Loading...
HomeMy WebLinkAboutNC0040045_Wasteload Allocation_19930319NPDES DOCUMENT SCANNING COVER SHEET Permit: NC0040045 Bill's Truck Stop WWTP NPDES Document Type: Permit Issuance Wasteload Allocation Authorization to Construct (AtC) Permit Modification Complete File - Historical Engineering Alternatives (EAA) Staff Report Instream Assessment (67b) Speculative Limits Environmental Assessment (EA) Document Date: March 19, 1993 This document is printed on reuse paper - igiiore arty content on the reYeriae side NPDES WASTE LOAD ALLOCATION PERMIT NO.: NC0040045 PERM TTEE NAME: FACILITY NAME: Bill's Truck Stop Bill's Truck Stop Facility Status: Existing Permit Status: Renewal Major Minor Pipe No.: 001 Design Capacity: 0.006 MGD Domestic (% of Flow): 10011 % Industrial (% of Flow): 0 % Comments: RECEIVING STREAM: south Potts Creek Class: C Sub -Basin: 03-07-04 Reference USGS Quad: D17SE, Lexington W. County: Davidson Regional Office: Winston-Salem Regional Office Previous Exp. Date: 8/31/93 Treatment Plant Class: Classification changes within three miles: change to WS-V at High Rock Lake (please attach) Requested by: Randy Kepler Date: 1/7/93 Prepared by: /._r Date: �7 •3 Reviewed by: wh4'i CW-00-11 Date: l -3oc 1—BLS/W% 3lfI/ w6:l Modeler Date Rec. # 5ftv.) P.0 73oq Drainage Area (mi2 ) (3 Avg. Streamflow (cfs): (2- •- 7Q10 (cfs) C Winter 7Q10 (cfs) 4.05 30Q2 (cfs) 2.. Toxicity Limits: IWC % Acute/Chronic Instream Monitoring: Parameters Upstream Location Downstream Location Effluent Characteristics Summer Winter BOD5 (mg/1) 30 3 0 NH3-N (mg/1) D.O. (mg/1) TSS (mg/1) 30 'co F. Col. (/100 ml) i00 200 pH (SU) 6 _ �9 0,,t4isE /t): MoM1ToR l_, , r , ittoMro2 ( 64): 6.01Tbg. vt.mi me_ -rtl ( ,) • 0104tro(L n,—..,...z. puj i Atz, NtTo(L n i Liu Comments: sk'bt FAc-T 51-160 FoR. 'ext5Tlts4 LtM1 i 5 ont LiT' 5. Foil 5- G ►� . 1F rkW'(TY tkgs Nnr 4g PF061-D. t.p12-7 i2 Nu TR' Jr Mo-,rorc1144 15 cc,,H.meluc7ED To F aL.ITYs P2oygIleiT`( To 141Srt Kock GA Kt. Mops 5'crunrc r CoNrgaLs oN p n g erir bipars Jw4y Be REquiRED tN THE rtcrwee Facility Name: NPDES No.: Type of Waste: Facility Status: Permit Status: Receiving Stream: Stream Classification: Subbasin: County: Regional Office: Requestor: Date of Request: Topo Quad: FACT SHEET FOR WASTELOAD ALLOCATION Bill's Truck Stop NC0040045 Domestic - 100% Existing Renewal South Potts Creek C 030704 Davidson WSRO R. Kepler 1/7/93 D17SE Request # HEOEiVEli k1.c: Dept, of EHNFF MAR P 5 1011 Winston-Salem 7309 Regional Office Stream Characteristic: USGS # Date: Drainage Area (mi2): Summer 7Q10 (cfs): Winter 7Q10 (cfs): Average Flow (cfs): 30Q2 (cfs): IWC (%): 13 0.76 2.05 12.4 2.66 1.21 Wasteload Allocation Summary (approach taken, correspondence with region, EPA, etc.) This facility is up for renewal due to the basin renewal plan. A WLA was performed for this facility 5/92. No changes are proposed for this permitting period. Quarterly nutrient monitoring is recommended due to the facility's proximity to High Rock Lake. More stringent controls on nutrient inputs may be required in the future. Facility is relocating from UT South Potts Creek to South Potts Creek. Special Schedule Requirements and additional comments from Reviewers: Recommended by: y�ti401/idl; Reviewed by Instream Assessment: ;i`- Regional Supervisor: Permits & Engineering: Date: vI9 Date: off /q_3 Date: 7—1 ? - 13 Date: 3 /( 3/q 3 RETURN TO TECHNICAL SERVICES BY: MAR 3 0 1993 2 Existing Limits: Wasteflow (MGD): BOD5 (mg/I): NH3N (mg/1): DO (mg/1): TSS (mg/1): Fecal Col. (/100 ml): pH (SU): Residual Chlorine (µg/1): Oil & Grease (mg/1): TP (mg/1): TN (mg/1): Recommended Limits: Wasteflow (MGD): BOD5 (mg/1): NH3N (mg/1): DO (mg/I): TSS (mg/1): Fecal Col. (/100 ml): pH (SU): Residual Chlorine (41): Oil & Grease (mg/1): TP (mg/1): TN (mg/1): Limits Changes Due To: Change in 7Q10 data Change in stream classification Relocation of discharge Change in wasteflow Other (onsite toxicity study, interaction, etc.) Instream data New regulations/standards/procedures New facility information CONVENTIONAL PARAMETERS (UT S. Potts Crk) Monthly Average Summer Winter 0.006 0.006 5 10 2 4 30 30 200 200 6-9 6-9 30 30 (S. Potts Crk) Monthly Average Summer Winter 0.006 0.006 30 30 monitor monitor 30 30 200 200 6-9 6-9 monitor monitor monitor monitor monitor monitor (S. Potts Creek) Monthly Average Summer Winter WQ or EL 0.006 0.006 30 30 WQ monitor monitor 30 30 200 200 6-9 6-9 monitor monitor monitor monitor monitor monitor 1/quarter 1/quarter 1/quarter Parameter(s) Affected _X_ Parameter(s) are water quality limited. For some parameters, the available load capacity of the immediate receiving water will be consumed. This may affect future water quality based effluent limitations for additional dischargers within this portion of the watershed. OR No parameters are water quality limited, but this discharge may affect future allocations. 3 INSTREAM MONITORING REQUIREMENTS Upstream Location: Downstream Location: Parameters: Special instream monitoring locations or monitoring frequencies: MISCELLANEOUS INFORMATION & SPECIAL CONDITIONS Adequacy of Existing Treatment Has the facility de onstrated the ability to meet the proposed new limits with existing treatment facilities? Yes No If no, which parameters cannot be met? Would a "phasing in" of the new limits be appropriate? Yes No If yes, please provide a schedule (and basis for that schedule) with the regional office recommendations: If no, why not? 7\tvt. C.NWA\st:C (1\01/4Z- \k(2.- am. tNee,\ \-)C) \'‘.14.\\ q.\*“ Ct\c)C*1/4.ot (Zo,As\\c't (,tv.ek•-. Special Instructions or Conditions Wasteload sent to EPA? (Major) _N (Y or N) (If yes, then attach schematic, toxics spreadsheet, copy of model, or, if not modeled, then old assumptions that were made, and description of how it fits into basinwide plan) Additional Information attached? N (Y or N) If yes, explain with attachments. 0975 Alt1/..),9 c • it me o r Q;FF -000? AiGi' L`? c.,s . CA = �cs 1 % 55. s c 61/R a1.1:10L / '1.i.M7 'V /' 1, % % /XI .1-s? 3 r/ tic- 61WILCA /1Aarlr%71- 2/fr-Vi4. �.... - . 11 '_ ._ .. rrc, ! '- �;rf ��c or/• /JT C/%s:• f • j•Iti i 0 r�Lf�!'�. --- - C4r.:5!?!_]_,f,ec^ti (,) 6 / 1. _ ` 17! G11Gofagrl-%7!%JG 1.41Vc_ 1��..Ctj4u�"--(.L)e (c.) . J 4 p-14ov//46 LE i 11Cc,r1-dfL.I - /✓o ^7 tior r ___Ut_441:21v - /k62/1/(%g,/4 f ? LI i The LYIT.,' ..,f``: __�%...� U ��JL_ 1.�__/`✓`f.. __��= s ... %� :=:I-rCS . CC: Permits and Engineering Technical Support Branch County Health Dept. Central Files WSRO { FEB IE.CHNIc/' SU C T 5RANCH SOC PROJECT; Yes X SOC No. 90-53 Ad I To: Permits and Engineering Unit Water Quality Section Attention: Randy Kepler Date: February 18, 1993 NPDES STAFF REPORT AND RECOMMENDATION County Davidson Permit No. NC0040045 PART I - GENERAL INFORMATION 1. Facility and Address: Mr. Bob Walser Bill's Truck Stop Route 1 Linwood, N.C. 27299 2. Date of Investigation: February 17, 1993 3. Report Prepared by: Mike Mickey, Environmental Tech V 4. Persons Contacted and Telephone Number: Mr. Bob Walser, ph (704) 956-4494, Mr. Clark Cable, ORC, ph (704) 249-6704 5. Directions to Site: From Winston-Salem take Hwy 52 to Lexington and then take Hwy. 29/70 south approximately 8.0 miles to the Belmont Road Exit (486). Turn right onto SR 1288 and the truck stop is immediately on the left. 6. Discharge Points(s), List for all discharge points: Latitude: 35° 44' 59" Longitude: 80° 21' 12" U.S.G.S. Quad No. E-17-NE U.S.G.S. Quad Name Southmont 7. Site size and expansion area consistent with application ? X Yes: 8. Topography (relationship to flood plain included): The facility is located on the ridge line 0.15 mile away from any flowing stream. 9. Location of nearest dwelling: No dwellings are located within a 1000 ft of the new discharge point. 10. Receiving stream or affected surface waters: The WWTP is presently discharging into an U.T. to South Potts Creek. After constructing a new outfall line, the facility will discharge into South Potts Creek. The relocation has already been approved by DEM when the NPDES permit was reissued on 9-1-92 for the new discharge location. a. Classification C b. River Basin and Subbasin No.: YAD-04 c. Describe receiving stream features and pertinent downstream uses: South Potts Creek flows through a rural agricultural area of Davidson County. Churchland Elementary (NC0029947) discharges into South Potts Creek approximately 3 miles upstream of the new proposed discharge location. Southern Railway (NC0029246) discharges into South Potts Creek approximately 1.3 mile downstream of the proposed outfall. Part II 1. a. b. c. d. - DESCRIPTION OF DISCHARGE AND TREATMENT WORKS Volume of Wastewater to be permitted: 0.006 MGD (Ultimate Design Capacity) What is the current permitted capacity of the Waste Water Treatment facility? 0.006 MGD Actual treatment capacity of the current facility (current design capacity)? 0.006 MGD Date(s) and construction activities allowed by previous Authorizations to Construct issued in the previous two years. ACB04004S issued 12/31/92 for new outfall (not yet constructed) e. Please provide a description of existing or substantially constructed wastewater treatment facilities: The existing system consists of the following: grease traps, 15,680 gallon septic tank, a 4000 gallon recirculating dosing tank with dual 88.5 GPM pumps, a 40 x 50 recirculating surface sandfilter, sanuril chlorinator, contact chamber, Isco flow measuring device, and a gravity effluent line (to be abandoned) to U.T. to South Potts Creek. f. Please provide a description of proposed wastewater treatment facilities. The new outfall line will consist of the following: 32 GPM pump station with dual pumps, 1,700 linear feet of 3 inch force main and 2,234 linear feet of 6 inch gravity sewer with discharge to South Potts Creek. NPDES Permit Staff Report Version 10/92 Page 2 g. Possible toxic impacts to surface waters: Noneexpected. 2. Residuals handling and utilization/disposal scheme: d. Other disposal/utilization scheme: Septage hauler 3. Treatment plant classification. Class 1 4. SIC Code(s): 5812 Primary 10 Main Tr eatment Unit Code: 4 5 0 X 7 PART III OTHER PERTINENT INFORMATION 1. Is this facility being constructed with Construction Grant Funds or are any public monies involved. (municipals only)? No 2. Special monitoring or limitations (including toxicity) p g requests: None 3. Important SOC, JOC ,indicate) or Compliance Schedule dates: (Please Submit Permit Modification Request to Relocate Outfall Submission of Plans and Specifications Begin Construction Complete Construction Attain Compliance with Final Limits Date Sept. 28 1990 (MET) Oct. 1, 1992 (MET) April 1, 1993 July 1, 1993 Sept. 1, 1993 4. Alternative Analysis Evaluation: Has the facility evaluated all of the non -discharge options available. Please provide regional perspective for each option evaluated. Spray Irrigation: Unable to purchase land to north of site. Facility landlocked to south by I-85. Connection to Regional Sewer System: Unfeasible due to distance to City of Lexington. Subsurface: Soils inadequate. Subsurface systems at the facility have experienced problems in the past. Wastewater from the kitchen is presently routed to a subsurface system permitted by the Health Dept. Other disposal options: Extending the outfall to a positive flow stream was the only option. 5. Other Special Items: None NPDES Permit Staff Report Version 10/92 Page 3 PART IV - EVALUATION AND RECOMMENDATIONS Bill's Truck Stop is served by a recirculating surface sandfilter that was constructed during the summer of 1989 and began operation in late August 1989. Since the system discharges into a zero flow stream (7Q10=0), the summer limits contained in the permit are 5 mg/1 BOD and 2 mg/1 NH3. To date, the facility has yet to consistently comply with the strict effluent limitations (mainly NH3-N). Therefore, the truck stop is operating under SOC-#90-53 AdI that requires them to relocate the outfall. On September 1, 1992, Bill's Truck Stop was reissued a modified permit approving the relocation of their outfall to South Potts Creek. The Authorization to Construct for the new effluent line was issued on 12/31/92. At present, the facility is discharging into an U.T. to South Potts Creek until the outfall can be extended. The SOC (90-53 Ad I) requires them to complete construction by 7-1-93. WSRO recommends reissuance of the permit. Signature of report per• arer Water Quality Regio 1 Supervisor Date NPDES Permit Staff Report Version 10/92 Page 4