Loading...
HomeMy WebLinkAbout20210240 Ver 1_PreFiling Email 30-Day Clock Reached Email_20210306Strickland, Bev From: laserfiche@ncdenr.gov Sent: Saturday, March 6, 2021 12:01 AM To: jlawler@smeinc.com Cc: Turlington, Chad Subject: Pre -Filing Time Clock has been reached for Line 391 Retrofit - 20210240 Ver 1 Attachments: DWR Pre -Filing Meeting Request Form.pdf The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Line 391 Retrofit that you submitted on 2/3/2021. The ID number for that project is 20210240, Version 1. Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be accepted. When you submit your application please upload a copy of the attached document in this email. This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as responses are not monitored. ID#* 20210240 Version* 1 Regional Office* Fayetteville Regional Office - (910) 433-3300 Reviewer List* Chad Turlington Pre -Filing Meeting Request submitted 2/3/2021 ...................................................................................................................................................................................................................... Contact Name * Joey Lawler Contact Email Address* jlawler@smeinc.com Project Name* Line 391 Retrofit Project Owner* Project County* Owner Address: Piedmont Natural Gas Anson Street Address 4720 Piedmont Row Drive Address Line 2 aty Charlotte Postal / Zip Code 28201 Is this a transportation project?* r Yes r No State / Province / Region NC Country usa Type(s) of approval sought from the DWR: W 401 Water Quality Certification - F 401 Water Quality Certification - Regular Express r- Individual Permit r- Modification r- Shoreline Stabilization Does this project have an existing project ID#?* r Yes r No Do you know the name of the staff member you would like to request a meeting with? Chad Turlington Please give a brief project description below. Piedmont Natural Gas (PNG) is planning to retrofit a segment of their Line 391 natural gas transmission pipeline west of Pleasant Grove Church Road near the Town of Wadesboro in Anson County, North Carolina. PNG will be constructing two station sites along the existing line, approximately one mile apart, as shown on the attached figures. The project area also includes a proposed access corridor along an existing earthen road that originates off Pleasant Grove Church Road and ends at the proposed western station location. The project may involve impacts to streams/wetlands, and require authorization under NWP-12 / GC 4133. Please give a couple of dates you are available for a meeting. 3/5/2021 Please attach the documentation you would like to have the meeting about. 1- Vicinity.pdf 465.83KB 2- Topo.pdf 929.15KB 3- Soils.pdf 844.54KB 4 - Aerial.pdf 864.69KB pdf only By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section 401 Certification Rule the following statements: • This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification Rule. • I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing meeting request. • I also understand that DWR is not required to respond or grant the meeting request. Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an application. Signature Submittal Date 2/3/2021