HomeMy WebLinkAboutNCC201112_NOT Closeout Documents_20210304North Carolina Department of Environmental Quality
Land Resources: Systel Building, 225 Green Street, Suite 714, Fayetteville, NC 28301-5094
(910) 433-3300
Peartree West, Section One, Part
County: Cumberland Project: Two - Lots 23, 94 & 95 River basin: Cape Fear
Person financially responsible: H&H Constructors, Inc. - Brian Walker, Division Project N: CUNME-2020-123
Manager & Agent
Address: 2919 Breezewood Avenue, Suite 400, Fayetteville, NC 28303
1. Project Location: Hunting Lodge Road, Rockfish
Pictures: No
2. Weather and soil conditions: Dry, workable soils Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements?
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name): No one Title:
Inspection report: Sent Report Date given/sent: March 03, 2021
9. Corrective action needed:
Yes
10. Comments: Permanent ground cover sufficient to restrain erosion has been established. No additional
self -monitoring or self -inspections are required. Project is in compliance and released under
the SPCA. Termination of coverage under the NPDES General Stormwater Permit for
Construction Activities must be requested by the permittee via a Notice of Termination
(NOT). The NOT is available at: https://edocs.deq.nc.gov/Fonns/NCGOI-Termination.
Please note that this correspondence must be uploaded as part of completing the Notice of
Termination process.
Reported by: Melissa Joyner Others present:
Date of inspection: March 02, 2021 Time arriving on site: 10:40 AM Time leaving site: 10:50 AM
cc: