Loading...
HomeMy WebLinkAbout20120734 Ver 1_401 Application_2012071220120734 --- 1VATMWI Umted States Department of the Intenor SERVICS National Park Service DA Cape Lookout National Seashore It, ROLY 131 C harle-, Street Harkers I51and, north CarOlUld 2853'1 July 26 2012 NC Dept of Environment and Natural Resources Division of Water Quality Karen Higgins 1650 Mail Service Center Raleigh, NC 27699 1650 Dear Ms Higgins I would like to submit the enclosed three applications for proposed dredging activities at Cape Lookout National Seashore for review I have been in contact with Ian McMillan and Teresa Watson regarding these applications and have electronically transferred a total of $720 to cover the fee for these applications If you have any questions please contact me at the phone number below Thank You for our sis ce Michael Rikard Ph D Resource Management Specialist 252 728 2250 0012 INAMERIC.A� @ ���� JUL 3 1 2042 oENR �anda $ S7e _ 17-V y �� � � _ t 20120734 Office Use Only Corps action ID no DWQ project no Form Version 1 3 Dec 10 2008 Page 1 of 11 PCN Form —Version 1 3 December 10 2008 Version Pre - Construction Notification PC Form A Applicant Information 1 Processing y f la Type(s) of approval sought from the Corps ❑Section 404 Permit ®Section 10 Permit 1 b Specify Nationwide Permit (NWP) number or General Permit (GP) number 1c Has the NWP or GP number been verified by the Corps' ❑ Yes ® No 1 d Type(s) of approval sought from the DWQ (check all that apply) ® 401 Water Quality Certification — Regular ❑ Non 404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1e Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification ❑ Yes ® No For the record only for Corps Permit ❑ Yes ® No 1f Is payment into a mitigation bank or in lieu fee program proposed for mitigation of impacts? If so attach the acceptance letter from mitigation bank or in lieu fee program ❑ Yes ® No 1g Is the project located in any of NC s twenty coastal counties If yes answer 1h below ® Yes ❑ No 1 h Is the project located within a NC DCM Area of Environmental Concern (AEC)? ® Yes ❑ No 2 Project Information 2a Name of project Perform Maintenance Dredging of Great Island Boat Basin 2b County Carteret 2c Nearest municipality / town n/a 2d Subdivision name n/a D 2e NCDOT only T I P or state project no n/a 3 Owner Information 3 d 2012 1 3a Name(s) on Recorded Deed National Park Service Cape Lookout National Seashore DENR 3b Deed Book and Page No n/a a ware fi,; y 3c Responsible Party (for LLC if applicable) Pat Kenney Superintendent ~� 3d Street address 131 Charles Street 3e City state zip Harkers Island NC 28531 3f Telephone no 252 728 2250 3g Fax no 252 728 2160 3h Email address CALO — Superintendent @nps gov Page 1 of 11 PCN Form —Version 1 3 December 10 2008 Version 4 Applicant Information (if different from owner) 4a Applicant is ❑ Agent ❑ Other specify 4b Name 4c Business name (if applicable) 4d Street address 4e City state zip 4f Telephone no 4g Fax no 4h Email address 5 Agent/Consultant Information (if applicable) 5a Name 5b Business name (if applicable) 5c Street address 5d City state zip 5e Telephone no 5f Fax no 5g Email address Page 2 of 11 PCN Form —Version 1 3 December 10 2008 Version B Project Information and Prior Project History 1 Property Identification 1a Property identification no (tax PIN or parcel ID) Great Island Cabin Area South Core Banks 16 Site coordinates (in decimal degrees) Latitude 34 76143 Longitude 7641318 (DD DDDDDD) ( DD DDDDDD) 1c Property size 7 033 6 acres 2 Surface Waters 2a Name of nearest body of water (stream river etc) to Core Sound proposed project 2b Water Quality Classification of nearest receiving water SA 2c River basin White Oak 3 Project Description 3a Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application Hurricane Irene washed sand into the boat basin which has made portions of the boat basin unuseable The boat basin is accessed from Core Sound via a channel 3b List the total estimated acreage of all existing wetlands on the property 1500 3c List the total estimated linear feet of all existing streams (intermittent and perennial) on the property none 3d Explain the purpose of the proposed project to dredge the sand from the basin 3e Describe the overall project in detail including the type of equipment to be used The project consists of dredging and pumping or hauling sand and other organic matter from the Great Island boat basin Less than 1000 cubic yards of sand will be removed and the basin restored to a useable depth of 5 feet The sand will be disposed of within the interior of the island NOTE Approval for additional dredging at other locations throughout Cape Lookout National Seashore is not being requested through this document This PCN applies only to the boat basin at Great Island 4 Jurisdictional Determinations 4a Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / ❑ Yes ® No ❑ Unknown project (including all prior phases) in the past? Comments 4b If the Corps made the jurisdictional determination what type Preliminary Final of determination was made 4c If yes who delineated the jurisdictional areas? Agency /Consultant Company Name (if known) Other 4d If yes list the dates of the Corps jurisdictional determinations or State determinations and attach documentation 5 Project History 5a Have permits or certifications been requested or obtained for El Yes ❑ No ® Unknown this project (including all prior phases) in the past? 5b If yes explain in detail according to help file instructions Page 3 of 11 PCN Form — Version 13 December 10 2008 Version 6 Future Project Plans 6a Is this a phased project? ❑ Yes ® No 6b If yes explain Page 4 of 11 PCN Form — Version 1 3 December 10 2008 Version C Proposed Impacts Inventory 1 Impacts Summary la Which sections were completed below for your project (check all that apply) ❑ Wetlands ❑ Streams tributaries ❑ Buffers ❑ Open Waters ❑ Pond Construction 2 Wetland Impacts If there are wetland impacts proposed on the site then complete this question for each wetland area impacted 2a 2b 2c 2d 2e 2f Wetland impact Type of jurisdiction number — Type of impact Type of wetland Forested (Corps 404 10 Area of impact Permanent (P) or (if known) DWQ — non 404 other) (acres) Temporary T W1 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W2 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W3 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W4 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W5 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ W6 ❑ P ❑ T ❑ Yes ❑ Corps ❑ No ❑ DWQ 2g Total wetland impacts 2h Comments 3 Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site then complete this question for all stream sites impacted 3a 3b 3c 3d 3e 3f 3g Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact number (PER) or (Corps 404 10 stream length Permanent (P) or intermittent DWQ — non -404 width (linear Temporary (T) (INT)? other) (feet) feet) S1 [-]PMT ❑ PER ❑ Corps ❑ INT ❑ DWQ S2 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S3 [:]PMT ❑ PER ❑ Corps ❑ INT ❑ DWQ S4 []PMT ❑ PER ❑ Corps ❑ INT ❑ DWQ S5 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ S6 ❑ P ❑ T ❑ PER ❑ Corps ❑ INT ❑ DWQ 3h Total stream and tributary impacts 31 Comments Page 5 of 11 PCN Form — Version 1 3 December 10 2008 Version 4 Open Water Impacts If there are proposed impacts to lakes ponds estuaries tributaries sounds the Atlantic Ocean or any other open water of the U S then individually list all open water impacts below 4a 4b 4c 4d 4e Open water Name of waterbody impact number — (if applicable) Type of impact Waterbody type Area of impact (acres) Permanent (P) or Temporary 01 ®P ❑ T Core Sound Dredging Sound 05 02 ❑P ❑T 03 ❑P ❑T 04 ❑P ❑T 4f Total open water impacts 05 4g Comments 5 Pond or Lake Construction If pond or lake construction proposed then complete the chart below 5a 5b 5c 5d 5e Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or purpose (acres) Flooded Filled Excavated Flooded Filled Excavated Flooded number of pond P1 P2 5f Total 5g Comments 5h Is a dam high hazard permit required? ❑ Yes ❑ No If yes permit ID no 51 Expected pond surface area (acres) 51 Size of pond watershed (acres) 5k Method of construction 6 Buffer Impacts (for DWQ) If project will impact a protected riparian buffer then complete the chart below If yes then individually list all buffer impacts below If any impacts require mitigation then you MUST fill out Section D of this form 6a ❑ Neuse ❑ Tar Pamlico ❑ Other Project is in which protected basin? ❑ Catawba ❑ Randleman 6b 6c 6d 6e 6f 6g Buffer impact number — Reason Buffer Zone 1 impact Zone 2 impact Permanent (P) or for Stream name mitigation (square feet) (square feet) Temporary impact required? ❑Yes 61 ❑P ❑T ❑ No ❑Yes B2 ❑P ❑T ❑ No ❑Yes B3 ❑P ❑T ❑ No 6h Total buffer impacts 61 Comments Page 6 of 11 PCN Form — Version 1 3 December 10 2008 Version D Impact Justification and Mitigation 1 Avoidance and Minimization 1a Specifically describe measures taken to avoid or minimize the proposed impacts in designing project Dredging will be limited to a small area within an currently use boat basin The dredged material will be disposed of nearby within the interior of South Core Banks 1b Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques 2 Compensatory Mitigation for Impacts to Waters of the U S or Waters of the State 2a Does the project require Compensatory Mitigation for impacts to Waters of the U S or Waters of the State? ❑ Yes ® No 2b If yes mitigation is required by (check all that apply) ❑ DWQ ❑ Corps 2c if yes which mitigation option will be used for this project? ❑ Mitigation bank ❑ Payment to in lieu fee program ❑ Permittee Responsible Mitigation 3 Complete if Using a Mitigation Bank 3a Name of Mitigation Bank 3b Credits Purchased (attach receipt and letter) Type Quantity 3c Comments 4 Complete if Making a Payment to In lieu Fee Program 4a Approval letter from in lieu fee program is attached ❑ Yes 4b Stream mitigation requested linear feet 4c If using stream mitigation stream temperature ❑ warm ❑ cool ❑cold 4d Buffer mitigation requested (DWQ only) square feet 4e Riparian wetland mitigation requested acres 4f Non riparian wetland mitigation requested acres 4g Coastal (tidal) wetland mitigation requested acres 4h Comments 5 Complete if Using a Permittee Responsible Mitigation Plan Ea If using a permittee responsible mitigation plan provide a description of the proposed mitigation plan Page 7 of 11 PCN Form — Version 1 3 December 10 2008 Version 6 Buffer Mitigation (State Regulated Riparian Buffer Rules) — required by DWQ 6a Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ❑ Yes ® No 6b If yes then identify the square feet of impact to each zone of the riparian buffer that requires mitigation Calculate the amount of mitigation required Zone 6c Reason for impact 6d Total impact (square feet) Multiplier 6e Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1 1 5 6f Total buffer mitigation required 6g If buffer mitigation is required discuss what type of mitigation is proposed (e g payment to private mitigation bank permittee responsible riparian buffer restoration payment into an approved in lieu fee fund) 6h Comments Page 8 of 11 PCN Form — Version 1 3 December 10 2008 Version E Stormwater Management and Diffuse Flow Plan (required by DWQ) 1 Diffuse Flow Plan 1 a Does the project include or is it adjacent to protected riparian buffers identified ❑ Yes ® No within one of the NC Riparian Buffer Protection Rules? 1 b If yes then is a diffuse flow plan included? If no explain why ❑ Yes ❑ No Comments 2 Stormwater Management Plan 2a What is the overall percent imperviousness of this project? 0% 2b Does this project require a Stormwater Management Plats ❑ Yes ® No 2c If this project DOES NOT require a Stormwater Management Plan explain why 2d If this project DOES require a Stormwater Management Plan then provide a brief narrative description of the plan ❑ Certified Local Government 2e Who will be responsible for the review of the Stormwater Management Plan? ❑ DWQ Stormwater Program ❑ DWQ 401 Unit 3 Certified Local Government Stormwater Review 3a in which local government s Jurisdiction is this project? n/a ❑ Phase II 3b Which of the following locally implemented stormwater management programs ❑ NSW ❑ USMP apply (check all that apply) ❑ Water Supply Watershed ❑ Other 3c Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 4 DWQ Stormwater Program Review ❑ Coastal counties ❑ HQW 4a Which of the following state implemented stormwater management programs apply ❑ ORW (check all that apply) ❑ Session Law 2006 246 ❑ Other 4b Has the approved Stormwater Management Plan with proof of approval been ❑ Yes ❑ No attached? 5 DWQ 401 Unit Stormwater Review 5a Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ No 5b Have all of the 401 Unit submittal requirements been mete ❑ Yes ❑ No Page 9 of 11 PCN Form — Version 1 3 December 10 2008 Version F Supplementary Information 1 Environmental Documentation (DWQ Requirement) la Does the project involve an expenditure of public (federal /state /local) funds or the ® Yes ❑ No use of public (federal /state) land? lb If you answered yes to the above does the project require preparation of an ® Yes ❑ No environmental document pursuant to the requirements of the National or State (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c if you answered yes to the above has the document review been finalized by the State Clearing House? (If so attach a copy of the NEPA or SEPA final approval Yes ® No letter) Comments Categorical Exclusion 2 Violations (DWQ Requirement) 2a Is the site in violation of DWQ Wetland Rules (15A NCAC 2H 0500) Isolated ❑ Yes ® No Wetland Rules (15A NCAC 2H 1300) DWQ Surface Water or Weband Standards or Riparian Buffer Rules (15A NCAC 2B 0200)? 2b is this an after the fact permit application? ❑ Yes ® No 2c If you answered yes to one or both of the above questions provide an explanation of the violation(s) 3 Cumulative Impacts (DWQ Requirement) 3a Will this project (based on past and reasonably anticipated future impacts) result in Yes ® No additional development which could impact nearby downstream water quality? 3b If you answered yes to the above submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy If you answered no provide a short narrative description n/a 4 Sewage Disposal (DWQ Requirement) 4a Clearly detail the ultimate treatment methods and disposition (non discharge or discharge) of wastewater generated from the proposed project or available capacity of the subject facility n/a Page 10 of 11 PCN Form —Version 1 3 December 10 2008 Version 6 Endangered Species and Designated Critical Habitat (Corps Requirement) 5a WIII this project occur in or near an area with federally protected species or ® Yes ❑ No habitat 5b Have you checked with the USFWS concerning Endangered Species Act ® Yes ❑ No impacts? ® Raleigh 5c If yes indicate the USFWS Field Office you have contacted ❑ Asheville 5d What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? Over 20 years of monitoring T &E species in this area 6 Essential Fish Habitat (Corps Requirement) 6a Will this project occur in or near an area designated as essential fish habitat? ® Yes ❑ No 6b What data sources did you use to determine whether your site would impact Essential Fish Habitat? This area has been dredged in the past and has been used for ferry operations on a routine basis 7 Historic or Prehistoric Cultural Resources (Corps Requirement) 7a Will this project occur in or near an area that the state federal or tribal governments have designated as having historic or cultural preservation ❑ Yes ® No status (e g National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b What data sources did you use to determine whether your site would impact historic or archeological resources? 8 Flood Zone Designation (Corps Requirement) 8a Will this project occur in a FEMA designated 100 year floodplain? ® Yes ❑ No 8b If yes explain how project meets FEMA requirements 8c What source(s) did you use to make the floodplain determination? FEMA FIRM 3720842200J Patrick M Kenney Applicant/Agents Printed Name Date Applicant/Agents Sigrfature, (Agents signature is valid only d an authorization letter from the applicant is provided Page 11 of 11 PCN Form — Version 1 3 December 10 2008 Version Great Island site -Boat Basin Produced by Natural Resource Management Office June 2012