Loading...
HomeMy WebLinkAboutNCC200958_NOT Closeout Documents_20210304North Carolina Department of Environmental Quality Land Resources: 450 W. Hanes Mill Road, Suite 300, Winston-Salem, NC 27105 (336) 776-9800 County: Davie Project: Davie Campus Parking Lot Expansion River basin: Yadkin-PeeDee Person financially responsible: Davidson County Community College - Keith Project #: DAVIE-2020-011 Raker Address: PO BOX 1287, Lexington, NC 27293 1. Project Location: S Salisbury St, Mocksville Pictures: Yes - Digital 2. Weather and soil conditions: sunny, workable soils Initial inspection: No 3. Is site currently under notice of violation? No 4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below: 5. Violations: 6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes Describe: 7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply) Degree of damage: 8. Contact made with (name): Inspection report: Sent Report 9. Corrective action needed: Title: Date given/sent: November 25, 2020 10. Comments: This site was inspected for compliance on November 24, 2020. At the time of inspection permanent ground cover sufficient to restrain erosion has been established. No additional self -monitoring or self -inspections are required. Project is released. Termination of coverage under the NPDES General Stormwater Permit for Construction Activities should be requested by the permittee via Notice of Termination. Reported by: Blane Houck Others present: Date of inspection: November 24, 2020 Time arriving on site: 11:15 AM Time leaving site: 11:30 AM cc: