HomeMy WebLinkAbout20210260 Ver 1_PreFiling Email 30-Day Clock Reached Email_20210308Strickland, Bev
From: laserfiche@ncdenr.gov
Sent: Monday, March 8, 2021 12:01 AM
To: eric.mularski@hdrinc.com
Cc: Turlington, Chad
Subject: Pre -Filing Time Clock has been reached for PNG - Line 2 Segment 2 Issue 3 - In -Line
Inspection Retrofit Project - 20210260 Ver 1
Attachments: DWR Pre -Filing Meeting Request Form.pdf
The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for PNG - Line 2
Segment 2 Issue 3 - In -Line Inspection Retrofit Project that you submitted on 2/5/2021. The ID number for that project is
20210260, Version 1.
Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be
accepted.
When you submit your application please upload a copy of the attached document in this email.
This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as
responses are not monitored.
ID#* 20210260
Version* 1
Regional Office* Fayetteville Regional Office - (910) 433-3300
Reviewer List* Chad Turlington
Pre -Filing Meeting Request submitted 2/5/2021
Contact Name * Eric Mularski
Contact Email Address* eric.mularski@hdrinc.com
Project Name* PNG - Line 2 Segment 2 Issue 3 - In -Line Inspection Retrofit Project
Project Owner* Piedmont Natural Gas
Project County* Bladen
Owner Address: Street Address
4720 Piedmont Row Drive
Address Line 2
aty State / Frovince / Region
Charlotte NC
Rbstal/Zip Code Country
28210 USACE
Is this a transportation project?* r Yes r No
Type(s) of approval sought from the DWR:
W 401 Water Quality Certification - F- 401 Water Quality Certification -
Regular Express
r- Individual Permit r- Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
Do you know the name of the staff member you would like to request a meeting with?
No
Please give a brief project description below.
PNG proposes to retrofit Line 2 to be efficiently assessed through In -
Line Inspection (ILI). ILI assessment of transmission pipeline assets is
part of Piedmont Natural Gas's Transmission Integrity Management
Program standards and practices.
PNG determined that an existing fitting was impacting their ability to
perform ILI tool inspections for the pipeline specifically at the Line 2
Segment 2 Issue 3 site. The project will consist of removing the wall
thickness transition piece and replacing it with a new one that
conforms with current PNG standards. An outage of the pipeline to
perform the work will not be feasible due to the current gas flow
demands. Therefore, a stopple system with a bypass will be installed
around the faulty fitting to allow for continued gas flow during
replacement. Stopple fittings will be installed on the pipeline
approximately 10-feet in either direction. Access to the site will
require temporary driveways, a turnaround, and matting which will
result in unavoidable impacts to a jurisdictional wetland features.
According to General Water Quality Certification No. 4133, these
activities not require written authorization or approval from the
NCDWR. This is a for the record only submittal to comply with the
electronic Pre -Construction Notification Required for the USACE 404
Nationwide 12 authorization.
Please give a couple of dates you are available for a meeting.
2/12/2021
Please attach the documentation you would like to have the meeting about.
08_PlanSet_Reduced.pdf 9.46MB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
i9lic 44VL4�#f
Submittal Date 2/5/2021