Loading...
HomeMy WebLinkAboutNCC211020_ESC Approval Submitted_20210308PITT COUNTY coUPLANNING & DEVELOPMENT DEPARTMENT DEVELOPMENT SERVICES BUILDING ® 1717 W. 5" STREET �a GREENVILLE, NORTH CAROLINA 27834-1696 JAMES F. RHODES, AICP g c� TELEPHONE: (252) 902-3250 DIRECTOR FAX: (252) 830-2576 February 10, 2021 Re: Ashbury Individual Lots Project Tracking #/ID: PC SESC 2021-01 Disturbed Acres: 12.51 Century Complete 1225 Eastchester Dr. #107 High Point, NC 27265 Dear Sir/Madam: This is to advise you that the Pitt County Technical Review Committee conditionally approved the soil erosion and sedimentation control plan and stormwater plan for ASHBURY INDIVIDUAL LOTS on February 10, 2021. Conditions and requirements as a part of this approval are attached below. Copies of the draft minutes from the meeting will be available upon request prior to the next Technical Review Committee meeting. As stipulated on the financial responsibility form, you are responsible for ensuring compliance with all aspects of the approved plan and the Pitt County Soil Erosion and Sedimentation Control Ordinance. Your primary objectives include, but are not limited to, preventing offsite sedimentation, preventing sediment from entering watercourses, and establishing vegetation on all disturbed areas within 7-14 calendar days, following any completion of a phase of grading. As of April 1, 2019, all new construction activities are required to complete and submit an electronic Notice of Intent (NOI) form requesting a Certificate of Coverage (COC) under the NCGO10000 Construction Stormwater General Permit. This form MUST be submitted prior to the commencement of any land disturbing activity on the above named project. The NOI form may be accessed at dgg.nc.gov/NCG0l. Please direct questions about the NOI form to Annette Lucas at Annette.lucas _)ncdenr.gov or Paul Clark at Paul. clark I)mcdenr. 7ov. After you submit a complete and correct NOI Form, a COC will be emailed to you within three business days. Please be aware that your project will be covered by requirements of the NPDES Construction Stormwater General Permit NCGO10000. Please become familiar with all the requirements and conditions of this permit in order to achieve compliance. Upon discovery of noncompliance by our office, the following actions may be taken: 1. No further permits for building or other construction will be issued. 2. The authority to continue construction, other than for erosion control measures, will be terminated. 3. Penalties of up to $5000 per day may begin to accrue. Failure to immediately comply upon notice of noncompliance will result in injunctive and/or criminal action. Other Comments: 4. This erosion control plan shall expire three years following the date of approval if no land disturbing activity has been undertaken. 5. The Division of Water Quality may pursue legal action against you in order to enforce requirements of the NPDES, Phase II permit. 6. The Pitt County Soil Erosion and Sedimentation Control Ordinance authorizes County officials to inspect sites to ensure compliance with the Sedimentation Pollution Control Act. Title 15A NCAC 4B .0118(a) requires that a copy of the approved erosion control plan be on file at the job site. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. North Carolina's Sedimentation Pollution Control Act is performance -oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land -disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. Land disturbance shall not begin until a preconstruction meeting has taken place. Please provide a copy of the certificate of coverage prior to beginning any land disturbance. If you need further information or assistance, please contact me at (252) 902-3250. Sincerely, Thomas Shrader Planner III CONDITIONS AND REQUIREMENTS [Planning] 1. Show parcel number on the plans. 2. A copy of any 401 /404 permits and/or any NCGO 1 paperwork must be submitted before any disturbance can begin. [Greenville Utilities Commission] 3. Please add 10' EE back of RoW on right side Ashbury Ln and left side of unnamed stub road. [Pitt County Environmental Health] 4. Each lot will be evaluated in accordance with rules .1940 of the Laws and Rules for Sanitary Sewage Collection, Treatment, and Disposal (15A NCAC 18A .1900). 5. No fill material (including construction spoils) is allowed on any area to be used for a sewage disposal system or 100% repair area. Any amount of fill found on these areas will be grounds for disapproval of the proposed lot. 6. The location of any proposed berms must be shown on all subsequent maps. The final dimensions of the completed berm must be shown so that the Environmental Health staff can verify that no portion of any berms will interfere with the sewage system or 100% repair locations. 7. Locations of any soil stock pilings should be shown on the construction plan. These stock pilings should be placed in an area not to be utilized for on -site sewage disposal. 8. If underground electrical lines or natural gas lines cross the property at any point, they must be flagged by ULOCO before the site is evaluated by the Environmental Health staff. 9. The location of any existing or proposed drainage tile must be field located and shown of a surveyed map provided to Environmental Health staff. 10. A backhoe maybe required for the site evaluations (15A NCAC 18A .1939(b)). 11. Any riparian buffers or floodways must be noted on subsequent maps. [General Comments] • Soils located on site include Bb, Co, GoA, NrA, NrD, and NrB2, and possess the following characteristics: ■ Seasonal high water table (Bb, GoA and Co) ■ Slow Permeability (Co) ■ Flooding or Ponding (Bb) ■ Moderate shrink -swell potential water (Co) ■ Unstable for trenching 4 feet or more (Bb) ■ Contentnea Creek Watershed ■ This parcel is within the'/2 mile Voluntary Agricultural District Buffer ■ There is sub -surface drain tile onsite. Please see the attached map. • The following agencies have reviewed the Construction & Erosion Control Plan for ASHBURY and have no comments: Pitt County Emergency Management NCDOT ■ Pitt County Engineering • The following agencies have reviewed the Construction & Erosion Control Plan for ASxsuRY and have not returned comments: ■ Bell Arthur Water Ashbury Tile Ma