi- annual distribution of grease education materials to users of the collection system by the permittee or its representative. (C) Grease education materials shall be distributed more often than required in Parts (A) and (B) of this Subparagraph if necessary to prevent grease -related sanitary sewer overflows. • 15 A NCAC 02T .0403(A,B, & C)(8) Right-of-ways and easements are maintained in the full easement width for personnel and equipment accessibility. 15 A' NCAC 02T .0403(a)(9) Documentation shall be kept for Subparagraphs (a)(1) through (a)(9) of this Rule for a minimum of three years with exception of the map, which shall be maintained for the life of the system. 15 A NCAC 02T .0403(a)(1) & (a)(10)