HomeMy WebLinkAbout20210241 Ver 1_PreFiling Email 30-Day Clock Reached Email_20210306Strickland, Bev
From: laserfiche@ncdenr.gov
Sent: Saturday, March 6, 2021 12:00 AM
To: jonathan@estatespace.com
Cc: Tankard, Robert
Subject: Pre -Filing Time Clock has been reached for Jolly Rogers Restaurant - 20210241 Ver 1
Attachments: DWR Pre -Filing Meeting Request Form.pdf
The North Carolina Division of Water Resources has received the Pre -Filing Meeting Request Form for Jolly Rogers
Restaurant that you submitted on 2/3/2021. The ID number for that project is 20210241, Version 1.
Your Pre -Filing Meeting Request has now reached the 30 calendar days' requirement and your application can now be
accepted.
When you submit your application please upload a copy of the attached document in this email.
This email was automatically generated by Laserfiche workflow. Please do not respond to this email address, as
responses are not monitored.
ID#* 20210241 Version* 1
Regional Office* Washington Regional Office - (252) 946-6481
Reviewer List* Robert Tankard
Pre -Filing Meeting Request submitted 2/3/2021
..................................................................................................................................................................................................................
Contact Name * Jonathan Fishbeck
Contact Email Address*
Project Name*
Project Owner*
Project County*
Owner Address:
jonathan@estatespace.com
Jolly Rogers Restaurant
Mr Hae-Chan Park
Hyde
Street Address
410 Irvin Garrish Highway
Address Line 2
aty
Ocracoke
Rbstal / Zip Code
27960
Is this a transportation project?* r Yes r No
State / Province / Region
NC
Country
Hyde
Type(s) of approval sought from the DWR:
W 401 Water Quality Certification - F 401 Water Quality Certification -
Regular Express
r- Individual Permit r- Modification
W Shoreline Stabilization
Does this project have an existing project ID#?*
r Yes r No
Do you know the name of the staff member you would like to request a meeting with?
Robert Pullinger
Please give a brief project description below.
It is understood that the scope of this effort will involve the re -design
and rebuild of an existing 1,862 sf waterfront restaurant that currently
incorporates approximately 854 sf of interior space/kitchen/B.O.H.
space, with an adjoined 1008 sf of exterior covered outdoor seating.
In addition, the lot includes an adjacent exterior covered open air
pavilion that will be incorporated into the design masterplan, and
attached to the main building. The preliminary proposed design
approach would be to re -build the entire structure, while elevating the
ground floor to raise it above existing flood plain, while utilizing the
existing building footprint for the main restaurant and expanding the
pavilion to maximize value of the property and clean up the road side
presentation of the buildings. As a result, the newly constructed
ground level footprint and building coverage will be similar, if not
identical, to what exists today. The new design though, will seek to
incorporate additional seating by the way of a second level rooftop
deck which will be accessible via staircase and elevator, while staying
under the 120 seat maximum in which the buildings septci system is
rated for.
Furthermore, the design studies will seek to incorporate the adjacent
exterior pavilion into an overall design strategy that architecturally
unifies the site's two elements while maximizes the value and with a
possibility of connecting the restaurant and pavilion upper levels via
`bridge' while retaining the lower level breezeway to the dock edge at
the ground floor.
The design build process and documentation can be understood to
fall into five (5) main phases: Concept Design, Schematic Design,
Construction Documents & Permit, Construction and Commissioning.
The project will be privately funding.
Please give a couple of dates you are available for a meeting.
2/3/2021
Please attach the documentation you would like to have the meeting about.
pdf only
By digitally signing below, I certify that I have read and understood that per the Federal Clean Water Act Section
401 Certification Rule the following statements:
• This form completes the requirement of the Pre -Filing Meeting Request in the Clean Water Act Section 401 Certification
Rule.
• I understand by signing this form that I cannot submit my application until 30 calendar days after this pre -filing
meeting request.
• I also understand that DWR is not required to respond or grant the meeting request.
Your project's thirty -day clock started upon receipt of this application. You will receive notification regarding meeting location
and time if a meeting is necessary. You will receive notification when the thirty -day clock has expired, and you can submit an
application.
Signature
two
Submittal Date 2/3/2021