HomeMy WebLinkAboutNCC200958_NOT Closeout Documents_20210304North Carolina Department of Environmental Quality
Land Resources: 450 W. Hanes Mill Road, Suite 300, Winston-Salem, NC 27105
(336) 776-9800
County: Davie Project: Davie Campus Parking Lot Expansion River basin: Yadkin-PeeDee
Person financially responsible: Davidson County Community College - Keith Project #: DAVIE-2020-011
Raker
Address: PO BOX 1287, Lexington, NC 27293
1. Project Location: S Salisbury St, Mocksville
Pictures: Yes - Digital
2. Weather and soil conditions: sunny, workable soils Initial inspection: No
3. Is site currently under notice of violation? No
4. Is the site in compliance with S.P.C.A. and rules? Yes If no, check violations below:
5. Violations:
6. Is the site in compliance with NPDES Permit NCGO10000 Construction Stormwater requirements? Yes
Describe:
7. Has sedimentation damage occurred since last inspection? No If Yes, where? (check all that apply)
Degree of damage:
8. Contact made with (name):
Inspection report: Sent Report
9. Corrective action needed:
Title:
Date given/sent: November 25, 2020
10. Comments: This site was inspected for compliance on November 24, 2020. At the time of inspection
permanent ground cover sufficient to restrain erosion has been established. No additional
self -monitoring or self -inspections are required. Project is released. Termination of coverage
under the NPDES General Stormwater Permit for Construction Activities should be requested
by the permittee via Notice of Termination.
Reported by: Blane Houck Others present:
Date of inspection: November 24, 2020 Time arriving on site: 11:15 AM Time leaving site: 11:30 AM
cc: