HomeMy WebLinkAbout20210240 Ver 1_PreFiling Email 30-Day Clock Reached Email_20210306Strickland, Bev
From: laserfiche@ncdenr.gov
Sent: Saturday, March 6, 2021 12:01 AM
To: jlawler@smeinc.com
Cc: Turlington, Chad
Subject: Pre -Filing Time Clock has been reached for Line 391 Retrofit - 20210240 Ver 1
Attachments: DWR Pre -Filing Meeting Request Form.pdf
The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Line 391 Retrofit
that you submitted on 2/3/2021. The ID number for that project is 20210240, Version 1.
Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be
accepted.
When you submit your application please upload a copy of the attached document in this email.
This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as
responses are not monitored.
ID#* 20210240 Version* 1
Regional Office* Fayetteville Regional Office - (910) 433-3300
Reviewer List* Chad Turlington
Pre -Filing Meeting Request submitted 2/3/2021
......................................................................................................................................................................................................................
Contact Name * Joey Lawler
Contact Email Address* jlawler@smeinc.com
Project Name* Line 391 Retrofit
Project Owner*
Project County*
Owner Address:
Piedmont Natural Gas
Anson
Street Address
4720 Piedmont Row Drive
Address Line 2
aty
Charlotte
Postal / Zip Code
28201
Is this a transportation project?* r Yes r No
State / Province / Region
NC
Country
usa
Type(s) of approval sought from the DWR:
W 401 Water Quality Certification - F 401 Water Quality Certification -
Regular Express
r- Individual Permit r- Modification
r- Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
Do you know the name of the staff member you would like to request a meeting with?
Chad Turlington
Please give a brief project description below.
Piedmont Natural Gas (PNG) is planning to retrofit a segment of their
Line 391 natural gas transmission pipeline west of Pleasant Grove
Church Road near the Town of Wadesboro in Anson County, North
Carolina.
PNG will be constructing two station sites along the existing line,
approximately one mile apart, as shown on the attached figures. The
project area also includes a proposed access corridor along an
existing earthen road that originates off Pleasant Grove Church Road
and ends at the proposed western station location.
The project may involve impacts to streams/wetlands, and require
authorization under NWP-12 / GC 4133.
Please give a couple of dates you are available for a meeting.
3/5/2021
Please attach the documentation you would like to have the meeting about.
1- Vicinity.pdf
465.83KB
2- Topo.pdf
929.15KB
3- Soils.pdf
844.54KB
4 - Aerial.pdf
864.69KB
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
Submittal Date 2/3/2021